This document provides details for a federal construction solicitation from the Department of the Army Corps of Engineers Engineering District Fort Worth. The solicitation number is W9126G22R0002 and is for an Air Traffic Control Tower at Kelly Field with a project magnitude between $10 million and $25 million. Offerors must enter a National Institute of Standards and Technology score in the Supplier Performance Risk System before an award can be made. The point of contact is Alfredo Avila at alfredo.avila@usacearmy.mil or 325-244-2857. The solicitation requires construction of an Air Traffic Control Tower located at Kelly Field and is valued between $10 million to $25 million. Offerors must submit a National Institute of Standards and Technology score in the Supplier Performance Risk System to be considered for award.

View the file

Other files

File Type Posted
Amendment 11.pdf PDF
Amendment 10.pdf PDF
Amendment 9.pdf PDF
Amendment 8.pdf PDF
Amendment 07.pdf PDF
Amendment 06.pdf PDF
Kelly ATCT SIte Visit Sign In Sheet 01FEB22.pdf PDF
Amendment 05.pdf PDF
Attachment 2 Past performance Assesment Worksheet As 20220131.pdf PDF
Amendment 04.pdf PDF
Site Visit 1 Kelly ATCT SIte Visit Sign In Sheet.pdf PDF
Amendment 03.pdf PDF
Monaco JA.pdf PDF
Best Locks Name Brand JA.pdf PDF
Amendment 02.pdf PDF
UAR Form jbsanantonio7.pdf PDF
Amendment 01.pdf PDF
MPLS_MBPB01160_10790_D685_005.pdf PDF
MPLS_MBPB01160_10807_KC01_015.pdf PDF
MPLS_MBPB01160_10790_D685_002.pdf PDF
76-0048.pdf PDF
MPLS_MBPB01160_10807_KC01_019.pdf PDF
MPLS_MBPB01160_10807_KC01_018.pdf PDF
MPLS_MBPB01160_10790_D685_006.pdf PDF
MPLS_MBPB01160_10807_KC01_010.pdf PDF
82-0027.pdf PDF
MPLS_MBPB01160_10807_KC01_011.pdf PDF
MPLS_MBPB01160_10790_D685_001.pdf PDF
g22r0002_Drawings.pdf PDF
MPLS_MBPB01160_10807_KC01_016.pdf PDF
71-4.pdf PDF
MPLS_MBPB01160_10807_KC01_002.pdf PDF
MPLS_MBPB01160_10807_KC01_017.pdf PDF
MPLS_MBPB01160_10807_KC01_022.pdf PDF
DACA63-68-B-0130.pdf PDF
MPLS_MBPB01160_10807_KC01_008.pdf PDF
MPLS_MBPB01160_10807_KC01_001.pdf PDF
MPLS_MBPB01160_10807_KC01_006.pdf PDF
B08 Appendix A - 1160 HAZMAT Surveys.pdf PDF
MPLS_MBPB01160_10807_KC01_007.pdf PDF
MPLS_MBPB01160_10807_KC01_004.pdf PDF
MPLS_MBPB01160_10807_KC01_003.pdf PDF
MPLS_MBPB01160_10790_D685_003.pdf PDF
g22r0002_Demo Drawings.pdf PDF
MPLS_MBPB01160_10807_KC01_020.pdf PDF
MPLS_MBPB01160_10807_KC01_014.pdf PDF
MPLS_MBPB01160_10790_D685_004.pdf PDF
MPLS_MBPB01160_10807_KC01_005.pdf PDF
MPLS_MBPB01160_10807_KC01_012.pdf PDF
MPLS_MBPB01160_10807_KC01_023.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Bid-Build Request For Proposal

Air Traffic Control Tower Kelly Field Lackland Air Force Base, TX

W9126G22R0002

Small Business Set-Aside December 2021

US Army Corps of Engineers Fort Worth District

This page was intentionally left blank

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 44 CONSTRUCTION SCHEDULE

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 13.10 00 SPECIAL PROCEDURES - SURVEYING

01 35 13.20 00 SPECIAL PROJECT PROCEDURES - CAD

01 35 13.30 00 SPECIAL PROJECT PROCEDURES - GIS

01 35 17.00 44 SPECIAL PROJECT PROCEDURES FOR LACKLAND AIR FORCE BASE

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00.17 44 TEMPORARY CONSTRUCTION FACILITIES FOR LACKLAND AFB

01 56 00.00 44 DUST CONTROL

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 20.17 10 ENVIRONMENTAL PROTECTION FOR LACKLAND AIR FORCE BASE

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 58 00 PROJECT IDENTIFICATION

01 62 35 RECYCLED / RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 13.00 10 ASBESTOS ABATEMENT

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 45 00 PRECAST ARCHITECTURAL CONCRETE

03 45 33 PRECAST PRESTRESSED STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

PROJECT TABLE OF CONTENTS Page 1

Kelly Airfield Air Traffic Control Tower KA22ATCT

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 19 00 WATER REPELLENTS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 39 54 BLAST RESISTANT DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 88 58 AIR TRAFFIC CONTROL TOWER CAB GLASS

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

PROJECT TABLE OF CONTENTS Page 2

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 51 13 LOCKERS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

DIVISION 14 - CONVEYING EQUIPMENT

14 21 13 ELECTRIC TRACTION FREIGHT ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 00 HEATING BOILERS

23 65 36 FLUID COOLERS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 19.10 10 INSULATED WIRE AND CABLE

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 LOW-VOLTAGE SWITCHGEAR

26 27 13.10 30 ELECTRIC METERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY

APPLICATIONS

26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA

CAPACITY

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

PROJECT TABLE OF CONTENTS Page 3

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 63 29 DRILLED CONCRETE PIERS AND SHAFTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE BASE COURSES

32 11 29 LIME-STABILIZED SUBGRADE

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 51 13.00 30 NATURAL-GAS METERING

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

APPENDIX

APPENDIX A HAZMAT SURVEYS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

Section: 00 11 00 W9126G22R0002

Item Unit Line Item No. Description Quantity Unit Price Amount

0001 Air Traffic Control Tower: The contractor shall construct an Air Traffic Control Tower up to the 5' building line, at JBSA-Lackland, Texas. All work shall be done in accordance with the attached specifications.

1 JOB $ *** $

Drilled Piers: 36" Diameter; All materials, labor, and equipment to install per the plans and specifications. 366 LF $ $

0003 Drilled Piers: 24" Diameter: All materials, labor, and equipment to install per the plans and specifications. 488 LF $ $

0004 Supporting Facilities: The contractor shall provide site improvements and other required support for the Air Traffic Control Tower, up to the 5' building line, located at JBSA-Lackland, Texas. All work shall be done in accordance with the attached specifications.

1 JOB $ *** $

0005 UPS: The Contractor shall provide an Uninterrupted Power Source (UPS) equipment, connections and other required support for the Air Traffic Control Tower located at JBSA-Lackland, Texas. All work shall be done in accordance with the attached specifications.

1 JOB $ *** $

0006 Backup Generator: The Contractor shall provide a backup generator equipment, connections and other required support for the Air Traffic Control Tower located at JBSA-Lackland, Texas. All work shall be done in accordance with the attached specifications. 1 JOB $ *** $

Air Traffic Control Tower Kelly Field Lackland Air Force Base, TX

CONTRACT LINE ITEM SCHEDULE

BASE OFFER: All work required by the contract.

Item Unit Line Item No. Description Quantity Unit Price Amount

Air Traffic Control Tower Kelly Field Lackland Air Force Base, TX

CONTRACT LINE ITEM SCHEDULE

0007 Demolish Building 1160: The contractor shall demolish Building 1160 (existing ATCT) at JBSA-Lackland, Texas. All work shall be done in accordance with the attached specifications. 1 JOB $ *** $

0008 Electrical Connection Fees Preliminary estimate of connection fees by the privatized electrical utility provider, CPS Energy, San Antonio, TX, and Section 01 35 13.01 44.

