W9127821R0050 AM03.pdf

PDF 4 MB Posted

Attached to
SOF Special Tactics Operations Facility (23STS) FTEV103005, Hurlburt Field, Florida
Solicitation number
W9127821R0050
Issued by

About this file

This is a solicitation for the construction of the SOF Special Tactics Operations Facility (23STS) FTEV103005 at Hurlburt Field, Florida. The project will construct 103,700 square feet of facilities including administrative areas, team rooms, equipment and vehicle maintenance and storage, a covered storage area, and unique features such as a concrete hardstand, rappelling tower, and antenna platform. Site improvements, pavements, communications, passive force protection, and utilities will also be provided. Demolition of six existing buildings is included. The facilities must incorporate Department of Defense sustainable building and anti-terrorism/force protection requirements. Proposed construction duration is 900 calendar days. The solicitation should be reviewed in its entirety.

View the file

Other files

File Type Posted
W9127821R0050 - Approved_SAM_Brand Name JA for Trane HVAC_AF_Hurlburt Field FL.pdf PDF
AM07.pdf PDF
W9127821R0050 AM06.pdf PDF
W9127821R0050 AM05.pdf PDF
W9127821R0050 AM05 DRAWINGS.pdf PDF
W9127821R0050 AM04 DRAWINGS.pdf PDF
W9127821R0050 AM04.pdf PDF
W9127821R0050 AM03 DRAWINGS.pdf PDF
W9127821R0050 23 STS Meeting Minutes and Sign-in_07212021.pdf PDF
W9127821R0050 AM02.pdf PDF
W9127821R0050 AM02 DRAWINGS.pdf PDF
W9127821R0050 AM01.pdf PDF
APPB.pdf PDF
RTA DRAWINGS VOL1 of 4.zip ZIP file
VOL3.PDF PDF
RTA DRAWINGS VOL3 of 4.pdf PDF
VOL4.PDF PDF
VOL2.PDF PDF
RTA DRAWINGS VOL2 of 4.pdf PDF
RTA DRAWINGS VOL4 of 4.pdf PDF
EM 385-1-1.pdf PDF
VOL1.PDF PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127821R0050-0003 9 AUGUST 2021 MEY21001

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127821R0050

9B. DATED (SEE ITEM 11)

9 JULY 2021

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: SOF SPECIAL TACTICS OPERATIONS FACILITY, HURLBURT FIELD, FLORIDA

Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS FOR AMENDMENT NO. 0003

NOTE: THE RECEIPT OF PROPOSAL DATE IS HEREBY REVISED BY THIS AMENDMENT. REFER TO BLOCK 13.A OF THE SF1442.

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SOF SPECIAL TACTICS OPERATIONS FACILITY W9127821R0050

HURLBURT FIELD, FLORIDA MEY21001

SF 30 Page 2 W9127821R0050-0003

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

Table of Contents Revised as indicated herein.

SF1442 Revised Block 13.A as indicated herein.

00 11 00 Revised Paragraphs 4.2 as indicated herein.

01 91 00.15 10 Revised Paragraphs 3.1.4, 3.1.5, 3.1.6, 3.1.6.3, 3.1.6.6.3, 3.2, 3.3.1, and 3.3.2 as indicated herein.

21 13 13.00 10 Revised Paragraphs 1.1, 1.2, 1.2.1.2, 1.4.1, 1.4.3, 2.5.2, 2.5.3, 2.12, 3.4.1, and 3.4.4 as indicated herein. Deleted Paragraphs 2.5.2.1, 2.5.2.2, 2.5.3.1, 2.5.3.2, and 2.6.

21 30 00 Revised Paragraphs 1.1, 1.4, 1.5, 2.1, 2.8.2, 2.9, 2.11, 3.3.1, 3.8.2, 3.8.4.3, and 3.8.4.4 as indicated herein.

22 00 00 Revised Paragraphs 1.2, 2.4.3, 2.4.6, 2.7, 2.10.3, 2.13, 3.3.3, 3.3.5, 3.6.3, and 3.12 as indicated herein. Deleted Paragraph 2.6.8 and

3.11.2. Added Paragraphs 2.10.3.1, 2.10.3.2, and 3.8.1.3.

23 00 00 Revised Paragraphs 2.8.3, 2.8.4, 3.7.4, and 3.10 as indicated herein.

23 07 00 Revised Paragraphs 3.2.1.1, 3.2.1.5, 3.2.1.6, 3.2.2.2, 3.4.2.1, and 3.4.3.1 as indicated herein.

23 09 00 Revised Paragraph 1.1 as indicated herein.

23 11 20 Revised Paragraph 3.19 as indicated herein.

