AM0005 15JUL26.pdf

PDF 3 MB Posted

Attached to
B90176 Hangar Door Expansion (HADES)
Solicitation number
W9126G26RA087
Issued by

About this file

This is an Amendment to a federal construction solicitation for the B90176 Hangar Door Expansion (HADES) project at Fort Hood, Texas, issued by the U.S. Army Corps of Engineers, Fort Worth District.

The amendment extends the proposal receipt deadline from July 20, 2026, at 2:00 PM CT to July 21, 2026, at 2:00 PM CT. It modifies the solicitation W9126G26RA087 by replacing the Project Table of Contents and Submittal Register, deleting specifications for Building Air Barrier System (07 27 10) and Self-Adhering Air Barriers (07 27 19.01), and revising three electrical drawings (ED101, E-105, and E-106) to detail additional electrical demolition and relocation requirements. The work involves replacing two existing 120-foot-wide hangar doors with single rolling sectional doors and structural modifications to accommodate the ME-11B aircraft. Bidders must acknowledge receipt of this amendment prior to the proposal deadline through completion of amendment items, acknowledgment on each offer copy, or separate written communication. The target price range is $6,500,000.00 to $8,500,000.00. Award will be made to the responsible offeror with the highest technically rated proposal found to have fair and reasonable pricing under the HTR-FRP approach. Technical proposals are limited to 20 pages with price proposals having no page limitation, submitted electronically via PIEE. Site visits were scheduled for June 22, 2026, and July 7, 2026, at Fort Hood.

View the file

Other files

File Type Posted
am_04.pdf PDF
Site Visit-07JUL26.pdf PDF
Site Visit-22JUN26.pdf PDF
AM0003.pdf PDF
am_2.pdf PDF
am_01.pdf PDF
g26ra087.pdf PDF
g26ra087_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 2

0005 15 JUL 2026 572918

W9126G

W076 ENDIST FT WORTH

KO CONTRACTING DIVISION, 819 TAYLOR ST BOX 17300

FORT WORTH, TX 76102-6124

UNITED STATES

CHRISTINE NORIEGA, EMAIL: CHRISTINE.NORIEGA@USACE.ARMY.MIL

TELEPHONE: (817) 886-1104

SCD: PAS:

W9126G26RA087

17 JUN 2026

SEE SECTION G - CONTRACT ADMINISTRATION DATA

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: B90176 Hangar Door Expansion (HADES)

See SF 30 Continuation Page

Proposal receipt date of July 20, 2026, at 2:00pm CT, is hereby changed to July 21, 2026, at 2:00pm CT.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

W9126G26RA087

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO SOLICITATION W9126G26RA087

CHANGES TO PROPOSAL RECEIPT DATE

1. Proposal Receipt Date: Change the proposal receipt date from " July 20, 2026, at 2:00pm CT" to " July 21, 2026, at 2:00pm CT ".

CHANGES TO THE SPECIFICATIONS

2. Replacement Sections: Replace the following section with the accompanying new section of the same number and title bearing the notation W9126G26RA087-0005.

PROJECT TABLE OF CONTENTS

SUBMITTAL REGISTER

00 21 16 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

3. Deleted Specifications: The sections listed below have been deleted the solicitation.

07 27 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHEARING AIR BARRIERS

CHANGES TO THE DRAWINGS

4. Replacement Drawings: Replace the drawings listed below with the attached new drawings of the same number bearing notation W9126G26RA087-0005.

ED101 FLOOR PLAN – DEMO – OVERALL – Detail additional electrical demolition requirements.

E-105 FLOOR PLAN – POWER – AREA HB – Detail additional electrical relocation requirements.

E-106 FLOOR PLAN – POWER – AREA HC – Detail additional electrical relocation requirements.

End of Summary of Changes

B90176 Hangar Door Expansion (HADES) FH26HDE

PROJECT TABLE OF CONTENTS

AMENDMENT 0002

AMENDMENT 0004

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 00 01 SOLICITATION, OFFER AND AWARD, SF-1442

00 10 00 CONTRACT LINE ITEM SCHEDULE

00 21 00 INSTRUCTIONS

00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

00 22 00 SUPPLEMENTARY INSTRUCTIONS

00 22 16 DESIGN-BID-BUILD SELECTION PROCEDURES

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 72 00 GENERAL CONDITIONS

00 73 00 SUPPLEMENTARY CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 44 CONSTRUCTION SCHEDULE

01 01 10.00 44 AT/OPSEC

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 10.00 44 SPECIAL PROJECT PROCEDURES FOR FORT HOOD (FORMERLY KNOWN

AS FORT CAVAZOS)

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 71 23.00 44 SURVEY, LAYOUT, AND OTHER DATA

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 27 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 42 13 METAL WALL PANELS

PROJECT TABLE OF CONTENTS Page 1

</AM#0002>

<AM#0002> 01 56 00.00 44 DUST CONTROL

AMENDMENT 0005

<AM#0005>

</AM#0005>

W9126G26RA087-0005

m2pmjjf9 Cross-Out m2pmjjf9 Cross-Out m2pmjjf9 Cross-Out

B90176 Hangar Door Expansion (HADES) FH26HDE

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 34 16.20 VERTICAL LIFT FABRIC DOORS

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

09 67 23.14 CHEMICAL RESISTANT RESINOUS FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

DIVISION 21 - FIRE SUPPRESSION

21 13 24.00 10 MILSPEC FLUORINE FREE FOAM (MFFF) FIRE PROTECTION SYSTEM

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 15 26 COMPRESSED AIR PIPING SYSTEMS (UP TO 5000 PSI)

DIVISION 26 - ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 20 BASE COURSE FOR RIGID PAVING

32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY

PAVEMENTS <AM#0004> FOR USE ON AIRFIELD APRON </AM#0004>

32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT

DIVISION 33 - UTILITIES

33 40 00 STORMWATER UTILITIES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

<AM#0002>

</AM#0002>

W9126G26RA087-0005

m2pmjjf9 Cross-Out

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 23 PAGES

B90176 Hangar Door Expansion (HADES)

01 30 00 SD-01 Preconstruction Submittals

1.5Field Office Overhead

1.5.1Field Office Overhead

1.5.2Field Office Overhead

1.5Accounting Practice

1.6Delegation Of Authority

<AM#0002>

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 10.00 44 SD-02 Shop Drawings

GHardware schedule

Keying system

GElectro-Mechanical Devices

SD-03 Product Data

1.8.3Casing Pipe

Paint Usage and Safety Data

Sheet (SDS)

Air Emission Inventory

Certificate of Conformity for New

Generators

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

W9126G26RA087-0005

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 23 PAGES

01 35 10.00 44 1.8.2 GPlastic Marking Tape and Tracer

Wire

GLocks and Latches

SD-07 Certificates

1.21Customer Service Inspections

3.1.2Customer Service Inspection

Certificate

1.6.1Digging And Water Use Permits

1.6.3Army Radiation Permits (ARP)

1.17.1Landfill Permit

3.1.1Landfill Permit

01 35 26 SD-01 Preconstruction Submittals

1.8 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

1.5 GMonthly Exposure Reports

SD-07 Certificates

1.9 GActivity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

1.13Hot Work Permit

1.14License Certificates

1.14.1 GPortable Gauge Operations

Planning Worksheet

1.14.1 GRadiography Operation Planning

Work Sheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 23 PAGES

01 35 26 1.12.4 GStandard Lift Plan

01 45 00 SD-01 Preconstruction Submittals

1.5.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

1.12.3Verification Statement

01 45 35 SD-06 Test Reports

3.1.1Special Inspection Daily Reports

3.1.2Special Inspection Daily Reports

3.1.1Special Inspection Biweekly

Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Certificate of Compliance

SD-11 Closeout Submittals

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.3.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

01 56 00.00 44 SD-01 Preconstruction Submittals

3.1 GDust Control

2.1 GProducts and Procedures

2.1 GMaterial Safety Data Sheets

3.3.2 GSandblasting

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 23 PAGES

01 56 00.00 44 1.7Recordkeeping

01 71 23.00 44 SD-01 Preconstruction Submittals

3.1Survey Data

01 74 19 SD-01 Preconstruction Submittals

1.6 GConstruction Waste Management

Plan

SD-06 Test Reports

1.8.2Monthly Reporting

01 78 00 SD-02 Shop Drawings

1.5.1Preliminary Record Drawings

1.5.1.1Final Record Drawings

1.5.1.2Final Record Drawings

SD-03 Product Data

1.9.1Warranty Management Plan

1.9.5Warranty Tags

1.7Spare Parts Data

1.9.4warranty report

Inventory of Contractor Furnished and Insttalled Equipment

3.6.1.1video

3.6.5Red Zone Meeting

SD-08 Manufacturer’s Instructions

1.9.1Instructions

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 23 PAGES

01 78 00 3.6 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

3.5As-Built Record of Equipment and Materials

1.9.1Warranted Equipment and

Materials

3.4 GFinal Approved Shop Drawings

2.2 GCertification Of USDA Designated

Items

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

3.2.1 GOperation And Maintenance

Manual, Progress Submittal

3.2.2 GOperation And Maintenance

Manual, Prefinal Submittal

3.2.3 GOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 23 PAGES

01 78 23 3.1.1 GTraining Plan

1.5.6.7 GRecord Drawings And Utility

Systems

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G CODemolition Plan

1.11Existing Conditions

SD-07 Certificates

1.7 G CONotification

03 30 53 SD-02 Shop Drawings

1.4 GInstallation Drawings

SD-03 Product Data

2.2.3.2Accelerating Admixture

2.2.3.3Water-Reducing or Retarding

Admixture

2.2.11Curing Materials

2.2.6Expansion Joint Filler Strips, Premolded

2.2.7Joint Sealants - Field Molded

Sealants

3.1.4.3Batching and Mixing Equipment

3.2Conveying and Placing Concrete

2.2.8Formwork

2.3 GMix Design Data

2.3Ready-Mix Concrete

2.4.1Curing Compound

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 23 PAGES

03 30 53 2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.8.3 GCompressive Strength Testing

3.8.3 GSlump

3.8.3Air Content

2.2.4Water

SD-07 Certificates

2.2.1Cementitious Materials

2.2.1.2Pozzolan

2.2.2Aggregates

2.3Delivery Tickets

SD-08 Manufacturer’s Instructions

2.4.1Curing Compound

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 23 PAGES

05 05 23.16 1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

SD-05 Design Data

1.4.2 GShoring and Temporary Bracing

SD-06 Test Reports

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 23 PAGES

05 12 00 3.7.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 50 13 SD-02 Shop Drawings

2.3 GFloor Gratings

2.4 GBollards/Pipe Guards

2.5 GAngles and Plates

SD-03 Product Data

2.3 GFloor Gratings

SD-07 Certificates

2.1 GCertified Mill

05 51 33 SD-02 Shop Drawings

2.3Ladders

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 23 PAGES

05 51 33 SD-03 Product Data

2.3Ladders

2.3.2Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

1.5.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.1.2 GProtective Coating