1 JOB $ *** $ 58,000.00

0009 Water Connection Fees Preliminary estimate of connection fees by the privatized water utility provider, American Water Military Services, San Antonio, TX, and Section 01 35 13.01

44. 1 JOB $ *** $ 195,000.00

0010 Cost associated with Gas utility provider's Connection Fees. 1 JOB $ *** $ 68,000.00

0011 Cost associated with Sewer utility provider's Connection Fees 1 JOB $ *** $ 640,000.00

$TOTAL OFFER

Air Traffic Control Tower Kelly Field

Lackland Air Force Base, TX

CONTRACT LINE ITEM SCHEDULE

NOTES:

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable

NOTE NO. 3. All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

NOTE NO. 4. Responders are advised that this requirement may be delayed, cancelled, or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

NOTE NO. 5. The Army will procure this facility through a cost competition in accordance with the provisions set forth in this Request for Proposals (RFP). When awarded, it will be a "Firm Fixed Price Contract."

NOTE NO. 6. Any proposal that is materially unbalanced as to prices for the Base Schedule may be rejected. An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.

NOTE No. 7. Amount represents preliminary estimated charges by the System Owners (SO) for the planned utility work. After award, the Contractor must coordinate with the SO and get final approved and professionally sealed drawings. After receipt, the SO will provide costs for the utility work. The Contractor will negotiate contract and schedule the work directly with the SO and pay the SO to do the approved work. The Government will only pay paid invoice amounts as provided by the SO. A modification will be issued to the Contractor if the actual SO connection costs differ from the original estimated connection fees indicated in CLIN 0008, 0009, 0010 and 0011. See 01 35 17.00 44 for additional information.

NOTE NO. 8. ABBREVIATIONS

For the purpose of this solicitation, the units of measure are represented as follows:

a. JOB

b. LF(Linear Feet)

NOTE No. 9. Profit will not be paid on bonds or insurance.

END OF CLIN SCHEDULE

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.215-7008 Only One Offer JUL 2019 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors.

JAN 2018

CLAUSES INCORPORATED BY FULL TEXT

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed-Price contract resulting from this solicitation.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

49.4% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Joint Base San Antonio-Lackland AFB, San Antonio, Bexar County, Texas.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

USACE Fort Worth Attention: CECT-SWF 819 Taylor St.

Fort Worth, TX 76102 SWF-Protest@usace.army.mil

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- See Section 00 21 30

(c) Participants will meet at-- See Section 00 21 30

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

COST OR PRICING DATA

Offerors are not required to submit Cost or Pricing Data with their offers.

SECTION 00 21 30

SITE VISITS

PART 1 GENERAL

1.1 SITE VISITS

a. Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," and the Site Visit Clause in Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS, prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors are urged and expected to inspect the site where the work will be performed. Site visits will be arranged during normal duty hours.

b. Site visit information: The site visit will be:

Date: 10 January 2022 Time: 10 am, CT Location: Upson Park (next to project site) POC: Jonathan McCarthy EMAIL: Jonathan.K.Mccarthy@usace.army.mil Phone: (915) 283-9248

Offerors and subcontractors wishing to participate must submit a complete listing of all personnel to attend the preproposal site visit, via email, to the referenced Base Access POC, a minimum of seven (7) calendar days prior to the preproposal site visit. Include the following information for all attendees and subcontractors. The first name on the list will indicate: TEAM CHIEF, and this individual will be responsible for all other personnel:

Offeror's and offeror's subcontractor personnel full names Date of Birth Home Address Driver's License, including the State Issued Vehicle Registration Proof of Insurance SSN (last 4 digits) Firm

Personnel are required to wear masks during site visits and maintain a distance of six (6) feet between individuals, where able. Contractors must provide their own masks.

NOTE: The U.S. Government will conduct a check of every individual submitted; this will include checking all law enforcement databases.

Persons with questionable criminal records or outstanding warrants will be denied access to the installation.

c. In no event will a failure to inspect the site constitute grounds for

DOCUMENT 00 21 30 Page 1 withdrawal of a proposal after receipt of proposal or for a claim after award of the contract.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

DOCUMENT 00 21 30 Page 2

Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, and Basis of Award One Step - Best Value, Design-Build (Single Award)

EVALUATION CRITERIA

GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS

W9126G22R0002

Air Traffic Control Tower Kelly Field Annex Joint Base San Antonio - Lackland AFB, Bexar County, Texas

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits construction of Air Traffic Control Tower Kelly Field Annex.

Work location is Joint Base San Antonio - Lackland AFB, Bexar County, Texas. Antiterrorism/Force protection measures and sustainment mandates will be incorporated. The resultant contract will be Firm Fixed-Price (FFP).

