Text version
Request For Proposal
Airmen Training Complex Dorms 5 Large Business Package Lackland AFB, TX
W9126G-18-R-0010 November 2017
US Army Corps of Engineers Fort Worth District
This page was intentionally left blank
Airmen Training Complex Dormitory #5 FY16 LKATCD5
PROJECT TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 13.00 10 ASBESTOS ABATEMENT
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
02 83 13.00 20 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 23 00 STEEL STRESSING TENDONS AND ACCESSORIES FOR
POST-TENSIONED CONCRETE
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
03 45 00 PRECAST ARCHITECTURAL/STRUCTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
04 21 26 GLAZED STRUCTURAL CLAY TILE AND PREFACED CONCRETE MASONRY
UNITS
DIVISION 05 - METALS
05 05 23 WELDING, STRUCTURAL
05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS
05 12 00 STRUCTURAL STEEL
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 21 23 STEEL JOIST GIRDER FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 42 50 PRE-ENGINEERED COLD-FORMED STEEL TRUSSES
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 08 27.00 10 BUILDING AIR BARRIER SYSTEM TESTING FOR COMMISSIONING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
PROJECT TABLE OF CONTENTS Page 1
07 14 10 WATERPROOF FLOORING MEMBRANE
07 17 00 BENTONITE WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET AND SEMI-RIGID INSULATION
07 22 00 ROOF AND DECK INSULATION
07 26 16 BELOW GRADE VAPOR RETARDERS
07 27 00 COLD LIQUID APPLIED MOISTURE BARRIER
07 27 39 SPRAYED POLYURETHANE FOAM INSULATION AND AIR-BARRIER
SYSTEM
07 42 16 INSULATED CORE METAL WALL PANELS
07 53 24 MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 72 00 ROOF VENTILATORS, GRAVITY-TYPE
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 60 45 SKYLIGHTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 STUCCO
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.14 CHEMICAL RESISTIVE RESINOUS FLOORING
09 68 00 CARPET
09 83 13 ACOUSTICAL WALL TREATMENT
09 90 00 PAINTS AND COATINGS
09 96 59 HIGH-BUILD GLAZE COATINGS
09 97 23.17 INTERIOR LINING FOR CONCRETE STORAGE TANKS (FOR GRAY
WATER STORAGE)
DIVISION 10 - SPECIALTIES
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 52 00 SOLID PLASTIC LOCKERS AND LOCKER BENCHES
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
PROJECT TABLE OF CONTENTS Page 2
12 48 13.13 ENTRANCE FLOOR MATS
DIVISION 14 - CONVEYING EQUIPMENT
14 24 00 HYDRAULIC ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 00 01 GREYWATER HARVESTING SYSTEM
22 14 29.00 40 SUMP PUMPS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 11 25 FACILITY GAS PIPING
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS
23 82 19.00 40 FAN COIL UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 33.17 CONNECTION CABINET FOR MOBILE GENERATOR
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 00.00 20 HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS AND SWITCHGEAR
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 3
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 21 00.00 20 INTERCOMMUNICATION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 20 01.00 10 ELECTRONIC SECURITY SYSTEM
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
31 63 26 DRILLED CAISSONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSE
32 11 29 LIME-STABILIZED SUBGRADE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 11 CONCRETE PAVEMENT FOR HEAVY-DUTY PAVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 24.00 10 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 31 19 ORNAMENTAL METAL GATES
32 84 24 IRRIGATION SPRINKLER SYSTEMS
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 46 13 FOUNDATION DRAINAGE SYSTEM
33 47 13 FOUNDATION DRAIN LINER
33 51 15 NATURAL-GAS DISTRIBUTION
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 91 PAGES
Airmen Training Complex Dormitory #5 FY16
02 41 00 SD-01 Preconstruction Submittals
1.10 GExisting Conditions
SD-07 Certificates
1.2.1 GDemolition Plan
1.7 GNotification
02 81 00 SD-03 Product Data
3.1 GOnsite Hazardous Waste
Management 3.2Notices of Non-Compliance and
Notices of Violation 2.1.1Packaging Notifications
SD-06 Test Reports
3.7 GRecordkeeping
3.8Spill Response
3.7 GException Report
SD-07 Certificates 1.5.3Certification 3.2.4Security Plan
1.5.1 GTransportation and Disposal
Coordinator
1.5.2 GTraining
3.2.2EPA Offsite Policy 3.2.5Certificates of Disposal
3.2.3 GShipping Documents and
Packagings Certification 3.6Waste Minimization
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 91 PAGES
02 82 13.00 10 SD-02 Shop Drawings
1.5 GDetailed Drawings
SD-03 Product Data
3.11.3.1 GAsbestos Waste Shipment
Records 1.2Weight Bills and Delivery Tickets
2.1 GEncapsulants
1.10.1 GRespiratory Protection Program
3.11 GCleanup and Disposal
1.7.1 GQualifications
1.12Training Program 1.9.1Licenses, Permits and
Notifications
3.11.3.2 GAsbestos Management Plan
SD-06 Test Reports
3.9 GExposure Assessment and Air
Monitoring
1.8.3 GLocal Exhaust System
SD-07 Certificates 1.8.3Local Exhaust System
2.1 GEncapsulants
1.10 GMedical Surveillance
Requirements 02 82 14.00 10 SD-02 Shop Drawings
1.4 GDetailed Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 91 PAGES
02 82 14.00 10 3.11.3.1 GAsbestos Waste Shipment Records
1.1 GWeight Bills and Delivery Tickets
2.1 GEncapsulants
1.9.1 GRespiratory Protection Program
3.11 GCleanup and Disposal
1.6.1 GQualifications
1.11Training Program
1.8.1 GLicenses, Permits and
Notifications
3.11.3.2 GAsbestos Management Plan
SD-06 Test Reports
3.9 GExposure Assessment and Air
Monitoring 1.7.3Local Exhaust System
SD-07 Certificates 1.7.3Local Exhaust System
2.1 GEncapsulants
1.9Medical Surveillance
Requirements 02 82 33.13 20 SD-03 Product Data
1.6.4 GVacuum Filters
1.6.1 GRespirators
SD-06 Test Reports
1.5.2.3 Gsampling results
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 91 PAGES
02 82 33.13 20 1.5.2.3 GOccupational and Environmental Assessment Data Report
SD-07 Certificates
1.5.1.1 GQualifications of CP
1.5.1.3 GTesting Laboratory
2.1.1.1 GOccupant Notification
1.5.1.2 GTraining Certification
1.5.1.4 GThird Party Consultant
Qualifications
1.5.3 Glead-based paint/paint with lead
removal/control plan
1.6.3 GRental equipment notification
1.5.2.6 GRespiratory Protection Program
1.5.2.7 GHazard Communication Program
2.5.2 GEPA or State approved
hazardous waste treatment, storage, or disposal facility
1.5.2.8 GLead Waste Management Plan
1.6.4 GVacuum filters
SD-11 Closeout Submittals
2.5.2.1 Ghazardous waste manifest
1.5.2.4 GMedical Examinations
1.5.1.2 GTraining Certification
02 83 13.00 20 SD-01 Preconstruction Submittals
1.6.2.3 GOccupational and Environmental
Assessment Data Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 91 PAGES
02 83 13.00 20 1.6.2.2 GLead Compliance Plan
1.6.1.1 GCompetent Person
