AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this amendment is to:
1) Section L: Schedule an additional site visit for 31 July 2018 @0900.
2) Section M: Correct the location dif ferential calculation.
3) Section C: Correct task 5.1.2 Tug Services in the PWS.
POC David Dvorak (david.l.dvorak@usace.army.mil) 503-808-4633.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 100
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N18R0052
X 9B. DATED (SEE ITEM 11)
14-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jul-2018
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N18R0052
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
FOR
SHIP REPAIR, MAINTENANCE AND OVERHAUL FOR THE USACE HOPPER DREDGE YAQUINA
5.1.2 Tug Services (Category B)
01. General
Provide two (2) each, USCG-licensed tug boats and crew to perform vessel movement to / from the Port of Portland Terminal 2 (T2) in Portland, OR and the Contractor’s facilities. Provide two (2) each tugs from closest sea buoy to contractor's facilities if outside vessel's homeport channel. Pricing shall be per one-way tug.
02. Specifications
Tug boats shall be of sufficient horsepower and tonnage to maintain continuous control of the vessel’s movement under anticipated environmental conditions, typical of the repair periods specified in Paragraph
1.3 (Maintenance and Repair Work Package). Contractor shall be responsible for monitoring the vessel for fire and flooding at all times. Contractor shall also provide shaft locking on all propulsion equipment to prevent freewheeling.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
INSTRUCTION TO OFFERORS
1. Overview: This Request for Proposal (RFP) solicits for the Ship Repair, Maintenance and Overhaul for the
U.S. Army Corps of Engineers (USACE) Hopper Dredge YAQUINA. This will be a Firm-Fixed Price (FFP) job order.
For the purpose of this RFP, the Government will use the Lowest Price Technically Acceptable (LPTA) source selection process in accordance with Federal Acquisition Regulation (FAR) subpart 15.101-2, using technical (non-price) and price factors specific to the tasks in the job order. Interested offerors are required to submit technical proposals in conjunction with a pricing schedule for review and consideration by the Government. The Government will evaluate each proposal in accordance with FAR subpart 15.305 Proposal Evaluation and in accordance with the criteria described in Section M.
2. Who May Submit a Proposal: Any organization holding a Master Ship Agreement for Repair and Alteration of Vessels (MSRA) for overhaul of the YAQUINA with USACE, Portland District, may submit a proposal.
If a prospective offeror wants to submit a proposal for this job order and does not hold a MSRA for overhaul of the YAQUINA with Portland District, then the following procedures shall be followed:
A. The prospective offeror shall submit a capabilities package in accordance with the sources sought notice titled “2019 Dredge YAQUINA Overhaul,” number W9127N18R0052, posted on Federal Business Opportunities and can be accessed via www.fbo.gov. The capabilities package shall be received by Portland District no later than 2:00 P.M. Pacific Time ten (10) calendar days prior to the proposal due date.
Offerors submitting a capabilities package for a MSRA will be notified of their eligibility or non- eligibility within seven (7) calendar days of receipt of the capability package.
B. If there are any questions regarding the MSRA for overhaul of the YAQUINA or the procedures to submit a capabilities package for consideration for the award of a MSRA, please contact Mr. David Dvorak at David.L.Dvorak@usace.army.mil.
All Offeror’s interested in submitting a capabilities package for consideration of an MSRA shall be registered in System for Award Management at www.sam.gov.
3. Mandatory Site Visit: A mandatory pre-proposal site visit will be required as part of the RFP. The dates for the site visits are 03 July 2018 10 July 2018, 17 July 2018, 24 July 2018, and 31 July 2018. Site visits will begin promptly at 9:00 AM Pacific Time. All offerors will be required to wear Personal Protective and Safety Equipment (PPE) that meet the requirements of EM 385-1-1. PPE WILL NOT be provided by USACE, so offerors will be expected to bring their own PPE to the site visit.
To attend a site visit all offerors need to confirm atendence by emailing David Dvorak (David.l.dvorak@usace.army.mil) and Brandon Lasich (Brandon.m.lasich@usace.army.mil) no later than 1200 the Friday Monday prior to the scheduled site visit.