1.2 The instructions and requirements contained herein establish uniform evaluation procedures for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Lowest Price Technically Acceptable Decision by the Source Selection Authority (SSA) using the Lowest Price Technically Acceptable Source Selection Process (See Federal Acquisition Regulation 15.101-2). Proposals should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

1.3 Each offeror must submit both a Price Proposal (volume 1) and Technical Proposal (volume 2), in addition to Past Performance Questionnaires. The Price Proposal and Technical Proposal must be submitted as separate volumes/files as outlined in paragraph 3.5 below. All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa.

The Price and the Technical Proposals in addition to the Past Performance Questionnaires must be received by the closing date and time set for receipt of proposals. No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal.

Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

The technical data criteria specified for each factor identified herein, shall be submitted as part of the proposal.

The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

Failure to submit all the data required by the RFP and its attachments, may be cause for determining a proposal incomplete and therefore may not be considered for award.

1.4 All questions and/or comments are to be submitted via ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W9126G22R0002 The Bidder Inquiry Key is: NHZ7TV-3QVE9C

Last day to submit ProjNet questions is seven (7) calendar days prior to bid closure date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Standard Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP

2. GENERAL INSTRUCTIONS.

In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

In accordance with FAR 15.306(c)(1) and FAR Clause 52.215-1(f)(4), Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer.

As further described in paragraph 2.3 below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code.

2.2 If applicable, a 8(a) Joint Venture or SBA/DoD approved Mentor-Protégé must submit all required documentation with their offer to be considered responsive, in accordance with (IAW) the requirements set forth in Title 13 Code of Federal Regulations (CFR) Part 125.8.

2.3 The Government will only evaluate the information submitted by the legal entity with whom the Government would enter a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code. However, IAW CFR 125.8(e), the Government will also evaluate experience and past performance submitted by the individual firms that make up a joint venture.

2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether an affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor. Successor entities shall clearly demonstrate in Volume I, Tab A of their proposal the official legal means performed to transform the former Predecessor Company to its current Successor, legal business entity. Examples of substantive documentation may include but is not limited to Articles of Incorporation, Joint Venture Agreements, Novation Agreements, and Merger Documentation.

"Successor" means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger).

Note: The term ''successor'' does not include new offices/ divisions of the same company or a company that only changes its name.

2.5 Offerors shall submit their proposal in accordance with the Section 3. General Proposal Format, paragraph 3.5.

2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

2.7 Basis for Award: Award will be made on the basis of the lowest evaluated price of technically acceptable proposals meeting or exceeding the acceptability standards for non-cost factors, after appropriate consideration is given to the two (2) evaluation factors: (1) Price, (2) Past Performance. The Source Selection Board shall review all proposals for acceptability and provide the Contracting Officer with a written technical analysis of each Offeror’s proposal. Proposals are evaluated for acceptability but not ranked using the non-cost/price factors. Tradeoffs are NOT permitted. The Government reserves the right to reject any and all offers.

3. GENERAL PROPOSAL FORMAT.

3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name and date of the submittal.

3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Technical proposal.

3.4 Offerors are advised to follow the DoD SAFE instructions for uploading files. DoD SAFE has posted official file size limitations of 8.0 GB per file, or 8.0 GB total for the entire drop-off. Additional instructions/guidance can be found at https://safe.apps.mil/about.php.

3.5 Each offeror must submit both a Price Proposal (Volume 1) and a Technical Proposal (Volume 2). Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the delivery time & date recorded within DoD SAFE. Do not assume that electronic submission will occur instantaneously. Large files may take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process and troubleshooting. Proposal submission difficulties should be coordinated with the DoD SAFE Service Desk at 1-844-347-2457. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions received after the deadline will be considered late and as such will be processed in accordance with FAR 15.208.

In an effort to reduce paperwork and cost, ALL proposals shall be submitted electronically via the DoD SAFE website at https://safe.apps.mil/ In order for an outside user (the offeror) to submit a proposal for the solicitation, they must receive a drop-off request from an inside user (the government). When the inside user generates a drop-off request for you, you will receive an email with a link to submit your drop-off. Optionally, the Government may provide you with a request code. In that case, click the Drop-off button on the SAFE home page and enter the Request code.

To request and receive a drop-off for this solicitation, the offeror must email the following at least two (2) business days before the proposal due date. It is the offeror’s responsibility to make the request within the appropriate timeframe. Include the solicitation number, in your Email Subject Line.

Contracting Officer: Nicholas I. Johnston, Nicholas.l.johnston@usace.army.mil Contract Specialist: Alfredo Avila, alfredo.avila@usace.army.mil

Offers received by email, modifications thereto, or cancellations of offers will or will not be accepted. Only the DoD SAFE submitted proposal will be accepted and evaluated by the Government.

No hard paper copies will be accepted or evaluated. Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W9126G22R0002_COMPANY NAME_VOLUME I

W9126G22R0002_COMPANY NAME_VOLUME II

Offerors shall submit bid bonds (Standard Form 24) in electronic format. Electronic copies of bid bonds shall be included in Volume 1: Offerors Certifications and Price under Tab H. Hard copies of bid bonds with the raised seal are no longer required to be mailed in at this time and do not need to be sent to the contracting office. Verification of Bid Bonds with sureties will be completed during the evaluation process and before award. Bid bond submissions shall be due by the proposal due date and time. Offerors are responsible for the accurate submission of the Bid Bonds with all signatures and seals applied.

The date and time of delivery will be established by the time of receipt by the email server (time stamped by the system), not by the date and time the offeror sent the proposal into their email account. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is sent minutes before the deadline but notification is not actually received in the recipients’ email inboxes until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

3.6 The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

3.7 The technical data criteria specified for each factor identified herein and as described in these instructions shall be submitted as part of the proposal. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.

3.8 Tabs. Proposal shall be organized and tabbed as follows:

3.8.1 VOLUME I: OFFEROR’S CERTIFICATIONS AND PRICE (FACTOR 1)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.

TAB CONTENTS OF THE PRICE PROPOSAL

A The Proposal Cover Sheet

B Standard Form 1442 & Acknowledgement of Amendments (If Applicable)

C FACTOR 1: PRICE

D Section 00 45 00 – Representations and Certifications

E Teaming Arrangement (If Applicable)

F Bid Guarantee (Bid Bond)

G Financial Information and Bonding Capability

H Supplier Performance Risk Score

TAB A – The proposal cover sheet is required by FAR 52.215-1 (c)(2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:

PROPOSAL COVER

SHEET

Offerors should ensure, DUNS number and CAGE Code are all included. DUNS number will be used to access Past Performance Information Retrieval System (PPIRS) data. Offerors should also provide any other assigned number that identifies them in the PPIRS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number on the Proposal Cover Sheet.

TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

If applicable - All amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.

TAB C – Factor 1 - Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 11 00 - Solicitation, Contract Line Item Number (CLIN) Schedule.

TAB D - Section 00 45 00 – Representations and Certifications.

TAB E - Teaming Agreement, if applicable. See paragraph 2.1 and 2.2 Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.

Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.

TAB F - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee electronically in Tab F. This requirement is to be completed regardless of Bid Bond requirement submission located in other parts of these instructions.

For the purposes of this Request for Proposal, please note that IAW FAR 28.001:

“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in FAR 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”

1. The solicitation number.

2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority unless that evidence has been previously furnished to the issuing office.

Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.

TAB G - Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.

TAB H - Supplier Performance Risk Score- Provide a screen shot of your score showing that you have complied with DFARS 252.204-2019 and 252.204-2020. Please NOTE this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) prior to responding to this solicitation. The NIST score is a responsiveness item. Bids/offers from contractors with a NIST score in SPRS will be considered responsive and evaluated/considered for award. Those without a NIST score in SPRS will be deemed NON-RESPONSIVE and thus not evaluated/considered for award.

3.8.2 VOLUME II: TECHNICAL PROPOSAL (Volume 2)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.

TAB CONTENTS OF THE TECHNICAL PROPOSAL

A Volume 2: Past Performance

Page Limitations: The following page limitations are established for the Volume described above:

Tab A Volume 2: Past Performance – Individual Past Performance Assessment Worksheets will not exceed one (1) page per project. Individual project Past Performance Questionnaires shall only have additional information required to make assessment on past performance; Government evaluators will review and evaluate only the information contained within these limits.

Project Limitation: The following project limitations are established for the factor described above:

Tab A Volume 2: Past Performance – Limited to no more than five (5) projects

NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government. Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

4. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB A — VOLUME 2 - PAST PERFORMANCE

4.1 SUBMISSION/MINIMUM REQUIREMENTS:

4.1.1 Past performance refers to the quality of recent and relevant project experience from the owner’s perspective.

The offeror shall complete and provide a Past Performance Assessment worksheet (Attachment 2) on no more than five (5) projects. Projects submitted under this factor must first be deemed recent and relevant. For any project without a CPARS the offeror will need to complete the Past Performance questionnaire. (Attachment 1)

4.1.1.1 Relevant: The minimum requirement for each project to be considered of similar size, scope, or complexity is to meet both criterial “a” and “b” below:

a. The project must be of a dollar value equal to or greater than $10,000,000.00 and

b. It must be for the construction of a DoD or Commercial Air Traffic Control Tower.

4.1.1.2 Recent: Projects of similar size, scope, and complexity that must have been completed (fully designed and constructed) within the past 6 years from the date of the solicitation, except one project may be submitted that is currently under construction and at least 50% completed.

4.1.2 Individual project Past Performance Questionnaires shall only include information relevant to the past performance evaluation. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government may call and confirm information provided by the offeror on the Past Performance Questionnaire with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.

4.1.3 The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Contract Performance Assessment Reporting System (CPARS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.

4.1.4 Offerors shall utilize the Past Performance Assessment Questionnaire in Attachment 1.

4.1.5 If the offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the Joint Venture. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

4.1.6 That Government is not limited in evaluation of past performance to only the projects submitted by the offeror but may review/evaluate other recent and relevant projects also.

4.2 EVALUATION CRITERIA:

4.2.1 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. Where the Government views an offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an offeror’s rating for this factor despite the quality of recent, relevant past performance information.

4.2.2 Past performance shall be initially evaluated to determine whether the offeror’s present/past performance is recent, and relevant to the effort to be acquired.

See paragraph 4.1.1.1 and 4.1.1.2

4.2.3 The Government will evaluate ONLY recent and relevant past performance based on the elements listed below to assign an overall past performance rating of acceptable/unacceptable. Offerors without a record of recent and relevant past performance will be rated “acceptable.”See note under “DEFINITIONS OF KEY EVALUATION TERMS FOR THE PURPOSE OF THIS ACQUISITION” below.

4.2.4 Second, the past performance evaluation shall determine how well the offeror performed on the prior contracts.

The contractor shall have no “unsatisfactory” in criteria 1-6, and no “marginal” ratings in criteria 1-3 (below) in the Contract Performance Assessment Reporting System (CPARS): quality, schedule, management, utilization of small business, regulatory compliance, and safety.

(1) Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the offeror’s ability to maintain quality control and accuracy of quality control documentation.

(2) Schedule. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.

(3) Management. The Government will evaluate all information available with respect to the offeror’s ability to manage resources and key personnel.

(4) Utilization of Small Business. The Government will evaluate all information available with respect to the offeror’s ability to meet small business subcontracting plan goals.

(5) Regulatory Compliance. The Government will evaluate all information available with respect the offeror’s ability to enforce laws and regulations, correct deficiencies when non-compliant, and communicate laws and regulations to subcontractors.

(6) Safety. The Government will evaluate all information available with respect to the contractor’s safety program or efforts.

4.2.5 Past Performance submitted by an offeror using the Past Performance Questionnaire (PPQ) should be rated at a minimum “Satisfactory” for all sections cover in section1-7 of the PPQ.

The Past Performance Questionnaire (PPQ) included in the solicitation (Attachment 1) is provided for the Offeror or its team members to submit to the client for each project the Offeror included in its proposal for Factor 1, Past Performance that does not have an interim or final Contractor Performance Assessment Reporting System (CPARS) evaluation or is a non-Federal Government project. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQ should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).

Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If any negative past performance information is received to which the Offeror has not previously had an opportunity to respond, the contractor will be given an opportunity to provide rebuttal. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Alfredo Avila, via e-mail at: alfredo.avila@usace.army.mil prior to proposal closing date.

Offerors shall not incorporate by reference into their proposals PPQ’s previously submitted for…