1.6.1.2 GTraining Certification
1.6.2.8 GLead Waste Management Plan
3.5.2.1 GWritten Evidence
1.6.2.4 GMedical Examinations
SD-06 Test Reports
1.6.2.3 GSampling Results
1.6.2.3 GOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.6.1.3 GTesting Laboratory
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 Ghazardous waste manifest
3.5.2.1 Gturn-in documents or weight
tickets 02 84 16 SD-07 Certificates
1.9.1 GQualifications of CIH
1.9.1 GTraining Certification
1.9.2 GPCB and Lamp Removal Work
Plan
1.9.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter certification
3.2.4Certification of Decontamination
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 91 PAGES
02 84 16 3.5.2.1Certificate of Disposal and/or recycling
02 84 33 SD-07 Certificates 1.7.1Training certification 1.7.2Qualifications of CIH 1.7.3PCB removal work plan 1.7.4PCB disposal plan 1.7.5Notification 3.8Transporter certification 3.5.4Certification of Decontamination 3.5.5Post cleanup sampling 3.8.1Certificate of disposal
03 11 13.00 10 SD-02 Shop Drawings 3.1.1Formwork
SD-03 Product Data 1.3Design 2.1Form Materials 2.1.6Form Releasing Agents
SD-04 Samples 1.5Sample Panels 2.1.7Fiber Voids
SD-06 Test Reports 3.5Inspection 3.4.1Formwork Not Supporting Weight of Concrete SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 91 PAGES
03 11 13.00 10 2.1.7Fiber Voids 03 15 00.00 10 SD-02 Shop Drawings
2.4 GWaterstops
SD-03 Product Data
2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops
SD-04 Samples 2.3.2Lubricant for Preformed
Compression Seals 2.3.3Field-Molded Type 2.4.1Non-metallic Materials 2.4Waterstops
2.5.2 GSplicing Waterstops
SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops
03 20 00.00 10 SD-02 Shop Drawings
3.1 GReinforcement
SD-03 Product Data 1.4.1Welding 3.1.4.2Butt-Splices 2.7Material
SD-06 Test Reports 2.7Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 91 PAGES
03 20 00.00 10 2.7Tests, Inspections, and Verifications
SD-07 Certificates 2.3Reinforcing Steel
03 23 00 SD-02 Shop Drawings
1.5.2 GInstallation Drawings
SD-03 Product Data
3.1.1 GPost-Tensioning Method and
Equipment 3.3Materials Disposition Records 3.1.6Post-Tensioning Operations
Records SD-06 Test Reports
2.1Stressing Tendons and Accessories
SD-07 Certificates 1.5.1Certification of Post-Tensioning
Technicians 03 30 00.00 10 SD-03 Product Data
Part 2Recycled Content Products 1.3Portland Cement 2.1Portland Cement 3.2.1Ready-Mixed Concrete 2.10Vapor Barrier 2.6Latex Bonding Agent 1.3.6Floor Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 91 PAGES
03 30 00.00 10 2.9Floor Hardener 2.3Chemical Admixtures 2.7Epoxy Resin 1.7.1Crystalline waterproofing admixture 2.3.8Crystalline waterproofing admixture 3.10.5Crystalline waterproofing admixture SD-04 Samples
2.3.5Surface Retarder SD-05 Design Data
1.3.1 GMixture Proportions
SD-06 Test Reports
3.10 GTesting and Inspection for CQC
1.7.1crystalline waterproofing admixture 2.3.8crystalline waterproofing admixture 3.10.5crystalline waterproofing admixture SD-07 Certificates
1.5Qualifications 03 35 00.00 10 SD-04 Samples
1.3.1Color Samples 1.3.2.1Textured Wall Panel Mockup
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 91 PAGES
03 35 00.00 10 1.3.2.2Class A Wall Panel Mockup 1.3.2.3Ground Slab Mockup
03 39 00.00 10 SD-03 Product Data 2.1Curing Materials 3.2Curing and Protection
SD-06 Test Reports 3.3Testing and Inspection for CQC
03 40 00.00 10 SD-01 Preconstruction Submittals 1.4.2.2Quality Control Procedures
