Attachment_to__W91278-17-R-0001_Bid_Schedule.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- W9127817R0001
About this file
Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127817R0001_Amendment_4.pdf | ||
| W9127817R0001_Amendment_3.pdf | ||
| 12.14.17_W91278-17-R-0002__Attachment_3.docx | DOCX document | |
| W9127817R0001-0002_Amendment.pdf | ||
| W9127817R0001-0001_Amendment_.pdf | ||
| W91278-17-R-0001_Solicitation_Generator.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| Hourly Rate | |||||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |||||||||
| Line Item | Category | Qty | Base Rate | Fully Burdened | Base Rate | Fully Burdened | Base Rate | Fully Burdened | Base Rate | Fully Burdened | Base Rate | Fully Burdened | |
| a | PROJECT MANAGER | 1 HR | |||||||||||
| b | SITE SUPERVISOR | 1 HR | |||||||||||
| c | SENIOR ENGINEER | GINEER | 1 HR | ||||||||||
| d | JUNIOR ENGINEER (GOV SITE) | GINEER | 1 HR | ||||||||||
| f | QUALITY CONTROL | 1 HR | |||||||||||
| g | SITE SAFETY HEALTH OFFICER | 1 HR | |||||||||||
| h | SCHEDULER (HOME OFFICE) | 1 HR | |||||||||||
| i | CADD OPERATOR (HOME OFFICE) | 1 HR | |||||||||||
| j | CLERICAL (HOME OFFICE) | 1 HR | |||||||||||
| k | MILLWRIGHT (GOV SITE) | 1 HR | |||||||||||
| l | WINDERS (GOV SITE) | 1 HR | |||||||||||
| m | ELECTRICIAN (GOV SITE) | 1 HR | |||||||||||
| n | TESTING/COMMISSION ENGINEER (GOV SITE) | 1 HR | |||||||||||
| o | CERTIFIED INDUSTRIAL HYGIENIST | 1 HR | |||||||||||
| p | WELDER (GOV SITE) | 1 HR | |||||||||||
| q | GENERAL LABORER (GOV SITE) | 1 HR | |||||||||||
| r | Mobilization/Demobilization | JOB | TBN at Task Order | TBN at Task Order | TBN at Task Order | TBN at Task Order | TBN at Task Order | ||||||
| s | MATERIALS | JOB | TBN at Task Order | TBN at Task Order | TBN at Task Order | TBN at Task Order | TBN at Task Order | ||||||
| t | EQUIPMENT | JOB | TBN at Task Order | TBN at Task Order | TBN at Task Order | TBN at Task Order | TBN at Task Order | ||||||
| u | TRAVEL | JOB | TBN at Task Order | TBN at Task Order | TBN at Task Order | TBN at Task Order | TBN at Task Order |
| G&A | ||||
| Fringe | ||||
| Overhead | ||||
| Subcontracts | ||||
| Escalation | ||||
| Provide a statement regarding how profit or G&A, if any, will be applied to Other Direct Costs (ODCs), Travel and Subcontracts. | Provide the profit % applied to the following. If 0%, state so. | |||
| ODCs | Travel | Subcontracts | ||
| Profit % |
| Provide the G&A % applied to the following. If 0%, state so. | ||||
| ODCs | Travel | Subcontracts | ||
| G&A % | ||||
| Provide a statement indicating what is considered a productive man year. |
Provide a statement confirming the understanding that profit will be negotiated on a task order basis.
Note 1: Wage Determination(s) is/are attached and made apart hereof. This/these WD(s) is/are provided for home office support at the contractor’s facility. Wage Determinations for locations other than the Contractor’s home office shall be incorporated as needed per task orders.
Note 2: Labor rate shall be fully burdened with G&A, fringe, taxes, overhead, other direct cost and all other fees applicable to that rate, EXCLUDING PROFIT. Profit will be negotiated on a task order basis.
| Note 3: Negotiation of each task order will be by labor category, rate, profit, travel, materials & equipment, and other costs associated with the task order, if any. |
| Note 4: See Scope of Work for descriptions of Contractor Personnel minimum qualifications. |
| Note 5: The fully burdened labor rates above shall be the maximum rate paid on a task order basis for each labor category. Any subcontracts proposed under any task orders shall conform to the labor categories above and shall not exceed the labor rates of the prime contractor. |
Bid Schedule
File details come from the government source that posted it.