2.2.8 GSteel Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-06 Test Reports

1.4.1 GWelding Inspections

2.3 GMill Test Reports

SD-07 Certificates

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

07 21 16 SD-03 Product Data

2.1 G AEBlanket Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 23 PAGES

07 21 16 2.3Accessories

SD-08 Manufacturer’s Instructions

3.2.1Insulation

07 42 13 SD-01 Preconstruction Submittals

1.4.3 G ROQualification of Manufacturer

1.4.4 G ROQualification of Installation

Contractor

1.7 G ROWarranty

SD-02 Shop Drawings

1.4.1.1 G ROInstallation Drawings

SD-03 Product Data

2.3.2 G AESteel Sheet Panels

2.3.3Factory Color Finish

1.4.5Closure Materials

2.3.6.6Pressure Sensitive Tape

2.3.6.3Sealants and Caulking

1.4.3.1Galvanizing Repair Paint

1.4.3.1Enamel Repair Paint

2.3.6Accessories

SD-04 Samples

2.3.2 G AESteel Sheet Panels

1.4.3.1 G AEFasteners

2.3.6.2 G AEMetal Closure Strips

SD-05 Design Data

1.4.1.2 G AEWind Load Design Analysis

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 23 PAGES

07 42 13 3.5.1 G ROLeakage Tests

2.1.2 G ROWind Load Tests

2.3.3.6 G ROCoating

2.3.3.6 G ROChalking

2.1.2 G ROSeismic Tests

SD-07 Certificates

1.4.3.1 G ROCoil Stock

1.4.3.1 G AEFasteners

1.4.3.1 G AEGalvanizing Repair Paint

1.4.3.1 G AEEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3.1 G ROInstallation

SD-09 Manufacturer’s Field

Reports

3.5.4.1.2 G POManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.7 G ROWarranty

1.4.6 G ROMaintenance Instructions

1.7.120 Year 'No Dollar Limit'

Warranty for Labor and Material

07 60 00 SD-02 Shop Drawings

2.1.1 G POExposed Sheet Metal

3.1.17 G AEExpansion Joints

2.1.1 G AEGravel Stops and fascia

3.1.10 G AECounterflashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 23 PAGES

07 60 00 2.1.15 G AEReglets

3.1.19 G AECopings

3.1.14 G AEDrip Edges

SD-04 Samples

1.4.2 G AEFinish Samples

SD-07 Certificates

2.1.12.1 G AEWarranty on Finishes

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

SD-10 Operation and Maintenance

Data

1.4.3 G POCleaning and Maintenance

07 92 00 SD-03 Product Data

2.1 G AESealants

2.2 G AEPrimers

2.3 G AEBond Breakers

2.4 G AEBackstops

2.5 G AECleaning Solvents

SD-06 Test Reports

3.1 G POField Adhesion

08 11 13 SD-02 Shop Drawings

2.1 G AEDoors

2.4 G AEFrames

2.2Accessories

SD-03 Product Data

2.1 G AEDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 23 PAGES

08 11 13 2.4 G AEFrames

2.2Accessories

08 34 16.20 SD-01 Preconstruction Submittals

1.4.1 G AEManufacturer's Qualifications

1.4.2 G AEInstaller's Qualifications

SD-02 Shop Drawings

1.3.1 G AEDoor Design

SD-03 Product Data

2.3 G AEElectric Operator

2.3.5 G AEMotors

2.2 G AEDoors

2.3.6 G AEControls

2.1.7 G AEDoor Fabric

2.3.6.1 G AESurge Protection Device (SPD)

SD-05 Design Data

1.3.2.1 G AECalculations

1.3.4 G AEDoor Load Diagrams

1.3.1 G AEDoor Compliance Matrix

SD-06 Test Reports

2.3.3.1 G AESafety Arrester Operation Test

2.1.7 G AEDoor Fabric

2.1.7 G AEDoor Fabric

2.2.1 G AEDoor Fabric Connection

3.2.2 G AEWeld Inspection Report

SD-07 Certificates

1.4.1 G AEManufacturer's Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 23 PAGES

08 34 16.20 1.4.2 G AEInstallers Qualifications

1.5 G AEWelding Procedures and

Qualifications

SD-09 Manufacturer’s Field

Reports

3.5 G AEAcceptance Testing Procedure

SD-10 Operation and Maintenance

Data

2.9.1 G AEDoor Operation

1.4.3.1 G AEEmergency and Routine

Preventative Maintenance Plan

SD-11 Closeout Submittals

3.5 G AEAcceptance Testing Procedure

1.4.3 G AEWarranty

08 71 00 SD-02 Shop Drawings

1.3 G AEManufacturer's Detail Drawings

1.3 G AEVerification of Existing Conditions

1.5 G AEHardware Schedule

2.3.6 G AEKeying System

SD-03 Product Data

2.3 G AEHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 G AEHardware Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 23 PAGES