SD-02 Shop Drawings
1.2.1 GStandard Precast Units
1.2.2 GCustom-Made Precast Units
SD-03 Product Data 1.2.1Standard Precast Units 1.2.3Proprietary Precast Units 3.1.3Embedded Items 2.1.9Accessories
SD-05 Design Data
1.2.2 GDesign Calculations
1.2.5.1 GConcrete Mix Proportions
SD-06 Test Reports 1.4.2.4Test Reports
SD-07 Certificates 1.4.2.2Quality Control Procedures
03 45 00 SD-02 Shop Drawings
1.16.3 Gwall panel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 91 PAGES
03 45 00 2.8.18 Gwall panel SD-03 Product Data
2.6 GCast-in embedded items and
connectors
2.6.4 GConnection devices
2.1.1Thermally Low-Conductive
Sandwich Panel Wythe Connectors
2.4.11Thermally Low-Conductive Sandwich Panel Wythe Connectors
SD-04 Samples
2.8.8 Gfinishing
1.16.8 GMock-up
SD-05 Design Data
1.16.4 G AEdesign calculations
2.8.10 G AErepair of surface defects
1.16.5 Gconnection and embedment
design calculations
1.7.1.1 GMoisture and Thermal
Performance Calculations SD-06 Test Reports
1.15.3 GStrength tests
SD-11 Closeout Submittals
1.6Manufacturer's Qualifications 1.7.8Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 91 PAGES
03 45 00 1.7.9Mix Design 1.11Precast Concrete Manufacturer 1.13Wall-panel Installer 1.15.2Concrete 1.15.2Exposed-to-View Concrete 1.15.2Backing Concrete 1.15.3Compressive Strength 1.16.9Pre-Installation Meeting
SD-08 Manufacturer’s Instructions 1.17Tolerances 2.4.16Air-Entrained Admixtures 3.4Erection
04 20 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data 1.2.1Local/Regional Materials 1.2.2Environmental Data
2.2 GClay or Shale Brick
2.6.4 GCement
2.12 GInsulation
1.6.2 GCold Weather Installation
SD-04 Samples
2.2 GClay or Shale Brick
2.6.2 GColored mortar
2.4 GPrecast concrete sill
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 91 PAGES
04 20 00 2.6.5 GPre-mixed Mortar
1.2.3.1 GUnit Strength Method
SD-06 Test Reports
3.23.1 GField Testing of Mortar
3.23.2 GField Testing of Grout
2.3.3 GFire-rated CMU
1.4.4 GMasonry Inspector Qualifications
SD-10 Operation and Maintenance Data
3.22.2Take-Back Program 04 21 26 SD-03 Product Data
2.2Ceramic Glazed Structural Clay Facing Tile
2.3Prefaced Concrete Masonry Units
SD-04 Samples 2.2Ceramic Glazed Structural Clay
Facing Tile 2.3Prefaced Concrete Masonry
Units 2.3Prefaced Concrete Masonry
Units
2.4.2 GMortar Tuck Point
05 05 23 SD-03 Product Data
1.6 GWelding Procedure Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 91 PAGES
05 05 23 1.6.5Welder, Welding Operator, and Tacker Qualification
1.6.6Inspector Qualification 1.6.2Previous Qualifications 1.6.3Pre-qualified Procedures
SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination
05 05 23.13 10 SD-03 Product Data 1.6.1Ultrasonic Inspection
05 12 00 SD-02 Shop Drawings
1.6.1 GFabrication drawings
SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.4Load indicator washers 2.3.2Non-Shrink Grout 2.2.5Load indicator bolts
SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers
SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 2.5Galvanizing 2.8Teflon (PTFE) Bearing System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 91 PAGES
05 12 00 1.5AISC Quality Certification 1.6.2.2Welding procedures and qualifications 05 21 19 SD-01 Preconstruction Submittals
1.5.2Welder qualification 1.5.2Safety Data Sheet
SD-02 Shop Drawings
1.5.1 GSteel joist framing
SD-06 Test Reports 3.4.1Welding inspections
SD-07 Certificates 2.1Accessories
05 21 23 SD-01 Preconstruction Submittals 1.5.2Welder qualification 1.5.2Safety Data Sheet
SD-02 Shop Drawings
1.5.1 GSteel joist girder framing
SD-06 Test Reports 3.4.1Welding inspections
SD-07 Certificates 2.1Accessories
05 30 00 SD-02 Shop Drawings
1.4.5 GFabrication Drawings
2.3.2.1Cant Strips 2.3.2.2Ridge and Valley Plates 2.3.2.3Metal Closure Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 91 PAGES
05 30 00 SD-03 Product Data 2.2Accessories 2.3.1Deck Units 2.1.6Galvanizing Repair Paint 2.1.5Joint Sealant Material 2.2.9Mechanical Fasteners 1.4.2Powder-Actuated Tool Operator 2.3.4Repair Paint 1.4.3Welder Qualifications
SD-04 Samples 2.3Metal Roof Deck Units 2.1.7Flexible Closure Strips 2.3Flexible Closure Strips
SD-05 Design Data 2.3.1Deck Units
SD-07 Certificates 1.4.4.1Fire Safety 1.4.4.2Wind Storm Resistance
05 40 00 SD-02 Shop Drawings
1.7.1 GFraming Components
SD-03 Product Data 2.1studs,joists
SD-05 Design Data
1.7.2 GMetal framing calculations
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 91 PAGES
05 40 00 1.5Load-bearing cold-formed metal framing
3.1.1Welds 05 42 50 SD-02 Shop Drawings
1.4.1Truss components 2.2.3Truss components
SD-03 Product Data
1.4.1 GTruss Components
2.2.3 GTruss Components
05 50 13 SD-02 Shop Drawings 2.3Access doors and panels
2.10 GAccess covers for gray water
storage tanks
3.12 GAccess covers for gray water
storage tanks
3.15 GFall Protection
2.11 GInterior Metal Joint Cover
2.6 Gangles and plates
SD-03 Product Data 2.3Access doors and panels 2.10Access covers for gray water storage tanks 3.12Access covers for gray water storage tanks
2.4 GFloor Door
2.7 GBicycle Rack
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 91 PAGES
05 50 13 3.15 GFall Protection 2.9Roof hatch 3.11Roof hatch
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars and
Strips
2.13 GMetal Stair System
SD-03 Product Data
2.15 GTread Plank
2.15.3 GTread Plank
2.15.3 GFloor Plank
2.2 GSteel Products
SD-07 Certificates
1.3 GWelding Procedures
1.3 GWelder Qualification
SD-08 Manufacturer’s Instructions 2.15Tread Plank 2.15.3Tread Plank 2.15.3Floor Plank
05 51 33 SD-02 Shop Drawings 2.4Ladders
SD-03 Product Data 2.4Ladders
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 91 PAGES
05 52 00 2.1 GIron and Steel Hardware
3.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars and
Strips
3.1 GSteel Shapes, Plates, Bars and
Strips
1.2.1 GSteel Railings
1.2.1 GStainless Steel Handrails
2.13 GStainless Steel Handrails
SD-03 Product Data
1.2.1 GStainless Steel Handrails
2.13 GStainless Steel Handrails
1.2.1 GAnchorage and Fastening
Systems SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.1 GInstallation Instructions
06 10 00 SD-03 Product Data 1.9.1Local/Regional Materials 1.8Fire-retardant treatment 2.4.1Adhesives
SD-07 Certificates 1.9.3Forest Stewardship Council
(FSC) Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 91 PAGES
06 10 00 SD-11 Closeout Submittals 1.9.1Local/Regional Materials 2.4.1Adhesives 1.9.2Certified Wood 1.9.3Certified Wood
06 20 00 SD-02 Shop Drawings
2.9 GWood Cabinets
3.2.6 GCountertops
SD-04 Samples
2.1.1 GHardwood
SD-11 Closeout Submittals 1.4.1Local/Regional Materials 1.4.2Coatings 1.4.2Adhesives 2.7.1Adhesives 2.7.1Adhesives 1.4.3Certified Wood
06 61 16 SD-02 Shop Drawings
1.7 GDetail Drawings
3.1 GInstallation
SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications
SD-04 Samples
2.1 GMaterial
