This is a solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Environmental Remediation Services in the Mobile District Area of Responsibility (AOR). The solicitation seeks contractors to provide a full range of environmental remediation services including hazardous waste assessments, investigations, remedial designs, actions, operations and monitoring. Services will support customers of the U.S. Army Corps of Engineers Mobile District across Alabama, Tennessee, Mississippi, and Florida. The base contract is for a 10-year ordering period with task orders issued and awarded periodically. Base contract labor rates and other pricing terms are provided in exhibits to the solicitation. The response date for offers is May 5, 2021. Award will be made to multiple contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127820R0060 AM06.pdf | ||
| W9127820R0060 AM05.pdf | ||
| W9127820R0060 AM03 SF30 .pdf | ||
| W9127820R0060 AM0002 .pdf | ||
| W9127820R0060 AM0002.pdf | ||
| W9127820R0060 AM0001.pdf | ||
| W9127820R0060 ERS RFP 8OCT2020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
AM0004
W91278
The purpose of this amendment (AM0004) is to replace the solicitation W9127820R0060 in its entirety.
ENDIST MOBILE CONTRACTING DIVISION
109 ST JOSEPH STREET
MOBILE, AL 36602
W9127820R0060
1 1
04/05/2021
10/08/2020
CODE
PAGE(S)
X
A X B X C
D
EX
X G F
X H
RATING PAGE OF PAGES
7. ISSUED BY
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 131
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W91278 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
PART II - CONTRACT CLAUSES
ENDIST MOBILE CONTRACTING DIVISION
109 ST JOSEPH ST
MOBILE AL 36602
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
05-Apr-2021
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W9127820R0060
Until 2:00PM Local time 05-May-2021 (Time) (Date)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED Job 10 Year Ordering Period
FFP
Environmental Remediation Services (ERS) Contract for the Mobile District U.S.
Army Corps of Engineers. The contract will be for a period of ten (10) years. See the Performance Work Statement for full description of services. Specific requirements will be issued and awarded per task order. The basic contract labor rates are provided in the attached exhibits. All other required labor, equipment, subcontracts, etc. will be negotiated per task order.
FOB: Destination
PSC CD: F999
MAX
NET AMT
Official Use Only
CESAM ERS MATOC 10 Year Ordering Period Labor Rate Schedule
Draft CESAM ERS MATOC Labor Categories
Ordering Year 1 & 2
Ordering Year 3 & 4
Ordering Year 5 & 6
Ordering Year 7 & 8
Ordering Year 9 & 10
FAR 52.217.8 -
Option to Extend Services (Max of 6 months)
Program Manager
Project Manager
Safety & Health Manager
Site & Safety Health Officer
Industrial Hygienist Certified Health Physicist
(CHP)
Sr. Contract Manager
Quality Control Manager
Sr. Engineer
Mid. Engineer
Jr. Engineer
Sr. Environmental Scientist
Mid. Environmental Scientist
Jr. Environmental Scientist
Sr. Geologist/Hydrogeologist
Mid. Geologist/Hydrogeologist
Jr. Geologist/Hydrogeologist
Sr. Environmental Technician
Mid. Environmental Technician
Jr. Environmental Technician
Sr. Chemist
Mid. Chemist
Jr. Chemist
Sr. Biologist
Mid. Biologist
Jr. Biologist
Sr. Archeologist
Mid. Archeologist
Jr. Archeologist
Risk Assessor
Geophysicist
Historian\Researcher
Regulatory Specialist
Field Technician
Sr. Project Controls/Scheduler
Mid. Project Controls/Scheduler
Jr. Project Controls/Scheduler
Estimator
Construction Foreman
Site Superintendent/Supervisor
Laborer
GIS Specialist
CADD Specialist Administrative Assistant/Clerical
NOTES:
1. Hourly Labor Rates shall include overhead(s), general and administrative (G&A) expenses, labor burden fringes, any other applicable costs.
2. Profit will be negotiated with each task order - DO NOT include profit in the hourly labor rate.
3. The Hourly Labor Rates listed above shall be the maximum rates that can be proposed in response to Requests for Proposal (RFPs) issued during the Base Period of the contract; the Hourly Labor Rates listed above shall be the maximum rates that can be incorporated into task orders awarded during the Option Period of this contract. Lower rates may be proposed during the RFP process and incorporated into awarded task orders.
4. Modifications to task orders will reflect the applicable Hourly Labor Rates at the time the task order was awarded.
Rate Ordering Year 1 & 2
Ordering Year 3 & 4
Ordering Year 5 & 6
Ordering Year 7 & 8
Ordering Year 9 & 10
FAR 52.217.8 -
Option to Extend Services (Max of 6 months)
Overhead G&A
NOTES:
1. The rates in the table above will be applied to Other Direct Costs (ODCs) as negotiated per task order. ODCs may include but are not limited to reproduction, travel, subcontracting effort and specialized equipment.
2. Profit on ODCs will be negotiated per task order.
3. Modifications to task orders will reflect the applicable Overhead and G&A Rates at the time the task order was awarded.
NOTICE TO OFFEROR
SEE NOTE 5. LACK OF REGISTRATION IN THE SAM DATA BASE WILL RENDER THE OFFEROR
INELIGIBLE FOR AWARD
BEFORE SIGNING AND SUBMITTING THIS PROPOSAL, PLEASE TAKE NOTE OF THE
FOLLOWING, AS FAILURE TO PERFORM ANY ONE OF THESE ACTIONS MAY CAUSE YOUR
PROPOSAL TO BE REJECTED. THIS CHECKLIST IS DESIGNED FOR YOUR CONVENIENCE TO
ASSIST YOU IN COMPLETING YOUR OFFER. ITS COMPLETION DOES NOT GUARANTEE THAT
YOUR OFFER WILL BE ACCEPTABLE. A COMPLETE AND ACCEPTBLE OFFER IS SOLELY THE
RESPONSIBILTY OF THE CONTRACTOR.
1. Amendments: Have you acknowledged receipt of ALL amendments? If in doubt as to the number of amendments issued, email Nathan J. Fry @ Nathan.J.Fry@usace.army.mil.
2. Amended Bid Pages: If any of the amendments furnished new/revised bid pages, then the new/revised bid pages must be used in submitting your bid.
3. Mistakes in Proposal: Have you reviewed your offer price/rates for possible errors in calculation or work left out?
4. Your Proposal Should Include the Following: The SF33 (include TIN, DUNS, AND CAGE numbers in the block with your company’s name), Completed Proposal Data Sheet, Completed Hourly Rate Schedule (an excel file can be found in the attachments of the PDF) and Sample Project Proposal Schedule, any contract provision/clause requirements, and any technical information required by the solicitation (See sections L and M). Also include your Joint Venture (JV) agreement if applicable. Have all members sign the SF33 or provide a letter authorizing one person to bind the JV or partnership. Refer to the JV requirements outlined in the solicitation.
5. Your attention is directed to the following clause: FAR Clause 52.204-7, Required System Award Management (SAM) registration. Lack of registration in the SAM database will render bidder ineligible for award. Information on how to register and the time it takes is detailed in the clause.
6. Ensure the forms indicated in Section J are completed and submitted with your proposal.
REQUESTS FOR INFORMATION
Requests for Information
Any questions about this solicitation, including technical questions about plans and specifications, shall be submitted via the Bidder Inquiry Portal in ProjNet at https://www.projnet.org. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet.
Questions shall be submitted no later than April 20, 2021, 2:00 PM Central Time to allow time for a response, and amendment to the solicitation if necessary. On this date and time the portal will be closed. For technical questions, no other means of communication, e-mail, fax, or telephone will be accepted. Oral exchanges between offerors and the government prior to award of the contract will not be binding. In addition to information available to offerors on the Bidder Inquiry Portal, any information concerning this solicitation will be furnished to all offerors as an amendment to the solicitation if the information is necessary to the submittal of.
The Solicitation Number is: W9127820R0060 The Bidder Inquiry Key is: [WV6TIC-9ZQB76] Specific Instructions for ProjNet Bid Inquiry Access:
a. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
b. Identify the Agency. This should be marked as USACE.
c. Key. Enter the Bidder Inquiry Key listed above.
d. Email. Enter the email address you would like to use for communication.
e. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
f. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
g. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
a. For future access to ProjNet, you will not be emailed any type of password.
You will utilize your Secret Question and Secret Answer to log in.
b. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
c. Identify the Agency. This should be marked as USACE.
d. Key. Enter the Bidder Inquiry Key listed above.
e. Email. Enter the email address you used to register previously in ProjNet.
f. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
g. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
Note: Questions/comments should be entered in the system one at a time. List of questions uploaded into ProjNet, regardless of the format, will not be answered.
Offerors are requested to review the solicitation and amendments in their entirety, as well as to review the Bidder Inquiry Portal for previous questions and responses, prior to submission of a new inquiry on the Portal.
