Ammendment_0002.pdf
PDF 3 MB Posted
- Attached to
- WSMR FY20 Facility Maint & Repair Mult Bldgs
- Solicitation number
- W9126G20B0047
About this file
This amendment to the solicitation provides additional details for facility maintenance and repair work at multiple buildings on White Sands Missile Range. The work includes repairs to roofs, HVAC systems, lighting, electrical systems, floors, doors and windows at various buildings. Regulated materials surveys are required for areas to be disturbed. Work will take place in occupied buildings and must be phased and coordinated to minimize disruptions. The Army Corps of Engineers seeks contractors to provide repairs at buildings for roof replacement, HVAC installation, lighting installation, and other renovations as outlined in the appendices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C1_Bid Abstract_20B0047.xlsx | XLSX spreadsheet | |
| Sign in sheets FY20.pdf | ||
| am_4.pdf | ||
| am_4.pdf | ||
| am_3.pdf | ||
| am_2.pdf | ||
| g20b0047.pdf | ||
| am_1.pdf | ||
| DIV 00 Amended.pdf | ||
| g20b0047.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 11 00 Page 1
WSMR FY20 Facility Maintenance and Repair Mult Buildings WS20FMR
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes repairs and renovations to facilities including roofs, HVAC, EMERGENCY lighting, electrical, and floor, door and window replacement, regulated material surveys and incidental related work.
a. B128 – Appendix A
1. Replace carpet throughout bedrooms with VCT flooring including new cove base and initial waxing; excluding bathrooms, hallways, common areas, or laundry rooms. Repair water damage including mold abatement. For bidding purposes, the contractor is to assume approximately 1,000 SF of mold abatement. Replace approximately 135 SF of damaged VCT in rooms identified in Appendix A.
2. Historical regulated material surveys are not available for Building 128. Complete a regulated material survey of areas to be disturbed.
3. Facility will be occupied during work completion. Work shall occur in two phases. Contractor shall provide two weeks’ notice of anticipated start date for phase 1 to coordinate occupant move out of the west end of the building. Upon completion and acceptance of Phase 1, Government requires two weeks of transition time for occupant to move out of rooms on the east side of the building before the Contractor can proceed with Phase 2.
Contractor shall provide two weeks’ notice of anticipated acceptance of Phase 1 for coordination of occupant move out.
(AM0002)
b. B1646 – Appendix B
1. Install new condenser and ceiling mount air handlers for rooms 7, 8, 9 and 10 including demolition, ancillary work and equipment functional testing as shown in Appendix B. Provide as-built drawings in PDF and AutoCAD.
2. Historical regulated material surveys are not available for Building 1646. Complete a regulated material survey of areas to be disturbed.
3. Facility will be occupied during work completion. Work shall be phased by each room to minimize disruptions to operations. Rooms will be vacated for 3 days at time, as needed, for work completion. When work is not occurring in a room it will be occupied. Furniture (desks, filing cabinets, bookshelves) and equipment (computers, monitors) will remain in the room and shall be protected from damage and dust. Contractor is responsible to move furniture as required for work completion and return it to the original location.
4. Contractor will be escorted during all work occurring at B1646.
Contractor shall provide two weeks’ notice of anticipated work for escort coordination. (AM0002)
SECTION 01 11 00 Page 2
c. B1649 – Appendix C
1. Remove and replace existing “EXIT” signs and install new emergency
“Exit” combo type signs with 2 lights, LED bulbs, and Red lettering as shown on the drawing. Install wall pack lights as shown in the drawings, including new conduit and wiring from power source to device as indicated in Appendix C.
2. Historical regulated material surveys are provided in Appendix K.
For bidding purposes contractor shall assume all walls and ceilings on the second floor contain lead and asbestos.
Historical records may not represent current conditions. Complete a regulated material survey of areas to be disturbed.
3. Facility will be occupied during work completion. Work shall be completed in such a manner to allow exiting system to remain operational to the greatest extent possible.
4. Contractor will be escorted during all work occurring at B1649.
escort coordination.
d. B21140 – Appendix D
1. Remove and replace with new Built Up Roofing (BUR), evaporative coolers, and roof mounted lightning protection system components, including demolition, ancillary work and equipment functional testing. Provide as-built drawings in PDF and AutoCAD.
2. Historical regulated material surveys are not available for Building 21140. Existing roof system contains asbestos in the mastic. For bidding purposes the contractor is to assume all the mastic contains asbestos. Complete a regulated material survey of areas to be disturbed.
3. Contractor shall provide temporary heating or cooling during work completion.
4. Facility will be occupied during work completion.
e. B21234 – Appendix E
1. Replace HVAC, install UPS, install roof mounted searchlight and complete interior and exterior repairs and renovations as shown in Appendix E.
2. Historical regulated material surveys are not available for Building 21234. Complete a regulated material survey of areas to be disturbed.
3. Contractor will be escorted during all work occurring at B21234.
f. B21237 – OMA Funded – Appendix F
1. Replace sump pumps, replace HVAC system (interior and exterior), and refinish doors as shown in Appendix F. Temporary heating and cooling shall be required during replacement.
2. Historical regulated material surveys are not available for Building 21237. Complete a regulated material survey of areas to be disturbed.
3. Facility will be occupied and Contractor will be escorted during all work occurring at B21237. Contractor shall provide two weeks’ notice of anticipated work for escort coordination.
g. B21237 – RD&T Funded - Appendix G
1. Install new card reader box and conduit, replace two bullet resistant doors, and remove obsolete equipment as shown in Appendix G. Government retains salvage rights on the removed equipment.
SECTION 01 11 00 Page 3
2. Historical regulated material surveys are not available for Building 21237. Complete a regulated material survey of areas to be disturbed.
3. Facility will be occupied and Contractor will be escorted during all work occurring at B21237. Contractor shall provide two weeks’
h. B21240 – OMA Funded - Appendix H
1. Replace 3 ballistic windows, install gutter, replace flooring repair and paint interior and exterior as shown in Appendix H.
2. Historical regulated material surveys are not available for Building 21240. Complete a regulated material survey of areas to be disturbed.
3. Facility will be occupied and Contractor will be escorted during all work occurring at B21240. Contractor shall provide two weeks’
i. B21240 – RD&T Funded - Appendix I
1. Replace exterior door, install aluminum wall panels, install two 2 ton split systems, install new card reader box and conduit as shown in Appendix I.