The current Site Visits scheduled are:
03 July 2018 10 July 2018:
Newport, OR Coos Bay, OR NOAA Marine Operations Center-Pacific USACE Terminal 2002 SE Marine Science Drive 1460 N. Bayshore Drive Newport, OR 97365 Coos Bay, OR 97420
17 July 2018:
Portland, OR USACE Terminal 2 3556 NW Front Ave Portland, OR 97210
24 July 2018:
Portland, OR USACE Terminal 2 3556 NW Front Ave Portland, OR 97210
31 July 2018:
Longview WA Port of Longview (Pier 2) 10 E Port Way Longview WA, 98632
The Dredge Yaquina is currently in the operational dredge season throughout the Columbia River. Therefore, it is probable that a site visit will be held outside of Portland OR. Please take this into consideration when making your travel arrangements in order to arrive at the site visit by the appropriate date and designated time.
Some of the potential site visit locations will require a Transportation Worker Identification Certification (TWIC) card to obtain entry. If you do or do not have a TWIC card, please make the Point of Contact (POC) below aware of this information when scheduling the site visit. For those who do not have a TWIC card, an escort will be arranged for pick up from outside of the Port entry point.
Due to the current operational schedule, the details for the locations of the site visit dates above will be provided via Amendment to this RFP that will be posted to www.fbo.gov at least two (2) days prior to each site visit date.
To schedule a site visit, please contact David Dvorak via email at David.L.Dvorak@usace.army.mil or by phone at 503-808-4633.
4. Discussions: The Government intends to evaluate proposals and award the job order without discussions with
Offerors, except clarifications as described in FAR 15.306(a). The Government reserves the right to conduct discussions if the Contracting Officer later determines it to be necessary.
5. Associated Entities: Notwithstanding the specific requirements of any other area of the RFP, information submitted regarding any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor.
6. Proposals are due no later than the time and date specified in Block 9 of Standard Form (SF) 33 (Solicitation/ Offer and Award).
PROPOSAL SUBMISSION
1. INTRODUCTION
a. All proposals shall be submitted electronically via the AMRDEC SAFE website per SECTION B
– NOTES TO OFFERORS. No hardcopy proposals will be accepted, other than the Offeror’s Bid Bond (See Volume II, Tab D below).
b. The Offeror’s proposal shall consist of two volumes; Volume I: Technical Proposal and Volume II: Price Proposal. The use of hyperlinks in proposals are prohibited.
c. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
2. PROPOSALSUBMISSION REQUIREMENTS
a. a.Each volume shall be submitted electronically in a separate file. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have revised information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated. Each file which represents a volume shall be clearly labeled with its Title.
b. Proposals must set forth full, accurate, and complete information as required by this RFP. Absence of information will be deemed as if no support for that criterion was provided Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001-Statement or Entries Generally.
c. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this RFP (such as company brochures) shall be relegated to appendices.
3. PROPOSAL FILES
a. Format. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II) and label each file as follows: RFP Number, Offeror’s Company Name, and the Volume Number (i.e. W9127N18R0052_Company XYZ_VolumeI.pdf). Offerors must also submit a hardcopy bid bond separately from the electronic files above. Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the offeror's proposal. Failure to provide a complete Volume I and/or Volume II shall result in the offeror’s proposal being determined ineligible for award.
b. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal.
VOLUME I - The volume shall be organized into the following sections:
TAB A: FACTOR 1 – PRELIMINARY PRODUCTION SCHEDULE
The offeror shall submit a schedule identifying when the offeror proposes to perform and complete the specific requirements of this job order, as described below, within the period of performance specified in this RFP. Items shall be scheduled for earliest possible completion, commensurate with good ship repair practice and availability of materials (Reference Paragraph 4.4 - Schedules, of Section C).
The schedule shall be a Gantt Chart (.pdf format) using the critical path method showing a planned schedule to complete the project. Include each item identified in Section C – Technical Provisions with sufficient detail to:
a. Denote work overlaps;
b. Identify compliance with the requirements of the RFP, including start and completion date of all identified work tasks;
c. Show predecessor/successor relationships, milestones, and the logical and efficient order of all items (critical paths) the offeror proposes to accomplish all work identified in Section C; and
d. Identify key assumptions.
The Preliminary Production Schedule shall be based on the following assumptions (reference Paragraph 1.3 - Technical Provisions of Section C): Contract award date of July 31, 2018; Shipyard availability starting December 03, 2018; and Job Order completion date of February 18, 2019.
VOLUME II – This volume shall be organized into the following sections:
VOLUME II
Title Page Table of Contents TAB A: Signed SF33 and All Amendments TAB B: Bid Schedule (Section B) Including CLIN 0001 Pricing Schedule and Anticipated Items (Category B) Pricing Schedule
TAB C: Section K (Representations and Certifications) TAB D: Bid Bond TAB E: Small Business Subcontracting Plan (Large Businesses Only)
TAB A: Signed SF 33 and All Amendments Offeror shall complete Blocks 12 through 18 of the SF 33 acknowledging all amendments, if any.
TAB B: Pricing of Bid Schedule (Section B) Offeror shall complete and submit CLIN 0001 (Category A) Price Schedule as well as the Anticipated Items (Category B) Pricing Schedule located in Section B.
TAB C: Section K (Representations and Certifications) Offeror shall provide a current copy of their Representation and Certifications available from the System for Award Management (SAM) at https://www.sam.gov.
For Offerors interested in submitting proposals as a Service Disabled Veteran Owned Small Business, you are requested to submit the Department of Veteran Affairs (VA) Verification Letter verifying that Your business has been approved as such and added to the verified Veteran business database at www.VetBiz.gov.
The Government reserves the right to rely on other sources to confirm SDVOSB status if the Offeror has not been approved through the VA.
TAB D: Bid Bond See Clause 52.228-1 and any other notes, for required bond information. The Offeror is required to submit a hardcopy bid bond as part of the proposal. Any bid bond found to be insufficient shall affect an Offeror’s responsibility determination. Photocopied, scanned or facsimile bonds will not be accepted. THE ORIGINAL BID
BOND MUST BE MAILED TO:
U.S. ARMY ENGINEER DISTRICT, PORTLAND ATTN: CECT-NWP (David Boone)
PO BOX 2946
PORTLAND, OR 97208-2946
THE PACKAGE MUST BE CLEARLY IDENTIFIED WITH THE OFFEROR’S NAME, ADDRESS AND
THE RFP NUMBER. The bid bond must be received prior to the proposal due date.
NOTE: One-hundred percent (100%) Performance and Payment bonds are due within three (3) calendar days after award.
TAB E: Small Business Subcontracting Plan FOR LARGE BUSINESSES ONLY: A Subcontracting Plan shall be prepared in accordance with FAR 52.219-9 and Defense Federal Acquisition Regulation Supplement (DFARS) 525.219-7003 (or DFARS 252.219-7004 if the offeror has a comprehensive subcontracting plan) incorporated in Section I, Contract Clauses. Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at http://esrs.gov. Offerors are to ensure subcontractors agree to submit to ESRS.
Large Businesses shall provide a completed Subcontracting Plan and most recent annual subcontracting report.
SECTION M - EVALUATION FACTORS FOR AWARD
EVALUATION FACTORS FOR AWARD
A. BASIS FOR AWARD
Every prospective offeror wanting to be considered for the award of the job order under this RFP must hold a MSRA for overhaul of the YAQUINA with USACE, Portland District. If a prospective offeror wants to submit a proposal for this job order and has not entered into a MSRA for overhaul of the YAQUINA with Portland District, that prospective offeror shall follow the instructions in Sections L and M to be considered for the award of the job order under this RFP.
The job order contemplated by this RFP will be awarded on the basis of the Lowest Price Technically Acceptable (LPTA) source selection process using technical (non-price) and price factors specific to the tasks in the job order.
The LPTA source selection process shall be used in accordance with FAR Part 15.101-2. There are three (3) non-price evaluation factors consisting of Factor 1 – Preliminary Production Schedule, Factor 2 – Site Visit Attendance, and Factor 3 – Past Performance; price shall be evaluated separately. To receive consideration for award of the job order under this RFP, a rating of no less than ‘Acceptable’ must be achieved for all non-price evaluation factors.
The Government intends to evaluate proposals and award a contract without discussions with Offerors, except clarifications as described in FAR 15.306(a); therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
For evaluation purposes, the Government will calculate the overall price of each proposal by adding the total price proposed for CLIN 0001 (Category A) Price Schedule, the total price proposed for the Anticipated Items (Category B) Pricing Schedule, and the location adjustment described below. Additional details are explained below under Factor 4 – Price.
FACTORS AND SUB-FACTORS TO BE EVALUATED
The following evaluation factors will be used to evaluate each proposal:
VOLUME I: Technical Proposal
Factor 1 – Preliminary Production Schedule;
Factor 2 – Site Visit Attendance;
Factor 3 – Past Performance; and
VOLUME II: Price
Factor 4 – Price.
EVALUATION APPROACH
FACTOR 1 – PRELIMINARY PRODUCTION SCHEDULE
To receive a rating of “Acceptable” under Factor 1 – Preliminary Production Schedule, an Offeror shall submit a schedule that includes all Preliminary Production Schedule Items identified in Section C – Technical Provisions and shows their completion within the period of performance (POP) of the job order. A proposal that fails to include all required items or fails to identify their performance and completion within the POP specified in the RFP, shall receive a rating of “Unacceptable” under Factor 1 – Preliminary Production Schedule.
FACTOR 1
PRELIMINARY PRODUCTION SCHEDULE
Rating Description Acceptable Proposal meets the requirements of the RFP.
Unacceptable Proposal does not meet the requirements of the RFP.
FACTOR 2 – SITE VISIT ATTENDANCE
A mandatory site visit is required for this RFP. There are no submission requirements for this factor. The Contracting Officer and/or Contract Specialist will be present at each organized site visit and will have a sign in sheet for all attendees to fill out as record of attendance. As long as the Offeror is represented, signs the attendance sheet, and is present throughout one of the organized site visits, the Offeror will received a rating of ‘Acceptable’ under this factor. If an Offeror is not represented, does not sign the attendance sheet, or is not present throughout one of the organized site visits, the offeror will be assigned an ‘Unacceptable’ rating for this factor.
FACTOR 2
SITE VISIT ATTENDANCE
Rating Description Acceptable Proposal meets the requirements of the RFP.
Unacceptable Proposal does not meet the requirements of the RFP.
FACTOR 3 – PAST PERFORMANCE
The Government will pull past performance evaluations on projects for the last 24 months, which are similar in size and scope to the requirements of this RFP. This information will be used to evaluate past performance for this Job Order. The Government reserves the right to pull past performance information from all available sources to include, but are not limited to: past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), Wide Area Workflow (WAWF), and any other known sources not provided by the offeror. No further submissions are required.
Past Performance will be evaluated on an Acceptable/Unacceptable basis as follows:
FACTOR 3
PAST PERFORMANCE
Rating Description Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below)
Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)).
Therefore the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
FACTOR 4 – PRICE
Offeror’s price for tasks shall represent the best price in response to the RFP. For evaluation purposes, the Government will calculate the overall evaluated price of proposals by adding the total price proposed for CLIN 0001 (Category A) Price Schedule, the total price proposed for the Anticipated Items (Category B) Pricing Schedule, and the location adjustment described below. This overall price will be evaluated in accordance with FAR 15.404, Proposal Analysis, to determine the lowest-price, technically-acceptable proposal. Unit prices shall be evaluated to determine fairness, reasonableness and if unbalanced pricing exists. Per FAR 15.404-1(g), unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated. If cost or price analysis techniques indicate that a proposal is unbalanced, the Contracting Officer shall consider the risks to the Government associated with the unbalanced pricing. NOTE:
A proposal may be rejected if the Contracting Officer, determines that the unbalanced pricing poses an unacceptable risk to the Government.