CAUTION: ANY INQUIRY SUBMITTED AND ANSWERED WITHIN THIS
SYSTEM, WILL BE ACCESSIBLE TO VIEW BY ALL INTERESTED OFFERORS
ON THIS SOLICITATION.
The call center for the ProjNet operates weekdays from 8 AM to 5 PM U.S. Central Time Zone. The telephone number is 1-800-428-HELP.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
SECTION C - Description of Services
PERFORMANCE WORK STATEMENT
Environmental Remediation Services, Multiple Award Task Order Contract(s) (MATOC), U.S. Army Corps of Engineers, Mobile District
1.0 INTRODUCTION
The Contractor shall be responsible for providing a full range of environmental remediation services to customers of the U.S. Army Corps of Engineers. The environmental remediation services consist of hazardous, toxic and radioactive waste (HTRW) assessments, investigations, studies, remedial designs, remedial actions and operations, monitoring and other related services. Traditional construction services, as related to restoration activities (including the construction of support facilities) are included. The contractor shall furnish all materials, equipment, supplies, personnel, and all other services required to perform the environmental services
1.1 Scope
The contractor shall furnish all materials, equipment, supplies, personnel, and all other services required to perform the environmental services outlined in this statement of work and as specifically identified in the individual task orders. The services required by this contract will be provided for the customers of the U.S. Army Corps of Engineers, Mobile District. This includes, but is not limited to the states of Alabama, Tennessee, Mississippi, and Florida and other locations assigned to the Mobile District.
Task orders may use performance-based work statements (PWSs). A PWS structures all aspects of an acquisition around the purpose of the work to be performed and does not dictate how the work is to be accomplished. It is written to ensure that contractors are given the freedom to determine how to meet the Government’s performance objectives and provides for payment only when the results meet or exceed these objectives. It maximizes contractor control of work processes and allows for innovation in approaching various work requirements. A PWS emphasizes performance that can be contractually defined so that the results of the contractor’s effort can be measured in terms of technical and quality achievement, schedule progress, or cost performance. The goal of Performance-Based Acquisition (PBA) is to:
a. Save money by reducing contract costs from elimination of unnecessary effort through innovation by the contractor.
b. Enable the Government to shift its emphasis from processes to outputs.
c. Hold contractors accountable for the end results.
d. Ensure that contractors are given the freedom to determine how to meet
Government’s performance objectives.
Official Use Only 8 of 119
A performance work statement (PWS) may be prepared for each individual task order.
The PWS will include specific performance objectives and performance elements. The time frame and specific outcomes for each item of work will be described in the individual task order. The description stated herein provides a general understanding of the contractor functions to be performed. Individual task orders will contain the specific requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract. Based on the nature of the requirements and contracting acquisition approach for each task order, the scoping document may use a PWS, Statement of Work (SOW), or Statement of Objectives
(SOO).
2.0 GENERAL REQUIREMENTS
The Contractor must have the capability and experience to perform or provide a wide range of investigative, remedial design, compliance, restoration, safety and industrial hygiene, quality assurance, facilities operation and maintenance, inspection, and remediation services required to support the USACE environmental mission.
2.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.
2.2 Business Relations
The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors.
The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.
2.3 Contract Administration and Management
The following subsections specify requirements for contract administration, contract management and personnel administration.
2.3.1 Contract Management
The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirements specified in each task order. The contractor must maintain continuity between the support operations and the contractor's corporate offices.
2.3.2 Contract Administration
The Contractor shall establish processes and assign appropriate resources to effectively
Official Use Only 9 of 119 administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall be available within two hours during normal duty hours to meet with Government personnel designated by the contracting officer to discuss problem areas. After normal duty hours, the contractor shall be available within twenty-four hours or by the next business morning, whichever is earliest. The contractor shall assign work effort and maintain proper and accurate time keeping records of personnel assigned to work on the requirement.
2.3.3 Personnel Administration
The contractor shall provide the following management and support as required. The contractor shall maintain training of their employees by providing initial and refresher training as required to meet the scope requirements. The contractor shall make necessary travel arrangements for employees. The contractor shall provide necessary infrastructure to support contract tasks.
2.4 Subcontract Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. The Prime shall manage subcontractors and provide supervision/oversight in accordance with all USACE and FAR requirements.
Contractors may add subcontractors to their team after Contracting Officer’s notification and approval.
2.5 Contractor Personnel, Disciplines, and Specialties
The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The contractor shall ensure the labor categories, labor rates, and man-hours utilized in the performance of each Task Order issued hereunder will be the minimum necessary to accomplish the task. The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.
2.6 Location and Hours of Work
Accomplishment of the results contained in this PWS requires work within The Mobile District AOR and at various contractor, subcontractor, and Government facilities.
