This is Standard Form 30 Amendment 0002 to Solicitation W9126G26RA087 for the B90176 Hangar Door Expansion (HADES) project at Fort Hood, Texas, issued by the U.S. Army Corps of Engineers, Fort Worth District on July 2, 2026.

The amendment adds new specification sections, replaces existing sections, and modifies drawings related to the hangar door expansion work. Key additions include Section 01 56 00.00 44 Dust Control. Replacement sections address construction schedule, administrative requirements, temporary facilities, demolition, structural steel, metal fabrications, insulation, wall panels, flashing, sealants, doors, flooring, paints, signage, plumbing, electrical systems, fire alarm systems, and concrete paving. Deleted sections include temporary environmental controls, project identification, and milspec fluorine-free foam fire protection systems. The proposal due date remains unchanged at July 17, 2026 at 2:00 p.m. CT. The amendment requires contractors to acknowledge receipt prior to the deadline through completion of amendment items, acknowledgment on each offer copy, or separate written communication. The contract is firm-fixed-price with a 336-calendar-day completion period and liquidated damages of $1,390.38 per calendar day. The evaluation methodology uses a Highest Technical Rated-Firm Fixed Price (HTR-FRP) approach prioritizing past performance and technical approach, with price evaluated only for fairness and reasonableness of the highest-ranked proposal. Proposals must include past performance on up to five relevant projects completed within six years, a comprehensive technical approach addressing project schedule, disruption mitigation, execution plan, methodology, key personnel, risk management, quality control, and communication strategy. The price proposal includes CLINs from Section 00 10 00, representations and certifications, bid bond, and supplemental data forms.

View the file

Other files

File Type Posted
AM0005 15JUL26.pdf PDF
am_04.pdf PDF
Site Visit-22JUN26.pdf PDF
Site Visit-07JUL26.pdf PDF
AM0003.pdf PDF
am_01.pdf PDF
g26ra087.pdf PDF
g26ra087_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 2

0002 02 JUL 2026 572918

W9126G

W076 ENDIST FT WORTH

KO CONTRACTING DIVISION, 819 TAYLOR ST BOX 17300

FORT WORTH, TX 76102-6124

UNITED STATES

CHRISTINE NORIEGA, EMAIL: CHRISTINE.NORIEGA@USACE.ARMY.MIL

TELEPHONE: (817) 886-1104

SCD: PAS:

W9126G26RA087

17 JUN 2026

SEE SECTION G - CONTRACT ADMINISTRATION DATA

Project: B90176 Hangar Door Expansion (HADES)

See SF 30 Continuation Page

Proposal due date remains unchanged: July 17, 2026., 2:00pm, CT

W9126G26RA087

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO SOLICITATION W9126G26RA087

CHANGES TO THE SPECIFICATIONS

1. New Sections - Add the following accompanying new sections, each bearing the notation W9126G26RA087- 0002.

01 56 00.00 44 DUST CONTROL

2. Replacement Sections: Replace the following section with the accompanying new section of the same number and title bearing the notation W9126G26RA087-0002.

PROJECT TABLE OF CONTENTS

SUBMITTAL REGISTER

00 22 16 DESIGN-BID-BUILD SELECTION PROCEDURES

01 00 00.00 44 CONSTRUCTION SCHEDULE –

(Reissuing section in its entirety to remove the duplication of the Div 00 specs, all DIV

00 requirements remain in affect.)

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 35 10.00 44 SPECIAL PROJECT PROCEDURES FOR FORT HOOD FORMERLY KNOWN AS

FORT CAVAZOS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

02 41 00 DEMOLITION

05 12 00 STRUCTURAL STEEL

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

07 21 16 MINERAL FIBER BLANKET INSULATION

07 42 13 METAL WALL PANELS

07 60 00 FLASHING AND METAL DETAIL

07 92 00 JOINT SEALANTS

08 11 13 STEEL DOORS AND FRAMES

09 67 23.14 CHEMICAL RESISTANT RESINOUS FLOORING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

2. Replacement Drawings: Replace the drawings listed below with the attached new drawings of the same number bearing notation W9126G26RA087-0002.

ALL DRAWINGS Changed the solicitation number

G-001 COVER SHEET – Revised solicitation number on sheet.