09 67 23.14 SD-02 Shop Drawings

2.2 GFlooring Systems

SD-03 Product Data

2.4 GSealer and Resin

3.3.2 GFloor Surfacing

2.3 GConductive Sparkproof Flooring

3.2 GMixing

SD-04 Samples

2.2 GFlooring Systems

SD-06 Test Reports

3.4 GTesting

SD-07 Certificates

1.3.1 GQualifications of Installer

1.3.1Certification Letter from the

Manufacturer

SD-08 Manufacturer’s Instructions

3.3 GApplication

SD-10 Operation and Maintenance

Data

2.2 GFlooring Systems

09 90 00 SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

SD-04 Samples

2.2 G AEColor

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 23 PAGES

09 90 00 1.5.4Indoor Air Quality for Paints and

Primers

1.5.4Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

10 14 00.10 SD-02 Shop Drawings

3.1 GApproved Detail Drawings

SD-03 Product Data

3.1Installation

1.2 GExterior Signage

1.2.1Wind Load Requirements

SD-04 Samples

1.2 GExterior Signage

SD-10 Operation and Maintenance

Data

3.1.2 GProtection and Cleaning

10 14 00.20 SD-02 Shop Drawings

1.3.2 GDetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 23 PAGES

10 14 00.20 2.1 GRoom Identification And

Directional Signage System

2.2 GExit Door Tactile Sign

SD-04 Samples

1.3.1 GInterior Signage

2.2 GExit Door Tactile Sign

SD-10 Operation and Maintenance

Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

22 00 00 SD-02 Shop Drawings

3.5.1 GPlumbing System

SD-03 Product Data

3.5.1Plumbing System

SD-06 Test Reports

3.5Tests, Flushing and Disinfection

SD-07 Certificates

1.4Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.5.1 GPlumbing System

22 15 26 SD-03 Product Data

2.1.2Fittings

2.2Identification Labels For Piping

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 23 PAGES

22 15 26 SD-06 Test Reports

3.4.1.2Leak Tightness Test

SD-10 Operation and Maintenance

Data

3.2.3 GCleaning Procedures

SD-11 Closeout Submittals

1.3Compressed Air Systems

26 20 00 SD-03 Product Data

2.8 GSwitches

2.10 GReceptacles

2.11.3 GCircuit Breakers

2.9 GFuses

2.12 GEnclosed Circuit Breakers

2.14 GMotor Controllers

SD-06 Test Reports

3.5.2 G600-volt Wiring Test

3.5.5 GGrounding System Test

SD-07 Certificates

2.9 GFuses

SD-10 Operation and Maintenance

Data

1.6.1 GElectrical Systems

28 31 76 SD-01 Preconstruction Submittals

1.2.2 GQualified Fire Protection Engineer

(QFPE)

1.8.2.1 GFire alarm system designer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 23 PAGES

28 31 76 1.8.2.2 GSupervisor

1.8.2.3 GTechnician

1.8.2.4 GInstaller

1.8.2.5 GTest Technician

1.6 GFire Alarm System Site-Specific

Software Acknowledgement

SD-02 Shop Drawings

1.8.1.3 GNameplates

1.8.1.4 GWiring Diagrams

1.8.1.5 GSystem Layout

1.8.1.6 GNotification Appliances

1.8.1.7 GInitiating devices

1.8.1.8 GBattery Power

1.8.1.9 GVoltage Drop Calculations

SD-03 Product Data

2.3 GManual Stations

2.4 GAddressable Interface Devices

2.5 GAddressable Control Modules

1.8.1.6 GNotification Appliances

2.7 GSurge Protective Devices

2.7 GAlarm Wiring

3.3.3 GBack Boxes and Conduit

3.11.3 GDocument Storage Cabinet

SD-06 Test Reports

3.7.1 GTest Procedures

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 23 PAGES

28 31 76 3.7.2.1 GVerification of Compliant

Installation

3.7.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.9 GOperation and Maintenance