Specific locations for field work will be determined at the task order level. Normal workdays are Monday through Friday except US Federal Holidays. Workers typically work eight (8) hours per day, 40 hours per week. Work may be required outside of typical work hours and will be determined at the task order level.
2.7 Travel / Temporary Duty (TDY)
Travel to other government facilities or other contractor facilities may be required and will be specified at the task order level. All travel requirements (including plans, agenda, Official Use Only 10 of 119 itinerary, or dates) shall be pre-approved by the government (subject to local policy procedures). Travel costs will be negotiated for each task order as applicable, in accordance with the Joint Travel Regulations.
If not specified, the contractor shall provide any and all necessary transportation to fulfill the requirements of the contract.
3.0 SCOPE REQUIREMENTS
The Contractor shall be capable of providing innovative technologies, as well as traditional methods of site investigation and remediation while complying with all applicable USACE policies and procedures, and applicable federal, state and/or local statutes, rules and regulations.
Examples of some of the environmental restoration work that may be required are listed below. These examples are not intended to be all inclusive.
a. Conduct a full range of environmental services as required under RCRA, CERCLA, TSCA, CWA, and other federal and state environmental regulations.
b. Develop site specific work plans with accompanying sub plans. These sub plans include, but are not limited to, such documents as a UFP-QAPP (Uniform Federal Policy – Quality Assurance Project Plan, a sampling and analysis plan, a site safety and health plan, a Contractor quality control plan, and an erosion control plan.
c. Sampling and testing of soil (surface, shallow subsurface, and deep subsurface) and/or other solid matter; sampling and testing of sediment; sampling and testing of groundwater; and sampling and testing of surface water. Soils will be tested for both chemical and geotechnical parameters. Groundwater sampling may involve installation, development, and abandonment of monitoring wells.
d. Conduct waste site investigations (e.g., Remedial Investigations, RCRA Facility Investigations, Comprehensive Site Assessments, Site Assessments, etc.) in accordance with Federal, State, and local environmental regulations. This includes preparation of work plans and reports for approval by the Corps of Engineers and the applicable Federal, State, and/or local regulatory authority.
e. Prepare remedial action decision documents (e.g., Feasibility Studies, Proposed Plans, Records of Decision, Corrective Measures Studies, Corrective Action Plans, Remedial Action Plans, Remedial Designs, etc.) for approval by the Corps of Engineers and the applicable Federal, State, and/or local regulatory authority.
f. Perform risk assessments (both human health and ecological) in support of RCRA, CERCLA, or other state regulated programs.
g. Conduct remedial action activities at sites contaminated with the following types of substances: RCRA listed hazardous wastes, RCRA characteristic hazardous wastes, heavy metals, PCBs, asbestos, petroleum hydrocarbons, TSCA regulated substances, radioactive material, and other contaminants not specifically listed.
h. Remediation of contaminated soil. Soil remediation may include, but is not limited to, such techniques as excavation and off-site disposal, phytoremediation, soil vapor extraction, bioventing, soil washing, bioremediation (ex-situ and in-situ), stabilization, Official Use Only 11 of 119 and/or solidification.
i. Demolition, removal, decontamination, treatment, transport and/or disposal of manmade structures. Manmade structures include, but are not limited to, buildings, sumps, tanks (both aboveground and underground), drums, and transformers.
Additionally, these manmade structures may contain, or be contaminated with, asbestos, lead-based paint, PCBs, petroleum products, or other solid or hazardous wastes.
j. Remediation of contaminated groundwater. Groundwater remediation may include, but is not limited to, pump and treat, phytoremediation, in-situ bioremediation, reactive barriers, and air sparging.
k. Topographic, structural, and geophysical surveys.
l. Hydrogeological testing and data analysis (includes groundwater modeling using state-of-the-art computer models).
m. Chemical sampling, treatment, and/or disposal of investigation derived waste and of containerized wastes, such as waste inside tanks, drums, and transformers.
n. Construction of containments (e.g., caps, slurry walls, etc.) around hazardous and regulated waste sites.
o. Operation and maintenance of remediation facilities (e.g., groundwater collection and treatment systems, soil vapor extraction systems, air sparging systems, bioventing systems, etc.)