23 35 00.00 10 Revised Paragraph 2.4.1 as indicated herein.

SF 30 Page 3

23 64 10 Added Paragraphs 1.7 and 1.8.

23 64 26 Revised Paragraphs 1.3 and 2.2.2 as indicated herein.

25 05 11 Revised Paragraph 3.2.3 as indicated herein.

28 31 76 Revised Paragraphs 1.3, 2.5.3, 2.14.1.1, 2.15.13, and 3.2.1

33 61 13.13 Revised Paragraphs 2.2.2.1, 2.3.1, and 3.5.4 as indicated herein.

PART II - REVISIONS MADE BY DELETED PAGES/SECTIONS

The pages and/or sections listed below are to be deleted from the specifications by the bidders and marked "DELETED":

Section

23 05 48.00 40 Deleted in its entirety and any associated submittal registers.

PART III - NOTE: Revised, replacement and added drawings are listed below.

These revised, replacement and added drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised or replaced by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.

SHT

REF. TITLE OF DRAWINGS

COVER SHEET

CD103 SITE DEMOLITION PLAN

CD104 SITE DEMOLITION PLAN

CD105 SITE DEMOLITION PLAN

CD106 SITE DEMOLITION PLAN

PW103 BELOW SLAB WASTE PLAN - BLOCK 1B

PW104 BELOW SLAB WASTE PLAN - BLOCK 1C

PW105 BELOW SLAB WASTE PLAN - BLOCK 1D

PW106 BELOW SLAB WASTE PLAN - BLOCK 1F

PW113 FIRST FLOOR WASTE PLAN - BLOCK 1B

PW114 FIRST FLOOR WASTE PLAN - BLOCK 1C

PW115 FIRST FLOOR WASTE PLAN - BLOCK 1D

PW116 FIRST FLOOR WASTE PLAN - BLOCK 1F

PW203 SECOND FLOOR WASTE PLAN - BLOCK 2B

PW301 COMPOSITE PLUMBING ROOF PLAN

PP102 FIRST FLOOR WATER PLAN - BLOCK 1A

PP105 FIRST FLOOR WATER PLAN - BLOCK 1D

PP106 FIRST FLOOR WATER PLAN - BLOCK 1F

P-401 ENLARGED WASTE PLAN

P-403 ENLARGED WASTE PLAN

P-501 PLUMBING DETAILS

P-503 PLUMBING DETAILS

SF 30 Page 4

P-703 PLUMBING WASTE RISER DIAGRAM

P-704 PLUMBING WASTE RISER DIAGRAM

P-705 PLUMBING WASTE RISER DIAGRAM

P-711 PLUMBING WATER RISER DIAGRAM

P-714 PLUMBING WATER RISER DIAGRAM

P-801 PLUMBING SCHEDULES

P-802 PLUMBING SCHEDULES

MH116 MECHANICAL 1ST FLOOR PLAN - BLOCK 1F

M-401 ENLARGED 1A18 MECHANICAL ROOM PLAN

M-403 ENLARGED 2A29 MECHANICAL ROOM PLAN

M-404 ENLARGED 2A04 MECHANICAL ROOM PLAN

M-702 DETAILS

M-704 DETAILS

M-902 CONTROLS

M-903 CONTROLS

M-904 CONTROLS

M-905 CONTROLS

M-906 CONTROLS

M-907 CONTROLS

FA-112 FIRST FLOOR FIRE ALARM PLAN - BLOCK 1A

FA-122 SECOND FLOOR FIRE ALARM PLAN - BLOCK 2A

FA-601 RISER DIAGRAM & SCHEDULES - FIRE ALARM

FX-001 REFERENCE SHEET - SPRINKLER

FX-114 FIRST FLOOR SPRINKLER PLAN - BLOCK 1C

FX-115 FIRST FLOOR SPRINKLER PLAN - BLOCK 1D

FX-116 FIRST FLOOR SPRINKLER PLAN - BLOCK 1F

FX-117 FIRST FLOOR SPRINKLER PLAN - BLOCK 1G

FX-122 SECOND FLOOR SPRINKLER PLAN - BLOCK 2A

FX-501 SPRINKLER DETAILS

Encl as stated Revised pages of the specifications as indicated in Part I.