GC001 GENERAL CIVIL NOTES. update to Pollution Prevention Note 1 I-100 OVERALL FINISH FLOOR PLAN – Revision to epoxy repair to identify base contract requirements I-114 OVERALL STRIPING PLAN – Revision to striping plan and general notes.

I-501 FINISH DETAILS - Revision to detail F1 Label I-601 FINISH MATERIAL COLOR LEGEND – Revision to comment for CONC-1A FP001 GENERAL FIRE PROTECTION INFORMATION – Revision Fire Protection General

Note A.

PD100 DEMOLITION PLAN – PLUMBING – OVERALL - Deleted Plumbing General Note E PD101 DEMOLITION PLAN – PLUMBING – AREA HB - Deleted Plumbing General Note E

W9126G26RA087

PD102 DEMOLITION PLAN – PLUMBING – AREA HC - Deleted Plumbing General Note E P-100 FLOOR PLAN – PLUMBING – OVERALL - Deleted Plumbing General Note E P-101 FLOOR PLAN – PLUMBING – OVERALL - Deleted Plumbing General Note E P-102 FLOOR PLAN – PLUMBING – OVERALL - Deleted Plumbing General Note E P-301 PLUMBING SECTION – Deleted Plumbing General Note E E-000 LEGEND, ABBREVIATIONS & NOTES - Revision to General Note 10 ED501 DEMO ELECTRICAL SCHEDULES – Added switchboard and panelboard information E-101 FLOOR PLAN – POWER – OVERALL – Revision to General Note 1 E-501 ELECTRICAL SCHEDULES - Added switchboard and panelboard information E-602 HANGAR DOOR ELECTRICAL LOAD DIAGRAM – Updated remark to Conduit &

Conductor Schedule Table for Feeder 1A

3. Deleted Specifications: The sections listed below have been deleted the solicitation.

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

21 13 24.00 10 MILSPEC FLOURINE FREE FOAM (MFFF) FIRE PROTECTION SYSTEM

End of Summary of Changes

B90176 Hangar Door Expansion (HADES) FH26HDE

PROJECT TABLE OF CONTENTS

AMENDMENT 0002

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 00 01 SOLICITATION, OFFER AND AWARD, SF-1442

00 10 00 CONTRACT LINE ITEM SCHEDULE

00 21 00 INSTRUCTIONS

00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

00 22 00 SUPPLEMENTARY INSTRUCTIONS

00 22 16 DESIGN-BID-BUILD SELECTION PROCEDURES

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 72 00 GENERAL CONDITIONS

00 73 00 SUPPLEMENTARY CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 44 CONSTRUCTION SCHEDULE

01 01 10.00 44 AT/OPSEC

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 10.00 44 SPECIAL PROJECT PROCEDURES FOR FORT HOOD (FORMERLY KNOWN

AS FORT CAVAZOS)

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 71 23.00 44 SURVEY, LAYOUT, AND OTHER DATA

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 27 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 42 13 METAL WALL PANELS

PROJECT TABLE OF CONTENTS Page 1

</AM#0002>

<AM#0002> 01 56 00.00 44 DUST CONTROL

m2pmjjf9 Cross-Out m2pmjjf9 Cross-Out

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 34 16.20 VERTICAL LIFT FABRIC DOORS

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

09 67 23.14 CHEMICAL RESISTANT RESINOUS FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

DIVISION 21 - FIRE SUPPRESSION

21 13 24.00 10 MILSPEC FLUORINE FREE FOAM (MFFF) FIRE PROTECTION SYSTEM

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 15 26 COMPRESSED AIR PIPING SYSTEMS (UP TO 5000 PSI)

DIVISION 26 - ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 20 BASE COURSE FOR RIGID PAVING

32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY

PAVEMENTS

32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT

DIVISION 33 - UTILITIES

33 40 00 STORMWATER UTILITIES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

<AM#0002>

</AM#0002>

m2pmjjf9 Cross-Out

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 24 PAGES

B90176 Hangar Door Expansion (HADES)

01 30 00 SD-01 Preconstruction Submittals

1.5Field Office Overhead

1.5.1Field Office Overhead

1.5.2Field Office Overhead

1.5Accounting Practice

1.6Delegation Of Authority

<AM#0002>

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 10.00 44 SD-02 Shop Drawings

