Request for Proposal W9127N18R0045

Detroit Dam Linn County, Oregon

Detroit Tainter Gate Rehabilitation

Project Manual

TOC-1

DETROIT TAINTER GATE REHABILITATION

DETROIT, LINN COUNTY, OREGON

TABLE OF CONTENTS

00 10 00 SOLICITATION, OFFER, AND AWARD (SF 1442)

SF 30 INFORMATION ON AMENDMENT: NOT USED

00 10 00 SOLICITATION

00 70 00 CONDITIONS OF THE CONTRACT: NOT USED

00 72 00 GENERAL CONDITIONS

00 73 00 SUPPLEMENTARY CONDITIONS

GENERAL AND TECHNICAL SPECIFICATION REQUIREMENTS

ATTACHMENTS

A1: Submittal Register (ENG FORM 4288-R)

A2: Transmittal Form (ENG FORM 4025-R)

A3: Construction Project Identification Sign

A4: Spill Emergency - Initial Report Form

A5: Oregon Wage Rates

A6: BRZ Policy

PROJECT TITLE: Detroit Tainter Gate Rehabilitation

LOCATION OF PERFORMANCE: Detroit Dam, Detroit, OR

MAGNITUDE OF CONSTRUCTION: Betw een $10,000,000 and $25,000,000

SOCIO-ECONOMIC:Total Small Buisness Set-Aside

JORDAN M QUANTOCK (503) 808-4627

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

22-Jun-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9127N18R0045 49

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

Mob and Demob for 2019 GOSP

FFP

Measurement: Measurement will be made as a job for mobilizing and demobilizing all plant, equipment, fuel, supplies, materials, and personnel to and from the job site. This Contract Line Item Number (CLIN) applies to the Prime Contractor and all subcontractor mobilization and demobilization.

b. Payment: Payment will be made at the Contract amount under CLIN 0001 at a rate of 60 percent for mobilization and 40 percent for demobilization as defined in Contract Clause 252.236-7004, PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (Dec 1991). Submit a schedule of mobilization and demobilization costs prior to submitting the first request for payment.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

Gate 5 & 6 Structural

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with structural work on gates 5 & 6 as desribed on the structural drawings except for S-505, S-506, and S-507.

b. Payment: Payment will be made at the Contract amount under CLIN 0002.

FOB: Destination

NET AMT

00 10 00-3

0003 1 Job

Gate 5 & 6 Mechanical

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with mechanical work on gate 5 & 6 and described on the mechanical drawings and S-505, S-506, and S-507.

b. Payment: Payment will be made at the Contract amount under CLIN 0003.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 1 Job

Gate 5 & 6 Electrical

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with electrical work on gate 5 & 6 as decribed on the electrical drawings.

b. Payment: Payment will be made at the Contract amount under CLIN 0004.

00 10 00-4

0005 1 Job

Dam Switchboard DQ1 and Spillway Feeders

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with electrical switchboard and spillway feeder work common to all gates as described on electrical drawing sheets ED602, E-602, E-603, and E-604.

b. Payment: Payment will be made at the Contract amount under CLIN 0005.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 1 Job OPTION Mob and Demob for the 2020 GOSP

FFP

a. Measurement: Measurement will be made as a job for mobilizing and demobilizing all plant, equipment, fuel, supplies, materials, and personnel to and from the job site. This Contract Line Item Number (CLIN) applies to the Prime Contractor and all subcontractor mobilization and demobilization.

b. Payment: Payment will be made at the Contract amount under CLIN 0006 at a rate of 60 percent for mobilization and 40 percent for demobilization as defined in Contract Clause 252.236-7004, PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (Dec 1991). Submit a schedule of mobilization and demobilization costs prior to submitting the first request for payment.

00 10 00-5

0007 1 Job OPTION Gate 3 & 4 Structural

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with structural work on gates 3 & 4 as desribed on the structural drawings except for S-505, S-506, and S-507.

b. Payment: Payment will be made at the Contract amount under CLIN 0007.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0008 1 Job OPTION Gate 3 & 4 Mechanical

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with mechanical work on gate 3 & 4 and described on the mechanical drawings and S-505, S-506, and S-507.

b. Payment: Payment will be made at the Contract amount under CLIN 0008.