LOCATION ADJUSTMENT
The Dredge YAQUINA's current FY18 operating schedule directs dredging in the Columbia River near Portland/Vancouver prior to entry into and upon departure from the shipyard. The Columbia River is the largest, most dynamic navigation channel and dredging is required throughout the year to maintain adequate depth. The YAQUINA will be the only dredge available in February 2019. The YAQUINA will be required to dredge the Columbia River immediately before and after the shipyard availability. Portland is the homeport for the vessel and the home duty station for crews per union agreement. Therefore, Portland will be used as the reference point for round-trip travel for the purpose of comparing proposals. Due to the unknown location of the overhaul and the cost impact associated with the logistical concerns identified below, a location adjustment will be added to every proposal to obtain a total evaluated price. The rate will be calculated based on the offeror’s location where services will be rendered:
1. If the offeror’s location where services will be rendered is within 300 nautical miles of Portland, OR:
Location adjustments will not be required.
2. If the offeror’s location where services will be rendered is beyond 300 nautical miles of Portland, OR. The location adjustment will contain the following multiple factors.
a. Dredge Vessel Transportation: For the purpose of comparing proposals only, the Government’s cost to transport dredge from the homeport, to and from the offeror’s facilities. Costs include roundtrip travel.
i. FY19 YAQUINA cost is $2.36 per Gallon.
Consumption 3000 Gallons Per Day 3000 glns x $2.36 = $7,080 per day
11.5 nautical mile/hour = 276 nautical miles/day Cost per nautical mile = $7,080/276 = $25.65/nautical mile Total Cost = distance between excess of 300 NM from YAQUINA homeport and offeror's facilities x
2 x $25.65 (cost per Nautical Mile).
b. Crew members: For the purpose of comparing proposals only, the Government’s cost for forty-four (44) Government employee crew members from Portland to the offeror’s facilities. Costs include roundtrip travel but not per diem (assume liveaboard ship). Crew change every 2 weeks = 5 trips x 44 crew members = 220 individual air-fare; 5 trips x 2 vans per trip = 10 van trips.
c. Non-Crew member: For the purpose of comparing proposals only, the Government’s cost for on-site non-crew personnel and tools/equipment from Portland to the offeror’s facilities. Costs include roundtrip travel and daily per diem.
Periodic meetings for two (2) management personnel (2 days every 2 weeks) = 2 x 2 x 6 trips = 24 days per diem. One contract specialist and one COR on site (75 days, travel every 2 weeks) = 2 x 75 = 150 days per diem. Four (4) port engineers (75 days, travel every 2 weeks) = 4 x 75 = 300 days per diem. Three (3) moorings shop personnel including supervisor (75 days, travel every 2 weeks) = 3 x 75 = 225 days per diem. Total per diem = 24 + 150 + 300 + 225 = 669 days. Total trips = 75/14 (roundup to whole) = 6; 6 trips x 10 personnel = 60 individual air-fare; 6 trips x 7 cars per trip = 42 car trips. Total transportation of tools and equipment = one roundtrip freight fee = ~$2.50 per mile (on road). For shipyards not accessable by road from Portland OR, a $10,000.00 freight fee will be added in replacement of $2.50 per mile.
d. The rates will be pulled from published standard DOD rates, such as GSA airfare rates and location per diem charts. Nautical mileage will be pulled from the U.S. Department of Commerce’s publication entitled ‘Distance between United States Ports – 2012 (12th Edition).’
e. References:
http://www.gsa.gov/portal/content/104877 http://www.gsa.gov/portal/content/100715 http://www.transtats.bts.gov/Distance.asp?pn=0 http://www.defensetravel.dod.mil/Docs/DomesticCeilingRates.pdf https://www.google.com/maps/@
NWP Logistics Office (GSA minivan daily rate) U.S. Department of Commerce’s publication entitled “Distance between United States Ports. – 2012 (12th Edition).”
(End of Summary of Changes)
File details come from the government source that posted it.