p. Procure analytical laboratory services for performing the analyses associated with individual Task Orders. Note: Laboratories performing analytical testing under this MATOC shall have the applicable certifications required by the State accreditation authority under National Environmental Laboratory Accreditation Program (NELAP) and the DoD Environmental Laboratory Accreditation Program (DoD ELAP) certification for all of the analytical parameters, methods, and matrices to be utilized for each Task Order, as applicable. All laboratories shall provide proof of accreditation through the NELAP/ DoD ELAP as required. The strictest regulation shall apply. Laboratories working under this MATOC must agree to be audited at the Government’s discretion, to include desk audits or on-site audits.
q. Participation in community education and public affairs activities and preparation of associated documents.
r. Prepare Remedial Action Reports and/or Closure Reports/Post-Closure Reports after completion of the remedial action activities.
s. Conduct geotechnical investigations and actions for various parameters to include groundwater modeling, ground penetrating radar, sinkhole investigation, dredge spoil disposal and reuse.
t. Perform Long Term Management and 5-Year Reviews for sites that have not achieved Unrestricted Use/Unconditional Exposure, assessing current protectiveness of previously implemented remedial actions.
4.0 SPECIAL REQUIREMENTS
Official Use Only 12 of 119
This section describes the special requirements for this contract. The following sub-sections provide details of various considerations on this contract.
4.1 Security and Safety
DD Forms 254: Overarching security requirements and Contractor access to classified information shall be as specified in the basic DD Form 254, which will be further identified in the DD Form 254 for each TO, as required. All contractor personnel with access to unclassified information systems, including e-mail, shall have at a minimum a favorable National Agency Check (NAC).
Visitor Group Security Agreement. The contractor shall sign a Contractor Visitor Group Security Agreement to protect classified information involved in performance under this contract or Task Order. The Agreement will outline responsibilities in the following areas: Contractor security supervision; Standard Practice Procedures; access, accountability, storage, and transmission of classified material; marking requirements;
security education; personnel security clearances; reports; security checks; security guidance; emergency protection; protection of government resources; DD Forms 254;
periodic security reviews; and other responsibilities, as required.
Project Security Requirements. During performance of any particular project, the Contractor is expected to comply with security measures as applicable. These are related to antiterrorism (AT) and operations security (OPSEC) reviews requirements. There are currently 17 standard contract provisions and clause texts available in the standard OPSEC ENG FORM 6055, JUN 2015 (see Section J). Any or all of the 17 standard contract provisions may be required during the execution of a particular task orders based on the specific task order scope and place of performance.
Safety Requirements. The Contractor shall maintain a safety program compliant with USACE and OSHA requirements, including training, medical monitoring, safety program documentation, etc.
4.2 Monthly Status Report, Monthly Financial Section, Invoice.
The contractor shall submit, according to each task order, a monthly narrative and schedule status report and an invoice (if applicable), both in electronic format. This report and a payment invoice will be provided for approval by the 10th working day of the month following the month in which the services were performed. The monthly status report shall include project break out by hours for each task performed and brief summary of each task and shall be in Microsoft Word and PDF format to the authorized Contracting Officers Representative (COR). COR's will be assigned at the task order level. Generally invoicing procedures will be tailored at the task order level.
4.3 Government Furnished Materials
Government Furnished Information related to the required services will be provided at the task order level.
4.4 Environmental Requirements
The Contractor, the Contractors subcontractors, and the Contractors suppliers shall perform all work in full compliance with applicable Federal, State, and Local environmental laws and regulations including the following: pertinent Occupational
Official Use Only 13 of 119
Safety and Health Administration and Department of Transportation requirements, National Environmental Policy Act, Clean Water Act, Clean Air Act, Endangered Species Act, National Historic Preservation Act, Fish and Wildlife Conservation Act, Federal Insecticide, Fungicide, and Rodenticide Act, Asbestos Hazard Emergency Response Act, Noise Control Act, Pollution Prevention Act, Toxic Substances Control Act, Resource Conservation and Recovery Act which amended the Solid Waste Disposal Act of 1965, and Comprehensive Environmental Response, Compensation, and Liability Act as amended by the Superfund Amendments and Reauthorization Act. Any incidents of spills, releases, or noncompliance with regulations noted by the Contractor shall immediately be brought to the attention of the Contracting Officer with written notice provided as soon as possible thereafter. Nothing in this contract shall relieve the Contractor of his responsibility to comply with these laws and regulations. Further, the Contractor shall obtain all environmental permits, licenses, and/or certificates required by each task order. When required, the Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform the work as defined in each task order’s performance work statement. The Contractor shall provide necessary labor, supervision, insurance, vehicles, equipment, packing materials, labels, waste analysis, lab packing, weight slips, and manifest forms to safely and legally transport and dispose of, or recycle, solid non-hazardous waste, hazardous waste, and hazardous materials. The Contractor shall perform all work in accordance with 40 CFR Parts 190 through 289 and 49 CFR Parts 100 through 177.
4.5 Quality
The Contractor shall maintain a Quality Management Program compliant with USACE, DoD, and other Federal Government requirements. This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort.
4.5.1 Quality Control
The Contractor shall develop a Task/Delivery Order QCP and maintain an effective quality control program to ensure services are performed in accordance with the IDIQ contract and each individual PWS. The Contractor shall develop and implement procedures ensure and monitor quality, and to identify, prevent, and ensure non-recurrence of defective services. The Contractors QCP is the means by which contract compliance is managed, assured, controlled, and documented.
The finalized QCP will be accepted by the Government at the time of the award of the Task/Delivery Order. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to effective date of the change. The QCP shall be subject to the Governments review and approval. The Government may find the QCP "unacceptable" whenever the Contractors procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."
Official Use Only 14 of 119
4.5.2 Quality Assurance
Performance Standards and Quality Assurance Surveillance Plans (QASPs) are addressed in Section G.
Official Use Only 15 of 119
SAMPLE PROBLEM
PERFORMANCE WORK STATEMENT
FOR
ENVIRONMENTAL REMEDIATION SERVICES
AT
MYSTERY AFB, FL
US Army Corps of Engineers
Mobile District Sample Project for Solicitation No.: W9127820R0060
30 March 2021
SAMPLE PROBLEM
Table of Contents
1.0 SCOPE
1.1 PROJECT DESCRIPTION
1.2 PERFORMANCE OBJECTIVE
1.3 PERFORMANCE REQUIREMENTS
2.0 APPLICABLE DOCUMENTS
3.0 MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
3.1 PROJECT MANAGEMENT PLAN AND WORK BREAKDOWN STRUCTURE
3.2 SCHEDULE AND PLANNING REQUIREMENTS – INTEGRATED MASTER SCHEDULE
3.3 MILESTONE PAYMENT SCHEDULE
3.4 DOCUMENT REPOSITORY
3.5 COST AND STATUS REPORTING
3.6 CLIN/SUB-CLIN STRUCTURE AND PRICE SCHEDULE
3.7 MEETING AND CONFERENCE REQUIREMENTS
3.7.1 Meeting/Teleconference Support
3.7.2 Public Meetings and Hearings
3.8 SPATIAL DATA (MAP) REQUIREMENTS
3.9 NOTIFICATION REQUIREMENTS
3.10 PERMITS
3.10.1 Environmental Permits
3.10.2 Rights of Access to Non-Government Real Property
3.11 PHOTO DOCUMENTATION
3.12 REMOTE AND/OR AUSTERE SITES
3.13 SITE ACCESS
3.14 WORKSITE ACTIVITIES AND COORDINATION
3.14.1 Coordination of Activities
3.15 REGULATORY REQUIREMENTS
4.0 CHEMISTRY REQUIREMENTS
5.0 QUALITY ASSURANCE
5.1 LABORATORY SELECTION
5.2 ANALYTICAL DATA MANAGEMENT
5.3 RECORD KEEPING
6.0 PLANS AND REPORTS
6.1 QUALITY PROGRAM PLANS
6.1.1 General
6.1.2 Work Plans
6.1.3 Health and Safety Plan
6.1.4 Construction Quality Plan
7.0 TECHNICAL PLANS AND REPORTS
8.0 SITE WORK
8.1 CONSERVATION
8.2 SITE RESTORATION
8.3 SITE CHARACTERIZATION AND FIELD INVESTIGATION
8.4 SITE PREPARATION
8.5 DEMOLITION
9.0 ENVIRONMENTAL REQUIREMENTS
9.1 GENERAL ASSUMPTIONS
9.1.1 The Sample Conceptual Site Model Guidance
9.2 ENVIRONMENTAL CONSTRUCTION
9.3 DESIGN
9.4 INSPECTION
9.5 DELIVERY AND WARRANTY
9.6 ENVIRONMENTAL RESOURCES PROGRAM INFORMATION MANAGEMENT SYSTEM
9.7 INNOVATIVE AND PROVEN TECHNOLOGIES
9.8 MUNITIONS EXPLOSIVES OF CONCERN REMOVAL AND SUPPORT
9.9 RESPONSE ACTIONS
9.10 REQUIREMENTS
9.11 RADIOLOGICAL AND HAZARDOUS WASTE REMOVAL AND SUPPORT
9.12 STUDY EFFORT INCIDENTAL TO REMEDY OR CORRECTIVE ACTION
9.13 FIVE-YEAR REVIEW SUPPORT
9.14 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
10.0 POINTS OF CONTACT
Attachment A - CLIN/Sub-CLIN Structure
W9127820R0060
1.0 SCOPE
This is a fictional scenario developed for the ERS MATOC RFP. All information needed to develop a sample submittal is included in this document, i.e., no additional research is needed nor is there any additional support documentation to review concerning this Sample Project.