00 10 00-6

0009 1 Job OPTION Gate 3 & 4 Electrical

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with electrical work on gate 3 & 4 as decribed on the electrical drawings.

b. Payment: Payment will be made at the Contract amount under CLIN 0009.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0010 1 Job OPTION Mob and Demob for the 2021 GOSP

FFP

a. Measurement: Measurement will be made as a job for mobilizing and demobilizing all plant, equipment, fuel, supplies, materials, and personnel to and from the job site. This Contract Line Item Number (CLIN) applies to the Prime Contractor and all subcontractor mobilization and demobilization.

b. Payment: Payment will be made at the Contract amount under CLIN 0010 at a rate of 60 percent for mobilization and 40 percent for demobilization as defined in Contract Clause 252.236-7004, PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (Dec 1991). Submit a schedule of mobilization and demobilization costs prior to submitting the first request for payment.

00 10 00-7

0011 1 Job OPTION Gate 1 & 2 Structural

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with structural work on gate 4 as desribed on the structural drawings except for S-505, S-506, and S-507.

b. Payment: Payment will be made at the Contract amount under CLIN 0011.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0012 1 Job OPTION Gate 1 & 2 Mechanical

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with mechanical work on gate 1 & 2 and described on the mechanical drawings and S-505, S-506, and S-507.

b. Payment: Payment will be made at the Contract amount under CLIN 0012.

00 10 00-8

0013 1 Job OPTION Gate 1 & 2 Electrical

FFP

a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, and incidentals associated with electrical work on gate 1 & 2 as decribed on the electrical drawings.

b. Payment: Payment will be made at the Contract amount under CLIN 0013.

00 10 00-9

Section 00 21 00 - Instructions

BIDDER INQUIRIES

All inquiries regarding this solicitation are to be submitted via ProjNet-Bid. Telephone and email inquiries will not be accepted. ProjNet-Bid is a web-based program that allows offerors to post questions regarding the solicitation, and to view all questions by other offerors, and answers by the U.S. Army Corps of Engineers.

ProjNet-Bid can be accessed through the ProjNet website: https://www.projnet.org/projnet/.

To access the ProjNet-Bid website the first time:

1) Register.

2) Click Quick Add Key. (The Agency is USACE.)

3) Enter the following information for access:

The Bidder Inquiry Key: 3G67YS-TMEQMS

Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). (required on first project only)

Establish secret question and answer which will be used as a password (required on first project only)

4) For subsequent access use your email address, the Bid Inquiry Key and response to the secret question to access the ProjNet-Bid Module 00100.

5) Submit questions or review questions and answers. (A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review.

6) For a specific step-by-step for POSTING YOUR INQUIRIES, is available in the Reference link on the Contract Viewer.

7) For questions about the ProjNet-Bid, please contact the Call Center help desk. The contact information is listed on the ProjNet website.

No response will be posted to inquiries after the Close of Business on the seventh business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bid prior to bid submission. Nothing in the solicitation is changed unless an amendment is sent out.

INSTRUCTIONS TO OFFERORS

BASIS FOR AWARD.

A. General.

(1) The acquisition is being conducted as a total small business set-aside using Best Value Tradeoff (BVTO) source selection procedures for award of a firm-fixed-price contract. The Government intends to award a single, firm-fixed price contract to the responsible Offeror whose proposal represents the best value to the Government after evaluation in accordance with the factors in the solicitation.

00 21 00-1

(2) In the context of this proposal, “Offeror” refers to the proposed prime contractor. A “major subcontractor” is defined as a subcontractor that the Offeror proposes to perform 25% or more of the work required under the solicitation.

(3) The Government intends to make an award without discussions, but reserves the right to conduct discussions should discussions prove to be necessary or advantageous to the Government. Because the Government does not intend to hold discussions, Offerors are encouraged to include their best pricing in their initial proposal.

(4) All proposals received will stand alone and be considered complete and final. The evaluation board will not consider any information or data incorporated by reference or otherwise referred to. The successful Offeror will be selected solely on the basis of the evaluation factors set forth below. Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. Elaborate proposals, color brochures, and other excesses are discouraged.

(5) Joint Ventures (JV). A joint venture is defined as a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreements” or “strategic alliances,” which are not recognized as bona fide joint ventures for the purposes of this solicitation. An Offeror that is a joint venture shall submit a copy of its legally binding joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture with the chief executive of each entity identified. If submitting a proposal as a joint venture, the experience and past performance of each of the joint venture partners can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity. Page and project form limits apply to the joint venture as a whole.

