Request For Proposal

Dining Classroom Facility (DCF) #3

Joint Base San Antonio (JBSA) Lackland Air Force Base, Texas

W9126G-18-R-0010 November 2017

US Army Corps of Engineers Fort Worth District

Dining Classroom Facility (DCF) #3 LKDCF3

PROJECT TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE

03 45 00 PRECAST ARCHITECTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

04 21 26 GLAZED STRUCTURAL CLAY TILE AND PREFACED CONCRETE MASONRY

UNITS

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS

05 12 00 STRUCTURAL STEEL

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

06 64 00 FIBER REINFORCED PANELS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 14 10 WATERPROOF FLOORING MEMBRANE

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 26 16 BELOW GRADE VAPOR RETARDERS

07 27 00.45 10 BUILDING AIR BARRIER SYSTEM

07 42 13 COMPOSITE WALL PANELS

07 53 23 MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 81 00 SPRAY-APPLIED FIREPROOFING

PROJECT TABLE OF CONTENTS Page 1

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES

08 22 30 TRAFFIC DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPET

09 83 13 ACOUSTICAL WALL TREATMENT

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 21 23.16 CUBICLE TRACK AND HARDWARE

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 56 13 STEEL SHELVING

DIVISION 11 - EQUIPMENT

11 40 00 FOODSERVICE EQUIPMENT

DIVISION 12 - FURNISHINGS

12 22 00 PRIVACY CURTAINS

12 35 20 FOODSERVICE CASEWORK, COUNTERTOPS, AND ACCESSORIES

12 50 00 FURNITURE SYSTEMS

12 65 00 FIXED SEATING AND FIXED TRAINING TABLES

DIVISION 13 - SPECIAL CONSTRUCTION

13 21 26 COLD-STORAGE ROOMS (PREFABRICATED PANEL TYPE)

DIVISION 14 - CONVEYING EQUIPMENT

14 24 00 HYDRAULIC ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

PROJECT TABLE OF CONTENTS Page 2

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 23 00.00 20 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 11 25 FACILITY GAS PIPING

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 19.00 40 FAN COIL UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00.00 40 SWITCHBOARDS AND SWITCHGEAR

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 01.00 10 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 20 01.00 10 ELECTRONIC SECURITY SYSTEM

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 63 26 DRILLED CAISSONS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

PROJECT TABLE OF CONTENTS Page 3

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE BASE COURSE

32 11 29 LIME-STABILIZED SUBGRADE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 11 CONCRETE PAVEMENT FOR HEAVY-DUTY PAVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 84 24 IRRIGATION SPRINKLER SYSTEMS

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 46 13 FOUNDATION DRAINAGE SYSTEM

33 47 13 FOUNDATION DRAIN LINER

33 51 15 NATURAL-GAS DISTRIBUTION

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 73 PAGES

02 41 00 SD-01 Preconstruction Submittals

1.10 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.7 GNotification

03 11 13.00 10 SD-02 Shop Drawings 3.1.1Formwork

SD-03 Product Data 1.3Design 2.1Form Materials 2.1.6Form Releasing Agents

SD-04 Samples 2.1.7Fiber Voids

SD-06 Test Reports 3.5Inspection

SD-07 Certificates 2.1.7Fiber Voids

03 15 00.00 10 SD-02 Shop Drawings

2.4 GWaterstops

SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops

SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.3Sealant

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 73 PAGES

03 20 00.00 10 SD-02 Shop Drawings

3.1 GReinforcement

SD-03 Product Data 1.4.1Welding

SD-07 Certificates 2.3Reinforcing Steel

03 30 00.00 10 SD-03 Product Data Part 2Recycled Content Products 1.4Portland Cement 2.1Portland Cement 3.2.1Ready-Mixed Concrete 2.6Latex Bonding Agent 1.4.7Floor Finish 2.3Chemical Admixtures 2.7Epoxy Resin

