W9126G21R0037-Drawings_Part4.pdf
PDF 50 MB Posted
- Attached to
- Fort Hood Fuel Facility Replacement
- Solicitation number
- W9126G21R0037
About this file
This federal solicitation seeks construction services for a new fuel facility at Fort Hood, Texas. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Fort Worth for a firm-fixed price construction contract valued between $25-100 million. The selected contractor will construct a new Type III Hydrant System including above ground fuel storage tanks, a pump shelter with control room, product recovery tank, truck loading and unloading points, spill containment facilities, and supporting infrastructure. Additional requirements include installing new piping to complete the hydrant loop between the new pump house and fueling apron, demolishing existing hydrant pits and site preparation work. Phase 1 proposals are due by September 10, 2021 with contract award anticipated for September 30, 2021. All questions must be submitted by email and amendments will be posted to SAM.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .