Text version

Request For Proposal

Airmen Training Complex Dorms 5 Large Business Package Lackland AFB, TX

W9126G-18-R-0010 November 2017

US Army Corps of Engineers Fort Worth District

This page was intentionally left blank

Airmen Training Complex Dormitory #5 FY16 LKATCD5

PROJECT TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 13.00 10 ASBESTOS ABATEMENT

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 23 00 STEEL STRESSING TENDONS AND ACCESSORIES FOR

POST-TENSIONED CONCRETE

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

03 45 00 PRECAST ARCHITECTURAL/STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

04 21 26 GLAZED STRUCTURAL CLAY TILE AND PREFACED CONCRETE MASONRY

UNITS

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS

05 12 00 STRUCTURAL STEEL

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 21 23 STEEL JOIST GIRDER FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 42 50 PRE-ENGINEERED COLD-FORMED STEEL TRUSSES

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 08 27.00 10 BUILDING AIR BARRIER SYSTEM TESTING FOR COMMISSIONING

07 13 53 ELASTOMERIC SHEET WATERPROOFING

PROJECT TABLE OF CONTENTS Page 1

07 14 10 WATERPROOF FLOORING MEMBRANE

07 17 00 BENTONITE WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET AND SEMI-RIGID INSULATION

07 22 00 ROOF AND DECK INSULATION

07 26 16 BELOW GRADE VAPOR RETARDERS

07 27 00 COLD LIQUID APPLIED MOISTURE BARRIER

07 27 39 SPRAYED POLYURETHANE FOAM INSULATION AND AIR-BARRIER

SYSTEM

07 42 16 INSULATED CORE METAL WALL PANELS

07 53 24 MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 72 00 ROOF VENTILATORS, GRAVITY-TYPE

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES

08 51 13 ALUMINUM WINDOWS

08 60 45 SKYLIGHTS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 23 STUCCO

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.14 CHEMICAL RESISTIVE RESINOUS FLOORING

09 68 00 CARPET

09 83 13 ACOUSTICAL WALL TREATMENT

09 90 00 PAINTS AND COATINGS

09 96 59 HIGH-BUILD GLAZE COATINGS

09 97 23.17 INTERIOR LINING FOR CONCRETE STORAGE TANKS (FOR GRAY

WATER STORAGE)

DIVISION 10 - SPECIALTIES

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 52 00 SOLID PLASTIC LOCKERS AND LOCKER BENCHES

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

PROJECT TABLE OF CONTENTS Page 2

12 48 13.13 ENTRANCE FLOOR MATS

DIVISION 14 - CONVEYING EQUIPMENT

14 24 00 HYDRAULIC ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 00 01 GREYWATER HARVESTING SYSTEM

22 14 29.00 40 SUMP PUMPS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 11 25 FACILITY GAS PIPING

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED AND CONDENSER WATER PIPING SYSTEMS

23 65 00 COOLING TOWERS

23 82 19.00 40 FAN COIL UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 33.17 CONNECTION CABINET FOR MOBILE GENERATOR

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 00.00 20 HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 SWITCHBOARDS AND SWITCHGEAR

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 01.00 10 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

PROJECT TABLE OF CONTENTS Page 3

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 21 00.00 20 INTERCOMMUNICATION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 20 01.00 10 ELECTRONIC SECURITY SYSTEM

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 23 00.00 20 EXCAVATION AND FILL

31 63 26 DRILLED CAISSONS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE BASE COURSE

32 11 29 LIME-STABILIZED SUBGRADE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 11 CONCRETE PAVEMENT FOR HEAVY-DUTY PAVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 31 19 ORNAMENTAL METAL GATES

32 84 24 IRRIGATION SPRINKLER SYSTEMS

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 46 13 FOUNDATION DRAINAGE SYSTEM

33 47 13 FOUNDATION DRAIN LINER

33 51 15 NATURAL-GAS DISTRIBUTION

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 91 PAGES

Airmen Training Complex Dormitory #5 FY16

02 41 00 SD-01 Preconstruction Submittals

1.10 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.7 GNotification

02 81 00 SD-03 Product Data

3.1 GOnsite Hazardous Waste

Management 3.2Notices of Non-Compliance and

Notices of Violation 2.1.1Packaging Notifications

SD-06 Test Reports

3.7 GRecordkeeping

3.8Spill Response

3.7 GException Report

SD-07 Certificates 1.5.3Certification 3.2.4Security Plan

1.5.1 GTransportation and Disposal

Coordinator

1.5.2 GTraining

3.2.2EPA Offsite Policy 3.2.5Certificates of Disposal

3.2.3 GShipping Documents and

Packagings Certification 3.6Waste Minimization

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 91 PAGES

02 82 13.00 10 SD-02 Shop Drawings

1.5 GDetailed Drawings

SD-03 Product Data

3.11.3.1 GAsbestos Waste Shipment

Records 1.2Weight Bills and Delivery Tickets

2.1 GEncapsulants

1.10.1 GRespiratory Protection Program

3.11 GCleanup and Disposal

1.7.1 GQualifications

1.12Training Program 1.9.1Licenses, Permits and

Notifications

3.11.3.2 GAsbestos Management Plan

SD-06 Test Reports

3.9 GExposure Assessment and Air

Monitoring

1.8.3 GLocal Exhaust System

SD-07 Certificates 1.8.3Local Exhaust System

2.1 GEncapsulants

1.10 GMedical Surveillance

Requirements 02 82 14.00 10 SD-02 Shop Drawings

1.4 GDetailed Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 91 PAGES

02 82 14.00 10 3.11.3.1 GAsbestos Waste Shipment Records

1.1 GWeight Bills and Delivery Tickets

2.1 GEncapsulants

1.9.1 GRespiratory Protection Program

3.11 GCleanup and Disposal

1.6.1 GQualifications

1.11Training Program

1.8.1 GLicenses, Permits and

Notifications

3.11.3.2 GAsbestos Management Plan

SD-06 Test Reports

3.9 GExposure Assessment and Air

Monitoring 1.7.3Local Exhaust System

SD-07 Certificates 1.7.3Local Exhaust System

2.1 GEncapsulants

1.9Medical Surveillance

Requirements 02 82 33.13 20 SD-03 Product Data

1.6.4 GVacuum Filters

1.6.1 GRespirators

SD-06 Test Reports

1.5.2.3 Gsampling results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 91 PAGES

02 82 33.13 20 1.5.2.3 GOccupational and Environmental Assessment Data Report

SD-07 Certificates

1.5.1.1 GQualifications of CP

1.5.1.3 GTesting Laboratory

2.1.1.1 GOccupant Notification

1.5.1.2 GTraining Certification

1.5.1.4 GThird Party Consultant

Qualifications

1.5.3 Glead-based paint/paint with lead

removal/control plan

1.6.3 GRental equipment notification

1.5.2.6 GRespiratory Protection Program

1.5.2.7 GHazard Communication Program

2.5.2 GEPA or State approved

hazardous waste treatment, storage, or disposal facility

1.5.2.8 GLead Waste Management Plan

1.6.4 GVacuum filters

SD-11 Closeout Submittals

2.5.2.1 Ghazardous waste manifest

1.5.2.4 GMedical Examinations

1.5.1.2 GTraining Certification

02 83 13.00 20 SD-01 Preconstruction Submittals

1.6.2.3 GOccupational and Environmental

Assessment Data Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 91 PAGES

02 83 13.00 20 1.6.2.2 GLead Compliance Plan

1.6.1.1 GCompetent Person

1.6.1.2 GTraining Certification

1.6.2.8 GLead Waste Management Plan

3.5.2.1 GWritten Evidence

1.6.2.4 GMedical Examinations

SD-06 Test Reports

1.6.2.3 GSampling Results

1.6.2.3 GOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.6.1.3 GTesting Laboratory

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 Ghazardous waste manifest

3.5.2.1 Gturn-in documents or weight

tickets 02 84 16 SD-07 Certificates

1.9.1 GQualifications of CIH

1.9.1 GTraining Certification

1.9.2 GPCB and Lamp Removal Work

Plan

1.9.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter certification

3.2.4Certification of Decontamination

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 91 PAGES

02 84 16 3.5.2.1Certificate of Disposal and/or recycling

02 84 33 SD-07 Certificates 1.7.1Training certification 1.7.2Qualifications of CIH 1.7.3PCB removal work plan 1.7.4PCB disposal plan 1.7.5Notification 3.8Transporter certification 3.5.4Certification of Decontamination 3.5.5Post cleanup sampling 3.8.1Certificate of disposal

03 11 13.00 10 SD-02 Shop Drawings 3.1.1Formwork

SD-03 Product Data 1.3Design 2.1Form Materials 2.1.6Form Releasing Agents

SD-04 Samples 1.5Sample Panels 2.1.7Fiber Voids

SD-06 Test Reports 3.5Inspection 3.4.1Formwork Not Supporting Weight of Concrete SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 91 PAGES

03 11 13.00 10 2.1.7Fiber Voids 03 15 00.00 10 SD-02 Shop Drawings

2.4 GWaterstops

SD-03 Product Data

2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops

SD-04 Samples 2.3.2Lubricant for Preformed

Compression Seals 2.3.3Field-Molded Type 2.4.1Non-metallic Materials 2.4Waterstops

2.5.2 GSplicing Waterstops

SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops

03 20 00.00 10 SD-02 Shop Drawings

3.1 GReinforcement

SD-03 Product Data 1.4.1Welding 3.1.4.2Butt-Splices 2.7Material

SD-06 Test Reports 2.7Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 91 PAGES

03 20 00.00 10 2.7Tests, Inspections, and Verifications

SD-07 Certificates 2.3Reinforcing Steel

03 23 00 SD-02 Shop Drawings

1.5.2 GInstallation Drawings

SD-03 Product Data

3.1.1 GPost-Tensioning Method and

Equipment 3.3Materials Disposition Records 3.1.6Post-Tensioning Operations

Records SD-06 Test Reports

2.1Stressing Tendons and Accessories

SD-07 Certificates 1.5.1Certification of Post-Tensioning

Technicians 03 30 00.00 10 SD-03 Product Data

Part 2Recycled Content Products 1.3Portland Cement 2.1Portland Cement 3.2.1Ready-Mixed Concrete 2.10Vapor Barrier 2.6Latex Bonding Agent 1.3.6Floor Finish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 91 PAGES

03 30 00.00 10 2.9Floor Hardener 2.3Chemical Admixtures 2.7Epoxy Resin 1.7.1Crystalline waterproofing admixture 2.3.8Crystalline waterproofing admixture 3.10.5Crystalline waterproofing admixture SD-04 Samples

2.3.5Surface Retarder SD-05 Design Data

1.3.1 GMixture Proportions

SD-06 Test Reports

3.10 GTesting and Inspection for CQC

1.7.1crystalline waterproofing admixture 2.3.8crystalline waterproofing admixture 3.10.5crystalline waterproofing admixture SD-07 Certificates

1.5Qualifications 03 35 00.00 10 SD-04 Samples

1.3.1Color Samples 1.3.2.1Textured Wall Panel Mockup

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 91 PAGES

03 35 00.00 10 1.3.2.2Class A Wall Panel Mockup 1.3.2.3Ground Slab Mockup

03 39 00.00 10 SD-03 Product Data 2.1Curing Materials 3.2Curing and Protection

SD-06 Test Reports 3.3Testing and Inspection for CQC

03 40 00.00 10 SD-01 Preconstruction Submittals 1.4.2.2Quality Control Procedures

SD-02 Shop Drawings

1.2.1 GStandard Precast Units

1.2.2 GCustom-Made Precast Units

SD-03 Product Data 1.2.1Standard Precast Units 1.2.3Proprietary Precast Units 3.1.3Embedded Items 2.1.9Accessories

SD-05 Design Data

1.2.2 GDesign Calculations

1.2.5.1 GConcrete Mix Proportions

SD-06 Test Reports 1.4.2.4Test Reports

SD-07 Certificates 1.4.2.2Quality Control Procedures

03 45 00 SD-02 Shop Drawings

1.16.3 Gwall panel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 91 PAGES

03 45 00 2.8.18 Gwall panel SD-03 Product Data

2.6 GCast-in embedded items and

connectors

2.6.4 GConnection devices

2.1.1Thermally Low-Conductive

Sandwich Panel Wythe Connectors

2.4.11Thermally Low-Conductive Sandwich Panel Wythe Connectors

SD-04 Samples

2.8.8 Gfinishing

1.16.8 GMock-up

SD-05 Design Data

1.16.4 G AEdesign calculations

2.8.10 G AErepair of surface defects

1.16.5 Gconnection and embedment

design calculations

1.7.1.1 GMoisture and Thermal

Performance Calculations SD-06 Test Reports

1.15.3 GStrength tests

SD-11 Closeout Submittals

1.6Manufacturer's Qualifications 1.7.8Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 91 PAGES

03 45 00 1.7.9Mix Design 1.11Precast Concrete Manufacturer 1.13Wall-panel Installer 1.15.2Concrete 1.15.2Exposed-to-View Concrete 1.15.2Backing Concrete 1.15.3Compressive Strength 1.16.9Pre-Installation Meeting

SD-08 Manufacturer’s Instructions 1.17Tolerances 2.4.16Air-Entrained Admixtures 3.4Erection

04 20 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

SD-03 Product Data 1.2.1Local/Regional Materials 1.2.2Environmental Data

2.2 GClay or Shale Brick

2.6.4 GCement

2.12 GInsulation

1.6.2 GCold Weather Installation

SD-04 Samples

2.2 GClay or Shale Brick

2.6.2 GColored mortar

2.4 GPrecast concrete sill

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 91 PAGES

04 20 00 2.6.5 GPre-mixed Mortar

1.2.3.1 GUnit Strength Method

SD-06 Test Reports

3.23.1 GField Testing of Mortar

3.23.2 GField Testing of Grout

2.3.3 GFire-rated CMU

1.4.4 GMasonry Inspector Qualifications

SD-10 Operation and Maintenance Data

3.22.2Take-Back Program 04 21 26 SD-03 Product Data

2.2Ceramic Glazed Structural Clay Facing Tile

2.3Prefaced Concrete Masonry Units

SD-04 Samples 2.2Ceramic Glazed Structural Clay

Facing Tile 2.3Prefaced Concrete Masonry

Units 2.3Prefaced Concrete Masonry

Units

2.4.2 GMortar Tuck Point

05 05 23 SD-03 Product Data

1.6 GWelding Procedure Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 91 PAGES

05 05 23 1.6.5Welder, Welding Operator, and Tacker Qualification

1.6.6Inspector Qualification 1.6.2Previous Qualifications 1.6.3Pre-qualified Procedures

SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination

05 05 23.13 10 SD-03 Product Data 1.6.1Ultrasonic Inspection

05 12 00 SD-02 Shop Drawings

1.6.1 GFabrication drawings

SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.4Load indicator washers 2.3.2Non-Shrink Grout 2.2.5Load indicator bolts

SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 2.5Galvanizing 2.8Teflon (PTFE) Bearing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 91 PAGES

05 12 00 1.5AISC Quality Certification 1.6.2.2Welding procedures and qualifications 05 21 19 SD-01 Preconstruction Submittals

1.5.2Welder qualification 1.5.2Safety Data Sheet

SD-02 Shop Drawings

1.5.1 GSteel joist framing

SD-06 Test Reports 3.4.1Welding inspections

SD-07 Certificates 2.1Accessories

05 21 23 SD-01 Preconstruction Submittals 1.5.2Welder qualification 1.5.2Safety Data Sheet

SD-02 Shop Drawings

1.5.1 GSteel joist girder framing

SD-06 Test Reports 3.4.1Welding inspections

SD-07 Certificates 2.1Accessories

05 30 00 SD-02 Shop Drawings

1.4.5 GFabrication Drawings

2.3.2.1Cant Strips 2.3.2.2Ridge and Valley Plates 2.3.2.3Metal Closure Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 91 PAGES

05 30 00 SD-03 Product Data 2.2Accessories 2.3.1Deck Units 2.1.6Galvanizing Repair Paint 2.1.5Joint Sealant Material 2.2.9Mechanical Fasteners 1.4.2Powder-Actuated Tool Operator 2.3.4Repair Paint 1.4.3Welder Qualifications

SD-04 Samples 2.3Metal Roof Deck Units 2.1.7Flexible Closure Strips 2.3Flexible Closure Strips

SD-05 Design Data 2.3.1Deck Units

SD-07 Certificates 1.4.4.1Fire Safety 1.4.4.2Wind Storm Resistance

05 40 00 SD-02 Shop Drawings

1.7.1 GFraming Components

SD-03 Product Data 2.1studs,joists

SD-05 Design Data

1.7.2 GMetal framing calculations

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 91 PAGES

05 40 00 1.5Load-bearing cold-formed metal framing

3.1.1Welds 05 42 50 SD-02 Shop Drawings

1.4.1Truss components 2.2.3Truss components

SD-03 Product Data

1.4.1 GTruss Components

2.2.3 GTruss Components

05 50 13 SD-02 Shop Drawings 2.3Access doors and panels

2.10 GAccess covers for gray water

storage tanks

3.12 GAccess covers for gray water

storage tanks

3.15 GFall Protection

2.11 GInterior Metal Joint Cover

2.6 Gangles and plates

SD-03 Product Data 2.3Access doors and panels 2.10Access covers for gray water storage tanks 3.12Access covers for gray water storage tanks

2.4 GFloor Door

2.7 GBicycle Rack

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 91 PAGES

05 50 13 3.15 GFall Protection 2.9Roof hatch 3.11Roof hatch

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars and

Strips

2.13 GMetal Stair System

SD-03 Product Data

2.15 GTread Plank

2.15.3 GTread Plank

2.15.3 GFloor Plank

2.2 GSteel Products

SD-07 Certificates

1.3 GWelding Procedures

1.3 GWelder Qualification

SD-08 Manufacturer’s Instructions 2.15Tread Plank 2.15.3Tread Plank 2.15.3Floor Plank

05 51 33 SD-02 Shop Drawings 2.4Ladders

SD-03 Product Data 2.4Ladders

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 91 PAGES

05 52 00 2.1 GIron and Steel Hardware

3.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars and

Strips

3.1 GSteel Shapes, Plates, Bars and

Strips

1.2.1 GSteel Railings

1.2.1 GStainless Steel Handrails

2.13 GStainless Steel Handrails

SD-03 Product Data

1.2.1 GStainless Steel Handrails

2.13 GStainless Steel Handrails

1.2.1 GAnchorage and Fastening

Systems SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.1 GInstallation Instructions

06 10 00 SD-03 Product Data 1.9.1Local/Regional Materials 1.8Fire-retardant treatment 2.4.1Adhesives

SD-07 Certificates 1.9.3Forest Stewardship Council

(FSC) Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 91 PAGES

06 10 00 SD-11 Closeout Submittals 1.9.1Local/Regional Materials 2.4.1Adhesives 1.9.2Certified Wood 1.9.3Certified Wood

06 20 00 SD-02 Shop Drawings

2.9 GWood Cabinets

3.2.6 GCountertops

SD-04 Samples

2.1.1 GHardwood

SD-11 Closeout Submittals 1.4.1Local/Regional Materials 1.4.2Coatings 1.4.2Adhesives 2.7.1Adhesives 2.7.1Adhesives 1.4.3Certified Wood

06 61 16 SD-02 Shop Drawings

1.7 GDetail Drawings

3.1 GInstallation

SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications

SD-04 Samples

2.1 GMaterial

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 91 PAGES

06 61 16 SD-10 Operation and Maintenance Data

3.2Clean-up 07 08 27.00 10 SD-04 Samples

3.1.2 GMock-up

SD-07 Certificates

1.7.1.1 GAir Barrier Inspector

1.7.1.2Thermography Test Firm 1.7.1.3Thermography Test Technician

1.7.1.4 GAir Barrier Leakage Test Firm

1.7.1.5 GAir Barrier Leakage Test

Technician SD-06 Test Reports

3.2.2 GThermography Test Procedures

3.3.1 GBuilding Air Barrier Leakage Test

Procedures 1.7.2Design Review Report 3.2.3Thermographic Test Report 3.3.3Air Barrier Leakage Test Report

07 13 53 SD-03 Product Data

2.1.1 GElastomeric waterproofing sheet

material 2.4Drainage Composite Course 2.1.1Primers, adhesives, and mastics 2.7Geomembrane liner

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 91 PAGES

07 13 53 2.1Materials SD-08 Manufacturer’s Instructions

2.1.1Primers, adhesives, and mastics 07 14 10 SD-03 Product Data

2.1Waterproof Flooring Surfacing System

SD-04 Samples

3.3.1 GColor

07 17 00 SD-08 Manufacturer’s Instructions 3.2Application 3.3Protection 3.4Corrections

07 21 13 SD-03 Product Data

2.1 GBlock or board insulation

2.2Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.2.1Adhesive

07 22 00 SD-02 Shop Drawings

2.1.4 GTapered roof insulation

SD-03 Product Data

2.4 GFasteners

2.1 GInsulation

2.1.2Recycled materials 1.4.2Local/Regional Materials

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 91 PAGES

07 22 00 1.4.1Flame spread and smoke developed ratings

07 26 16 SD-03 Product Data

2.1 Gmaterial

SD-06 Test Reports 2.1material

SD-08 Manufacturer’s Instructions 3.2Installation

07 27 00 SD-03 Product Data

2.1 Gwaterproofing material

2.1Primers, adhesives, and mastics

SD-06 Test Reports 2.1waterproofing material 3.5Field Quality Control 3.1Verification Of Conditions 1.3.1Protective Covering

SD-08 Manufacturer’s Instructions 2.1Primers, adhesives, and mastics

07 27 39 SD-03 Product Data

2.4 GSprayed Polyurethane Foam

Insulation

2.3.1 GAir-Barrier Products

SD-06 Test Reports 1.4.5Daily Testing

SD-07 Certificates

1.4.1 GInstaller Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 91 PAGES

07 27 39 1.4.3 GCompatibility of Materials SD-08 Manufacturer’s Instructions

1.4.4 GInstallation Instructions

1.6.1 GInstallation Instructions

3.5.2 GInstallation Instructions

07 42 16 SD-01 Preconstruction Submittals

1.5.1 GQualification of Manufacturer

1.5.3 GQualification of Installer

SD-02 Shop Drawings

1.6.1 GWall Panel Assemblies

1.6.1Flashing and Accessories 1.6.1Anchorage Systems 1.6.1Closure Materials 1.6.1metal closure strips

SD-03 Product Data 1.9.1Regional Materials 1.9.2Recycled Content

1.6.1 GWall Panel Assemblies

1.6.1Flashing and Accessories 2.5Secondary Metal Framing 1.6.1Repair Paint 1.6.1Anchorage systems 1.6.1Insulation 1.6.1Flashing Tape 2.4.5Flashing Tape 1.6.1Fasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 91 PAGES

07 42 16 SD-04 Samples

1.6.1 Gmanufacturer's color chips

SD-05 Design Data

1.5.2 GCalculations

1.6.1 GWind design analysis

SD-06 Test Reports 1.3.7wind load tests

SD-07 Certificates 1.5.1Qualification of Manufacturer 1.5.3Qualification of Installer 1.6.1wall system assembly wind load

SD-08 Manufacturer’s Instructions 1.6.1Installation of Wall Panels

SD-09 Manufacturer’s Field Reports

3.5.2 GWater-Spray Test

3.5.3 GField Service Report

SD-11 Closeout Submittals 1.8Warranty 1.6.1Instructions 1.6.1Safety Data Sheets

07 53 24 SD-03 Product Data

1.6 GTPO Sheet

SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 91 PAGES

07 53 24 1.4.3 GFire Resistance SD-11 Closeout Submittals

1.8Warranty 3.8Information Card 3.7Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

2.1.2.1 GSoffits

3.1.20 GCovering on flat, sloped, or

curved surfaces

3.1.14 GGutters

3.1.15 GDownspouts

3.1.10 GBase flashing

3.1.11 GCounterflashing

3.1.21 GFlashing at roof penetrations

3.1.16 GScuppers

3.1.23 GPre-Finished Parapet Copings

3.1.17 GConductor heads

3.1.19 GEave flashing

SD-11 Closeout Submittals 3.6Quality Control Plan

07 61 14.00 20 SD-02 Shop Drawings

1.2.4 GRoofing

SD-03 Product Data

2.1 GRoofing panels

2.4.2 GUnderlayment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 91 PAGES

07 61 14.00 20 2.3 GAttachment clips

2.4.1 GClosures

2.4 GAccessories

2.4.3 GFasteners

2.4.4 GSealants

1.6.6 GFinish

2.1.3 GFinish

SD-04 Samples

1.8 GWarranty

1.8 GWarranty

1.8 GWarranty

1.8 GWarranty

SD-05 Design Data

1.5 GDesign calculations

SD-06 Test Reports

1.3.2.1 GWind Uplift Test

3.6 GField Inspection

1.3.3 GStructural performance

1.6.6 GFinish

2.1.3 GFinish

SD-07 Certificates

1.6.3 GManufacturer's Technical

Representative

1.6.4 GInstaller's Qualifications

2.1 GCoil stock

1.7.2 GLEED

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 91 PAGES

07 61 14.00 20 SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-11 Closeout Submittals

3.8 GInformation card

07 72 00 SD-03 Product Data

2.2 GLouvered Penthouse Ventilators

3.1 GLouvered Penthouse Ventilators

07 81 00 SD-03 Product Data

3.3 GFireproofing Material

SD-06 Test Reports

1.2.2 GFire Resistance Rating

SD-07 Certificates

1.4.1 GInstaller Qualifications

07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials

SD-07 Certificates 2.1Firestopping Materials 1.4Installer Qualifications 3.3Inspection

SD-11 Closeout Submittals 2.1.3.2Sealants

07 92 00 SD-03 Product Data 1.7.1Local/Regional Materials 1.7.2Environmental Data 2.1Sealants 1.7.2Primers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 91 PAGES

07 92 00 SD-04 Samples 2.1sealants

SD-07 Certificates 3.3.6Sealant

SD-11 Closeout Submittals 1.7.1Local/Regional Materials 2.1Sealants

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.4 GFrames

2.4 GFrames

2.3Accessories

SD-03 Product Data

2.1 GDoors

2.4 GFrames

2.3Accessories

08 11 16 SD-02 Shop Drawings

1.5.1 GDoors, sidelites, transoms and

frames SD-05 Design Data

1.2.1 Gcalculations

1.2.1.1 GDesign Analysis

SD-06 Test Reports

1.2.1.1 GStandard Airblast Test

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 91 PAGES

08 11 16 1.2.4 GNFRC validated Project Label Certificate

SD-08 Manufacturer’s Instructions 2.1Doors and frames

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

1.4Local/Regional Materials

1.3 GCertified Wood

SD-04 Samples

2.3.5.2 GDoor finish colors

08 22 20 SD-02 Shop Drawings

2.5.1 GDoors

2.6Door Hardware Components and

Accessories 2.6Weather-stripping 2.6Smoke Seals

SD-03 Product Data

2.5.1 GDoors

2.6Weather-stripping 2.6Smoke Seals

SD-04 Samples 2.2.1colors

08 33 23 SD-02 Shop Drawings

2.3 GOverhead Coiling Doors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 91 PAGES

08 33 23 1.4 GElectric Door Operators

2.6 GElectric Door Operators

SD-03 Product Data

2.3 GOverhead Coiling Doors

1.4 GElectric Door Operators

2.6 GElectric Door Operators

SD-10 Operation and Maintenance Data

3.3 GOperation and Maintenance

Manuals

1.4Materials 1.4Devices 1.4Procedures 1.4Parts Lists 3.2.2Cleaning

08 44 00 SD-02 Shop Drawings 1.5Glazed curtain wall system

SD-03 Product Data 1.5Glazed curtain wall system

SD-05 Design Data 1.3Calculations

1.5.6 GStructural calculations for

deflection

1.4.2.1 GDesign Analysis

1.5.6.1 GDesign Analysis

1.5.6.2 GDesign Analysis

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 91 PAGES

08 44 00 SD-06 Test Reports

1.4.2.1 GStandard Airblast Test

1.5.6.3 GStandard Airblast Test

SD-07 Certificates

1.11.5 GNFRC validated Project Label

Certificate SD-08 Manufacturer’s Instructions

1.5Glazed curtain wall system SD-11 Closeout Submittals

1.8WARRANTY

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.10Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.2.8.1 GHardware

1.11 GWindow performance

1.7.1Local/Regional Materials

SD-04 Samples 1.4.2.1Finish Sample

SD-05 Design Data

1.4.3 GDesign Analysis

SD-06 Test Reports 1.4.4Minimum condensation resistance factor

1.11.2.3 GStandard Airblast Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 91 PAGES

08 51 13 SD-07 Certificates

1.11.5 GNFRC validated Project Label

Certificate 08 60 45 SD-02 Shop Drawings

3.2 GShop Drawings

SD-03 Product Data

2.1 GSKYLIGHTS

1.6Warranty

SD-06 Test Reports 2.1Test Reports

SD-07 Certificates 2.4Systems 1.4Qualifications

08 71 00 SD-02 Shop Drawings

1.5 GHardware Schedule

2.3.6.1Keying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting 08 81 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 91 PAGES

08 81 00 1.7.1Insulating Glass 3.2.4Fire Rated Glass 2.1.7Fire Rated Glass Framing 1.3Glazing Accessories 1.6.1Local/Regional Materials

SD-04 Samples 2.1.6translucent laminated glass

SD-11 Closeout Submittals 1.6.1Local/Regional Materials

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

09 24 23 SD-03 Product Data 1.4Materials 2.1Recycled Content 2.1Regional Material

SD-04 Samples 1.3Sample Panel

SD-05 Design Data

2.9.1 GManufactured Suspension

System 09 29 00 SD-03 Product Data

2.1.1Gypsum Board 2.1.4Cementitious backer units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 91 PAGES

09 29 00 2.1.1Recycled Content 2.1.7Adhesives 2.1.5Joint Treatment Materials 1.5.1Local/Regional Materials

SD-07 Certificates

2.1 GAsbestos Free Materials

SD-11 Closeout Submittals 1.5.1Local/Regional Materials 2.1.1Gypsum Board 2.1.7Adhesives

09 51 00 SD-03 Product Data 1.2.3Acoustical Ceiling Systems

SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

09 65 00 SD-03 Product Data 2.8Resilient Flooring and

Accessories 2.4Adhesives 2.1Vinyl Composition Tile 2.2Wall Base 1.2.1Local/Regional Materials 1.4Certification

SD-04 Samples

2.8 GResilient Flooring and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 91 PAGES

09 65 00 SD-06 Test Reports 3.3Moisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2Surface Preparation 3.1Installation

SD-10 Operation and Maintenance Data

2.8Resilient Flooring and Accessories

SD-11 Closeout Submittals 1.2.1Local/Regional Materials 2.8Resilient Flooring and

Accessories 2.4Adhesives 2.2Wall Base

09 67 23.14 SD-02 Shop Drawings

2.1 GFlooring

SD-03 Product Data

2.1 GTapered Cementitious Topping

2.6.1 GTapered Cementitious Topping

2.1 GWaterproofing Membrane

2.6.2 GWaterproofing Membrane

2.3 GSealer and Resin

3.3.2 GFloor Surfacing

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 91 PAGES

09 67 23.14 2.2 GFlooring Systems SD-07 Certificates

1.3.1 GQualifications of Installer

SD-08 Manufacturer’s Instructions

3.3Application SD-10 Operation and Maintenance Data

2.2Flooring Systems 09 68 00 SD-02 Shop Drawings

3.4Installation 2.4Moldings

SD-03 Product Data 2.1Carpet 2.4Moldings 3.1Surface Preparation 3.4Installation 1.4Regulatory Requirements 2.1.1Physical Characteristics 1.2.1Local/Regional Materials 1.2.2Environmental Data

SD-04 Samples

2.1 GCarpet

2.4 GMoldings

SD-06 Test Reports 3.2Moisture and Alkalinity Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 91 PAGES

09 68 00 SD-10 Operation and Maintenance Data

2.1Carpet 3.5Cleaning and Protection

SD-11 Closeout Submittals 1.2.1Local/Regional Materials 2.1Carpet 2.3Adhesives and Concrete Primer

09 83 13 SD-03 Product Data 3.2Installation

2.1 GAcoustical Wall Panels

SD-04 Samples

2.1 GAcoustical Wall Panels

SD-07 Certificates 2.1Acoustical Wall Panels

SD-11 Closeout Submittals 1.2.1LEED Documentation

09 90 00 SD-03 Product Data 1.4.2Certification 1.9.1Local/Regional Materials 2.1Materials

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.11 GColor

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.