B. Evaluation Factors.

The Government will evaluate proposals under the following factors:

Factor 1: Experience Factor 2: Past Performance Factor 3: Schedule / Work Plan Factor 4: Price

All evaluation factors other than cost or price are approximately equal, when combined, are significantly more important than price.

The Government will use the following definitions when evaluating proposals:

Deficiency – A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

See FAR 15.001.

Significant Weakness – A flaw a proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

Weakness – A flaw in a proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.

Strength – An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

00 21 00-2

Significant Strength – An aspect of a proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

SUBMISSION OF PROPOSALS AND EVALUATION

A. Administrative Details and General Instructions: Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

(1) General Proposal Format.

Submit each copy of the proposal in tabbed, 3-ring binders with a “D” ring or locking closures.

Title Page. Each copy must include the Offeror’s name and address, phone number and email address, title of the solicitation, solicitation number, and date of submittal clearly identified on the front cover of the binder.

Table of Contents. Each binder of the proposal shall contain a detailed table of contents. The complete table of contents shall be included in each binder.

Printed Matter Submissions. Pages containing text are expected to be 8 ½ x 11 inches with at least one-inch margins at the top, bottom, and both sides. Paragraphs should be separated by at least one blank line.

A standard 11-point font in either Arial or Times New Roman is required.

Organization charts or schedules. A folded 11” x 17” format may be used. Larger format drawings or tables may be added by folding them to fit within the binder.

All information must be confined to the appropriate volume. If the materials do not fit within a single volume, they should be separated in additional binders, but clearly identified as such. Each volume of the proposal is expected to contain a table of contents, summary section with a brief abstract of the volume, and the narrative discussion.

THE OFFEROR SHALL SUBMIT AN ELECTRONIC VERSION OF EACH PROPOSAL. The electronic version shall be on a readable CD. Any discrepancies between the electronic and paper copies shall give precedence to the paper copy.

(2) Proposal Content Limitations.

The Offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal. The page count is at the discretion of the Offeror, however the proposal may not be more than 30 typewritten (single page only) pages total. The 30 page limit does NOT include past performance information submitted under Factor 2. Evaluation of the non-priced factors will end on the 30th page submitted.

Extraneous information provided in the proposals will not be considered in the evaluations; therefore, the Offeror should only provide information that satisfies the solicitation requirements. Merely restating the specifications without sufficient elaboration demonstrates a lack of understanding of the requirement.

DO NOT cross reference past performance information. It is acceptable to repeat data, project information or experience in more than one non-price area as long as it satisfies the requirements of the factor.

Proprietary information must be clearly marked.

(3) English Language Requirement.

00 21 00-3

In order for a proposal to be considered, it MUST be prepared in ENGLISH.

B. Content of Proposals: All proposals must be prepared in two volumes: A technical proposal (Volume I), a price proposal (Volume II). Each of the volumes shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal (Volume I) must not contain reference to price. The narrative and content structure of the proposal shall follow the format shown under Volume I below. Offerors that fail to submit a complete proposal may be excluded and thus receive no further consideration for award.

(1) Technical Proposal, Volume I: Provide one (1) hardcopy original and three (3) copies and one (1) .pdf file on a CD-ROM. Volume I shall consist of information for the four (4) factors, listed in tabular form, as noted below. Repeating or restating the specifications without sufficient elaboration will be determined to show a lack of understanding of the requirement.

Volume I – Technical (Non-Price) Factors

Tab 1 – Factor 1 - Experience

Tab 2 – Factor 2 – Past Performance

Tab 3 – Factor 3 – Schedule / Work Plan

(2) Price Proposal, Volume II: Provide one (1) original and one (1) .pdf file on a CD-ROM of a complete and detailed Price Proposal on the forms provided in the solicitation. Provide pricing and complete all line items on Standard Form 1442 (SF 1442). The price proposal must be prepared in accordance with the following and must include:

Tab 1 – SF1442, Solicitation, Offer, and Award.

The SF1442 shall be filled out completely by the Offeror and signed by an official that is authorized to bind the company. The Offeror shall also acknowledge all amendments to the solicitation in accordance with the instructions on the Standard Form 30 or Block 19 of SF1442.

Tab 2 – Section 00 10 00, Proposal Price / Bid Schedule.

The Offeror shall fully complete this section.

Tab 3 – Representations, Certifications and Other Statements of Offerors.

The Offeror shall complete all representations and certifications in Section 00 45 00 and also ensure current registration and completed/updated Annual Representations and Certifications on the System for Award Management (SAM) website, www.sam.gov.

Tab 4 – Banking and Bonding Points of Contact.

The Government is required to determine a contractor’s responsibility. Accordingly, the Offeror shall provide contact information (company name, point of contact, address, email address, and phone number) for the Offeror’s bank and bonding institutions.

Tab 5 – Bid/Offer Guarantee.

The Bid Bond shall be at least 20% of the bid price, but shall not exceed $3million. See FAR 52.228-1 – Bid Guarantee.

C. Submission of Proposals: Proposals must arrive at the location designated in the solicitation for receipt of such proposals prior to the time and date established in Block 13, SF 1442. There will not be a public proposal opening.

BY HAND OR COURIER TO:

00 21 00-4 http://www.sam.gov/

U. S. ARMY CORPS OF ENGINEERS, NWP

Block 300 (10th Floor USACE Security Desk) 333 SW. First Avenue Portland, Oregon 97204 Attention: Jordan Quantock – CECT-NWP-C

OR SURFACE MAIL ADDRESS:

U. S. ARMY CORPS OF ENGINEERS, NWP

P. O. Box 2946 Portland, OR 97208-2946 Attention: Jordan Quantock – CECT-NWP-C

NOTE: EMAIL SUBMISSIONS WILL NOT BE CONSIDERED. If the electronic CD-ROM proposal differs from the hard copy, the hard copy will take precedence.

OFFEROR SHALL MARK THE OUTSIDE ENVELOPE(S) AS FOLLOWS:

Envelope(s) shall be plainly marked with the following information:

Solicitation No. W9127N-18-R-0045 Proposal Due Date:

Number of each amendment that has been received:

EVALUATION FACTORS

Volume I – Technical (Non-Price) Submission Requirements and Evaluation Method

FACTOR 1 (TAB 1) – Experience

Submission Requirements:

The Offeror shall submit project information for no more than two (2) projects for the prime, and if applicable, no more than one (1) project for each proposed major subcontractor(s)*, completed or substantially completed** no more than ten (10) years before the proposal due date, that are comparable in size, scope, and complexity to the work required by this solicitation.

Information submitted for each project must include information outlined in Attachment A, Offeror’s Experience Form.

* Instructions on the use of major subcontractors to demonstrate experience:

When submitting experience of a major subcontractor, clearly identify what portion of the work that the major subcontractor will be performing under the solicitation.

** Substantially completed is defined as having completed more than 75% of the project work at the time of proposal submission. If an Offeror submits a project that it represents is “substantially complete”, the Offeror must reasonably explain why the project is considered at least 75% complete. If an Offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.

A maximum of two (2) projects for the prime and one (1) project for each major subcontractor will be evaluated. If an Offeror disregards these instructions and submits more than the maximum number of projects, only the first two (2) projects for the prime and one project (1) for each subcontractor will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess how the projects submitted meet the evaluation criteria outlined below.

Evaluation method:

00 21 00-5

In determining strengths and weaknesses, the Government will consider the following:

• The extent to which the Offeror’s past projects involved the following major features of work:

o Structural Rehabilitation:

Strengthening hydraulic steel structures in accordance with AWS D1.5 Steel Fabrication in accordance with AWS D1.5 o Mechanical Rehabilitation:

Rehabilitation of hoist equipment Installation of load limiting devices Rehabilitation and alignment of trunnion bearing systems o Electrical Rehabilitation:

Repair/Replace/re-conduct electrical gate control equipment Replacing switchgear and limit switches to increase the reliability of the power system.

• The extent of the Offeror’s experience performing the major features of work in and around hydropower generating units

• The extent of the Offeror’s cumulative experience performing projects similar to that required by this solicitation

Note: The Government may consider experience information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement.

The Government will rate this factor using the combined technical/risk rating as follows:

COLOR RATING DESCRIPTION

Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

TECHNICAL RISK RATING METHOD

ADJECTIVAL RATING DESCRIPTION

Low

Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance.

Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.

Moderate

Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.

High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or

00 21 00-6 degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.

Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.

FACTOR 2 (TAB 2) – Past Performance

Submission Requirements:

The Offeror shall provide past performance information for each project listed by the Offeror under Factor 1 – Experience.

• If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, the Offeror shall submit it with the proposal.

• If there is not a completed CPARS evaluation, the Offeror shall submit a Past Performance Questionnaire (PPQ) for the project. See Attachment B. Do not submit a PPQ when a completed CPARS is available.

o If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).

o Offerors should follow up with clients/references to ensure timely submittal of questionnaires.

If the client requests, questionnaires may be submitted directly to the Government's point of contact, Jordan Quantock, via email at jordan.m.quantock@usace.army.mil prior to proposal closing date. The Offerors shall instruct the clients to refer to the solicitation number in the subject line.

o PPQs are source selection materials. All successfully submitted PPQs will receive an email confirmation upon receipt. If the Offeror does not receive the confirmation, it is the Offeror’s responsibility to follow up to ensure the government has received the information.

Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other procurements. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.

Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the Offeror.

In addition to the above, the Government may review other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS (Past Performance Information Retrieval System) including CPARS, using all CAGE/DUNS (Commercial and Government Entity Code/Data Universal Numbering System) numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), FAPIIS (Federal Awardee Performance and Integrity Information System), Electronic Subcontract Reporting System (eSRS), or other databases, telephone interviews with organizations familiar with the Offeror’s performance, Government personnel with personal knowledge of the Offeror’s performance capability, and any other known sources not provided by the Offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the Offeror.

Evaluation Method:

00 21 00-7 mailto:jordan.m.quantock@usace.army.mil

The Government seeks a contractor who maintains a strong commitment to customer satisfaction and superior performance. It is the Offeror’s responsibility to affirmatively document these qualities in his technical proposal. In doing so, be mindful that “past performance” and “experience” are not identical. Experience measures what the Offeror has done and how many times, or for how long, the Offeror have done it. Past performance, however, measures how well the Offeror has performed.

The past performance evaluation results in an assessment of the Offeror’s probability of meeting the solicitation requirements. The recency and relevancy of the information, source of the information, context of the data, and general trends in the contractor’s performance shall be considered. These are combined to establish one performance confidence assessment rating for each Offeror.

There are three aspects to the past performance evaluation: recency, relevancy (including text of data), and quality (including general trends in contractor performance and source of information).

The first aspect is to evaluate the recency of the Offeror’s past performance. For this solicitation, recent projects are those completed or substantially completed (as defined above) no more than ten (10) years before the date that proposals are due.

The second aspect is to determine how relevant a recent effort accomplished by the Offeror is to the work required by the solicitation. There are four levels of relevancy as shown in the table below.

PAST PERFORMANCE RELEVANCY

RATING DESCRIPTION

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

In assessing the relevancy of the Offeror’s past performance, the Government will consider the following:

• The extent to which the Offeror’s past projects involved the following major features of work:

o Structural Rehabilitation:

Strengthening hydraulic steel structures in accordance with AWS D1.5 Steel Fabrication in accordance with AWS D1.5 o Mechanical Rehabilitation:

Rehabilitation of hoist equipment Installation of load limiting devices Rehabilitation and alignment of trunnion bearing systems o Electrical Rehabilitation:

Repair/Replace/re-conduct electrical gate control equipment Replacing switchgear and limit switches to increase the reliability of the power system.

• The extent of the Offeror’s experience performing the major features of work in and around hydropower generating units.

More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.

00 21 00-8

The third aspect of the past performance is to determine how well the Offeror performed on its past performance projects. If any performance issues are identified, the Government will consider the number, type and severity of the problems and effectiveness of corrective actions taken.

Based on a consideration of those three aspects for each project, the Government will assign a final Performance Confidence Assessment Rating for this factor. The Government will review the past performance information and determine the quality and usefulness as it applies to performance confidence assessment. In conducting a performance confidence assessment, each Offeror shall be assigned one of the ratings using the table below.

PERFORMANCE CONFIDENCE ASSESSMENT

RATING DESCRIPTION

Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.

Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

Neutral Confidence

No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.

No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.

In the case of an Offeror without a record of relevant past performance or for which information on past performance is not available, the Offeror will not be evaluated favorably or unfavorably on past performance, and therefore will receive a “Neutral Confidence” rating.

