C04 Bid Abstract_20B0049.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
DBB ARNORTH BLDG 16 South Wing Renovation FSH
Solicitation number
W9126G20B0049
Issued by

About this file

This document provides bid abstracts for a federal construction contract opportunity to renovate Building 16 South Wing at Fort Sam Houston in Texas. The opportunity is a design-bid-build project with a total estimated value between $5-10 million. Bids were due by September 8th and contract award is anticipated for September 25th. The scope of work involves renovating approximately 20,000 square feet on the first floor and 5,500 square feet on the second floor, including structural, electrical, plumbing, HVAC and interior work. The contract will have a one year period of performance from notice to proceed. The opportunity is set aside for small businesses and requires compliance with Davis-Bacon prevailing wage rates.

View the file

Other files

File Type Posted
B05 AMENDMENT 0007.pdf PDF
B05 AMENDMENT 0006.pdf PDF
B005 amendment 0005 final.pdf PDF
B16 SW RTA 08 17 2020.2.pdf PDF
200514_JBSA-FSH B16 S Wing CID.pdf PDF
200514_JBSA-FSH B16 HAZMAT_.pdf PDF
B05 AMENDMENT 0004 final.pdf PDF
B05 AM0003.pdf PDF
B05 AMENDMENT 02.pdf PDF
B05 AMENDMENT 01.pdf PDF
APPENDIX R SAMPLE PRELIMINARY SUBMITTAL.xls XLS spreadsheet
APPENDIX SUBMITTAL REGISTER.xls XLS spreadsheet
DRAWINGS.pdf PDF
B05 20B0049 SOLICATION.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FY 20 ARNORTH BLDG 16 SOUTH WING RENOVATION
FORT SAM HOUSTON, TX
Offeror Name:Gonzalez De La Garza and Assoc., LLC
BidCLINDescriptionBid Amount
Base0001All work required to renovate B 16 South Wing$ 9,633,262.00
Base0002All work required to abate all lead based paints for B16 South Wing$ 77,356.00
Base0003All work required to abate all mold for Bldg 16 South Wing$ 17,421.00
Base0004All work required to abate all asbetos for Bdg 16 South Wing$ 37,112.00
Base0005All work required for the removal of furniture for Bldg 16 South Wing$ 18,822.00
Base0006Costs associated with Electrical and Gas utility provider's Connection Fee$ 25,000.00
SUBTOTAL BASE$ 9,808,973.00
Option 10007All work required to procure and install Fixed Furniture and Equipment (FF&E) at Bldg 16 South Wing$ 506,027.00
SUBTOTAL OPTIONS$ 506,027.00
Total$ 10,315,000.00
Offeror Name:CCI UTILITY AND CONSTRUCTION SVC., LLC
BidCLINDescriptionBid Amount
Base0001All work required to renovate B 16 South Wing$ 10,388,256.21
Base0002All work required to abate all lead based paints for B16 South Wing$ 209,963.36
Base0003All work required to abate all mold for Bldg 16 South Wing
Base0004All work required to abate all asbetos for Bdg 16 South Wing$ 58,217.63
Base0005All work required for the removal of furniture for Bldg 16 South Wing$ 65,949.86
Base0006Costs associated with Electrical and Gas utility provider's Connection Fee$ 25,000.00
SUBTOTAL BASE$ 10,747,387.06
Option 10007All work required to procure and install Fixed Furniture and Equipment (FF&E) at Bldg 16 South Wing$ 437,563.04
SUBTOTAL OPTIONS$ 437,563.04
Total$ 11,184,950.10
Offeror Name:QAYAQ GOVERNMENT SOLUTIONS
BidCLINDescriptionBid Amount
Base0001All work required to renovate B 16 South Wing$ 12,220,000.00
Base0002All work required to abate all lead based paints for B16 South Wing$ 71,579.00
Base0003All work required to abate all mold for Bldg 16 South Wing$ - 0
Base0004All work required to abate all asbetos for Bdg 16 South Wing$ 34,387.00
Base0005All work required for the removal of furniture for Bldg 16 South Wing$ 20,221.00
Base0006Costs associated with Electrical and Gas utility provider's Connection Fee$ 25,000.00
SUBTOTAL BASE$ 12,371,187.00
Option 10007All work required to procure and install Fixed Furniture and Equipment (FF&E) at Bldg 16 South Wing$ 518,494.00
SUBTOTAL OPTIONS$ 518,494.00
Total$ 12,889,681.00
Offeror Name:EXPRESS CONTRACTING
BidCLINDescriptionBid Amount
Base0001All work required to renovate B 16 South Wing$ 11,037,820.62
Base0002All work required to abate all lead based paints for B16 South Wing$ 20,000.00
Base0003All work required to abate all mold for Bldg 16 South Wing$ 2,500.00
Base0004All work required to abate all asbetos for Bdg 16 South Wing$ 25,000.00
Base0005All work required for the removal of furniture for Bldg 16 South Wing$ 22,000.00
Base0006Costs associated with Electrical and Gas utility provider's Connection Fee$ 25,000.00
SUBTOTAL BASE$ 11,132,320.62
Option 10007All work required to procure and install Fixed Furniture and Equipment (FF&E) at Bldg 16 South Wing$ 569,119.72
SUBTOTAL OPTIONS$ 569,119.72
Total$ 11,701,440.34
Offeror Name:SMR CONSTRUCTION
BidCLINDescriptionBid Amount
Base0001All work required to renovate B 16 South Wing$ 11,854,859.00
Base0002All work required to abate all lead based paints for B16 South Wing$ 89,550.00
Base0003All work required to abate all mold for Bldg 16 South Wing$ - 0
Base0004All work required to abate all asbetos for Bdg 16 South Wing$ 18,940.00
Base0005All work required for the removal of furniture for Bldg 16 South Wing$ 5,000.00
Base0006Costs associated with Electrical and Gas utility provider's Connection Fee$ 25,000.00
SUBTOTAL BASE$ 11,993,349.00
Option 10007All work required to procure and install Fixed Furniture and Equipment (FF&E) at Bldg 16 South Wing$ 430,763.00
SUBTOTAL OPTIONS$ 430,763.00
Total$ 12,424,112.00
Offeror Name:MARC III GENERAL CONTRACTORS, LLC
BidCLINDescriptionBid Amount
Base0001All work required to renovate B 16 South Wing$ 8,801,382.00
Base0002All work required to abate all lead based paints for B16 South Wing$ 75,727.00
Base0003All work required to abate all mold for Bldg 16 South Wing$ - 0
Base0004All work required to abate all asbetos for Bdg 16 South Wing$ 55,770.00
Base0005All work required for the removal of furniture for Bldg 16 South Wing$ 64,400.00
Base0006Costs associated with Electrical and Gas utility provider's Connection Fee$ 25,000.00
SUBTOTAL BASE$ 9,022,279.00
Option 10007All work required to procure and install Fixed Furniture and Equipment (FF&E) at Bldg 16 South Wing$ 495,377.00
SUBTOTAL OPTIONS$ 495,377.00
Total$ 9,517,656.00
Offeror Name:STODDARD CONSTRUCTION
BidCLINDescriptionBid Amount
Base0001All work required to renovate B 16 South Wing$ 9,100,000.00
Base0002All work required to abate all lead based paints for B16 South Wing$ 65,850.00
Base0003All work required to abate all mold for Bldg 16 South Wing$ - 0
Base0004All work required to abate all asbetos for Bdg 16 South Wing$ 31,635.00
Base0005All work required for the removal of furniture for Bldg 16 South Wing$ 68,000.00
Base0006Costs associated with Electrical and Gas utility provider's Connection Fee$ 25,000.00
SUBTOTAL BASE$ 9,290,485.00
Option 10007All work required to procure and install Fixed Furniture and Equipment (FF&E) at Bldg 16 South Wing$ 515,000.00
SUBTOTAL OPTIONS$ 515,000.00
Total$ 9,805,485.00
Offeror Name:AMG CONTRACTORS, LLC
BidCLINDescriptionBid Amount
Base0001All work required to renovate B 16 South Wing$ 9,787,737.98
Base0002All work required to abate all lead based paints for B16 South Wing$ 302,486.00
Base0003All work required to abate all mold for Bldg 16 South Wing$ - 0
Base0004All work required to abate all asbetos for Bdg 16 South Wing$ 50,926.00
Base0005All work required for the removal of furniture for Bldg 16 South Wing$ 19,207.00
Base0006Costs associated with Electrical and Gas utility provider's Connection Fee$ 25,000.00
SUBTOTAL BASE$ 10,185,356.98
Option 10007All work required to procure and install Fixed Furniture and Equipment (FF&E) at Bldg 16 South Wing$ 537,404.91
SUBTOTAL OPTIONS$ 537,404.91
TotalCORRECTED$ 10,722,761.89
CONTRACTOR'S ACTUAL BID TOTAL$10,772,762.20
IGE
BidCLINDescriptionBid Amount
Base0001All work required to renovate B 16 South Wing$ 3,937,525.00
Base0002All work required to abate all lead based paints for B16 South Wing$ 4,976.00
Base0003All work required to abate all mold for Bldg 16 South Wing$ 10,995.00
Base0004All work required to abate all asbetos for Bdg 16 South Wing$ 7,609.00
Base0005All work required for the removal of furniture for Bldg 16 South Wing$ 186,035.00
Base0006Costs associated with Electrical and Gas utility provider's Connection Fee$ 25,000.00
SUBTOTAL BASE$ 4,172,140.00
Option 10007All work required to procure and install Fixed Furniture and Equipment (FF&E) at Bldg 16 South Wing$ 1,085,050.00
SUBTOTAL OPTIONS$ 1,085,050.00
Total$ 5,257,190.00

Solicitation: W9126G18B0042 CCAD Repairs Bid Opening: 24 Sept 2018

Sheet2 FY19 General Purpose Warehouse

RRAD, Texarkana, TX
Bid Opening Abstract
4231
Base:IGESGS Design BuilderNisou LGC LLCContractor #5Contractor #6Contractor #7Contractor #8Contractor #9Contractor #10
Base Bid:
CLIN 0001
CLIN 0002

Total Base: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Option(s):
CLIN 0003

Total Additives $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Base + Additives$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
000000

File details come from the government source that posted it. Updated .