SD-04 Samples 2.3.5Surface Retarder

SD-05 Design Data

1.4.1 GMixture Proportions

SD-06 Test Reports

3.8 GTesting and Inspection for CQC

SD-07 Certificates 1.6Qualifications

03 35 00.00 10 SD-03 Product Data Part 2Recycled Content Products

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 73 PAGES

03 35 00.00 10 1.4.1Field Test Panels 1.4.1.1Sample Wall Panels 1.4.1.2Slab Panels

03 39 00.00 10 SD-03 Product Data 2.1Curing Materials

SD-06 Test Reports

3.2 GTesting and Inspection for CQC

SD-08 Manufacturer’s Instructions 2.1Curing Compound

03 40 00.00 10 SD-01 Preconstruction Submittals 1.4.2.2Quality Control Procedures

SD-02 Shop Drawings

1.2.1 GStandard Precast Units

1.2.2 GCustom-Made Precast Units

SD-03 Product Data 1.2.1Standard Precast Units 1.2.3Proprietary Precast Units 3.1.3Embedded Items 2.1.9Accessories

SD-05 Design Data 1.2.2Design Calculations 1.2.5.1Concrete Mix Proportions

SD-06 Test Reports 1.4.2.4Test Reports

SD-07 Certificates 1.4.2.2Quality Control Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 73 PAGES

03 41 33 SD-02 Shop Drawings

1.8 GFabrication Drawings

1.8 GInstallation Drawings

SD-05 Design Data

2.1.1 GNormal Weight Concrete

SD-06 Test Reports

1.7.2 GAir Content

1.7.2 GAir Entrainment

2.1.1 GCompressive Strength

1.7.2 GDesign Mix

1.7.2 GUnit Weight

SD-07 Certificates

1.5 GQualifications for Welding Work

1.4 GInstallers

1.3 GManufacturer

2.8.7 GPretensioning

2.8.16 GDetensioning

1.5 GWelding Procedures

SD-08 Manufacturer’s Instructions

1.5 GInstallation Instructions

1.5 GWelding Sequence and

Procedure

2.6 GEpoxy-Resin Grout

2.6 GEpoxy-Resin Adhesive

03 45 00 SD-02 Shop Drawings

1.12.1 Gwall panel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 73 PAGES

03 45 00 2.6.16 Gwall panel SD-03 Product Data

2.4 GCast-in embedded items and

connectors

2.4.3 GConnection devices

2.1 GThermally Low-Conductive

Sandwich Panel Wythe Connectors

SD-04 Samples

2.6.7 Gfinishing

1.12.7 GMock-Up

SD-05 Design Data

1.12.2 Gdesign calculations

2.6.9 Grepair of surface defects

1.12.3 Gconnection and embedment

design calculations

1.5.1.1 GMoisture and thermal

performance calculations SD-06 Test Reports

3.16.1.2 GStrength tests

SD-11 Closeout Submittals

1.12.6 Gbatch ticket information

1.4Manufacturer's Qualifications 1.5.8Calculations 1.5.9Mix Design 1.9Precast Concrete Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 73 PAGES

03 45 00 1.10Wall-panel Installer 1.11.2Concrete 1.11.2Exposed-to-View Concrete 1.11.2Backing Concrete 1.11.3Compressive Strength 1.12.7Mock-Up 1.12.8Pre-Installation Meeting 1.13Tolerances 3.4Erection

04 20 00 SD-02 Shop Drawings

1.5.3 GDetail Drawings

SD-03 Product Data 1.3.1Local/Regional Materials 2.2Concrete Masonry Units (CMU)

2.4.2 GCement

2.10Insulation

1.7.2 GCold weather installation

SD-05 Design Data

2.4.3 GPre-mixed Mortar

1.3.2.1 GUnit Strength Method

SD-06 Test Reports

3.15.1 GField Testing of Mortar

3.15.2 GField Testing of Grout

1.5.2 GMasonry Inspector Qualifications

SD-07 Certificates 2.2Concrete Masonry Units (CMU)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 73 PAGES

04 20 00 SD-10 Operation and Maintenance Data

3.14.2Take-Back Program 04 21 26 SD-03 Product Data

2.3Prefaced Concrete Masonry Units

SD-04 Samples 2.3Prefaced Concrete Masonry

Units 05 05 23 SD-03 Product Data

1.6 GWelding Procedure Qualifications

1.6.5Welder, Welding Operator, and

Tacker Qualification 1.6.6Inspector Qualification 1.6.2Previous Qualifications 1.6.3Pre-qualified Procedures

SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination

05 05 23.13 10 SD-03 Product Data 1.6.1Ultrasonic Inspection

05 12 00 SD-02 Shop Drawings

1.6.2.1 GErection Plan

1.6.1 GFabrication drawings

SD-03 Product Data 2.4Shop primer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 73 PAGES

05 12 00 2.3.1Welding electrodes and rods 2.2.4Load indicator washers 2.3.2Non-Shrink Grout 2.2.5Load indicator bolts

SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 2.5Galvanizing 1.5AISC Quality Certification 1.6.2.2Welding procedures and qualifications 05 21 19 SD-01 Preconstruction Submittals

1.6.2Welder qualification 1.6.2Safety Data Sheet

SD-02 Shop Drawings

1.6.1 GSteel joist framing

SD-06 Test Reports 3.3.1Erection inspection 3.3.1Welding inspections

SD-07 Certificates 2.1Accessories 1.6.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 73 PAGES

05 30 00 1.4.5 GFabrication Drawings 2.3.2.1Cant Strips 2.3.2.2Ridge and Valley Plates 2.3.2.3Metal Closure Strips

SD-03 Product Data 2.2Accessories 2.3.1Deck Units 2.1.3.1Galvanizing Repair Paint 2.1.6Galvanizing Repair Paint 2.1.5Joint Sealant Material 2.2.12Mechanical Fasteners 2.3.5Repair Paint 1.4.3Welder Qualifications

SD-04 Samples 2.3Metal Roof Deck Units 2.3.1.2Metal Roof Deck Units 2.3.1.2Metal Roof Deck Units 2.1.7Flexible Closure Strips 2.3Flexible Closure Strips

SD-05 Design Data 2.3.1Deck Units

SD-07 Certificates 1.4.4.1Fire Safety 1.4.4.2Wind Storm Resistance

05 40 00 SD-02 Shop Drawings

1.7.1 GFraming Components

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 73 PAGES

05 40 00 SD-03 Product Data 2.1studs,joists

SD-05 Design Data

1.7.2 GMetal framing calculations

SD-07 Certificates 1.5Load-bearing cold-formed metal framing 3.1.1Welds

05 50 13 SD-02 Shop Drawings

2.3 GAccess doors and panels

2.9 GFall protection system

2.9 Gangles and plates

3.9 GRoof hatch

SD-03 Product Data 2.3Access doors and panels 2.4Control-joint covers 2.6Fence 2.6Ornamental Gates 2.9Fall Protection system 3.9Roof hatch

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars and

Strips

2.12 GMetal Stair System

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 73 PAGES

05 51 00 1.3Welding Procedures

1.3 GWelder Qualification

05 51 33 SD-02 Shop Drawings 2.4Ladders

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

2.1 GIron and Steel Hardware

3.1 GIron and Steel Hardware

2.1Steel Shapes, Plates, Bars and

Strips 3.1Steel Shapes, Plates, Bars and

Strips

1.2.1 GStainless Steel Handrails

SD-03 Product Data

1.2.1 GStainless Steel Railings and

Handrails

2.14 GStainless Steel Railings and

Handrails

1.2.1 GAnchorage and Fastening

Systems SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.1 GInstallation Instructions

06 10 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 73 PAGES

06 10 00 1.9.1Local/Regional Materials 1.8Fire-retardant treatment 2.4.1Adhesives

SD-07 Certificates 1.9.3Forest Stewardship Council

(FSC) Certification SD-11 Closeout Submittals

1.9.1Local/Regional Materials 2.4.1Adhesives 1.9.2Certified Wood 1.9.3Certified Wood

06 41 16.00 10 SD-02 Shop Drawings 2.7Shop Drawings 3.1Installation

SD-03 Product Data 2.1Wood Materials 2.6Wood Finishes 2.7.3.3Finish Schedule

SD-04 Samples 2.3Plastic Laminates

SD-07 Certificates 1.5Quality Assurance 2.6Laminate Clad Casework 3.1Laminate Clad Casework

SD-11 Closeout Submittals 1.3.1LEED Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 73 PAGES

06 61 16 SD-02 Shop Drawings

1.5.2 GDetail Drawings

3.1 GInstallation

SD-03 Product Data 2.1Solid polymer material 1.5.1Qualifications 2.3Fabrications

SD-04 Samples

2.1 GMaterial

SD-07 Certificates 2.3Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up SD-11 Closeout Submittals

1.3.1LEED Documentation 06 64 00 SD-10 Operation and Maintenance

Data 3.3Fiber Reinforced Panels

07 13 53 SD-03 Product Data

2.1.1 GElastomeric waterproofing sheet

material 2.4Drainage Composite Course 2.1.1Primers, adhesives, and mastics

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 73 PAGES

07 13 53 2.1Materials SD-08 Manufacturer’s Instructions

2.1.1Primers, adhesives, and mastics 07 14 10 SD-03 Product Data

2.1Waterproof Flooring Surfacing System

SD-04 Samples

3.3.1 GColor

07 21 13 SD-03 Product Data

2.1 GBlock or board insulation

2.2Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.2.1Adhesive

07 21 16 SD-03 Product Data 2.1Blanket insulation

07 22 00 SD-02 Shop Drawings

2.1.4 GTapered roof insulation

SD-03 Product Data

2.3 GFasteners

2.1 GInsulation

2.1.2Recycled materials 1.4.2Local/Regional Materials

SD-06 Test Reports 1.4.1Flame spread and smoke developed ratings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 73 PAGES

07 26 16 SD-03 Product Data

2.1 Gmaterial

SD-06 Test Reports 2.1material

SD-08 Manufacturer’s Instructions 3.2Installation

07 27 00.45 10 SD-03 Product Data

3.3 GBuilding Air Tightness Test

SD-06 Test Reports 1.4.3Test Report 3.3Building Air Tightness Test

SD-07 Certificates 1.6Air Barrier Inspector 1.5Building Air Tightness Test

Technician 07 42 13 SD-01 Preconstruction Submittals

1.5.3 GQualification of Manufacturer

1.5.4 GQualification of Installation

Contractor

1.8 GWarranty

SD-02 Shop Drawings

1.5.1.1 GInstallation Drawings

SD-03 Product Data

1.5.1 Gsustainable acquisition

2.2.4Factory Color Finish

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 73 PAGES

07 42 13 1.5.1 GWall Panels

1.5.1 GMetal Closure Strips

SD-05 Design Data

1.5.1.2 GWind load design analysis

SD-06 Test Reports

3.7.2 GLeakage Tests

2.2.4.2 GCoating

2.2.4.2 GChalking

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-09 Manufacturer’s Field Reports

3.8.1 GManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 GWarranty

1.5.6 GMaintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material 07 53 23 SD-03 Product Data

2.1.1 GTPO Sheet

SD-05 Design Data

1.4.4 GWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator

1.4.3 GFire Resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 73 PAGES

07 53 23 SD-11 Closeout Submittals 1.8Warranty 3.10Information Card 3.9Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

3.1.18 GCovering on flat, sloped, or

curved surfaces

3.1.13 GGutters

3.1.14 GDownspouts

3.1.9 GBase flashing

3.1.10 GCounterflashing

3.1.19 GFlashing at roof penetrations

3.1.15Conductor heads

3.1.17 GEave flashing

SD-11 Closeout Submittals 3.5Quality Control Plan

07 61 14.00 20 SD-02 Shop Drawings

1.2.5 GRoofing

SD-03 Product Data

2.1 GRoofing panels

2.4.2 GUnderlayment

2.3Attachment clips 2.4.1Closures 2.4Accessories 2.4.3Fasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 73 PAGES

07 61 14.00 20 2.4.4Sealants 3.3.1Insulation

1.8 Gwarranty

SD-04 Samples 2.1panel

1.8 Gwarranty

1.8 Gwarranty

1.8 Gwarranty

1.8 Gwarranty

SD-05 Design Data 1.5Design calculations

SD-06 Test Reports 3.6Field Inspection 1.3.3Structural performance 1.6.6Finish

1.3.2.1 GWind Uplift

SD-07 Certificates 1.6.3Manufacturer's Technical

Representative 1.6.4Installer's Qualifications

2.1 GCoil stock

1.7.2LEED

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-11 Closeout Submittals 3.8Information card

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 73 PAGES

07 81 00 SD-03 Product Data

3.3 GFireproofing Material

SD-06 Test Reports

1.2.2 GFire Resistance Rating

SD-07 Certificates

1.4.1 GInstaller Qualifications

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping Materials

SD-07 Certificates 2.1Firestopping Materials 1.4.1Installer Qualifications 3.3Inspection

07 92 00 SD-03 Product Data 2.1Sealants 2.1Primers 1.7.1Local/Regional Materials 1.7.2Environmental Data

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.6 GFrames

2.6 GFrames

2.4Accessories

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 73 PAGES

08 11 13 2.1 GDoors

2.6 GFrames

2.4Accessories

08 22 20 SD-02 Shop Drawings

2.4 GDoors

SD-03 Product Data

2.4 GDoors

2.4 GDoor Hardware Components and

Accessories

2.4 GWeather-stripping

2.4 GSmoke Seals

2.4 GThresholds

08 22 30 SD-02 Shop Drawings

2.2 GFrames

2.2 GFrames

08 41 13 SD-02 Shop Drawings

1.2.1 GInstallation Drawings

1.2.1 GFabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

SD-04 Samples

1.2.1 GFinish and Color Samples

SD-07 Certificates

3.4 GManufacturer's Product Warranty

08 51 13 SD-02 Shop Drawings

2.1 GWindows

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 73 PAGES

08 51 13 1.10Fabrication Drawings SD-03 Product Data

2.1 GWindows

2.2.8.1 GHardware

1.11 GWindow performance

2.2.4Adhesives 1.7.1Local/Regional Materials

SD-04 Samples 1.4.2.1Finish Sample

SD-05 Design Data

1.4.3 GDesign Analysis

SD-06 Test Reports 1.4.4Minimum condensation resistance factor

1.11.2.3 GStandard Airblast Test

08 71 00 SD-02 Shop Drawings

1.3 GHardware schedule

2.3.5Keying system

SD-03 Product Data

2.3 GHardware items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.3 GHardware Schedule

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 73 PAGES

08 71 00 1.4Key Bitting 08 81 00 SD-03 Product Data

1.7.1Insulating Glass 1.6.1Local/Regional Materials

SD-11 Closeout Submittals 1.6.1Local/Regional Materials

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

09 29 00 SD-03 Product Data 2.1.3Cementitious backer units 2.1.2Glass Mat Covered or Reinforced

Gypsum Sheathing 2.1.6Accessories 2.1.1Gypsum Board 2.1.5Adhesives 2.1.4Joint Treatment Materials 1.5.1Local/Regional Materials

SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions 2.1Safety Data Sheets

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 73 PAGES

09 29 00 2.1Manufacturer maintenance instructions

3.8Waste Management SD-11 Closeout Submittals

1.5.1Local/Regional Materials 2.1.1Gypsum Board 2.1.5Adhesives

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

SD-07 Certificates 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.10 GResilient Flooring and

Accessories SD-03 Product Data

2.10 GResilient Flooring and

Accessories

2.6Adhesives 2.1Vinyl Composition Tile 2.2Wall Base 2.3Platform Risers 1.2.1Local/Regional Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 73 PAGES

09 65 00 SD-04 Samples

2.10 GResilient Flooring and

Accessories SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions 3.2Surface Preparation 3.1Installation

SD-10 Operation and Maintenance Data

2.10Resilient Flooring and Accessories

SD-11 Closeout Submittals 1.2.1Local/Regional Materials 2.10Resilient Flooring and

Accessories 2.6Adhesives

09 67 23.13 SD-02 Shop Drawings

1.3.1 GInstallation Drawings

SD-03 Product Data

1.3.1.1 GManufacturer's Catalog Data

1.3.1.1Epoxy-Resin Base 1.4Epoxy-Resin Base 1.3.1.1Polyurethane Slurry Base 1.4Polyurethane Slurry Base

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 73 PAGES

09 67 23.13 1.3.1.1Decorative Flakes 1.4Decorative Flakes 1.3.1.1Urethane Thick Surface Coat 1.4Urethane Thick Surface Coat 1.3.1.1Epoxy Waterproofing Membrane 1.4Epoxy Waterproofing Membrane

SD-04 Samples

1.4.2 GHardboard Mounted Epoxy

Flooring SD-06 Test Reports

1.4 GRecords of Inspection

SD-07 Certificates

1.4 GReferenced Standards

Certificates

3.6 GWarranty

09 68 00 SD-02 Shop Drawings

3.4 GInstallation

SD-03 Product Data

2.1Carpet 3.1Surface Preparation 3.4Installation 1.4Regulatory Requirements 2.1.1Physical Characteristics 1.2.1Local/Regional Materials

SD-04 Samples

2.1 GCarpet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 73 PAGES

09 68 00 SD-06 Test Reports 3.2Moisture and Alkalinity Tests

SD-07 Certificates 2.1Carpet 1.4Regulatory Requirements

SD-10 Operation and Maintenance Data

2.1Carpet 3.5Cleaning and Protection 3.7.2Maintenance Service

SD-11 Closeout Submittals 1.2.1Local/Regional Materials 2.1Carpet 2.3Adhesives and Concrete Primer

09 83 13 SD-02 Shop Drawings

2.1 GApproved Detail Drawings

SD-03 Product Data

2.1 GAcoustical Wall Panels

SD-04 Samples

2.1 GAcoustical Wall Panels

SD-07 Certificates 2.1Acoustical Wall Panels

SD-11 Closeout Submittals 1.2.1LEED Documentation

09 90 00 SD-03 Product Data 1.4.2Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 73 PAGES

09 90 00 1.9.1Local/Regional Materials 2.1Materials

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.11 GColor

SD-08 Manufacturer’s Instructions

3.6.2Mixing 1.7.2Manufacturer's Safety Data

Sheets SD-10 Operation and Maintenance Data

2.1 GCoatings:

10 10 00 SD-03 Product Data

2.1Projection screen SD-07 Certificates

2.1Projection Screen 10 14 02 SD-02 Shop Drawings

3.1 GDrawings

SD-03 Product Data

3.1Installation SD-04 Samples

1.2 GInterior Signage

1.5Software

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 73 PAGES

10 14 02 SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings

3.2Installation Drawings 1.3Fabrication Drawings

SD-03 Product Data 1.3Toilet Partition System 1.3Cleaning and Maintenance

Instructions 2.5Colors And Finishes 2.2Partition Panels and Doors 2.1.5Hardware and Fittings 2.1.6Door Hardware 2.3Floor and Ceiling-Anchored

Partitions 1.6.1Local/Regional Materials 2.2.1Toilet Enclosures

SD-04 Samples 2.5Colors and Finishes

SD-11 Closeout Submittals 1.6.1Local/Regional Materials 2.2.1Toilet Enclosures

10 21 23.16 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 73 PAGES

10 21 23.16 1.3 GCubicle track layout SD-08 Manufacturer’s Instructions

3.1installation SD-10 Operation and Maintenance Data

2.1Cubicle track system 10 26 13 SD-02 Shop Drawings

2.2 GCorner Guards

2.3 GWall Guards (Bumper Guards)

SD-03 Product Data

2.2 GCorner Guards

2.3Wall Guards (Bumper Guards)