2. Historical regulated material surveys are not available for Building 21240. Complete a regulated material survey of areas to be disturbed.
3. Facility will be occupied and Contractor will be escorted during all work occurring at B21240. Contractor shall provide two weeks’
j. B25900 – Appendix J
1. Remove and replace existing “EXIT” signs and install new emergency “Exit” combo type signs with 2 lights, LED bulbs, and Red lettering as shown on the drawing. Install wall pack lights as shown in the drawings, including new conduit and wiring from power source to device as indicated in drawing.
2. Historical regulated material surveys are provided in Appendix K.
Historical records may not represent current conditions. Complete a regulated material survey of areas to be disturbed.
3. Facility will be occupied during work completion. Work shall be completed in such a manner to allow exiting system to remain operational to the greatest extent possible.
4. Contractor will be escorted during all work occurring at B25900.
1.1.2 Location
The work is located at the White Sands Missile Range (WSMR), NM, approximately as indicated in Appendix A - J. The exact location will be shown by the Contracting Officer.
1.2 DEMOLITION
1.2.1 Any and all demolition shall be the responsibility of the Contractor.
The Contractor shall dispose of removed materials (excluding items specifically indicated for salvage to the Government) at an off-site location that has been permitted, by the jurisdiction having authority, to accept and dispose of the waste and debris.
1.2.2 To the extent possible scrap metal, including electrical wiring, shall
SECTION 01 11 00 Page 4 be disposed of at the WSMR Metal Scrap Yard (575-678-3160 or 575-640- 8522), located 3.5 miles east of Main Post. All glass shall be removed from metal windows and metal doors before transporting the scrap metal to the Metal Scrap Yard.
1.2.3 Regulated Material Survey. A regulated material survey has not been completed for all areas that may be disturbed during the project.
Available regulated material surveys and documentation are available at Appendix K. The Contractor shall perform hazardous building materials sampling of all building material suspected of being Asbestos Containing Material (ACM) or contain Lead based paint that may be disturbed during this project. Asbestos sampling shall be performed by an asbestos inspector that meets the requirements of the Environmental Protection Agency (EPA) Asbestos Hazard Emergency Response Act (AHERA). If hazardous building materials are present, the Contractor shall inform the KO. The contractor shall be responsible for abating all hazardous building materials in the work area. Abatement of hazardous building materials (including asbestos containing material (ACM), Lead based paint (LBP), or mold) shall take place prior to performing other work of this project. The Contractor shall be responsible to perform abatement and disposal of all hazardous building materials in accordance with all applicable laws, rules and regulations, and with the Section 02 82 00 ASBESTOS REMEDIATION and Section 02 84 00.00 44 REMOVAL, RECYCLING AND
DISPOSAL OF REGULATED MATERIALS.
1.3 PHOTOGRAHY
The Contractor or any of their subcontractors are prohibited from taking photographs of any type while on the installation. Failure to comply with this requirement will result in employee being barred from entering the installation. Photographs may be taken by the government COR and provided to the Contractor upon security review and approval.
1.4 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract. Contractor shall anticipate loss of one productive hour per day for facilities that require escorts during work execution.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.5 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
PART 2 PRODUCTS
SECTION 01 11 00 Page 5
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
APPENDIX B
(AM0002) NOT USED
Building 1646
CLIN 0003(AM0002)
APPENDIX C
Building 1649
CLIN (AM0002)
0003 & 0004 &
0005(AM0002)
APPENDIX D
Building 21140
CLIN (AM0002) 00005 & 0006
& 0007 (AM0002)
MH 20
M
3F
CF
300 KVAR
CF
3F
4#1/0 4#1/0
4#1/0 1#6C
2#6
N E O P R E N E
C A B L E
K V
4#6 C
4#4 AL
1#6 C SL
1#6 AC
3F CF
100 AMP
SWITCH
C
AIR SWITCH
#58 600A
4#1/0 1#6 C
4#1/0
4#1/0
C
3 50 3
C U
A L
C
3#6 AL
A L
4#2 AL
A L
C
A
A C
#4 SOLID
3 25 1 4#1
/0
TBW
P
4#4
3 37.5 1
4#6 CU
3#6 AL
4#6 CU
4#4 AL
1#6 C
3#6 AL
4#4 AL
C W
C
V S P
S L
A C
1#6 C
1#6 ACW
3 10 3
4#4 /0
C 4
A L
3 25 1
A L
1#6 AC
1#6 C SL
120V SL
1#6 ACW 120VSL1#6 C
C
C
C
C U
1 5 1
A
3#6AL 120V3#6 AL
3F
CF
2# A
CF
3F
100 A SW
600A
POLE TOP SWITCH
4#6 C
4#1/0 AL
3#4 C
1 25 1
3 75 3
2#6 C
2#6 ACW
2#6 C
2#6 ACW
#3 CIRCUIT
3 37 3
3#6 C
4#4 ACSR
A L
T B W P
OPEN
DELTA
4#
TB
WP
1 10 1
3 15 1
4#4
TB
WP
C U
C U
C U
C I R C U I T
A
4#6 C
3#4 A
8# 1/ C
C
100 A SW
CF
3F
1 50 1
1 10 1
100 A SW
3F
CF
3F
CF
3F
CF 3F
CF
100 A
C
C
2#6 ACW
2#6 C
2#6 ACW
2#6 C
2#6 ACW
2#6 C
2#6 AL
#3 CIRCUIT
W P
C
A C W
A W C
C
A W C
C
5#6 C
1#6 AL
3#6 C
4#2 WP
4#6 C
A L
3 25 3
1 25 3
A L
3F
CF
100 A SW
3 75 3
W P
4# 1/
AL
1 37.5 1
6 25 1 1
W P
W P
C M W P
C
C
C
C
2#6 C
3#1 /0
AL
C
434/0 C
A L
3 25 1
2 15 1
A L
4# C
1 75 1
4#
AL
C U
2- 8#4/0 CU3 37.5 1
4#6
AL
3#6 CWP
3#6 CWP
3#4 AL
3#
WP
W P
C
A W C
C
A W C
A L
3F
4#6 C
4#1/0 AL
C
S H D
C O P P E R
N
3 37.5 1
449 448
4" C&WS
4" C&WS
2"
2"
1"
4" C&WS
4" C&WS
2"
1" 1
2"
1 1/4"
4" C&WS
C W S
C W S
C W S
1"
1 1/2"
S T E E L
2"
2" C&WS
C W S
1 1/4" STEEL
1/2" P.E. 2" CASTING
1" C&WS
1" POLY SVC.
LINE
1" POLY SVC.
LINE
1" POLY SVC.
LINE
4" POLY SVC.
LINE
1 1/2"
POLY SVC.
LINE
1"
POLY
SVC.
LINE
4" POLY VALVE
4" POLY MAIN
4" POLY
VALVE
1 1/2" POLY
SVC.
LINE
1 1/2" POLY
SVC.
LINE
1 1/2" POLY SVC.
LINE
1" POLY SVC.
LINE
1 1/4"
POLY SVC.
LINE
1 1/4" POLY SVC.
LINE
1" POLY
SVC LINE
1-1/4" poly
1 1/4" P.E. 1 1/2"
2" CASTING
4" C&WS
1 1/4"
4"
C W S
4" C&WS
1"1"
1 1/4"
1 1/4"
1"
C W S
1 1/2"
POLY
SVC.
LINE
2" POLY SVC.
LINE
2" POLY SVC.
LINE
1 1/4" POLY
SVC. LINE
2" Poly svc line
1" Poly svc line
P o l y s v c l i n e
P o l y s v c l i n e
P o l y s v c l i n e
1-1/4" Poly svc line
1" Poly svc line
1-1/4" Poly svc line
P o l y
M a i n l i n e
P o l y
M a i n l i n e
P o l y
M a i n l i n e
P o l y
M a i n l i n e
1-1/4" Poly svc line
1-1/4" Poly svc line
2" Poly svc line
1-1/4" Poly svc line
1-1/4" Poly svc lineMain line
16211
S
S
S-1744
S
W A S H
S
S-1753 S-1729
MATERIAL
S
S
S
S
S-1690
S
S-1523
S-1546
S
S-1527
T-1625
S-1648
S
S
T
S-1783
S-1790
S-1850
S-1735
S-1766
S-1763
S
S-1734
S-1737
S-1748
S-1787 S-1786
S
S
N
S-1826
T-1834
POST
T-1835
S-1552
TELEPHONE
EXCHANGE
S-1538
1867-N
1870-N
N
N
S-1871
S-1780
S-1774
S
S
S
S
S
S
S
T-149
WAREHOUSE AREA
S-1795
S
174A
S-078B
S L A B
TEST
BUILDING
W A S H
KENNELS
A
B
21090
S-1731
S-1798
S-1728
S-1733
S-1727
S
S-1721
S-1767
S-1541
21125 21110
21120 21115
21080
V C
490'
MH 648
C 4209.41
SEE PLATE #32
FOR BUILDING
FOR BUILDING
SEE PLATE #32
C 4210.05
MH 647
INV 4212.42
8" V C
I N V
I N V
8" VC
V C
INV 4207.20
I N V
I N V
I N V
MH 646AS
C 4227.21
MH 645
C 4220.84
MH 646
8" VC
INV 4209.29
6"
INV 4217.66
V C
I N V
I N V
V C
I N V
V C
I N V
INV 4194.50
MH 679
C 4196.72
15" VCINV 4194.50
MH 678
C 4195.08
C 4205.00
MH 78
569'
V C
I N V
I N V
V C
INV 4197.38
I N V
FOR BUILDING
SEE PLATE #32
MH 649
C 4210.85
MH 658
C 4203.93
MH 659
C 4205.17
4"
C 4223.89
MH 638
I N V
I N V
4"
660'
267'
269'
INV 4185.24 INV 4184.29
INV 4181.04INV 4181.09 15" VC
INV 4176.84
INV 4176.68
15" VC
INV 4182.34 INV 4182.24
I N V
V C
I N V
4" VC
V C
I N V
V C
MH 79
C 4195.41
MH 690
C 4191.67
V C
I N V
I N V
V C
V C
MH 80A
6"INV 4190.78
V C
C 4191.14
MH 80
V C
C 4184.83
MH 81
I N V
I N V
MH 664
C 4213.19
I N V
I N V
MH 689
C 4196.34
V C
COS
S
CO
S
S
CO
CO
S
CO
CO
CO
CO
CO
CO CO
CO
S
S
CO
CO
S
S
CO
S
CO
S
CO
S
S
S
CO
CO
S
CO
S
S
S
S
SAN MH
TOP=4240.93
INV=4230.46 (S)
INV=4230.46 (E)
SAN MH
TOP=4233.79
INV=4224.20 (E)
INV=4224.20 (W)
S S
S S
CO
CO
FH FH FH
FH
FH
FHFHFH
FH
FH
A C
C I
C I
6" AC
5-54
5-47
5-51
28-17
28-16
75-3
75-4
25-5
77-5
77-4
77-3
77-2
33-8
33-3
33-7
33-5
33-1
33-12
33-11
BREAK POINT
28-2
28-1
28-5
33-16
32-20
33-18
28-6
33-14
200501
R
G S
A C
6" AC
6" AC 6" AC
6" AC
A C
8" AC
A C
A C
A C
A C
6" AC
6" AC
8" AC
A C
8" AC
A C
A C
6" AC
6" AC
6" AC
A C
6" AC
8" AC
A C
A C
A C
A C
6" AC
A C
A C
8" AC
A C
6" AC
A C
A C
C I
A C
C I
6" AC 8" AC
A C
8" PVC8" AC
5-41
5-3
5-2
5-43
5-44
5-40 5-42
5-38
5-39
5-45
5-6
5-37 5-35
5-36
5-30
5-31
5-28
5-34
5-33
5-46
5-32
33-4
32-16
33-2
32-15
32-15
33-9 33-10
33-6
33-17
32-17
32-19
32-18
33-15
28-7
33-13
82-8
83-1
83-2
83-3
83-4
86-7
86-8
88-1
88-2
85-5
93-2
93-1
91-4
91-3
85-4
91-2
89-3
85-3
85-2
85-6
92-1
91-1
87-3
85-1
78-11
78-12
VALVE BOX
78-13
78-14
73-8
87-1
87-2
92-4
92-3
92-2
89-2
89-1
75-7
75-6
78-15 77-1
P V C
8" PVC
80-1
80-2
P V C
79-1
8" PVC
P V C
P V C
P V C
P V C1
A C
200504
6"
A C
5-27
P V C
73-6
73-7
A C
5-19
71-3
76-8
76-7
76-6
6" AC
V28-26
28-25
64-1
32-5
32-1 62-4
8" PVC
26-5
19-17
8" PVC
P V C
8" AC 53-23
VACUUM
BREAKER
VACUUM
6" AC
82-4
84-11
62-3
P V C
8" AC 62-2
62-1
VACUUM
BREAKER
8" AC
86-6
86-5
BACKFLOW PREV.
8" PVC
LAS CRUCES GATE ENTRANCE
HEADQUARTERS AVE.
NIKE AVE. PROJECT LOCATION
DESIGNED BY
CHIEF, ENGINEERING DIVISION
DATE
APPROVED
RECOMMENDED
BRANCH CHIEF
SUBMITTED
PROJECT MANAGER
CHECKED BY
DRAWN BY
NO. DATE
WHITE SANDS MISSILE RANGE, N.M.
DRAWING NUMBER
DIRECTORATE OF PUBLIC WORKS
SCALE
SHEET
ENGINEERING DIVISION
OF
PLATE
DESCRIPTION
REVISIONS
APPROVEDBY
WHITE SANDS MISSILE RANGE, NEW MEXICO
DIRECTORATE OF PUBLIC WORKS
REPLACE ROOF AND EVAPORATIVE COOLERS OF B21140
ENGINEERING DIVISION
W H
I T E
S
AN
DS
MI SSI
L E
R A N G E
B I R T H P L A C E O F
AMERI CA'S MI SSI L
E S P A
C E A C T I V
I T Y
REPLACE ROOF AND EVAPORATIVE
COOLERS OF B21140
COVER SHEET/DRAWING INDEX
WS-WTD051410P-2020-G-000-01
DIRECTORATE OF PUBLIC WORKS
LUCAS M. JAQUES LUCAS M. JAQUES
XX
LUCIANO RIGALES
RAFAEL ACOSTA
SAMUEL MORRIS
XX NOT TO SCALE
CONCURRENCES
Note: Signatures affixed on this sheet indicate official recommendation and approval of all the drawings in this set as indexed on this sheet
Safety
Security
Department
Environmental
Force Protection
Management
Maintenance
Customer 1
Customer 2
DPW
Information
Anti-Terrorism
Fire
Physical
Garrison
Operations &
D E S I G N
R E V I E W
DRAWING # TITLE
WS-WTD051410P-2020-G-000-01 COVERSHEET / INDEX SHEET
WS-WTD051410P-2020-RF-100-02 BUILDING 21140 TOP ROOF VIEW
WS-WTD051410P-2020-RF-100-03 ROOFING DETAIL
WS-WTD051410P-2020-M-100-04 DUCTING LAYOUT
WS-WTD051410P-2020-M-100-05 HVAC UNIT DETAILS
APPENDIX D-1
148'-2" i-----------------------125'-6" ---------------------i
LEVEL
·· ·•l---1 _H v_____,,I 0
I CJ :
= = DDER ACCESS TO LEVEL 2
= .. LEVEL 2 ...
c:::
c:::
c:::
c:::
c:::
c:::
c:::
c::: • c:::
c:::
c:::
u u
.. 0 Go.
0.
b
LEVEL
u u � u u
LEVEL 1
.·.l---1 �Hv----'1- 1---1 _Hv�I
I= t:::::J
.. lf---+---+-+---+----+-l---+----+--1---+----+------ll---+----+------l--+-----ff
... tt----+----+--+---+----+--+---+----+--t---+----+-------<t---+----+-------<--+-----ff
· . tt----+----+--+---+---+--+---+----+--t---+----+-------<t---+----+-------<--+-----ff
.. lf---+---+-+---+----+--l---+----+--1---+----+------ll---+----+------l--+-----ff
I=
I=
I=
I=
I=
I= j
_J ADDER ACCESS TO LEVEL 1
'1---, _ ___,, DDER ACCESS FROM GROUND LEVEL TO CATWALK
u u u u u u u u u u u u u U U U U\__U U U
BUILDING
SCALE: 178"
21140 ROOF TOP LAYOUT
= 1 '-o''·---------------
LEGEND
EXISTING HVAC UNIT
EXISTING ROOF VENT
EXISTING EQUIPMENT STANDS
EXISTING OPERATIONAL HVAC
EQUIPMENT
EXISTING VENT PIPES
EXISTING LARGE VENT PIPE
LADDER ACCESS
PEA GRAVEL SURFACE
GENERAL NOTES #
1. EXISTING BUILT UP ROOFING SYSTEM IS
TO BE REMOVED ALL THE WAY DOWN TO
BARE CONCRETE DECK FOR BOTH LEVELS
1 AND 2.
2. ONCE CONCRETE DECKING IS EXPOSED
CONTRACTOR IS TO MAKE SURE ENTIRE
SURFACE IS CLEAN AND IS PREPARED
BY ADDRESSING ALL ROOF
PENETRATIONS IN PREPARATION OF NEW
BUILT UP ROOFING SYSTEM.
3. ALL VENTS AND OTHER EQUIPMENT
IDENTIFIED SHALL REMAIN IN PLACE
AND SHALL NOT BE DISTURBED EXCEPT
IF SPECIFIED.
4. OLD EQUIPMENT STANDS LOCATED ON
FIRST LEVEL NEED TO BE REMOVED.
AFTER REMOVAL BARE SURFACE NEEDS
TO BE PREPARED TO ALLOW PROPER
DRAINAGE TOWARDS EAST SIDE OF THE
FACILITY .
5. THERE ARE ONLY TWO LADDER ACCESS
POINTS ONE FOR EACH LEVEL AS
SHOWN IN DRAWING. FOR THE SECOND
LEVEL DUE TO THE OVERALL HEIGHT
THERE IS A SAFETY CONCERN,
CONTRACTOR IS TO TAKE ALL SAFETY
PRECAUTIONS WHILE WORK IS
COMMENCING ON SECOND LEVEL.
6. REMOVE ROOF MOUNTED LIGHTNING
PROTECTION SYSTEM COMPONENTS TO
THE POINT OF EACH DOWN CONDUCTOR.
EXISTING DOWN CONDUCTORS TO REMAIN
FOR TIE-IN OF NEW ROOF MOUNTED
COMPONENTS.
7. ROOF MASTIC CONTAINS ASBESTOS.
COMPLETE A REGULATED MATERIAL
SURVEY FOR ALL AREAS TO BE DISTRUBED.
[y] fJC rlATF
F!E/1'.3 ;·�•-:;
WHllE SANDS MISSILE RANGE. N.M.
DIRECTORAlE OF PUBLIC WORKS
ENGINEERING DIVISION
DR/-.sXN OY I
)[SIGN[: JV
_vCf..S I/. �A:JUES LJCAS �1. J,'.;QUC:S
CHl:.CKI:_� tlY xx
SIJ□ f/lTTCD
LU::::IAJJC RICA [S
f<.".-Af-1 A::oc: .A.
cl--11',l�CH CHI:.-
APPRCv::c xx '.iC,\11
REPLACE ROOF AND EVAPORATIVE
COOLERS OF B21140
BUILDING 21140 ROOF TOP LAYOUT
WS-WfD051410P-2020-RF-100-02 02
APPENDIX D-1
b JUN 2020 ADDED INFORMATION FOR LPS DEMOLITION
CONCRETE DECK
POLYISOCYANURATE, WOOD FIBERBOARD, ATTACHMENT: HOT
GLASS FELT, SURFACE: RIVER GRAVEL
ASPHALT LAYER
GRANULE SURFACE, HOT MOPPED
GLASS FELT, SURFACE: RIVER GRAVEL
GLASS FELT, SURFACE: RIVER GRAVEL
GLASS FELT, SURFACE: RIVER GRAVEL
ASPHALT LAYER
ASPHALT LAYER
ASPHALT LAYER
ASPHALT LAYER
ASPHALT LAYER
ASPHALT LAYER
POLYISOCYANURATE, WOOD FIBERBOARD, ATTACHMENT: HOT
TYPICAL ROOF DETAIL
SCALE: NONE
GENERAL NOTES #
1. CONTRACTOR IS TO REMOVE ALL EXISTING
ROOFING MATERIALS DOWN TO EXISTING
CONCRETE DECK, INCLUDING FLASHING, METAL
EDGINGS, DRAIN LEADS, PIPE BOOTS, PITCH
POCKETS, EXISTING ROOFING SYSTEM MAY
CONTAIN ASBESTOS.
2. WORK TO ALSO INCLUDE SURFACE PREPARATION
OF BARE CONCRETE DECK AND ALL ROOFING
PENETRATIONS.
3. CONTRACTOR IS TO PROVIDE ALL LABOR,
EQUIPMENT AND MATERIAL TO INSTALL NEW BUILT
UP ROOFING SYSTEM. INSTALL NEW ROOFING
SYSTEM WITH TAPERED AND/OR BOARD
INSULATION.
4. CONTRACTOR IS TO RE-INSTALL ALL EXISTING
GUTTERS AND DOWNSPOUTS REMOVED DURING
CONSTRUCTION.
5. INSTALL NEW COUNTER FLASHING PITCH PANS,
AND ANCHORING TO NEW ROOF SYSTEM.
6. RE-INSTALL ALL EXISTING ROOF TOP EQUIPMENT
EXCLUDING HVAC UNITS. THIS INCLUDES ROOF
DRAINS ECT.
7. INSTALLATION OF NEW BUILT UP ROOFING SYSTEM
SHALL FOLLOW COMMON ROOF INSTALLATION
PRACTICE. AND SHALL FOLLOW MANUFACTURES
RECOMMENDATIONS FOR INSTALLATION.
8. LIGHTNING PROTECTION SYSTEM SHALL BE
REPLACED AND SHALL BE UL CERTIFIED TO MEET
CURRENT STANDARDS AND SHALL BE INSTALLED
BY A LICENSED PROFESSIONAL.
ASPHALT LAYER
VAPOR BARRIER
DESIGNED BY
CHIEF, ENGINEERING DIVISION
DATE
APPROVED
RECOMMENDED
BRANCH CHIEF
SUBMITTED
PROJECT MANAGER
CHECKED BY
DRAWN BY
NO. DATE
WHITE SANDS MISSILE RANGE, N.M.
DRAWING NUMBER
DIRECTORATE OF PUBLIC WORKS
SCALE
SHEET
ENGINEERING DIVISION
OF
PLATE
DESCRIPTION
REVISIONS
APPROVEDBY
REPLACE ROOF AND EVAPORATIVE
COOLERS OF B21140
TYPICAL ROOFING DETAIL
WS-WTD051410P-2020-RF-100-03
DIRECTORATE OF PUBLIC WORKS
LUCAS M. JAQUES LUCAS M. JAQUES
XX
LUCIANO RIGALES
RAFAEL ACOSTA
SAMUEL MORRIS
XX NOT TO SCALE
D E S I G N
R E V I E W
APPENDIX D-1
INSTALL NEW LIGHTNING PROTECTION SYSTEM ROOF
MOUNTED COMPONENTS MEETING NFPA 70, NFPA 780,
UL 96 AND SECTION 26 41 00 LIGHTNING PROTECTION
SYSTEM. TIE-IN AT EXISTING DOWN CONDUCTORS.
b JUN 2020 ADDED INFORMATION FOR LPS INSTALLATION
. 4 •• . ..
. .d.".
4 •
. . 4 ·.
MULTI-DIRECTIONAL DIFFUSER
GENERAL NOTES #
1. EXISTING DUCT IS TO BE REPLACED WITH
SIMILAR DESIGN AS SHOWN HERE IN THE
EXISTING HVAC DUCT PENETRATIONS.
2. ALL NEW DUCTING SHALL BE 32"X32" ANY
AND ALL ROOF PENETRATIONS SHALL BE
SEALED ACCORDING TO COMMON ROOF
PRACTICE.
3. EACH OPENING IN DUCTING SYSTEM SHALL
ALSO HAVE MULTI-DIRECTIONAL
DIFFUSER. NEW DIFFUSERS SHALL BE A
FOUR-WAY ADJUSTABLE CURVED BLADE
DIFFUSER FOR EACH OPENING. BASIS OF
DESIGN SHOEMAKER MANUFACTURING
MODEL CB4O.
4. COORDINATION WITH BUILDING OCCUPANTS
WILL BE NECESSARY AS SEVERAL DUCTING
SYSTEMS ARE LOCATED IN WORK AND
ENTRANCE AREAS OF THE FACILITY.
1.1 . . �-. 4 . ·a . .
. . .4 . ., . . .
,. .4 ".' ·•
. . . ·a· . .,_
EXISTING HVAC DUCT PENETRATIONS
SCALE: NONE
::! "4• .. •
! -�·· . 4 ., . . .
. . · .I .
4 ·•
. .d.,·_ .
MULTI-DIRECTIONAL DIFFUSER
. 4
<I � • 4
. 4· ..
. . . 4 ·.
4:
1.1 . . �- . 4
. ' ",.d . ., .• ..
. . fll 4 .•
. .. ·a·. •·
.. 4 ..
. . . .' 4
32"X32" DUCTING
ULTI-DIRECTIONAL DIFFUSER
LOCATED ON BOTH SIDES OF DUCTING
ULTI-DIRECTIONAL DIFFUSER
l)fC;CRll'I :m
WHITE SANDS MISSILE RANGE. N.M.
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
CHt.CK:_J 8Y
REPLACE ROOF AND EVAPORATIVE
xx
�,,-,.,-= ---- COOLERS OF B21140
EXISTING HVAC DUCT PENETRATIONS
RECO\H,IE\JC:C
APPR:J\!EJ I 'I A. If
SAlvUEL '·1IC's'slS
WS-WTD05141 0P-2020-M-1 00-04 04
xx l�CT TC s::;:\L =-
TYPICAL RIGID MEDIA 8" X2
II,, Q-. .... Q-., Q-. "'Q-.... Q-., Q-. .... Q,, .... Q-. ,Q-
<?'q.0q.q.q.q.q.q.,/"q.q.,lq.'<?'q.'5 f-0'l'q.
q./<'q.q.
q.
0<?'0'<', <?'
00q.00 q.
<?'000<?'
.q.� <?'q.(l'q.q.q. 0 q. q. q.
q.<?'q.
q. 0 q-0, f' 0 0 0 q. 0 00 <?' 0 0 0 <?' 0 0 0 <?'q. (l',
q. 0 Q' 0 q. 0 ° 0 q. 0° 0 <?' 0 ° 0 q. Q-� <?' q.
q.
q.
q.
q.
q.
q.
q.
q.
q.<?'q.0, f' 0 ° 0 q. 0 ° 0 q. 0 ° 0 q. 0 ° 0 q. 0 0,<?'0
00 q-0 0 0 <?' 000 q-0 00 0 0 '5f Q-0 q. <?' q. 0q. q. Q-0 q. q. Q-0 q. <?'q-0, f' 0 Q' 0 q. 0 'I' 0 q. 0° 0 <?' 0 ° 0 q. 0 0,
q. 0 Q' 0 q. 0 ° 0 q. 0 ° 0 q. 0 ° 0 q. Q-'5 f' Q-0 q. q. Q-0 q. q. q-0 Q-q. Q-0 q. q. q-0, <?' 0"' 0 <?' 0 0 0 <?' 00 0<?'0 0 0 0 0 0,
q. 0 0 0 q. 0 0.q. q. 0 0 0 <?' 0 0 0 <?'q. '5f Q-0 q. q. Q-0 q. q. q-0 Q-<?' Q-0 q. q. q-0,
q. 0 'I' 0 q. 0 ° 0 q. 0 ° 0 q. 0 ° 0 q. 0 0,
q. 0 'I' 0 q. 0 ° 0 q. 0° 0 q. 0 ° 0 q. 0'5f' Q-0 q. q. Q-0 q. q. q-0 q.<?' Q-0 q. 0 q. 0,
q. 0 0 0 q. 0 0 ,Q-q. 00 0 <?' 0 0 0 q. ,Q-�
q. 0 ° 0 q. 0 ° 0 q. 0° 0 q. 0 ° 0 q. Q-'5f' Q-0 q. q. Q-0 q. q. Q-0 q. Q-Q-0 q. q. Q-0,
q. 0 ° 0 q. 0 ° 0 q. 0° 0 q. 0 ° 0 ° -Q-�
q. 0 0 0 q. 0 0.q. q. 00
0<?' 0 0 0 q. 0'<', f' Q-0 q. q. Q-0 q. q. q-0 Q-q. Q-0 q. q. Q-0,
q. 0 ° 0 q. Q-0 0 q. 0° 0 q. 0 ° -Q-q. 0 �
q. 0 ° 0 q. Q-0 0 q. 0 ° 0 q. 0 ° -Q-q. "'""
q. Q-0 q. q. Q-0 q. q. q-0 Q-Q-Q-0 q. «' q-0, Q-0 0 0 0 0 0 0 q. 00
0«' 0 0 0 <?' 0 '5 f 0 ° 0 q. 0 ° 0 q. 0° 0 q. 0 ° 0 q. "'"" f' Q-0 q. q. Q-0 q. q. q. 0 q. q. Q-0 q. q. Q-0,
q. 0 ° 0 q. Q-0 0 q. 0° 0 q. 0 ° -Q-q. 0 '5 �,.0,._<?-. rl',,.."c. <f,.�,._0,.<t,..<t-.
'o 'o
� l...!
BLOWER FAN
HVAC UNIT
SCALE: NONE
Si DE
BOTTOM
SPECI Fl CATIONS
IS_ ---'
� l...!
�,Q-Q-{'�<'Q-<'�<'�<'�<'�<'�<'q. '<' ,Q' ,Q' ,Q' '<' '<' '<' ,Q' ,Q',, f'.0
.q.
«'0°/"0° .q.
°/<'q.'<'.
f 00 q.«' ,Q-0 ,Q-0 q.
0 /<' ,Q-,Q-'<' q.
q.
q.
q.
q.<?' q.
q.«'q.<l:, f'. .q-0 q.«' q-0 .q.
0 q.<?' 00 0«' .q.
f'.0 0.q.
<?' 00
-Q- 0000 q-0 0 0«'.q.,Q-'<' q.
q.«' q.0 q.
q.
q.
q.
0 q.«' q.
<l:, f q-0 q.«' ,Q-0 q.
«' 00 q.«' 0'<'.f q-0 q.«' .q-0 0<?' .q-0 q.<?'
0 q.«' 0,Q-
'<' q-0 q.«' q.
q.
<?' q-0 q.
<?' q-0 q.«' q.<l:, f 0 °,Q-<?' 0°
°0°0 q-0 'I' 0"'
0'<'.
f q.0
.q.
«' 0°
0°
.q.
° 0"'0°
'<' q-0 q.«' q-0 q.<?' q.'<' q.<?' q.'<' q.«' q.'<'.
f q.'<' q.«'
°0<?' q.
° 0"'
'<' 0 q. 0 <?' 0 <?' 0 <?' 0 re"' 00 q.
q.
.q.
0 q-0 .q-0
04' f<'Q-0 <?' Q-<?'0<?'0<?'0Q-0 <?' q. <?'0<?',J.
�'<'q.'<'q.0
.q.0 q.
.q.'<' q.
.q.
00.q. -Q-0 0 0 0 -Q-0 0 0.• f q.'<' q.«' q.0 q.
q.'<' q.<?' q.'<' q.«'q.'<'.
f q.'<' q.«' q.
00<?' /<' q.<?' q.'<' 0«'1/' f<-q. 'I' Q-<?' 0°0<?'0'<'.q. q. 0 'I' 0"'0<?:. f q.
,;-Q-,;-f q.'<' q.«' ,Q-0 0<?' q.'<' q.<?'
"' q.«' 0"'
q. q.'<' q.«' q.
q;
,Q-q.<?' q.'<' q.«' q;<l:, f ,;-,Q-q.<t' .q.0q.«' ,,_q. ,,_q. ,,.0 ,;-«'q.'<'.
f q. ,Q-q. <t' q.
q;<?'q;Q-q. <?' 0 0 q.«'q;,Q-f<' q.
'<' q.«' q.0 q;
0 q;0
.q.
0 q.'<' q.«' q;
f q.,Q-q.<t' q-0 q.<?' q.,Q-q.Q-q.'<' q.«' q.'<' 9 ,Q-,Q-,Q- <,' q.0 q;
<?' ,Q-,Q-,Q-Q-q.'<' q.«' q;
,Q-
'<' q-0 q.«' q-0 .q.
«' ,Q-,Q-,Q-<,' q.'<' q.«'q.<l:,f q. ,Q-Q-<?' q.0q.<?'q.,Q-q. q. Q-0 q. «'q.'<'.
90<?'00090<?'-Q- Q-�,Q-<!'Q-�,Q-�Q-<!',Q-�Q-�,Q-<!'0�J
FRONT
HVAC UNIT DESIGN
DATA
HORSE POWER 2
Fan RPM 592
MOTOR VOLTAGE 480
MOTOR PHASE 3
PUMP
VOLTAGE/AMPS 120/3.4
MOTOR AMP 2.9
CFM @ STATIC
PRESSURE 0.01
16,200
GENERAL NOTES #
1. ALL SIX HVAC UNITS ARE TO BE
REMOVED AND REPLACED THIS ALSO
INCLUDES ALL FLASHING AROUND EACH
UNIT .
2. HVAC UNITS SHALL MEET OR EXCEED
HVAC UNIT DESIGN DATA TABLE. BASIS
OF DESIGN PHOENXI MANUFACTURING
MODEL RF4224.
3. CONTRACTOR IS TO INSTALL NEW WIRING
FOR HVAC UNITS AND SHALL USE
EXISTING 15 CIRCUIT BREAKER FOR EACH
EVAPORATIVE COOLER AND THE NEMA 3R
DISCONNECT SWITCH WITH 15 AMP FUSES
THREE SHALL BE USED. NEW WIRE SHALL
BE INSTALLED AND SHALL BE #14 AWG,
COPPER STRANDED, THHN 600V RATED.
GROUND WIRE SHALL ALSO BE #14 AWG
CONTRACTOR IS TO USE EXISTING
CONDUIT.
4. ALL EXTERNAL WIRING AND AND
EQUIPMENT COMPONENTS SUCH AS
DISCONNECTS, MOTOR STARTERS, AND
OVER CURRENT PROTECTION DEVICES
SHALL BE SUPPLIED BY CONTRACTOR.
5. A SEPARATE 120 VOLT, 60 HERTZ,
SINGLE PHASE, GFCI PROTECTED PUMP
CIRCUIT IS REQUIRED TO MAINTAIN THE
UL LISTING OF THE EVAP. COOLER. PUMP
CAPACITY IS TAKING IN ACCOUNT TWO
PUMPS PER UNIT.
�IC. U,\I :_
R[VIS J\S
3Y
WHllE SANDS MISSILE RANGE. N.M.
DIRECTORAlE OF PUBLIC WORKS
ENGINEERING DIVISION
UkA'i'.'r1 l:JY I
J:_SIG\J:_ _ _:. :CY
-"2AS f✓. ,_IAQLl[S Ll.,CAS f,1. ,_l,'-QU=S xx
:-;u--Jf1111 c ;
REPLACE ROOF AND EVAPORATIVE
COOLERS OF B21140
I LJC I.AW; --il(;A f-';
r'RJ,C:CT f/,.;,�JAGE'<
BR/>JJCH CHIE=-
'.-;t,vUf- fl'.)kklC;
::HH, - r<; Nf-- k N<; 1:, v1s1c r
D.ATE
xx
HVAC UNIT SPECIFICATIONS
PL.ATE
WS-WTD051410P-2020-M-100-05 05
VlT TC) SCt,.1 I
Building:
Last Replacement:Occupancy:
21140 - TEMP TEST CHAMBER
4/28/2003WSMR
Sec Name:
Original Construction: 1/1/1984Area:
A
12,325 (SF)
Layout:
Parapet: Roof Edge:
Exp. Joint:
Adj. Wall:
Area Div.: Other:
315 (LF) 0 (LF)
148 (LF) 0 (LF)
0 (LF)
0 (LF)
Access: EXTERNAL LADDER: Permanent
Structural Frame:
Roof Deck:
Vapor Retarder:
Drainage:
Slope:
UNKNOWN
CONCRETE STD: Precast 1/4 in 12
SCUPPERS W/LEADERS & DOWNSPOUT
NONE
Structure:
Roof Category: Membrane
PLUMBING VENT, PITCH PAN, ROOF PENETRATION, EXPANSION JOINT: Flexible Cover, WALL/PARAPET, EQUIPMENT SUPPORT: Curbs
AGG: River Gravel
Description:
Protected Mem.:
Attachment:
METAL
NONE
Flashing Adhesive:
Types:
Walkways:
BUR: Asphalt
Spec. No.:
MOD BIT: Granule Surface
Reinforcement:
Type:
B.U.(HOT/COLD): Glass Felt
No
Surfacing:
ERSL W/=10+
ERSL W/O=10+
Base Flashing:
Counterflashing:
HOT MOPPED
Membrane Mfg:
UNKNOWN
Comments:
Thickness:
POLYISOCYANURATE, WOOD FIBERBOARD
Tapered:2Layers:
ADHESIVE - HOT
Types:
Attachment:
R-Value:
4.00 (IN)
Membrane:
Insulation:
No
Flashing:
Roof Section Inventory Report
White Sands Missile Range (35995) Unassigned
Page 1 of 5February 21, 2020
APPENDIX D-2
21140 - TEMP TEST CHAMBER
4/28/2003WSMR
Sec Name:
Original Construction: 1/1/1984Area:
B
1,162 (SF)
Layout:
Parapet: Roof Edge:
Exp. Joint:
Adj. Wall:
Area Div.: Other:
69 (LF) 0 (LF)
28 (LF) 0 (LF)
42 (LF)
0 (LF)
Access: EXTERNAL LADDER: Permanent
Structural Frame:
Roof Deck:
Vapor Retarder:
Drainage:
Slope:
UNKNOWN
CONCRETE STD: Precast 1/4 in 12
SCUPPERS W/LEADERS & DOWNSPOUT
NONE
Structure:
Roof Category: Membrane
WALL/PARAPET, EQUIPMENT SUPPORT: Curbs, PLUMBING VENT, EXPANSION JOINT: Flexible Cover
AGG: River Gravel
Description:
Protected Mem.:
Attachment:
METAL
NONE
Flashing Adhesive:
Types:
Walkways:
BUR: Asphalt
Spec. No.:
MOD BIT: Granule Surface
Reinforcement:
Type:
B.U.(HOT/COLD): Glass Felt
No
Surfacing:
ERSL W/=10+
ERSL W/O=10+
Base Flashing:
Counterflashing:
HOT MOPPED
Membrane Mfg:
UNKNOWN
Comments:
Thickness:
POLYISOCYANURATE, WOOD FIBERBOARD
Tapered:2Layers:
ADHESIVE - HOT
Types:
Attachment:
R-Value:
4.00 (IN)
Membrane:
Insulation:
No
Flashing:
Roof Section Inventory Report
White Sands Missile Range (35995) Unassigned
Page 2 of 5February 21, 2020
21140 - TEMP TEST CHAMBER
4/28/2003WSMR
Sec Name:
Original Construction: 1/1/1984Area:
C
4,441 (SF)
Layout:
Parapet: Roof Edge:
Exp. Joint:
Adj. Wall:
Area Div.: Other:
297 (LF) 0 (LF)
0 (LF) 0 (LF)
0 (LF)
0 (LF)
Access: EXTERNAL LADDER: Permanent
Structural Frame:
Roof Deck:
Vapor Retarder:
Drainage:
Slope:
UNKNOWN
CONCRETE STD: Precast 1/4 in 12
SCUPPERS
NONE
Structure:
Roof Category: Membrane
WALL/PARAPET, EQUIPMENT SUPPORT: Curbs, EQUIPMENT SUPPORT: None (unflashed), PITCH PAN
AGG: River Gravel
Description:
Protected Mem.:
Attachment:
METAL
NONE
Flashing Adhesive:
Types:
Walkways:
BUR: Asphalt
Spec. No.:
MOD BIT: Granule Surface
Reinforcement:
Type:
B.U.(HOT/COLD): Glass Felt
No
Surfacing:
ERSL W/=10+
ERSL W/O=10+
Base Flashing:
Counterflashing:
HOT MOPPED
Membrane Mfg:
UNKNOWN
Comments:
Thickness:
WOOD FIBERBOARD, POLYISOCYANURATE
Tapered:2Layers:
ADHESIVE - HOT
Types:
Attachment:
R-Value:
4.00 (IN)
Membrane:
Insulation:
No
Flashing:
Roof Section Inventory Report
White Sands Missile Range (35995) Unassigned
Page 3 of 5February 21, 2020
21140 - TEMP TEST CHAMBER
4/28/2003WSMR
Sec Name:
Original Construction: 1/1/1984Area:
D
498 (SF)
Layout:
Parapet: Roof Edge:
Exp. Joint:
Adj. Wall:
Area Div.: Other:
53 (LF) 0 (LF)
12 (LF) 0 (LF)
42 (LF)
0 (LF)
Access: EXTERNAL LADDER: Permanent
Structural Frame:
Roof Deck:
Vapor Retarder:
Drainage:
Slope:
UNKNOWN
CONCRETE STD: Precast 1/4 in 12
SCUPPERS W/LEADERS & DOWNSPOUT
NONE
Structure:
Roof Category: Membrane
WALL/PARAPET, EXPANSION JOINT: Flexible Cover, PIPE SUPPORTS: Wood Blocks, PITCH PAN
AGG: River Gravel
Description:
Protected Mem.:
Attachment:
METAL
NONE
Flashing Adhesive:
Types:
Walkways:
BUR: Asphalt
Spec. No.:
MOD BIT: Granule Surface
Reinforcement:
Type:
B.U.(HOT/COLD): Glass Felt
No
Surfacing:
ERSL W/=10+
ERSL W/O=10+
Base Flashing:
Counterflashing:
HOT MOPPED
Membrane Mfg:
UNKNOWN
Comments:
Thickness:
WOOD FIBERBOARD, POLYISOCYANURATE
Tapered:2Layers:
ADHESIVE - HOT
Types:
Attachment:
R-Value:
4.00 (IN)
Membrane:
Insulation:
No
Flashing:
Roof Section Inventory Report
White Sands Missile Range (35995) Unassigned
Page 4 of 5February 21, 2020
Roof Section Inventory Report
White Sands Missile Range (35995) Unassigned
Selection Criteria
Sort Criteria
Section Name Last Replacement Built Date Deck Type Roof Slope Section Area Membrane Attachment Facility Class Insulation Type Roof Type
All All All All All All All All All All
Section Name - Ascending
Page 5 of 5February 21, 2020
APPENDIX E
BUILDING 21234
CLIN (AM0002)
0008(AM0002)
APPENDIX F
BUILDING 21237
CLIN (AM0002)
0008 0009
(AM0002)
APPENDIX G
BUILDING 21237
CLIN (AM0002)
0010(AM0002)
APPENDIX H
Building 21240
CLIN (AM0002)
0011(AM0002)
APPENDIX I
Building 21240
CLIN (AM0002)
0012(AM0002)
APPENDIX J
Building 25900
CLIN (AM0002)
0013(AM0002)
File details come from the government source that posted it. Updated .