(O&M) Instructions

3.10 GInstruction of Government

Employees

SD-11 Closeout Submittals

1.8.1.12As-Built Drawings

1.10.1Spare Parts

32 01 19.61 SD-03 Product Data

2.1Sealants

3.4.2Manufacturer's

Recommendations

SD-04 Samples

2.1Sealants

2.3.1Blocking Media/Backup Materials

3.2.4.1Backer Rod

2.3.2Bond Breaking Tapes

SD-06 Test Reports

2.1Sealants

SD-07 Certificates

3.1Equipment List

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 23 PAGES

32 01 19.61 SD-08 Manufacturer’s Instructions

2.1Sealants

32 11 20 SD-03 Product Data

2.3 GPlant, Equipment, and Tools

SD-06 Test Reports

2.2.1 GInitial Tests

3.11.1 GIn-Place Tests

32 13 14.13 SD-01 Preconstruction Submittals

3.1.2 GProposed Techniques

2.13.2 GPreliminary Proposed

Proportioning

1.3.2.3 GPavement Quality Control Plan

SD-03 Product Data

2.1.7 GDiamond Grinding Plan

2.9.1 GDowels

2.9.2 GDowel Bar Assemblies

2.11 GEquipment

2.1.5 GConcrete Patching Mixture

SD-05 Design Data

2.13.2 G DOProportioning Studies

SD-06 Test Reports

2.1.4.1 GSampling and Testing

2.1.7 GDiamond Grinding of PCC

Surfaces

3.9.1 GRepair Recommendations Plan

3.12.5 GPaving Lot Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 23 PAGES

32 13 14.13 SD-07 Certificates

1.3.1 GContractor Quality Control (CQC)

Staff

1.3.2 GLaboratory Accreditation and

Validation

1.3.2 GCommercial Laboratory

32 13 73.19 SD-03 Product Data

2.1Equipment

3.1.1Manufacturer's Instructions

SD-04 Samples

2.2 GCompression Seals

SD-06 Test Reports

2.1.3 GTest Requirements

33 40 00 SD-08 Manufacturer’s Instructions

3.3 GPlacing Pipe

SD-11 Closeout Submittals

3.6.2.1.2 GPost-Installation Inspection

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

W9126G26RA087-0001

SECTION 00 21 16

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

AMENDMENT# 0001

AMENDMENT# 0005

1. GENERAL DESCRIPTION OF WORK

This construction project is for the expansion of hangar doors at Facility B90176, Fort Hood, Texas, to support the HADES mission and accommodate the ME-11B (Bombardier Global 6500) aircraft. The project includes replacing two existing hangar doors each with a single 120-foot-wide rolling sectional door of equal height vertical fabric door with two sections of increased height, requiring structural modifications to the pre-engineered metal building (PEMB).

Exterior improvements involve extending the trench drain and adjusting adjacent man-doors and wall mounted utility lines. Interior work consists of installing higher-capacity motors for the new door, refinishing and restriping affected areas of the hangar floor, making minor partitions and finish modifications to support new flight group requirements

2. OFFEROR'S QUESTIONS AND COMMENTS

a. All questions and/or comments are to be submitted via ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, enter email and bidder inquiry key, click Quick Add link, select agency USAGE, enter Key for this solicitation listed below, and your e-mail address, click Continue. Fill in all required information and click Add User. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

b. The Solicitation Number is: W9126G26RA087

The Bidder Inquiry Key is: 95NKA6-GDCFPI

c. <AM#0005>Last day to submit ProjNet questions is seven calendar days prior to bid closure date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. Bidder inquiries will be open for 24 hrs. BIs shall be only limited to items shown in this amendment</AM#0005>If the system is not closed in a timely manner, an inquiry posted within seven calendar days of the receipt of proposals will still be regarded as untimely and may not be afforded a substantive response.

d. Offerors are requested to ask only one question per inquiry. If multiple questions are included, only the first one will be answered.

e. Oral explanations or instructions are not binding. Any information given to an offeror, whether oral or through ProjNet, that impacts the solicitation and/or offer http://www.projnet.org/projnet will not be binding unless given in the form of a written amendment to the solicitation.

f. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Standard Time Zone (Chicago). The telephone number for the Call Center is 833-389-1097 and 217-367- 3273.

3. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This solicitation does not commit the Government to pay as a direct charge any costs incurred by the Offeror in the preparation and submission of its proposal or revisions. A stipend is not authorized.

4. NEGOTIATIONS

The Government intends to evaluate proposals and award a contract without negotiations with offerors (except clarifications as described in RFO 15.202(a)(2)).

Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The concept of a simultaneous competitive range and a common cut-off date for Final Proposal Revisions does not apply to this acquisition methodology.

