31_July_Site_Visit_Clarifications.docx
DOCX document 11 KB Posted
- Solicitation number
- W9127N18R0052
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31 July 2018 Site Visit Clarifications Task 5.41: Accommodation Inspection The mess area’s ceiling panels, wall panels, and flooring will be removed and replaced with new material from the external wall to the wall between the mess and galley. The galley will have the ceiling panel removed and re-installed to facilitate the required inspections above the ceiling panels.
File details come from the government source that posted it.