GHardware schedule

Keying system

GElectro-Mechanical Devices

SD-03 Product Data

1.8.3Casing Pipe

Paint Usage and Safety Data

Sheet (SDS)

Air Emission Inventory

Certificate of Conformity for New

Generators

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

W9126G26RA087-0002

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 24 PAGES

01 35 10.00 44 1.8.2 GPlastic Marking Tape and Tracer

Wire

GLocks and Latches

SD-07 Certificates

1.21Customer Service Inspections

3.1.2Customer Service Inspection

Certificate

1.6.1Digging And Water Use Permits

1.6.3Army Radiation Permits (ARP)

1.17.1Landfill Permit

3.1.1Landfill Permit

01 35 26 SD-01 Preconstruction Submittals

1.8 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

1.5 GMonthly Exposure Reports

SD-07 Certificates

1.9 GActivity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

1.13Hot Work Permit

1.14License Certificates

1.14.1 GPortable Gauge Operations

Planning Worksheet

1.14.1 GRadiography Operation Planning

Work Sheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 24 PAGES

01 35 26 1.12.4 GStandard Lift Plan

01 45 00 SD-01 Preconstruction Submittals

1.5.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

1.12.3Verification Statement

01 45 35 SD-06 Test Reports

3.1.1Special Inspection Daily Reports

3.1.2Special Inspection Daily Reports

3.1.1Special Inspection Biweekly

Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Certificate of Compliance

SD-11 Closeout Submittals

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.3.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

01 56 00.00 44 SD-01 Preconstruction Submittals

3.1 GDust Control

2.1 GProducts and Procedures

2.1 GMaterial Safety Data Sheets

3.3.2 GSandblasting

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 24 PAGES

01 56 00.00 44 1.7Recordkeeping

01 71 23.00 44 SD-01 Preconstruction Submittals

3.1Survey Data

01 74 19 SD-01 Preconstruction Submittals

1.6 GConstruction Waste Management

Plan

SD-06 Test Reports

1.8.2Monthly Reporting

01 78 00 SD-02 Shop Drawings

1.5.1Preliminary Record Drawings

1.5.1.1Final Record Drawings

1.5.1.2Final Record Drawings

SD-03 Product Data

1.9.1Warranty Management Plan

1.9.5Warranty Tags

1.7Spare Parts Data

1.9.4warranty report

Inventory of Contractor Furnished and Insttalled Equipment

3.6.1.1video

3.6.5Red Zone Meeting

SD-08 Manufacturer’s Instructions

1.9.1Instructions

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 24 PAGES

01 78 00 3.6 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

3.5As-Built Record of Equipment and Materials

1.9.1Warranted Equipment and

Materials

3.4 GFinal Approved Shop Drawings

2.2 GCertification Of USDA Designated

Items

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

3.2.1 GOperation And Maintenance

Manual, Progress Submittal

3.2.2 GOperation And Maintenance

Manual, Prefinal Submittal

3.2.3 GOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 24 PAGES

01 78 23 3.1.1 GTraining Plan

1.5.6.7 GRecord Drawings And Utility

Systems

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G CODemolition Plan

1.11Existing Conditions

SD-07 Certificates

1.7 G CONotification

03 30 53 SD-02 Shop Drawings

1.4 GInstallation Drawings

SD-03 Product Data

2.2.3.2Accelerating Admixture

2.2.3.3Water-Reducing or Retarding

Admixture

2.2.11Curing Materials

2.2.6Expansion Joint Filler Strips, Premolded

2.2.7Joint Sealants - Field Molded

Sealants

3.1.4.3Batching and Mixing Equipment

3.2Conveying and Placing Concrete

2.2.8Formwork

2.3 GMix Design Data

2.3Ready-Mix Concrete

2.4.1Curing Compound

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 24 PAGES

03 30 53 2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.8.3 GCompressive Strength Testing