5. HIGHEST TECHNICALLY RATED WITH A FAIR AND REASONABLE PRICE

(HTR-FRP) APPROACH

Award will be made to the responsible Offeror with the highest technically rated proposal found to have a fair and reasonable price. The HTR-FRP approach prioritizes technical merit and forbids the tradeoff between non-price factors and price. This approach prioritizes the best possible performance, provided the price is determined to be fair and reasonable. Here, all proposals are initially evaluated based solely on the non-price factors specified in the RFP. Only the price of the highest-ranked technical proposal is then evaluated to ensure it is fair and reasonable. Price is not an evaluation factor for the purpose of ranking proposals; it will be evaluated for fairness and reasonableness for the highest technically rated proposal in accordance with RFO 15.103-3.

6. SITE VISIT

Pursuant to Contract Clause "RFO 52.236-3, Site Investigation and Conditions Affecting the Work," prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors are urged and expected to inspect the site where the work will be performed. See the site visit information below:

Date: 22 June 2026

Time: 10:00am, CST Location: Central Texas Area Office (CTAO) at Fort Hood Bldg. 4617 72nd St and Sante Fe Avenue Ft. Hood, TX 76544 POC: Brad D. Butts EMAIL: brad.d.butts@usace.army.mil Phone: (254)220-2126

<AM#0001>Second Site Visit

Date: 07 July 2026 Time: 10:00am, CST Location: Central Texas Area Office (CTAO) at Fort Hood Bldg. 4617 72nd St and Sante Fe Avenue Ft. Hood, TX 76544 POC: Brad D. Butts EMAIL: brad.d.butts@usace.army.mil Phone: (254)220-2126 </AM#0001>

Note: Offerors and subcontractors wishing to participate must submit a complete listing of all personnel to attend the preproposal site visit, via encrypted email, to the referenced Base Access POC, a minimum of five (5) business days prior to the preproposal site visit.

7. PROPOSAL SUBMISSION

a. GUIDING PRINCIPLES FOR PROPOSAL SUBMISSION & REVIEW

This section outlines the foundational principles governing the submission and evaluation of all proposals. Adherence to these principles is mandatory.

(1) Completeness and Accuracy: Proposals must be submitted with all required information. Assumptions made by an offeror in place of required data may render the proposal non-compliant. If specific information is unavailable, this must be explicitly stated and explained.

(2) Regulatory Adherence and Citation: All submissions are reviewed for strict adherence to the current Revolutionary Federal Acquisition Regulation (FAR), Defense Federal Acquisition Regulation Supplement (DFARS), Army Federal Acquisition Regulation Supplement (AFARS), USACE Acquisition Instructions (UAI), and all related policies, including all changes from the Revolutionary FAR Overhaul (RFO).

(3) Currency of Information: Offerors are solely responsible for ensuring their proposals comply with all regulations and amendments in effect at the time of solicitation.

mailto:brad.d.butts@usace.army.mil mailto:brad.d.butts@usace.army.mil

(4) Mandatory Submission Requirements: Failure to provide the following documentation with the proposal may eliminate it from further consideration.

b. PROPOSAL SUBMISSION REQUIREMENTS

(1) Each volume shall be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation module; no hard copies will be accepted. Any portion of the proposal that is changed (as a result of negotiations or proposal revisions) should be annotated and dated. Each volume shall be clearly labeled with its Title and Volume number. Each paragraph should be single spaced and shall be separated by at least one blank line. All narratives shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages and a standard, 12-point minimum font size applies. Schedule Diagram, Drawings shall be in Adobe PDF format and shall be on 11 x 17 size pages. Where page limitations are specified, 11 x 17 size pages will be considered as one (1) page. Arial or New Times Roman fonts are required.

Page limitations, where specified in the RFP, shall be considered a maximum.

Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government. Tables and illustrations may use a reduced font size no less than 8-point and may be produced in landscape mode. All volumes of the proposal must be received by the closing date and time set for receipt of proposals.

Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Offerors are advised to follow the PIEE instructions for uploading files. Additional instructions/guidance can be found at https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf

Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the delivery time & date recorded within PIEE suite at https://piee.eb.mil/. Do not assume that electronic submission will occur instantaneously. Large files may take some time to upload.

Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process and troubleshooting. It is the offeror’s responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by the Fort Worth District Contracting office. In the event that the Solicitation Module is down, an alternate method for proposal submission will be provided only after obtaining approval from the Contracting Officer shayla.j.lucas@usace.army.mil to use an alternate submission method. Offerors are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission.

https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf https://piee.eb.mil/ mailto:shayla.j.lucas@usace.army.mil

(2) The following volumes of material shall be submitted:

Volume Title Digital Copies

Maximum Pages

I TECHNICAL PROPOSAL 1

20 Pages

II PRICE PROPOSAL 1

No page limitation

(3) Proposal Formats/Sections:

(a) The first page of the proposal for each volume must include the elements found at 52.215-1(c)(2).

(b) Table of Contents. Each volume of the proposal shall contain a detailed table of contents and must be bookmarked. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. The offerors shall not submit any materials not required by this solicitation.

(c) Do not cross-reference similar material in the Past

Performance/Technical Proposal with the Price Proposal. No dollar amounts from Volume II shall be included in Volume I.

(d) As this is a competitive negotiation acquisition, there is no public bid opening, and no information will be given out as to the number of offerors or the results of the competition until all awards are made.

(e) Bonds Format: Offerors shall submit bid bonds (Standard Form 24) in electronic format. Electronic copies of bid bonds shall be included in Volume II:

Offerors Certifications and Price. Hard copies of bid bonds with the raised seal are no longer required to be mailed in at this time and are not to be sent to the contracting office. Verification of Bid Bonds with sureties will be completed during the evaluation process and before award. Bid bond submissions shall be due by the proposal due date and time. Offerors are responsible for the accurate submission of the Bid Bonds with all signatures and seals applied.

(4) Joint Venture and LLC Proposal Requirements:

(a) For Joint Ventures:

• Joint Venture Agreement: A complete copy of the JV agreement and any addendum must be submitted with the proposal. For 8(a), HUBZone, or Mentor-Protege JVs, the agreement must comply with 13 CFR Part 124, 13 CFR Part 126, and 13 CFR Part 125, respectively.

• Representations and Certifications: A small business JV offeror must submit the representation required in Section 00 45 00 and RFO solicitation provision 52.219-1, Small Business Program Representations, for all applicable small business categories (Small, SDVOSB, WOSB, EDWOSB, HUBZone).

(b) Limited Liability Companies (LLCs):

• Proof of Signature Authority: The offeror must submit a copy of the operating agreement or other documentation that clearly demonstrates the authority of the signatory to bind the LLC to the contract.

(c) Core Joint Venture (JV) Agreement Provisions:

The submitted JV Agreement should, at a minimum, contain the following provisions to be considered compliant. If the JV Agreement is general and does not address the resources and responsibilities specific to the proposed work, this must be addressed in an addendum.

• Purpose & Management: The agreement must state the specific purpose of the JV and designate the small business partner as the "managing venturer."

• Ownership & Profit: For a separate legal entity JV, the small business must own at least 51%. It must also state that profits will be distributed commensurately with the work performed by each partner.

• Bank Account: The agreement must provide for a special bank account in the name of the JV, requiring consent from all parties for any withdrawals.

• Resources & Responsibilities: The agreement must itemize the resources to be provided by each partner and specify each party's responsibilities for contract performance. For Mentor-Protégé JVs, reference 13 CFR 125.8(b)(vi) and (vii), for 8(a), reference 13 CFR 124.513(c)(6) and (7), and for HUBZone, reference 13 CFR 126.616(c)(6) and (7).

• Performance & Records: This agreement binds all parties, jointly and severally, to uphold the terms and guarantee the full performance of all contractual duties. All official records pertaining to this agreement shall be securely maintained at the designated office of the managing venturer.

(d) Performance of Work Requirements:

• JV Work Share: The joint venture as a whole must perform the applicable percentage of work required by the prime contract's limitation on subcontracting clause.

• Small Business Work Share: The small business partner(s) must perform at least 40% of the work done by the joint venture itself. This work must be substantive and not just administrative in nature. If the small business partner is not expected to exceed the 40% workshare on this project individually, the JV must submit the workshare (in dollars) between each partner on all other projects to support that the workshare for this contract will result in compliance with the 40% requirement for the aggregate workshare across all contracts.

c. PROPOSAL FILES

(1) Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .