A5.1_JA_BEP_Hardware.pdf

PDF 327 KB Posted

Attached to
AWARD NOTICE
Solicitation number
W9126G18R0066
Issued by

About this file

JA Hardware

View the file

Other files

File Type Posted
BEP_-_Industry_Day_Attendance_16_APR.PDF PDF
A5.1_JA_BEP_Security-Identiv.pdf PDF
A5.1_JA_BEP_Security-HySecurity.pdf PDF
A5.1_JA_BEP_DELL.PDF PDF
A5.1_JA_BEP_CISCO.PDF PDF
A5.1_JA_BEP_Fire.pdf PDF
A5.1_JA_BEP_Security-Aventura.pdf PDF
A5.1_JA_BEP_IT_ADRF_(002).pdf PDF
NDA_Nonpublic_EA_Company_v3.docx DOCX document
Prequal_Questions.xlsx XLSX spreadsheet
NDA_Nonpublic_EA_Company_v3.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control No. SWF18-15

For Official Use Only

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

1. Contracting Activity: Department of Army, US Army Corps of Engineers, Fort Worth

District, Contracting Division, Fort Worth, Texas 76102

2. Description of Action: This justification is to support the Bureau of Engraving

(BEP), Western Currency Facility (WCF) expansion in North Fort Worth, TX. This is a justification for other than full and open competition for a portion of the procurement to require that the Prime contractor obtain VonDuprin door hardware equipment to provide hardware that is compatible with the existing Underwriters Laboratory (UL) listed delayed egress system. The estimated cost for the door hardware is $388,000.

3. Description of Supplies/Services: As a part of the design-bid-build contract, the project will extend the door hardware features to the expansion areas of the Administration, Production, and Vehicle Inspection Station. The scope includes everything necessary to expand the facility and ensure the new door hardware is compatible with the existing egress system and meets the requirements of BEP.

The required Door Hardware is noted below:

1.0 VonDuprin Qty

1.1 ELECTRIC POWER TRANSFER

CONCEALED; 10-24GA

WIRES 689 60

1.2 EXIT DEVICE TYPE 1; F01 625 8

1.3 EXIT DEVICE TYPE 1; F01; RX/RX; LBM 626 2

1.4 EXIT DEVICE TYPE 1; F03 626 4

1.5 EXIT DEVICE TYPE 1; F08 625 8

1.6 EXIT DEVICE TYPE 3; F01; RX/RX/LBM 626 16

1.7 EXIT DEVICE TYPE 3; F03 625 24

1.8 EXIT DEVICE TYPE 3; F08 625 17

1.9 EXIT DEVICE TYPE 4; F08; RX/RX 626 2

1.10 EXIT DEVICE TYPE 8; F01; LBL 626 2

1.11 EXIT DEVICE-DELAYED

EGRESS TYPE 1; F01; RX/LBM 625 12

1.12 EXIT DEVICE-DELAYED

EGRESS TYPE 3; F01; RX/LBM 626 15

1.13 EXIT DEVICE-FIRE TYPE 1; F01; F 625 3

1.14 EXIT DEVICE-FIRE TYPE 1; F08; F 625 3

1.15 EXIT DEVICE-FIRE TYPE 3; F03; F 626 1

1.16 EXIT DEVICE-FIRE TYPE 3; F03; RX/LBM; F 625 2

1.17 EXIT DEVICE-FIRE TYPE 3; F08; F 625 15

1.18 EXIT DEVICE-FIRE TYPE 3; F14; RX/RX; F 626 2

1.19 MONITOR STRIKE 4582-T2 626 5

1.20 POWER SUPPLY PS900; AS REQUIRED GRY 31

1.21 REMOTE DELAYED EGRESS DE5300 630 31

1.22 REMOVABLE MULLION TYPE 22 689 15

1.23 REMOVABLE MULLION TYPE 22; M-STBL 689 1

1.24 REMOVABLE MULLION-FIRE TYPE 22; F 689 3

4. Authority Cited: The statutory authority permitting other than full and open

Competition for this procurement is 10 U.S.C. 2304 (c)(1), implemented by FAR 6.302-1(a) (2) (ii) (A) Only One Responsible Source and No Other Supplies or Services will Satisfy Agency Requirements.

5. Reason for Authority Cited: The Von Duprin products have been standardized throughout the BEP facility. Installing a different manufacturer’s system will create significant duplication in cost for the facility and may not function properly with the existing system. Von Duprin is the only UL listed and ANSI/BHMA certified brand of products and systems that meets all the required door hardware applications, controlled access integrations and special locking arrangements including backwards compatibility with existing facility door hardware legacy applications currently in operation at the BEP facility. In addition, these components are the same as existing at the facility and the end user has been trained regarding operation of the openings for life safety and security. Also, the facilities maintenance and security staff maintain inventory of these items for immediate resolve of any issues that are an immediate threat to the integrity of the security of the facility. Thus, utilizing a different brand name equipment will result in substantial duplication of cost to the Government that is not expected to be recovered through competition. The new equipment will need to be compatible with BEP’s existing system, incompatibility will result in an impact to BEP’s operations and may result in an impact to National security and the U.S economy as the BEP WCF produces approx. 65% of the U.S currency each year and is only one of two facilities nationwide that produces U.S currency.

6. Efforts to Obtain Competition: In accordance with the Competition in Contracting

Act (CICA), the component identified above is identified as brand name; however, the overall procurement for construction of the BEP Expansion will be competed using an Unrestricted full and open competitive Best-Value acquisition.

7. Actions to Increase Competition: Competition is anticipated for the overall acquisition of the BEP Expansion construction. Which is estimated between $100M and $250M. It will be the responsibility of the offerors to obtain competitive pricing from the manufacturer/supplier of the Von Duprin equipment and to submit a proposal for the project.

8. Market Research: Previous projects, at the BEP Facility, have had problems with the interfacing using other vendors’ products. The system has proprietary language that is not recognized by other manufacturers. Internet searches for other viable vendors were unsuccessful. Approval of these items as brand name is critical to ensure BEP’s critical services to Manufacturing / Production are not interrupted, interruptions to BEPs operations may impact National security and the U.S economy.

9. Interested Sources: To date, no other sources have expressed an interest.

10. Other Facts:

a. BEP WCF is one of only two locations nationwide that produces U.S currency with the other location being located in Washington, D.C. Currently, the Fort Worth WCF produces approx. 65% of the U.S currency each year, which may grow as the WCF is in the process of a major construction expansion. Any impacts to the BEP WCF’s operations with the production of currency could severely impact the U.S economy.

b. Technical data packages, specifications, engineering descriptions and statements of work have been written to be suitable for full and open competition to the maximum extent possible.

11. Technical Certification: “I certify that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.”

Typed Name: Robert Lopez

Title: Project Coordinator

Date: _____________________ Signature: _____________________

12. Requirements Certification: “I certify that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.”

Typed Name: Tim Tran

Title: Program Manager

13. Fair and Reasonable Cost Determination: “I hereby determine that the anticipated cost for this contract action will be fair and reasonable. Cost and price analysis techniques will be used as the basis for this determination. The estimated m2ecstt9 Stamp

M2CTPLDE

Typewritten Text 5/10/18 cost does not meet the threshold for certified cost or pricing data.”

Typed Name: Linda Eadie

Title: Contracting Officer

14. Contracting Officer Certification: “I certify that this justification is accurate and complete to the best of my knowledge and belief.

Typed Name: Linda Eadie

Title: Contracting Officer

APPROVAL

Based on the foregoing justification, I hereby approve the door hardware equipment, for the Bureau of Engraving and Printing, Western Currency Facility on an other than full and open competition basis pursuant to the authority of 10 U.S. Code 2304 - Contracts:

competition requirements, subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.

Signature Date

M2CTPLDE

10-May-2018

M2CTPLDE

Typewritten Text 10-May-2018

M2CTPLDE

10-May-2018

2018-05-09T16:02:43-0500
LOPEZ.ROBERT.J.1379283850
2018-05-10T08:00:04-0500
EADIE.LINDA.D.1231046662
2018-05-10T08:00:23-0500
EADIE.LINDA.D.1231046662
2018-05-10T08:00:45-0500
EADIE.LINDA.D.1231046662

File details come from the government source that posted it.