AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for Airmen Training Complex Dorm 5 and Dining Facility 3 at Lackland Airforce Base is amended as follows: This amendment affects the CLIN Schedule.

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is 14 February 2018, 10:00 am CST, as previously announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G18R0010

X 9B. DATED (SEE ITEM 11)

29-Nov-2017

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Feb-2018

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W9126G18R0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO CLIN SCHEDULE

1. CLIN Schedule: Replace the CLIN Schedule with the accompanying new CLIN Schedule, bearing the notation W9126G18R0010-0005.

End of Summary of Changes

ATC #5 and DCF #3 Consolidated Solicitation W9126G18R0010 JBSA - Lackland, San Antonio, TX Page 1 of 3

Section 00 11 00 - Standard Form (SF) 1442 and CLIN Schedule

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount___

0001 All work required to construct the ATC Dormitory #5 Complex complete (excluding other items listed separately). 1 JB *** $____________

0002 Concrete Piers for ATC Dormitory #5 *** *** *** $____________

0002 AA Pier Type I 394 VLF $_________ $____________

0002 AB Pier Type II 2066 VLF $_________ $____________

0002 AC Pier Type III 1258 VLF $_________ $____________

0002 AD Pier Type IV 991 VLF $_________ $____________

0002 AE Pier Type V 1218 VLF $_________ $____________

0002 AF Pier Type VI 1198 VLF $_________ $____________

0002 AG Pier Type VII 270 VLF $_________ $____________

0002 AH Pier Type VIII 1399 VLF $_________ $____________

0003 All work required to construct the DCF dining/classroom facility #3 (DCF #3) complete. 1 JB *** $____________

0004 Concrete Piers for DCF #3 *** *** *** $____________

0004AA Pier Type I <AM#0002>41425729</AM#0002> VLF $__________ $____________

0004AB Pier Type II 449 VLF $__________ $____________

0004AC Pier Type III 1697 VLF $__________ $____________

0004AD Pier Type IV 236 VLF $__________ $____________

0005 All work required to construct the Equipment Building. 1 JB *** $____________

0006 <AM#0002> All work required to provide and install MEP equipment in the Equipment Building that supports

ATC #5 dormitory.

All work required to provide and install MEP equipment in the Equipment Building that supports DCF #3 dining/classroom facility.

Equipment Includes:

One (1) 437 ton chiller One (1) 387 ton chillers

W9126G18R0010-0005

ATC #5 and DCF #3 Consolidated Solicitation W9126G18R0010 JBSA - Lackland, San Antonio, TX Page 2 of 3

One (1) cooling tower Two (2) 12,000 boilers One (1) chilled water pump One (1) condenser water pump One (1) hot water pump 1 JB *** $____________

0007 All work required to provide and install MEP equipment in the Equipment Building that supports

DCF #3 dining/classroom facility All work required to provide and install all MEP equipment in the Equipment Building excluding what is Identified in CLIN <AM#0004> 0007

0006 </AM#0004> (DCF#3). 1 JB *** $____________

</AM#0002>

0008 Enterprise Products, Inc. high pressure gas pipe line inspection fee for the ATC West Campus temporary construction haul road. 1 JB *** $____________

<AM#0004>

0009 Removal of existing dirt/gravel piles

As shown on drawing A5-CD201.

</AM#0004>

<AM#0005> 606,645 CY $_________ $____________

22,468 </AM#0005>

TOTAL BASE BID $_________________

NOTE: See specification section 01 78 00, Closeout Submittals for withholding amounts for Operation & Maintenance (O&M) manuals and As-Built drawings.

Section: 00 11 00 W9126G18R0010

ATC #5 and DCF #3, JBSA - Lackland, San Antonio, TX

CONTRACT LINE ITEM SCHEDULE

NOTES:

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable

NOTE NO. 3. All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

NOTE NO. 4. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

NOTE NO. 5. The Army will procure this facility through a design and cost competition in accordance with the provisions set forth in this Request for Proposals (RFP). When the contract is awarded, it will be a "Firm Fixed Price Contract."

NOTE NO. 6. Any proposal that is materially unbalanced as to prices for the Base Schedule may be rejected. An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.

NOTE NO. 7. ABBREVIATIONS

For the purpose of this solicitation, the units of measure are represented as follows:

a. JB (job)

b. VLF (vertical linear feet)

<AM#0004>

c. CY (cubic yards)

</AM#0004>

END OF CLIN SCHEDULE

AMENDMENT 0005
SUMMARY OF CHANGES
CLIN SCHEDULE