This Performance Work Statement (PWS) defines the scope of environmental services necessary to conduct site restoration. The range of activities include maintenance of established remedies, implementation of optimization to enhance remedial progress at the applicable site, and achievement of site-specific objectives. The Contractor shall undertake Environmental Remediation activities to achieve the Performance Objective (PO) as described in this PWS.
NOTE: The term “Government” includes the Air Force (AF) and United States Army Corps of Engineers (USACE). While regulators are a governmental entity, they are also a third party over whom the Government has no control over and, as such, will be referred to as “regulators”.
1.1 Project Description
A fictional active military installation in Florida, Mystery Air Force Base (AFB) historically stored jet petroleum grade 4 (JP-4) on a portion of the base (herein referred to as site SWMU- 007 and is being managed under the RCRA program. All structures, foundations and slabs have been previously removed from the site. The site is currently covered with grass that is regularly mowed by the Installation. The site has not been utilized since the JP-4 storage facility was removed in 1969. All tanks and associated piping were removed at that time. The site is relatively flat with surface drainage generally directed to the north. The Installation’s long-term plan (approximately 10 years out) is to construct a recreational training facility and running track on this site and military housing. The performance objective (PO) is therefore, remediation of the site to residential conditions, no further action without institutional controls and abandonment of all monitoring wells. The proposal shall address remediation of soil and ground water (GW) for all exposures (ingestion, inhalation, vapor intrusion and dermal). The site is bounded on three sides by wooded undeveloped area and one side is bounded by a paved road. The contractor will conduct all activities in accordance with all Federal, State (FDEP) and local environmental laws and regulations.
Soil and GW sampling have been conducted at the site and it has been determined that Polynuclear Aromatic Hydrocarbons (PAHs) were identified in soil and groundwater.
Concentrations of 1-methylnaphthalene exceeding Florida Department of Environmental Protection (FDEP)’s residential soil cleanup target level (SCTL) are confined to three closely spaced (separated by no more than 20 feet) rectangular areas of varying size covering an aggregate area of approximately one (1) acre. Concentrations of 1-methylnaphthalene range from 2,000 mg/kg to 7,000 mg/kg. Contamination goes through the subsurface to ground water.
Three feet of the clay soils (classified as CL in accordance with the unified Soils Classification System (USCS)) were observed in each of the three contaminated areas. Overall, the site is underlain by sand and gravel. The unconfined water table aquifer begins at 25 feet below ground surface, and the average hydraulic conductivity of the aquifer is 9x10-7 (m/s) and porosity is 35%. The groundwater contamination is bounded vertically by a clay confining layer at a depth of approximately 55 feet below ground surface, and the hydraulic gradient was calculated to be
0.00641 ft/ft to the northwest. A creek that flows through the Installation is located 2,500 feet to the northwest of the site. Groundwater contamination exceeding applicable groundwater cleanup target levels (GCTLs) was delineated to an area of approximately a quarter acre during a sampling event conducted seven years ago, and the highest concentration of 1-methnapthalene in groundwater was 100 ug/L.
1.2 Performance Objective
The Contractor shall perform all necessary environmental investigation and remediation activities required to achieve the PO of No Further Action without institutional and engineering controls within the Performance Period (PP) of five (5) years. The Contractor shall maintain compliance with regulatory requirements until SC is achieved. This PWS, along with guidance included in attachments and enclosures include the general requirements of the project to meet the project objectives.
The Government places great value on error-free work products of the highest quality that support technically sound decisions consistent with applicable Government and regulatory requirements. Additionally, the Contractor shall ensure programmatic consistency and quality across the entire contract.
Requirements for efficient management of this contract include, but are not limited to, the achievement of the PO within the PP per Table 1 of this PWS and timely identification and solution of impediments to successful project execution. The Contractor shall provide all personnel, equipment, supplies, tools, materials and other items necessary to perform the tasks defined in this PWS. The Contractor is solely responsible for reviewing all publicly available information and forming their independent, professional conclusions/interpretations of site conditions and requirements to achieve the PO of this contract within the PP specified.
The Government will rely on the Contractor’s expertise in recognizing potential risk that may impact achievement of the PO within the PP. The Contractor shall perform all work in accordance with federal, state, and local statutes and regulations. The Contractor shall also comply with Installation regulations. The Contractor shall continue work throughout the entire duration of the PP.
No contaminated soil or groundwater (except investigation derived wastes) is to be removed from the installation for disposal or treatment purposes. The IDW will be stored and disposed of by the Mystery AFB Environmental Office. Contractor is not responsible for storage and/or removal of IDW. The reuse plan for the site is a recreational facility, running track and military housing. This remediation contract includes restoration of the site to approximately pre-remediation grade and conditions, and all backfill will be structural soil fill compacted to at least 90% of the standard Proctor maximum dry density. Required restoration also includes six inches of topsoil and St. Augustine sod for the entire site.
1.3 Performance Requirements
Table 1 presents task order requirements and PO elements for this task order.
Table 1: Performance Table Site/Task Performance Objective Performance Period Performance Standard
Task 1: PMP Project Management Plan (PMP):
1) Draft PMP
2) Final PMP
3) Annual review and updates as necessary
Draft PMP within 60 calendar days from contract award, Final PMP within 14 calendar days of receipt of USACE comments on the Draft, and updates as necessary throughout the PP (per PM/COR)
USACE approval of PMP.
The PMP should be maintained with accuracy and completeness based on the current technical approach for each site, management structure, etc.
Task 2: IMS/MPS Integrated Master Schedule (IMS)/Milestone Payment Schedule
(MPS)
Draft IMS/MPS within 60 calendar days from contract award, Final IMS/MPS within 14 calendar days of receipt of USACE comments on the Draft, and updates monthly throughout the PP
USACE approval of IMS/MPS.
OU-007 Site Closeout (SC) Five (5) years USACE, and regulator- approval of SC documentation (e.g., Site Rehabilitation Completion Order and Well Abandonment Confirmation Report).
2.0 APPLICABLE DOCUMENTS
The Contractor shall identify and comply with all applicable federal, state, and local statutes;
Department of Defense (DoD), USACE, instructions, manuals, handbooks, regulations, guidance, and policy letters (including Government policy and guidance for IRP, and MMRP);
Executive Orders (EOs); American Society for Testing and Materials (ASTM); American Petroleum Institute (API) Codes; National Association of Corrosions Engineers (NACE);
National Fire Protection (NFPA); Steel Structures and Painting Counsel (SSPC); National Electrical Code (NEC); Uniform Fire Code (UFC); and International Building Code (IBC) including all changes and amendments in effect on the date of issuance of this contract. It is the Contractor’s responsibility to identify and comply with all applicable requirements. In addition, the Contractor shall refer to the current versions of the DoD Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing and The United States Construction Management Implementation Guide.
The Contractor shall identify and comply with all applicable documents for an Installation including RODs, ROD Amendments, ESDs, RCRA Permits and subsequent modifications, Risk Evaluation Corrective Action Program (RECAP) documents, the Endangered Species Act, other Decision Documents, Deeds, and conveyance notices.
The information provided in this PWS is not intended as a substitute for complete analysis of technical data available, nor is it intended to be a guide on how the Contractor should address achievement of the PO.
3.0 MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
The Contractor shall implement a full range of environmental remediation activities as required to meet objectives of this contract and in accordance with all applicable or relevant and appropriate federal, state, and local laws and regulations; DoD policies; and Installation-specific orders, agreements or rules. The Contractor shall supply all labor, equipment, and materials necessary to accomplish the work through the entire contract PP. The Contractor shall perform management and planning functions, including performance measurement and fund status reporting. The IMS, MPS, and PMP shall be consistent.
The Contractor shall work closely with the PM/COR to ensure effective communication is maintained to execute the Sample Project in accordance with this PWS and other contract requirements. Project management coordination shall include, but not limited to, contract option Sub-CLIN reviews to confirm the contract option modification is in alignment with the IMS/MPS, reviews of performance progress, and other issues identified by the PM/COR.
3.1 Project Management Plan and Work Breakdown Structure
The Contractor shall develop and maintain a detailed PMP after award. (See Section L para. 3.2 for actual proposal submittal requirement).
The PMP shall specify the project’s resources and tasks corresponding to the Sub-CLINs for this contract as required for the planning, execution, control, and completion of the stated POs, and shall follow guidance documents. At a minimum, the PMP shall include the following sections: technical approach for achieving the POs in accordance with the PWS, organization and integration of the project team, schedule management and project controls, transitional activities, risk management, quality management, health and safety…
This is the start of the file's text. The full file is on GovTribe.