SD-04 Samples

2.5 GFinish

SD-11 Closeout Submittals 1.2LEED Documentation

10 28 13 SD-03 Product Data 2.1.2Finishes 2.2Accessory Items

SD-04 Samples 2.1.2Finishes

2.2 GAccessory Items

10 44 16 SD-01 Preconstruction Submittals 2.1Manufacturer's Data

SD-03 Product Data 2.1Fire Extinguishers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 73 PAGES

10 44 16 Part 2Accessories Part 2Cabinets Part 2Wall Brackets

10 51 13 SD-02 Shop Drawings

2.1 GTypes

2.1 GLocation

3.1Installation

10 56 13 SD-03 Product Data 2.1Shelving Units

SD-04 Samples 2.2Finish

11 40 00 SD-02 Shop Drawings

2.3.30 GShop Drawings

3.9Rough-in

SD-03 Product Data

2.5.11 GEquipment List

SD-04 Samples

1.3.3 Gsamples

SD-10 Operation and Maintenance Data

3.13manuals 3.13maintenance

12 22 00 SD-03 Product Data 1.3Certification

SD-04 Samples

2.1.1.1 GPrivacy curtain fabric

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 73 PAGES

12 22 00 SD-06 Test Reports 2.1.1.2Flame resistance

12 35 20 SD-01 Preconstruction Submittals 1.3.1Contractor's Field Verification

Data SD-02 Shop Drawings

1.3.2 GFoodservice Configuration

1.3 GEquipment Schedule

SD-04 Samples 2.1.2.1Closure panels

12 50 00 SD-02 Shop Drawings

1.5.3 GDetail Drawings

3.1Installation

SD-03 Product Data 1.7Warranty 1.2.1Workstations 2.1Materials 2.1.1Composite Wood and Fiberboard 2.1.1Emissions 2.1.2Fabric

SD-10 Operation and Maintenance Data

3.2Maintenance Manuals 3.2Cleaning 2.1Plastic Identification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 73 PAGES

12 50 00 1.3.1LEED Documentation 12 65 00 SD-02 Shop Drawings

3.2 GDetailed Drawings

SD-03 Product Data

3.2Installation 2.1Local/Regional Materials

SD-04 Samples

3.2 GSeating and Table Systems

2.3 GTraining Table

SD-07 Certificates 2.1Recyclable Materials

SD-10 Operation and Maintenance Data

3.3Maintenance Manuals SD-11 Closeout Submittals

1.4Adhesives 1.4Fresh Paint

13 21 26 SD-02 Shop Drawings 2.1Cold-storage rooms

SD-03 Product Data 2.1Cold-storage rooms 2.2Shelves 2.3Refrigeration equipment

SD-06 Test Reports 3.3tests

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 73 PAGES

13 21 26 2.1Cold-storage rooms 2.3Refrigeration equipment

SD-10 Operation and Maintenance Data

2.1 GCold-storage rooms

2.3 GRefrigeration equipment

SD-11 Closeout Submittals 3.4operating instructions

14 24 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

2.1 GPassenger Elevators

3.2 GField Quality Control

2.4.2 GLogic Control

SD-05 Design Data

1.2.1 GReaction Loads

1.2.1 GHeat Loads

SD-06 Test Reports

3.2.2 GField Tests Reports

SD-07 Certificates

1.4.3 GQualifications

SD-10 Operation and Maintenance Data

3.3 GOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 73 PAGES

14 24 00 1.7.1 GMaintenance and Diagnostic Tools

2.4.2.3Maintenance and Diagnostic Software

1.7 GMaintenance and Repair Action

Plan

3.3 GOperation and Maintenance

Training

21 12 00 SD-02 Shop Drawings

1.4.4 GStandpipe system

SD-03 Product Data

2.1.3 GValves

SD-06 Test Reports

3.8.1 GPreliminary tests

3.8.2 GAcceptance tests

SD-11 Closeout Submittals

1.6.2 GSystem as-built drawings

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.10As-Built Drawings

SD-03 Product Data

1.4.1 GFire Protection Related

Submittals

2.3 GMaterials and Equipment

1.6 GSpare Parts

3.11 GOnsite Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 73 PAGES

21 13 13.00 10 SD-05 Design Data 1.4.3Sway Bracing

1.2.1.3 GHydraulic Calculations

SD-06 Test Reports 3.10Final Acceptance Test Report

SD-07 Certificates 3.3Inspection by Fire Protection

Specialist SD-10 Operation and Maintenance Data

3.11Operating and Maintenance Manuals

21 23 00.00 20 SD-02 Shop Drawings

1.2 GFire extinguishing system

SD-03 Product Data 3.2.1Storage cylinder 2.2Fusible links 2.2Release mechanisms 1.2.1Valve 3.2.1Discharge nozzle 3.2.1Pipe and fittings 2.1Piping and accessories 2.2Remote manual actuation stations 3.2.1Pressure-operated switches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 73 PAGES

21 23 00.00 20 3.1Manufacturer's installation and maintenance manuals

SD-07 Certificates

1.5.1 GQualifications of installer

SD-08 Manufacturer’s Instructions

1.2 GFire extinguishing system

SD-10 Operation and Maintenance Data

1.2Fire extinguishing system 1.5.1as-built drawings

SD-11 Closeout Submittals 2.3Sign legends

22 00 00 SD-02 Shop Drawings

3.8.1 GPlumbing System

SD-03 Product Data 2.4Fixtures 2.4.3Flush valve water closets 2.4.4Flush valve urinals 2.4.6Wall hung lavatories 2.4.7Countertop lavatories

2.4.8 GDrinking-water coolers

2.9 GPumps

3.8.1.1 GBackflow prevention assemblies

3.3 GVibration-Absorbing Features

3.8.1Plumbing System

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 73 PAGES

22 00 00 3.8Tests, Flushing and Disinfection

3.8.1.1 GTest of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.8.1 GPlumbing System

23 00 00 SD-02 Shop Drawings

1.4.5 G DODetail Drawings

SD-03 Product Data

2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.9.1.2Duct Connectors

2.9.2 G DODuct Access Doors

2.9.3Fire Dampers

2.9.4 G DOManual Balancing Dampers

2.9.6Automatic Smoke-Fire Dampers 2.9.7Automatic Smoke Dampers 2.9.11.1Diffusers 2.9.11.2Registers and Grilles 2.9.12Louvers 2.9.13Air Vents, Penthouses, and

Goosenecks

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 73 PAGES

23 00 00 2.10.1.1Centrifugal Fans 2.10.1.2In-Line Centrifugal Fans 2.10.1.3Centrifugal Type Power Roof

Ventilators 2.10.1.4Air-Curtain Fans

2.11 G DOAir Handling Units

2.12.1 G DOFan-Coil Units

2.12.2.1 G DOConstant Volume, Single Duct

Terminal Units

2.12.2.2 G DOVariable Volume, Single Duct

Terminal Units

2.12.2.3 G DOVariable Volume, Single Duct, Fan-Powered Terminal Units

2.12.2.5 G DOReheat Units

2.13 G DOEnergy Recovery Devices

1.2.1.2 G DODiagrams

SD-06 Test Reports

3.13 G DOPerformance Tests

3.11 G DODamper Acceptance Test

1.4.7Certification

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.15.2Operation and Maintenance

Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 73 PAGES

23 00 00 SD-10 Operation and Maintenance Data

3.15.1 GOperation and Maintenance

Manuals

23 05 48.00 40 SD-02 Shop Drawings 1.2Installation Drawings 1.2Outline Drawings

SD-03 Product Data 1.2Equipment and Performance

Data

2.3 GIsolators

SD-06 Test Reports

2.1 GType of Isolator

2.1 GType of Base

2.1 GAllowable Deflection

2.1 GMeasured Deflection

23 05 93 SD-01 Preconstruction Submittals

1.3 G DORecords of Existing Conditions

1.3.3 G DORecords of Existing Conditions

1.5.4.1 G DOTAB Firm

1.2 G DOTAB team assistants

1.2 G DOTAB team engineer

1.5.4.2 GTAB Specialist

1.2 G DOTAB team field leader

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 73 PAGES

23 05 93 1.3.3 G DOTAB Schematic…