3.8.3 GSlump

3.8.3Air Content

2.2.4Water

SD-07 Certificates

2.2.1Cementitious Materials

2.2.1.2Pozzolan

2.2.2Aggregates

2.3Delivery Tickets

SD-08 Manufacturer’s Instructions

2.4.1Curing Compound

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 24 PAGES

05 05 23.16 1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

SD-05 Design Data

1.4.2 GShoring and Temporary Bracing

SD-06 Test Reports

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 24 PAGES

05 12 00 3.7.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 50 13 SD-02 Shop Drawings

2.3 GFloor Gratings

2.4 GBollards/Pipe Guards

2.5 GAngles and Plates

SD-03 Product Data

2.3 GFloor Gratings

SD-07 Certificates

2.1 GCertified Mill

05 51 33 SD-02 Shop Drawings

2.3Ladders

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 24 PAGES

05 51 33 SD-03 Product Data

2.3Ladders

2.3.2Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

1.5.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.1.2 GProtective Coating

2.2.8 GSteel Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-06 Test Reports

1.4.1 GWelding Inspections

2.3 GMill Test Reports

SD-07 Certificates

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

07 21 16 SD-03 Product Data

2.1 G AEBlanket Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 24 PAGES

07 21 16 2.3Accessories

SD-08 Manufacturer’s Instructions

3.2.1Insulation

07 27 10 SD-02 Shop Drawings

2.1 G ROAir Barrier System Shop

Drawings

SD-03 Product Data

2.1 G AEAir Barrier System Product Data

SD-04 Samples

2.1 G AEMaterial Samples For Air Barrier

System

SD-06 Test Reports

3.1.2 G ROInspection

07 27 19.01 SD-01 Preconstruction Submittals

1.6.1 G AEQualifications of Manufacturer

1.6.2 G AEQualifications of Installer

SD-02 Shop Drawings

1.4.1 G AESelf-adhering Air Barrier Shop

Drawings

SD-03 Product Data

2.1 G AESelf-adhering Air Barrier

2.2 G AEPrimers, Adhesives, and Mastics

1.4.2 G AESafety Data Sheets

SD-04 Samples

1.4.3 G AESelf-adhering Air Barrier System

Mockup

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 24 PAGES

07 27 19.01 SD-06 Test Reports

1.6.3 G AEField Peel Adhesion Test

1.4.4 G AEFlame Propagation of Wall

Assemblies

3.4.1 G AESite Inspections and Testing

SD-08 Manufacturer’s Instructions

1.4.2 G AESelf-adhering Air Barrier

Manufacturer's Printed Instructions

2.2 G AEPrimers, Adhesives, and Mastics

07 42 13 SD-01 Preconstruction Submittals

1.4.3 G ROQualification of Manufacturer

1.4.4 G ROQualification of Installation

Contractor

1.7 G ROWarranty

SD-02 Shop Drawings

1.4.1.1 G ROInstallation Drawings

SD-03 Product Data

2.3.2 G AESteel Sheet Panels

2.3.3Factory Color Finish

1.4.5Closure Materials

2.3.6.6Pressure Sensitive Tape

2.3.6.3Sealants and Caulking

1.4.3.1Galvanizing Repair Paint

1.4.3.1Enamel Repair Paint

2.3.6Accessories

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 24 PAGES

07 42 13 2.3.2 G AESteel Sheet Panels

1.4.3.1 G AEFasteners

2.3.6.2 G AEMetal Closure Strips

SD-05 Design Data

1.4.1.2 G AEWind Load Design Analysis

SD-06 Test Reports

3.5.1 G ROLeakage Tests

2.1.2 G ROWind Load Tests

2.3.3.6 G ROCoating

2.3.3.6 G ROChalking

2.1.2 G ROSeismic Tests

SD-07 Certificates

1.4.3.1 G ROCoil Stock

1.4.3.1 G AEFasteners

1.4.3.1 G AEGalvanizing Repair Paint

1.4.3.1 G AEEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3.1 G ROInstallation

SD-09 Manufacturer’s Field

Reports

3.5.4.1.2 G POManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.7 G ROWarranty

1.4.6 G ROMaintenance Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 24 PAGES

07 42 13 1.7.120 Year 'No Dollar Limit'

Warranty for Labor and Material

07 60 00 SD-02 Shop Drawings

2.1.1 G POExposed Sheet Metal

3.1.17 G AEExpansion Joints

2.1.1 G AEGravel Stops and fascia

3.1.10 G AECounterflashing

2.1.15 G AEReglets

3.1.19 G AECopings

3.1.14 G AEDrip Edges

SD-04 Samples

1.4.2 G AEFinish Samples

SD-07 Certificates

2.1.12.1 G AEWarranty on Finishes

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

SD-10 Operation and Maintenance

Data

1.4.3 G POCleaning and Maintenance

07 92 00 SD-03 Product Data

2.1 G AESealants

2.2 G AEPrimers

2.3 G AEBond Breakers

2.4 G AEBackstops

2.5 G AECleaning Solvents

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 24 PAGES

07 92 00 3.1 G POField Adhesion

08 11 13 SD-02 Shop Drawings

2.1 G AEDoors

2.4 G AEFrames

2.2Accessories

SD-03 Product Data

2.1 G AEDoors

2.4 G AEFrames

2.2Accessories

08 34 16.20 SD-01 Preconstruction Submittals

1.4.1 G AEManufacturer's Qualifications

1.4.2 G AEInstaller's Qualifications

SD-02 Shop Drawings

1.3.1 G AEDoor Design

SD-03 Product Data

2.3 G AEElectric Operator

2.3.5 G AEMotors

2.2 G AEDoors

2.3.6 G AEControls

2.1.7 G AEDoor Fabric

2.3.6.1 G AESurge Protection Device (SPD)

SD-05 Design Data

1.3.2.1 G AECalculations

1.3.4 G AEDoor Load Diagrams

1.3.1 G AEDoor Compliance Matrix

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 24 PAGES

08 34 16.20 2.3.3.1 G AESafety Arrester Operation Test

2.1.7 G AEDoor Fabric

2.1.7 G AEDoor Fabric

2.2.1 G AEDoor Fabric Connection

3.2.2 G AEWeld Inspection Report

SD-07 Certificates

1.4.1 G AEManufacturer's Qualifications

1.4.2 G AEInstallers Qualifications

1.5 G AEWelding Procedures and

Qualifications

SD-09 Manufacturer’s Field

Reports

3.5 G AEAcceptance Testing Procedure

SD-10 Operation and Maintenance

Data

2.9.1 G AEDoor Operation

1.4.3.1 G AEEmergency and Routine

Preventative Maintenance Plan

SD-11 Closeout Submittals

3.5 G AEAcceptance Testing Procedure

1.4.3 G AEWarranty

08 71 00 SD-02 Shop Drawings

1.3 G AEManufacturer's Detail Drawings

1.3 G AEVerification of Existing Conditions

1.5 G AEHardware Schedule

2.3.6 G AEKeying System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 24 PAGES

08 71 00 SD-03 Product Data

2.3 G AEHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 G AEHardware Schedule

09 67 23.14 SD-02 Shop Drawings

2.2 GFlooring Systems

SD-03 Product Data

2.4 GSealer and Resin

3.3.2 GFloor Surfacing

2.3 GConductive Sparkproof Flooring

3.2 GMixing

SD-04 Samples

2.2 GFlooring Systems

SD-06 Test Reports

3.4 GTesting

SD-07 Certificates

1.3.1 GQualifications of Installer

1.3.1Certification Letter from the

Manufacturer

SD-08 Manufacturer’s Instructions

3.3 GApplication

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 24 PAGES

09 67 23.14 2.2 GFlooring Systems

09 90 00 SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

SD-04 Samples

2.2 G AEColor

SD-07 Certificates

1.5.4Indoor Air Quality for Paints and

Primers

1.5.4Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

10 14 00.10 SD-02 Shop Drawings

3.1 GApproved Detail Drawings

SD-03 Product Data

3.1Installation

1.2 GExterior Signage

1.2.1Wind Load Requirements

SD-04 Samples

1.2 GExterior Signage

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 24 PAGES

10 14 00.10 SD-10 Operation and Maintenance

Data

3.1.2 GProtection and Cleaning

10 14 00.20 SD-02 Shop Drawings

1.3.2 GDetail Drawings

SD-03 Product Data

2.1 GRoom Identification And

Directional Signage System

2.2 GExit Door Tactile Sign

SD-04 Samples

1.3.1 GInterior Signage

2.2 GExit Door Tactile Sign

SD-10 Operation and Maintenance

Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

22 00 00 SD-02 Shop Drawings

3.5.1 GPlumbing System

SD-03 Product Data

3.5.1Plumbing System

SD-06 Test Reports

3.5Tests, Flushing and Disinfection

SD-07 Certificates

1.4Materials and Equipment

2.1.1Bolts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 24 PAGES

22 00 00 SD-10 Operation and Maintenance

Data

3.5.1 GPlumbing System

22 15 26 SD-03 Product Data

2.1.2Fittings

2.2Identification Labels For Piping

SD-06 Test Reports

3.4.1.2Leak Tightness Test

SD-10 Operation and Maintenance

Data

3.2.3 GCleaning Procedures

SD-11 Closeout Submittals

1.3Compressed Air Systems

26 20 00 SD-03 Product Data

2.8 GSwitches

2.10 GReceptacles

2.11.3 GCircuit Breakers

2.9 GFuses

2.12 GEnclosed Circuit Breakers

2.14 GMotor Controllers

SD-06 Test Reports

3.5.2 G600-volt Wiring Test

3.5.5 GGrounding System Test

SD-07 Certificates

2.9 GFuses

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 24 PAGES

26 20 00 SD-10 Operation and Maintenance

Data

1.6.1 GElectrical Systems

28 31 76 SD-01 Preconstruction Submittals

1.2.2 GQualified Fire Protection Engineer

(QFPE)

1.8.2.1 GFire alarm system designer

1.8.2.2 GSupervisor

1.8.2.3 GTechnician

1.8.2.4 GInstaller

1.8.2.5 GTest Technician

1.6 GFire Alarm System Site-Specific

Software Acknowledgement

SD-02 Shop Drawings

1.8.1.3 GNameplates

1.8.1.4 GWiring Diagrams

1.8.1.5 GSystem Layout

1.8.1.6 GNotification Appliances

1.8.1.7 GInitiating devices

1.8.1.8 GBattery Power

1.8.1.9 GVoltage Drop Calculations

SD-03 Product Data

2.3 GManual Stations

2.4 GAddressable Interface Devices

2.5 GAddressable Control Modules

1.8.1.6 GNotification Appliances

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 24 PAGES

28 31 76 2.7 GSurge Protective Devices

2.7 GAlarm Wiring

3.3.3 GBack Boxes and Conduit

3.11.3 GDocument Storage Cabinet

SD-06 Test Reports

3.7.1 GTest Procedures

SD-07 Certificates

3.7.2.1 GVerification of Compliant

Installation

3.7.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.9 GOperation and Maintenance

(O&M) Instructions

3.10 GInstruction of Government

Employees

SD-11 Closeout Submittals

1.8.1.12As-Built Drawings

1.10.1Spare Parts

32 01 19.61 SD-03 Product Data

2.1Sealants

3.4.2Manufacturer's

Recommendations

SD-04 Samples

2.1Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 24 PAGES

32 01 19.61 2.3.1Blocking Media/Backup Materials

3.2.4.1Backer Rod

2.3.2Bond Breaking Tapes

SD-06 Test Reports

2.1Sealants

SD-07 Certificates

3.1Equipment List

SD-08 Manufacturer’s Instructions

2.1Sealants

32 11 20 SD-03 Product Data

2.3 GPlant, Equipment, and Tools

SD-06 Test Reports

2.2.1 GInitial Tests

3.11.1 GIn-Place Tests

32 13 14.13 SD-01 Preconstruction Submittals

3.1.2 GProposed Techniques

2.13.2 GPreliminary Proposed

Proportioning

1.3.2.3 GPavement Quality Control Plan

SD-03 Product Data

2.1.7 GDiamond Grinding Plan

2.9.1 GDowels

2.9.2 GDowel Bar Assemblies

2.11 GEquipment

2.1.5 GConcrete Patching Mixture

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 24 PAGES

32 13 14.13 2.13.2 G DOProportioning Studies

SD-06 Test Reports

2.1.4.1 GSampling and Testing

2.1.7 GDiamond Grinding of PCC

Surfaces

3.9.1 GRepair Recommendations Plan

3.12.5 GPaving Lot Report

SD-07 Certificates

1.3.1 GContractor Quality Control (CQC)

Staff

1.3.2 GLaboratory Accreditation and

Validation

1.3.2 GCommercial Laboratory

32 13 73.19 SD-03 Product Data

2.1Equipment

3.1.1Manufacturer's Instructions

SD-04 Samples

2.2 GCompression Seals

SD-06 Test Reports

2.1.3 GTest Requirements

33 40 00 SD-08 Manufacturer’s Instructions

3.3 GPlacing Pipe

SD-11 Closeout Submittals

3.6.2.1.2 GPost-Installation Inspection

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SECTION 00 22 16

DESIGN-BID-BUILD SELECTION PROCEDURES

AMENDMENT# 0002

Award will be made to the Offeror whose proposal represents the best overall value through the HTR-FRP approach. The HTR-FRP approach prioritizes technical merit and forbids the tradeoff between non-price factors and price. The approach prioritizes the best possible performance, provided the price is determined to be fair and reasonable. Here, all proposals are initially evaluated based solely on the non-price factors specified in the RFP. Only the price of the highest-ranked technical proposal is then evaluated to ensure it is fair and reasonable. The non-price evaluation factors are in descending order of importance: Past Performance and Construction Schedule. Price is not an evaluation factor for the purpose of ranking proposals; it will be evaluated for fairness and reasonableness for the highest technically rated proposal in accordance with RFO 15.103-3. Relative weights among technical factors are provided in this Section. The Source Selection Evaluation Board (SSEB) reviews, evaluates, and rates the proposals against the source selection criteria in the RFP.

BASIS FOR AWARD

The Contracting Officer will award a single firm-fixed-price contract to the Offeror responsible that submits the highest technically rated proposal with a price that is determined to be fair and reasonable. This source selection will be conducted in accordance with the HTR-FRP approach described in RFO 15.103-3. Under this approach, proposals will first be evaluated and ranked based on the non-price factors only. Price is not an evaluation factor for the purpose of ranking proposals and will not be considered during the technical evaluation. After the Source Selection Authority (SSA) determines the highest technically rated proposal, the price of only that proposal will be evaluated for fairness and reasonableness in accordance with RFO Subpart 15.4. If the price of the highest technically rated proposal is determined to be fair and reasonable, that proposal will be selected for award. If the price is determined not to be fair and reasonable, the Government will reject that offer and proceed to evaluate the price of the next highest technically rated proposal. This sequential approach will continue until a contract is awarded to the highest technically rated responsible offeror with a fair and reasonable price.

The Government will not award a contract to an Offeror whose proposal contains a deficiency as defined in RFO 15.001.

VOLUME I: PAST PERFORMANCE/TECHNICAL PROPOSAL

FACTOR LOCATION DESCRIPTION RELATIVE IMPORTANCE

FACTOR 1

Vol I, TAB A

PAST

PERFORMANCE

MOST IMPORTANT

FACTOR

FACTOR 2

Vol I, TAB B

TECHNICAL

APPROACH

LESS IMPORTANT THAN

FACTOR 1

NOTE: All evaluation factors, other than price, when combined, are considered approximately equal to price.

FACTOR 1 - PAST PERFORMANCE:

TAB A - FACTOR 1 - PAST PERFORMANCE refers to the quality of relevant and recent project experience. This tab shall contain past performance information regarding same/similar projects that demonstrate the experience of the offeror and/or proposed team. The past performance evaluation factor assesses the degree of confidence the Government has in an offeror’s ability to supply products and services that meet users' needs, based on a demonstrated record of performance.

A. Submission Requirements for Factor 1:

Offerors shall submit no more than five Government and/or commercial projects for Construction which are recent and relevant to the efforts required by this solicitation as defined below. Use the attached Construction Past Performance Worksheet (Attachment 1) to submit construction experience. Limit each worksheet to no more than three pages.

Relevant: Demonstrate the experience of the offeror and/or proposed team on projects same/similar in SIZE, SCOPE, and COMPLEXITY to that described in the solicitation. Offerors shall identify and describe the relevancies for each of the projects submitted compared to the scope of this project. The Government will evaluate the information provided in making the relevancy determination.

Recent: All projects submitted for construction experience must have been completed within six years from the date of the solicitation. The Government will consider projects completed within six (6) years of the solicitation issuance date to be recent. If a project is not recent, the Government will not evaluate it further.

If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. If projects were design-bid-build, identify them as such. If the Offeror is a Joint Venture (JV) and past performance cannot be provided as a JV, each partner shall submit past performance information. Combined number of projects submitted shall be no more than the number allowed.

Past Performance Assessment Questionnaire (PPQ) (Attachment 2) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1: Past Performance that does not have a final Contractor Performance Assessment Reporting System (CPARS) evaluation or is a non-Federal Government project. Ensure correct phone numbers and email addresses are provided for the client point of contact.

Completed PPQ’s should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ which will provide contract and client information for the respective project(s).

Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Shayla J. Lucas via email at shayla.j.lucas@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Do not request PPQs on projects that have a final CPARS evaluation. If a final CPARS evaluation exists and a PPQ is provided for the same project, the CPARS evaluation will be reviewed as the official past performance record for the project, and the PPQ will not be considered by the Source Selection Board or the SSA.

For USACE or other DoD projects which are underway but do not yet have a final CPARS evaluation, one PPQ per contract may be submitted; to be considered, the PPQ shall be signed by the Administrative Contracting Officer (ACO) or Contracting Officer for the contract.

Offerors are not required to submit any additional past performance information.

The Government will utilize CPARS, and any other information deemed relevant to assess confidence in the Offeror's ability to perform.

Offerors are encouraged to submit completed CPARS for projects submitted for past performance experience.

Offerors may submit performance recognition documents received within the last six years, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition. There is no page limit for the performance recognition documents.

Offerors may submit information on past performance issues and corrective actions taken to prevent these issues from reoccurring. Discuss whether these corrective actions have been implemented on projects awarded subsequent to the performance issues, the effectiveness of the corrective actions, and POC information for the subsequent projects. Limit to no more than three pages, if submitted.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through CPARS, using all CAGE/UEI numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror's proposal, inquiries of owner representative(s), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

B. Evaluation Criteria for Factor 1:

1. Relevancy Determination

a. The Government will evaluate the Offeror's past performance to determine how relevant each of the past performance projects is to the project under consideration. The Government may place greater value on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project past performance will not be rated inherently more important than non-Federal Government project past performance.

b. Projects completed outside the defined time period for recency will not be considered relevant to this solicitation.

c. More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.

d. Projects with lower degrees of relevance will not be as strong of predictors of likely future contract performance success and will typically have less influence on the final past performance confidence rating.

e. Projects that have little or no relevance typically do not influence the performance confidence rating; however, any projects with adverse past performance could reflect larger company-wide concerns and may impact upon the past performance confidence rating.

2. Confidence Determination

a. The SSEB will review the past performance information available to determine the quality and usefulness as it applies to performance confidence assessment. If the Government cannot establish the Offeror’s relevant past performance, it reserves the right to utilize the PPQ to conduct telephone interviews on any source it deems relevant to the evaluation. References may be asked to comment on items such as quality of construction, timeliness, management of the work, subcontractor management, including timely payment to subs or suppliers, safety, relations between owner and designer or contractor, level of support for such things as as-built documentation, O&M manuals, training, correcting construction errors, warranty work, etc.

b. The Government's evaluation is not limited to past performance information on the cited example projects.

c. In determining the performance confidence rating for Past Performance, the degree of relevancy/recency of each of the considered efforts; the overall performance record of the offeror on each contract assessed; number and severity of problems, the demonstrated effectiveness of corrective actions taken (not just planned or promised); recognition documents; and trend data will be evaluated.

Projects with higher degrees of relevance will typically have a greater influence on the final performance confidence rating. Projects with lower degrees of relevance will typically have less influence on the final performance confidence rating however, any projects with adverse past performance could reflect larger company-wide concerns and may impact upon the past performance confidence rating.

Projects which are comparatively more recent may be better predictors of likely future success than older projects. The resulting relevant/recent assessment conclusions will then be combined, along with the assessed quality of performance on prior projects, to arrive at a single performance confidence rating for the Past Performance…