51 Revised drawings as indicated in Part III.

TOC Page 1 of 5 Revised by Amendment No. W9127821R0050-0003

TABLE OF CONTENTS

VOLUME 1 OF 4

CHECKLIST FOR PREPARATION OF OFFERS

BIDDING REQUIREMENTS

Contract Clauses

STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD

BIDDING SCHEDULE

EXPLANATION OF BID ITEMS

STANDARD FORM 24 - BID BOND

STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY

STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES

00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD

00 21 16 INSTRUCTION TO PROPOSERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONTRACT CLAUSES

CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION AND SUPPORTING

DATA FOR CONTRACTOR PROGRESS PAYMENT INVOICE

SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS

PROJECT SIGNS

FORM DD1354

FORM DD1354 CHECKLIST

WAGE RATES

01 00 01 GENERAL CONTRACT REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

SUBMITTAL REGISTERS

ENGINEERING FORM 4025R

01 33 29 SUSTAINABILITY REPORTING

AIR FORCE SUSTAINABILITY REQUIREMENTS SCORESHEET

DOD GUIDING PRINCIPLES COMPLIANCE FOR NEW

CONSTRUCTION & MODERNIZATION SCOPING CHECKLIST

PROOF OF REGISTRATION

DOD GUIDING PRINCIPLES COMPLIANCE - THIRD-PARTY DESIGN

ASSESSMENT REPORT

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

SAM FORM 696

01 45 35 SPECIAL INSPECTIONS

STATEMENT OF SPECIAL INSPECTIONS

SCHEDULE OF SPECIAL INSPECTIONS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS – HURLBURT STANDARD

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 10 TOTAL BUILDING COMMISSIONING

TOC Page 2 of 5

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 – MASONRY

04 20 00 UNIT MASONRY

VOLUME 2 OF 4

DIVISION 05 – METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 14 00 FLUID-APPLIED WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 41 13 METAL ROOF PANELS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

TOC Page 3 of 5

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 13 COILING COUNTER DOORS

08 33 23 OVERHEAD COILING DOORS

08 34 59 VAULT DOORS AND DAY GATES

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 – FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS

10 22 26.13 ACCORDION FOLDING PARTITIONS

10 28 13 TOILET ACCESSORIES

10 99 00 MISCELLANEOUS BUILDING SPECIALTIES

DIVISION 12 – FURNISHINGS

12 50 00.13 10 FURNITURE, EQUIPMENT AND FURNITURE INSTALLATION

DIVISION 14 – CONVEYING EQUIPMENT

14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS

DIVISION 21 – FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

TOC Page 4 of 5

VOLUME 3 OF 4

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 14 29.00 40 SUMP PUMPS

22 15 13.16 40 HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS, AND

VALVES, STAINLESS

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 20 FACILITY GAS PIPING

23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE EXHAUST REMOVAL SYSTEM(S)

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 HEATING HOT WATER AND CHILLED WATER PIPING SYSTEMS

DIVISION 25 – INTEGRATED AUTOMATION

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

DIVISION 26 – ELECTRICAL

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 36 00.00 10 NON-AUTOMATIC TRANSFER SWITCHES

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET

COMMUNICATION SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

TOC Page 5 of 5

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

VOLUME 4 OF 4

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE

32 11 23.23 BASE COURSE DRAINAGE LAYERS

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 14 13.13 INTERLOCKING PRECAST CONCRETE UNIT PAVING

32 16 19 CONCRETE HEADER CURBS, MAINTENANCE STRIPS, AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13.53 CHAIN LINK FENCES AND GATES

32 84 24 TEMPORARY IRRIGATION SPRINKLER SYSTEMS

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING (HDD)

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS

33 40 00 STORM DRAINAGE UTILITIES

33 51 15 NATURAL-GAS

33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

APPENDICES

APPENDIX A BORING LOCATION PLAN & BORING LOGS

APPENDIX B COMPREHENSIVE INTERIOR DESIGN (CID)/FURNISHINGS, FIXTURES &

EQUIPMENT (FF&E) (PROVIDED ELECTRONICALLY ONLY)

END OF TABLE OF CONTENTS

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9127821R0050

2. TYPE OF

SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

9 JULY 2021

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

MEY21001

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S. ARMY ENGINEER DISTRICT, MOBILE

CONTRACTING DIVISION (CESAM-CT)

109 SAINT JOSEPH STREET

MOBILE, AL 36628-0001

SAME AS BLOCK 7

9. FOR INFORMATION

CALL : Lanell Roberts

Kimberly Brackett

A. NAME

Lanell.A.Roberts@usace.army.mil Kimberly.L.Brackett@usace.army.mil

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 251-694-3859 251-441-5170

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

SOF SPECIAL TACTICS OPERATIONS FACILITY (23STS) FTEV103005, HURLBURT FIELD, FLORIDA

* See Section 01 00 00, Paragraph “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”.

**Block 13A. : Refer to Section 00 11 00 for the number of copies to submit with the original offer.

11. The Contractor shall begin performance within _8____ calendar days and complete it within __*__ calendar days after receiving award, notice to proceed.

This performance period is mandatory, negotiable. (See _ __ .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and ___**___ copies to perform the work required are due at the place specified in Item 8 by _1400_ (hour) local time 16 19 AUGUST 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than __120__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101

STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

STANDARD FORM 1442 BACK (REV. 4-85)

SECTION 00 11 00

00 11 00

4.2 Volume II - Factor 1 – Past Performance Information of the Prime Contractor. The Past Performance of the Prime Contractor (Offeror) consists of (a) Relevant Company Effort and (b) Quality of Past Performance. The Government will review recent, relevant company efforts and quality information provided by the owners of those efforts to assess the Offeror’s past experience and probability of successfully performing the work described in this solicitation. For this factor, a recent, relevant project is a construction project:

(a) Performed under a contract or task order, as those terms are defined in FAR 2.101, for the Federal Government, or similar contractual agreements for State or Local Governments, or the commercial or private sector. (Multiple projects under a single contract or task order are considered one project. However, do not combine multiple projects under separate contracts or task orders to create a single project.);

(b) That is “recent”; one that has been completed within eight (8) years of the solicitation issue date, or one where the construction is at least 50% complete (measured by performance period days) as of the solicitation issue date. (Offerors are responsible for providing start and completion dates for each completed project, or the start and scheduled completion dates for projects currently under construction.);

(c) That is “relevant”; one that is similar in scope (type, size, complexity and dollar value) to the project types described in this solicitation. In terms of dollar value, a relevant project is one ranging from $25M to $100M; however, projects outside of this dollar range may be considered when similar in scope and complexity. For a project to be assessed any degree of “relevancy” it must reflect performance of requirements as described by this solicitation.

This project is for the construction of facilities totaling 103,700sf with foundation and floor slab, structural framing, insulated walls, sloped roofs, environmental control, fire detection and suppression and all necessary support. Unique features include concrete hardstand, and rappelling tower, and antenna platform. Includes utilities, site improvements, pavements (roadway, parking and marshaling yard), communications, passive force protection and all other necessary support. Demolition includes buildings 91033, 91065, 91070, 91032, 91037, and 99020.

Section 01 91 00.15 10 Revised by Amendment No. W9127821R0050-0003

01 91 00.15 10

3.1.4 Design Review

The Lead Commissioning Specialist and Technical Commissioning Specialists must review the construction contract plans and specifications, the Owner's Project Requirements Document, and the Basis of Design. The Owner's Project Requirements Document is attached as Appendix A. The Basis of Design is attached as Appendix B. The Owner's Project Requirements Document and Basis of Design documents are not contract documents and are provided for commissioning review purposes only.

a. Advise the Contracting Officer's Representative of any discrepancies between the Basis of Design and Owner's Project Requirements, deficiencies of the design to comply with the Owner's Project Requirements or Basis of Design, and deficiencies that would prevent the building systems and features from operating or performing effectively and from being adequately maintainable..

b. The Commissioning Specialists must provide a Design Review Report individually listing each deficiency and the corresponding proposed corrective action necessary for proper system operation or performance.

Submit one hard copy and an electronic copy of the report to the Contracting Officer's Representative no later than 14 days after approval of the Commissioning Specialists.

c. The Lead Commissioning Specialist must participate in a meeting to discuss any items contained in the report no later than 14 calendar days after submission of the report.

The Lead Commissioning Specialist and Technical Commissioning Specialists must review the construction contract plans and specifications and the Basis of Design. The Basis of Design will be provided by Contracting Officer.

The Basis of Design documents are not contract documents and are provided for commissioning review purposes only.

a. Advise the Contracting Officer's Representative of deficiencies that would prevent the building systems and features from operating or performing effectively and from being adequately maintainable.

b. The Commissioning Specialists must provide a Design Review Report individually listing each deficiency and the corresponding proposed corrective action necessary for proper system operation or performance.

Submit one hard copy and an electronic copy of the report to the Contracting Officer's Representative no later than 14 days after approval of the Commissioning Specialists.

c. The Lead Commissioning Specialist must participate in a meeting to discuss any items contained in the report no later than 14 calendar days after submission of the report.

3.1.5 Construction Submittals

Provide all submittals associated with the systems to be commissioned, including shop drawings; equipment submittals; test plans, procedures, and

Section 01 91 00.15 10 Revised by Amendment No. W9127821R0050-0003 reports; and resubmittal's to the Commissioning Specialists. The Technical Commissioning Specialist must review the submittals to the extent necessary verify that the equipment and system installation will comply with the contract requirements and the requirements of the Basis of Design and the Owner's Project Requirements Document.