FACTOR 3 (TAB 3) – Schedule / Work Plan

Submission Requirements:

The Offeror shall provide detailed work plans and schedule for the major features of work to include Mechanical, Structural and Electrical rehabilitation to be performed on the project.

Gantt chart. The Offeror shall submit a project schedule in Gantt chart format (MS Project or Primavera software) showing a planned schedule to complete the project in accordance with the Plans and Specifications of the solicitation. The schedule shall include fabrication, installation, testing, commissioning, mobilization, demobilization, reservoir drawdown periods, in water work periods (IWWP), identified schedule windows, critical submittals involving long lead items, interim milestones, and contract completion date.

Work Plan: At a minimum, the Offeror shall address the following in relation to each major feature of work:

Mechanical Equipment Provide a detailed narrative that addresses the challenges to be encountered and procedures proposed for the successful completion of the mechanical work for this project.

a. Mechanical equipment procurement and fabrication plan, to include procurement and fabrication of the hoist system and trunnion bearing system.

b. Procedure for installing and aligning the components of the hoist system.

00 21 00-9

c. Procedure for installing and aligning the trunnion bearing system.

Structural Equipment Provide a detailed narrative that addresses the methods and equipment proposed to be used for the successful completion of the structural work for this project.

a. Type of equipment, equipment setup, transportation methods, and equipment access proposed to perform the work.

b. Procedures for shop welding, field welding, and quality control in accordance with AWS (American Welding Society) D1.5 and AISC (American Institute for Steel Construction).

c. Submit a certificate indicating the Offeror’s fabricating plant/fabricator is certified under AISC Quality Management System, Advanced Steel Bridges (ABR) or Intermediate (IBR) Bridges category with Fracture Critical endorsement.

Electrical Equipment Provide a detailed narrative of the challenges to be encountered and procedures proposed for the successful completion of the electrical work for this project.

a. Electrical equipment procurement plan to include control panel fabrication and testing.

b. Removal of the existing control system.

c. Installing and testing of the proposed electrical control system

The work plan may also include drawings, cut sheets, examples, or other types of information to communicate the work plan.

Evaluation Method The Government will rate this factor using the combined technical/risk rating as follows:

COLOR RATING DESCRIPTION

Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

TECHNICAL RISK RATING METHOD

ADJECTIVAL RATING DESCRIPTION

Low

Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance.

Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.

Moderate

Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.

High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or

00 21 00-10 degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.

Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.

The work plans will be evaluated based on the Offeror’s proposed approaches to the major features of work. In determining strengths and weaknesses, the Government will consider the following when evaluating the Offeror’s work plan:

• Whether the Offeror’s proposed schedule has realistic durations and timeframes for each required work task and includes work task sequencing in a logical order;

• Whether the Offeror’s proposed schedule and plan demonstrates the ability to complete the work on time, despite schedule constraints, fabrication and procurement of long lead items, and potential contingencies that may arise;

• The extent to which the Offeror’s proposal demonstrates that the Offeror understands the scope of work and the challenges/risks to be encountered during construction (such as access restrictions, crane limitations, compressed schedule, environmental and permitting requirements, testing requirements, quality control requirements, demolition requirements, and commissioning requirements);

• The extent to which the Offeror’s proposal has a realistic plan and sound approach to mitigate those challenges/risks; and

• At a minimum, the Offeror must submit a certificate indicating the Offeror’s fabricating plant/fabricator is certified under AISC Quality Management System, Advanced Steel Bridges (APR) or Intermediate (IBR) Bridges category with Fracture Critical endorsement.

A detailed and specific work plan will be rated higher than a vague and general work plan.

Volume II – Price

Evaluation Method:

The Price Proposal will be evaluated to determine fairness and reasonableness. For evaluation purposes, the total evaluated price will be calculated by adding the total price for all optional items to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.

The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017

00 21 00-11

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

252.215-7008 Only One Offer OCT 2013

CLAUSES INCORPORATED BY FULL TEXT

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

(a) Definitions. As used in this provision--

Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

Federal contracts and grants with total value greater than $10,000,000 means--

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.

(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in--

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

00 21 00-12

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management database via https://www.acquisition.gov (see 52.204-7).

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm fixed price construction contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

00 21 00-13 https://www.acquisition.gov/

2.9% (Linn County) 6.9%

These goals are applicable to all the Contractor's construction…