W91278230069_NOI (APC).pdf
PDF 78 KB Posted
- Attached to
- Missile Defense Agency (MDA) Ground Test Facility Infrastructure (GTFI), Redstone Arsenal, AL
- Solicitation number
- Not on record
About this file
This document is a sources sought notice from the U.S. Army Corps of Engineers, Mobile District regarding a future procurement for American Power Conversion (APC) Netshelter communication cabinets as part of the Missile Defense Agency (MDA) Ground Test Facility Infrastructure (GTFI) project located at Redstone Arsenal, Alabama. Interested vendors are requested to provide the manufacturer's name, product data, and a written statement of compliance for the APC Netshelter communication cabinets by January 2, 2024. The statement of compliance shall include backup design information, supporting documentation, and a list of similar past project references including locations and points of contact. The communication cabinets are essential to meeting requirements for compatibility with existing systems for long-term maintenance, reconfiguration, and visual continuity. The notice is to identify sources for the APC communication cabinets, and if no other sources can meet requirements, the intent is to specify the APC brand name in the FY-24 MDA GTFI solicitation by the U.S. Army Corps of Engineers, Mobile District.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91278230069_NOI (Lockmaster).pdf | ||
| W91278230069_NOI (SEL).pdf | ||
| W91278230069_NOI (MillerKnoll).pdf | ||
| W91278230069_NOI (Honeywell).pdf | ||
| W91278230069_NOI (Best).pdf | ||
| W91278230069_NOI (Siemens).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description
The U.S. Army Corps of Engineers, Mobile District (SAM) intends to place a brand name specification into solicitation W9127823R0069 in accordance with FAR 6.302. Interested persons may identify their capability to respond to the requirement. This notice is not a request for competitive proposals;
however, all information received within 15 days after publication of this synopsis will be considered by the Government. A determination by the Government not to include this proposed brand name specification based upon responses to this notice is solely within the discretion of the Government. The U.S. Army Corps of Engineers, Directorate of Contracting, is conducting a market survey to identify sources for American Power Conversion (APC) Netshelter communication cabinets.
The U.S. Army Corps of Engineers, Mobile District, anticipates a future procurement for the FY-24 Missile Defense Agency (MDA) Ground Test Facility Infrastructure (GTFI) project located at Redstone Arsenal, AL. The GTFI includes conversion of approximately 163,466 SF of existing administrative space to data center, RDT&E laboratories, and updated administrative space. The GTFI also includes a 14,138 SF one-story building expansion for electrical gear housing.
The APC Netshelter communication cabinets includes key(s), leveling feet, mounting hardware and pre-installed casters, side panels. The use of APC Netshelter communication cabinets is essential to meeting the Government’s requirements, thereby precluding consideration of another product. All existing communication cabinets in the Proponent Agency’s existing facilities, including the facility being renovated, use APC Netshelter communication cabinets. The communication cabinets used in the new GTFI must be compatible with existing systems for ease of long-term maintenance, reconfiguration, and visual continuity.
This request is not a request to be placed on a solicitation mailing list. It is for information only and is not a request for proposal (RFP) or announcement of a solicitation. The purpose of this Sources Sought request is to obtain sources for the keying system to meet the above requirements. If no other sources exist that can meet these requirements, then it is the Government’s intent to specify the APC Brand Name for the facility’s communication cabinets for use in the FY-24 MDA GTFI solicitation. Firms interested in being considered shall provide manufacturer's name, product data, and written statement of compliance with stated requirements. The written statement of compliance shall include necessary backup design information and supporting documentation. A list of projects in which the APC communication cabinets has met similar requirements for similar applications shall be provided. The list shall include the exact location of project(s) and a point of contact with phone numbers. The Government will not pay for any material provided in response to this notice nor return the data provided. Responses should be emailed to the contacts identified in SAM.gov no later than 5:00 PM CST, 02 January 2024. No other forms of transmission are requested or will be accepted.
File details come from the government source that posted it. Updated .