Provide all submittals associated with the systems to be commissioned, including shop drawings; equipment submittals; test plans, procedures, and reports; and resubmittal's to the Commissioning Specialists. The Technical Commissioning Specialist must review the submittals to the extent necessary verify that the equipment and system installation will comply with the contract requirements and the requirements of the Basis of Design document.

3.1.6 Inspection and Testing

Demonstrate that all system components have been installed, that each control device and item of equipment operates, and that the systems operate and perform, including interactive operation between systems, in accordance with contract documents and the Owner's Project Requirements. Requirements in related specification sections are independent from the requirements of this section and do not satisfy any of the requirements specified in this specification section. Provide all materials, services, and labor required to perform the Pre-Functional Checks, Building Envelope Inspection, Integrated Systems Tests, and Functional Performance Tests.

Demonstrate that all system components have been installed, that each control device and item of equipment operates, and that the systems operate and perform, including interactive operation between systems, in accordance with contract documents. Requirements in related specification sections are independent from the requirements of this section and do not satisfy any of the requirements specified in this specification section. Provide all materials, services, and labor required to perform the Pre Functional Checks, Building Envelope Inspection, Integrated Systems Tests, and Functional Performance Tests.

3.1.6.3 Pre-Functional Checks

Pre-Functional Checklists from the approved Final Construction Phase Commissioning Plan must be completed by the commissioning team. Complete one Pre-Functional Checklist for each individual item of equipment or system for each system required to be commissioned including, but not limited to, ductwork, piping, equipment, fixtures (lighting and plumbing), and controls.

Indicate commissioning team member inspection and acceptance of each Pre- Functional Checklist item by initials. Acceptance of each Pre-Functional Checklist item by each team member indicates that item conforms to the construction contract requirements in their area of responsibility.

Technical Commissioning Specialist acceptance of each Pre-Functional Checklist item indicates that each item has been installed correctly and in accordance with contract documents and the Owner's Project Requirements.

Submit the completed and initialed Pre-Functional Checklists no later than 7 calendar days after completion of inspection of all checklists items for each system. Submit one hard copy and an electronic copy. Include manufacturer start-up checklists associated with equipment with the submission of the Pre-Functional Checklists.

Section 01 91 00.15 10

Pre-Functional Checklists from the approved Final Construction Phase Commissioning Plan must be completed by the commissioning team. Complete one Pre-Functional Checklist for each individual item of equipment or system for each system required to be commissioned including, but not limited to, ductwork, piping, equipment, fixtures (lighting and plumbing), and controls.

Indicate commissioning team member inspection and acceptance of each Pre- Functional Checklist item by initials. Acceptance of each Pre-Functional Checklist item by each team member indicates that item conforms to the construction contract requirements in their area of responsibility.

Technical Commissioning Specialist acceptance of each Pre-Functional Checklist item indicates that each item has been installed correctly and in accordance with contract documents. Submit the completed and initialed Pre- Functional Checklists no later than 7 calendar days after completion of inspection of all checklists items for each system. Submit one hard copy and an electronic copy. Include manufacturer start-up checklists associated with equipment with the submission of the Pre-Functional Checklists.

3.1.6.6.3 Sample Strategy

Perform Functional Performance Tests using the following sample strategy.

Prepare and complete a Functional Performance Test Checklist for each item of equipment or system to be tested. For sample sizes less than 100 percent for all similar equipment, the Government will select the specific equipment or system to be tested during testing. Equipment Identifiers are as indicated on the design drawings:

Equipment Identifier Sample Size (Percent)

AHU 100

VAV 25

CUH 25

CWP 100

DWH 100

Lighting Controls 100

Renewable Energy Systems/Equipment 100

Perform Integrated Systems Tests for all systems and equipment having interactive operation.

Section 01 91 00.15 10

3.2 COMMISSIONING REPORT

Following the completion of Functional Performance Tests and Integrated Systems Tests, with the exception of Seasonal Tests, the Lead Commissioning Specialist must prepare a Commissioning Report.

a. Include an executive summary describing the overall commissioning process, the results of the commissioning process, any outstanding deficiencies and recommended resolutions, and any seasonal testing that must be scheduled for a later date. Indicate, in the executive summary, whether the systems meet the requirements of the construction contract and the Owner's Project Requirements. Include an executive summary describing the overall commissioning process, the results of the commissioning process, any outstanding deficiencies and recommended resolutions, and any seasonal testing that must be scheduled for a later date. Indicate, in the executive summary, whether the systems meet the requirements of the construction contract.

b. Detail any deficiencies discovered during the commissioning process and the corrective actions taken in the report. Include the completed Building Envelope Inspection Checklists, Pre-Functional Checklists, Functional Performance Test Checklists, Integrated Systems Test Checklists,the Commissioning Plans, the Issues Log, Performance Verification Test Reports, Training Attendance Rosters, the Design Review Report, the final TAB Report.

c. Submit the Commissioning Report no later than 14 calendar days following commissioning team acceptance of all Functional Performance Tests and Integrated Systems Tests with the exception of Seasonal Tests. Submit three hard copies and an electronic copy.

d. Following any Seasonal Tests or Post-Construction Activities, update the Final Commissioning Report to reflect any changes and resubmit.

File the approved, updated, Final Commissioning Report in the Sustainability eNotebook.

3.3.1 Post-Construction Endurance Test

Perform an Endurance Test in accordance with the paragraph Endurance Test in Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC once during the peak heating season and once during the peak cooling season during outdoor air condition extremes with the exception that network bandwidth usage measurement and recording is not required. Use the Temporary Trending Hardware, if necessary, in accordance with Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.

The Mechanical System Commissioning Specialists must review the trend logs from the Endurance Tests to ensure that the systems have stable operation and operate as required by the construction contract, and the Owner's Project Requirements Document. The Commissioning Specialists must provide a Post-Construction Trend Log Report that identifies any deficiencies noted in operation, recommendations for correction, and includes a graphical

Section 01 91 00.15 10 Revised by Amendment No. W9127821R0050-0003 representation of the trends. Provide one Trend Log Report for the peak cooling season and one Trend Log Report for the peak heating season. Submit one hard copy and one electronic copy of the Post-Construction Trend Log Reports no later than 14 calendar days following receipt of the trend log data by the Commissioning Specialist.

Perform an Endurance Test in accordance with the paragraph Endurance Test in Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC once during the peak heating season and once during the peak cooling season during outdoor air condition extremes with the exception that network bandwidth usage measurement and recording is not required. Use the Temporary Trending Hardware, if necessary, in accordance with Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.

The Mechanical System Commissioning Specialists must review the trend logs from the Endurance Tests to ensure that the systems have stable operation and operate as required by the construction contract. The Commissioning Specialists must provide a Post-Construction Trend Log Report that identifies any deficiencies noted in operation, recommendations for correction, and includes a graphical representation of the trends. Provide one Trend Log Report for the peak cooling season and one Trend Log Report for the peak heating season. Submit one hard copy and one electronic copy of the Post-Construction Trend Log Reports no later than 14 calendar days following receipt of the trend log data by the Commissioning Specialist.

3.3.2 Post-Construction Site Visit

The Commissioning Specialists must visit the building site concurrent with the 9 month warranty inspection to inspect building system equipment and review building operation with the building operating/maintenance staff. The Commissioning Specialists must identify any deficiency of the building systems to operate in accordance with the contract requirements and the Owner's Project Requirements. The Commissioning Specialists must advise the Contracting Officer's Representative of any identified deficiencies and the proposed corrective action. Submit an updated commissioning report and systems manual documenting the results of the post-construction inspection.

The Commissioning Specialists must visit the building site concurrent with the 9 month warranty inspection to inspect building system equipment and review building operation with the building operating/maintenance staff.

The Commissioning Specialists must identify any deficiency of the building systems to operate in accordance with the contract requirements. The Commissioning Specialists must advise the Contracting Officer's Representative of any identified deficiencies and the proposed corrective action. Submit an updated commissioning report and systems manual documenting the results of the post-construction inspection.

(Note: The remainder of the section is unchanged by this amendment.)

Section 21 13 13.00 10 Revised by Amendment No. W9127821R0050-0003

21 13 13.00 10

1.1 REFERENCES

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-600-01 (2016; with Change 2, 2018) Fire Protection

Engineering for Facilities

(Note: The remainder of the paragraph is unchanged by this amendment.)

1.2 SYSTEM DESCRIPTION

Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively effect or disrupt the sprinkler discharge pattern and coverage. Provide wet pipe sprinkler system in areas indicated on the drawings. Except as modified herein, the system shall be designed and installed in accordance with NFPA 13 as modified by UFC 3-600-

01. Rack sprinklers shall be in accordance with NFPA 13. Pipe sizes which are not indicated on drawings shall be determined by hydraulic calculation.

Design any portions of the sprinkler system that are not indicated on the drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the drawings or is not specified herein. The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein.

1.2.1.2 Basis for Calculations

The design of the system shall be based upon a water supply with a static pressure of 52 54, and a flow of 1,068 1,269 at a residual pressure of 49

46. Water supply shall be presumed available at the point of connection to existing. Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for steel piping, 150 for copper tubing, 140 for new cement-lined ductile-iron piping, and 100 for existing underground piping. Hydraulic calculations shall be based on operation of the fire pump(s) provided in Section 21 30 00 FIRE PUMPS.

1.4.1 Fire Protection Specialist

Perform work specified in this section under the supervision of and certified by the Fire Protection Specialist who is an individual registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES) or who is certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Automatic Sprinkler System Layout subfield of

Section 21 13 13.00 10 Revised by Amendment No. W9127821R0050-0003

Fire Protection Engineering Technology in accordance with NICET 1014-7.

Submit the name and documentation of certification of the proposed Fire Protection Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations. The Fire Protection Specialist shall prepare and submit a list of the fire protection related submittals, no later than 7 days after the approval of the Fire Protection Specialist, from the Contract Submittal Register that relate to the successful installation of the sprinkler systems(s). The submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist when submitted to the Government. The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.

1.4.3 Shop Drawings

Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13. Submit one copy of the Sprinkler System shop drawings, no later than 21 days prior to the start of sprinkler system installation. Drawings shall include plan and elevation views demonstrating that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of drawings shall include the following:

a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifying device symbols, nomenclature, and conventions used.

b. Floor plans drawn to a scale not less than 1/8" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's test connections, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of bushings, reducing couplings, and welded joints shall be indicated.

2.5.2 Copper Tube Components NOT USED

2.5.2.1 Copper Tube

Copper tube shall conform to ASTM B88, Types L and M.

2.5.2.2 Copper Fittings and Joints

Cast copper alloy solder-joint pressure fittings shall conform to ASME B16.18 and wrought copper and bronze solder-joint pressure fittings shall conform to ASME B16.22 and ASTM B75/B75M. Cast copper alloy fittings for flared copper tube shall conform to ASME B16.26and ASTM B62. Brass or

Section 21 13 13.00 10 Revised by Amendment No. W9127821R0050-0003 bronze adapters for brazed tubing may be used for connecting tubing to flanges and to threaded ends of valves and equipment. Extracted brazed tee joints produced with an acceptable tool and installed as recommended by the manufacturer may be used. Grooved mechanical joints and fittings shall be designed for not less than 125 psig service and shall be the product of the same manufacturer. Grooved fitting and mechanical coupling housing shall be ductile iron conforming to ASTM A536. Gaskets for use in grooved joints shall be molded synthetic polymer of pressure responsive design and shall conform to ASTM D2000 for circulating medium up to 230 degrees F. Grooved joints shall conform to AWWA C606. Coupling nuts and bolts for use in grooved joints shall be steel and shall conform to ASTM A183.

2.5.3 Plastic Piping Components NOT USED

2.5.3.1 Plastic Pipe

Plastic pipe shall be chlorinated polyvinyl chloride (CPVC) conforming to ASTM F442/F442M, 175 psi rating and listed in UL Fire Prot Dir for use in wet pipe sprinkler systems.

2.5.3.2 Plastic Fittings

Plastic fitting shall be chlorinated polyvinyl chloride (CPVC) as listed in UL Fire Prot Dir for use in wet pipe sprinkler systems.

2.6 ALARM CHECK VALVE ASSEMBLY

Assembly shall include an alarm check valve, standard trim piping, pressure gauges, bypass, retarding chamber, testing valves, main drain, and other components as required for a fully operational system.

2.12 FIRE HOSE REEL ASSEMBLY NOT USED

Assembly shall include nozzle, fire hose, reel, 1-1/2 inch valve, and bracket suitable for wall mounting. The assembly shall be semi-automatic type complete with Underwriters clip which permits controlled one-man operation whereby control valve can be opened, hose unreeled and clip released by pulling on hose. Valve shall be non-rising stem, all bronze, angle type with 1-1/2 inch American National Standard Fire Hose Screw Thread (NH) male outlet in accordance with NFPA 1963. Reel shall be of steel construction with red enamel finish and shall be equipped with100 feet of 1- 1/2 inch rubber lined fire hose. Nozzle shall be of the industrial combination fog-straight stream type with shutoff. Components of the assembly shall be listed in UL Fire Prot Dir.

3.4.1 Protection of Piping Against Earthquake Damage

Seismically protect the system piping against damage from earthquakes. This requirement is not subject to determination under NFPA 13. Install the seismic protection of the system piping in accordance with UFC 3-301-01, Section 21 13 13.00 10 Revised by Amendment No. W9127821R0050-0003

NFPA 13 and Annex A. Include the required features identified therein that are applicable to the specific piping system.

3.4.1 Labeling of Piping

Provide labeling on the surfaces of the piping in the pump room to show the water flow direction and pipe function. Provide white painted stenciled letters and arrows a minimum 2 inch in height and visible from at least three sides when viewed from the floor. For area is not specific to the fire pump room provide labeling on the surfaces of all feed and cross mains to show the pipe function. For pipe sizes 4 inch and larger provide white painted stencil letters arrow and arrows, minimum of two inches in height and visible from at least two sides when viewed from the floor. For pipe sizes less than 4 inch, provide white painted stenciled letters and arrows a minimum of 0.75 inches in height and visible from the floor.

3.4.4 Pendent Sprinklers

Drop nipples to pendent sprinklers shall consist of minimum 1 inch pipe with a reducing coupling into which the sprinkler shall be threaded. Hangers shall be provided on arm-overs to drop nipples supplying pendent sprinklers when the arm-over exceeds 12 inches for steel pipe or 6 inches for copper tubing. Where sprinklers are installed below suspended or dropped ceilings, drop nipples shall be cut such that sprinkler ceiling plates or escutcheons are of a uniform depth throughout the finished space. The outlet of the reducing coupling shall not extend more than 1 inch below the underside of the ceiling. On pendent sprinklers installed below suspended or dropped ceilings, the distance from the sprinkler deflector to the underside of the ceiling shall not exceed 4 inches. Recessed pendent sprinklers shall be installed such that the distance from the sprinkler deflector to the underside of the ceiling shall not exceed the manufacturer's listed range and shall be of uniform depth throughout the finished area. Pendent sprinklers in suspended ceilings shall be a minimum of 6 inches from ceiling grid located in the center of the ceiling tile.

Section 21 30 00 Page 1

21 30 00

1.1 SUMMARY

Except as modified in this Section or on the drawings, install fire pumps in conformance with NFPA 20, NFPA 70, and NFPA 72. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification governs. Devices and equipment for fire protection service must be UL Fire Prot Dir listed or FM APP GUIDE approved. Interpret all reference to the authority having jurisdiction to mean the Contracting Officer or the Southeast Division, Naval Facilities Engineering Command, Fire Protection Engineer for Navy projects.

1.4 REFERENCES

UNDERWRITERS LABORATORIES (UL)

UL 1247 (2007; Reprint Oct 2019) Diesel Engines for Driving

Stationary Fire Pumps

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval.

The Southeast Division, Naval Facilities Engineering Command, Fire Protection Engineer, will review and approve all submittals in this section requiring Government approval.

Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Fire Pump Installation Related Submittals

Fire Protection Specialist; G

No later than 14 days after the Notice to Proceed and prior to the submittal of the fire pump installation drawings.

SD-02 Shop Drawings

Installation Drawings; G

3 copies

Section 21 30 00 Page 2

As-Built Drawings; G

Piping Layout; G

Pump Room; G

SD-03 Product Data

Catalog Data; G

Spare Parts

Preliminary Tests

At least 14 days prior to the proposed date and time to begin Preliminary Tests.

Field Tests; G

At least 2 weeks before starting field tests.

Manufacturer's Representative; G

Field Training; G

Army Final Acceptance Test

Navy Formal Inspection and Tests

SD-06 Test Reports

Preliminary Tests

3 copies of the completed Preliminary Tests Reports, no later than 7 days after the completion of the Preliminary Tests.

Army Final Acceptance Test

Navy Formal Inspection and Tests; G

SD-07 Certificates

Fire Protection Specialist

No later than 14 days after the Notice to Proceed and prior to the submittal of the fire pump installation drawings

Qualifications of Welders

Qualifications of Installer

Preliminary Test Certification

Final Test Certification

SD-10 Operation and Maintenance Data

Section 21 30 00 Page 3

Operating and Maintenance Instructions; G

At least 14 days prior to conducting field training

Flow Meter

Submit Data Package 2 for flow meter and controllers in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.

2.1 MATERIALS AND EQUIPMENT

a. Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products and shall essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.

b. Submit manufacturer's catalog data included with the Fire Pump

Installation Drawings for each separate piece of equipment proposed for use in the system. Catalog data shall indicate the name of the manufacturer of each item of equipment, with data annotated to indicate model to be provided. In addition, a complete equipment list that includes equipment description, model number and quantity shall be provided. Catalog data for material and equipment shall include, but not be limited to, the following:

(1) Fire pumps, drivers and controllers including manufacturer's certified shop test characteristic curve for each pump. Shop test curve may be submitted after approval of catalog data but shall be submitted prior to the final tests.

(2) Pressure maintenance pump and controller.

(3) Piping components.

(4) Valves, including gate, check, globe and relief valves.

(5) Gauges.

(6) Hose valve manifold test header and hose valves.

(7) Flow meter. NOT USED

(8) Restrictive orifice union.

(9)…

This is the start of the file's text. The full file is on GovTribe.