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 91 PAGES
06 61 16 SD-10 Operation and Maintenance Data
3.2Clean-up 07 08 27.00 10 SD-04 Samples
3.1.2 GMock-up
SD-07 Certificates
1.7.1.1 GAir Barrier Inspector
1.7.1.2Thermography Test Firm 1.7.1.3Thermography Test Technician
1.7.1.4 GAir Barrier Leakage Test Firm
1.7.1.5 GAir Barrier Leakage Test
Technician SD-06 Test Reports
3.2.2 GThermography Test Procedures
3.3.1 GBuilding Air Barrier Leakage Test
Procedures 1.7.2Design Review Report 3.2.3Thermographic Test Report 3.3.3Air Barrier Leakage Test Report
07 13 53 SD-03 Product Data
2.1.1 GElastomeric waterproofing sheet
material 2.4Drainage Composite Course 2.1.1Primers, adhesives, and mastics 2.7Geomembrane liner
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 91 PAGES
07 13 53 2.1Materials SD-08 Manufacturer’s Instructions
2.1.1Primers, adhesives, and mastics 07 14 10 SD-03 Product Data
2.1Waterproof Flooring Surfacing System
SD-04 Samples
3.3.1 GColor
07 17 00 SD-08 Manufacturer’s Instructions 3.2Application 3.3Protection 3.4Corrections
07 21 13 SD-03 Product Data
2.1 GBlock or board insulation
2.2Accessories
SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.2.1Adhesive
07 22 00 SD-02 Shop Drawings
2.1.4 GTapered roof insulation
SD-03 Product Data
2.4 GFasteners
2.1 GInsulation
2.1.2Recycled materials 1.4.2Local/Regional Materials
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 91 PAGES
07 22 00 1.4.1Flame spread and smoke developed ratings
07 26 16 SD-03 Product Data
2.1 Gmaterial
SD-06 Test Reports 2.1material
SD-08 Manufacturer’s Instructions 3.2Installation
07 27 00 SD-03 Product Data
2.1 Gwaterproofing material
2.1Primers, adhesives, and mastics
SD-06 Test Reports 2.1waterproofing material 3.5Field Quality Control 3.1Verification Of Conditions 1.3.1Protective Covering
SD-08 Manufacturer’s Instructions 2.1Primers, adhesives, and mastics
07 27 39 SD-03 Product Data
2.4 GSprayed Polyurethane Foam
Insulation
2.3.1 GAir-Barrier Products
SD-06 Test Reports 1.4.5Daily Testing
SD-07 Certificates
1.4.1 GInstaller Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 91 PAGES
07 27 39 1.4.3 GCompatibility of Materials SD-08 Manufacturer’s Instructions
1.4.4 GInstallation Instructions
1.6.1 GInstallation Instructions
3.5.2 GInstallation Instructions
07 42 16 SD-01 Preconstruction Submittals
1.5.1 GQualification of Manufacturer
1.5.3 GQualification of Installer
SD-02 Shop Drawings
1.6.1 GWall Panel Assemblies
1.6.1Flashing and Accessories 1.6.1Anchorage Systems 1.6.1Closure Materials 1.6.1metal closure strips
SD-03 Product Data 1.9.1Regional Materials 1.9.2Recycled Content
1.6.1 GWall Panel Assemblies
1.6.1Flashing and Accessories 2.5Secondary Metal Framing 1.6.1Repair Paint 1.6.1Anchorage systems 1.6.1Insulation 1.6.1Flashing Tape 2.4.5Flashing Tape 1.6.1Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 91 PAGES
07 42 16 SD-04 Samples
1.6.1 Gmanufacturer's color chips
SD-05 Design Data
1.5.2 GCalculations
1.6.1 GWind design analysis
SD-06 Test Reports 1.3.7wind load tests
SD-07 Certificates 1.5.1Qualification of Manufacturer 1.5.3Qualification of Installer 1.6.1wall system assembly wind load
SD-08 Manufacturer’s Instructions 1.6.1Installation of Wall Panels
SD-09 Manufacturer’s Field Reports
3.5.2 GWater-Spray Test
3.5.3 GField Service Report
SD-11 Closeout Submittals 1.8Warranty 1.6.1Instructions 1.6.1Safety Data Sheets
07 53 24 SD-03 Product Data
1.6 GTPO Sheet
SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 91 PAGES
07 53 24 1.4.3 GFire Resistance SD-11 Closeout Submittals
1.8Warranty 3.8Information Card 3.7Instructions To Government
Personnel 07 60 00 SD-02 Shop Drawings
2.1.2.1 GSoffits
3.1.20 GCovering on flat, sloped, or
curved surfaces
3.1.14 GGutters
3.1.15 GDownspouts
3.1.10 GBase flashing
3.1.11 GCounterflashing
3.1.21 GFlashing at roof penetrations
3.1.16 GScuppers
3.1.23 GPre-Finished Parapet Copings
3.1.17 GConductor heads
3.1.19 GEave flashing
SD-11 Closeout Submittals 3.6Quality Control Plan
07 61 14.00 20 SD-02 Shop Drawings
1.2.4 GRoofing
SD-03 Product Data
2.1 GRoofing panels
2.4.2 GUnderlayment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 91 PAGES
07 61 14.00 20 2.3 GAttachment clips
2.4.1 GClosures
2.4 GAccessories
2.4.3 GFasteners
2.4.4 GSealants
1.6.6 GFinish
2.1.3 GFinish
SD-04 Samples
1.8 GWarranty
1.8 GWarranty
1.8 GWarranty
1.8 GWarranty
SD-05 Design Data
1.5 GDesign calculations
SD-06 Test Reports
1.3.2.1 GWind Uplift Test
3.6 GField Inspection
1.3.3 GStructural performance
1.6.6 GFinish
2.1.3 GFinish
SD-07 Certificates
1.6.3 GManufacturer's Technical
Representative
1.6.4 GInstaller's Qualifications
2.1 GCoil stock
1.7.2 GLEED
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 91 PAGES
07 61 14.00 20 SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-11 Closeout Submittals
3.8 GInformation card
07 72 00 SD-03 Product Data
2.2 GLouvered Penthouse Ventilators
3.1 GLouvered Penthouse Ventilators
07 81 00 SD-03 Product Data
3.3 GFireproofing Material
SD-06 Test Reports
1.2.2 GFire Resistance Rating
SD-07 Certificates
1.4.1 GInstaller Qualifications
07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials
SD-07 Certificates 2.1Firestopping Materials 1.4Installer Qualifications 3.3Inspection
SD-11 Closeout Submittals 2.1.3.2Sealants
07 92 00 SD-03 Product Data 1.7.1Local/Regional Materials 1.7.2Environmental Data 2.1Sealants 1.7.2Primers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 91 PAGES
07 92 00 SD-04 Samples 2.1sealants
SD-07 Certificates 3.3.6Sealant
SD-11 Closeout Submittals 1.7.1Local/Regional Materials 2.1Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.3Accessories
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.3Accessories
08 11 16 SD-02 Shop Drawings
1.5.1 GDoors, sidelites, transoms and
frames SD-05 Design Data
1.2.1 Gcalculations
1.2.1.1 GDesign Analysis
SD-06 Test Reports
1.2.1.1 GStandard Airblast Test
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 91 PAGES
08 11 16 1.2.4 GNFRC validated Project Label Certificate
SD-08 Manufacturer’s Instructions 2.1Doors and frames
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
1.4Local/Regional Materials
1.3 GCertified Wood
SD-04 Samples
2.3.5.2 GDoor finish colors
08 22 20 SD-02 Shop Drawings
2.5.1 GDoors
2.6Door Hardware Components and
Accessories 2.6Weather-stripping 2.6Smoke Seals
SD-03 Product Data
2.5.1 GDoors
2.6Weather-stripping 2.6Smoke Seals
SD-04 Samples 2.2.1colors
08 33 23 SD-02 Shop Drawings
2.3 GOverhead Coiling Doors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 91 PAGES
08 33 23 1.4 GElectric Door Operators
2.6 GElectric Door Operators
SD-03 Product Data
2.3 GOverhead Coiling Doors
1.4 GElectric Door Operators
2.6 GElectric Door Operators
SD-10 Operation and Maintenance Data
3.3 GOperation and Maintenance
Manuals
1.4Materials 1.4Devices 1.4Procedures 1.4Parts Lists 3.2.2Cleaning
08 44 00 SD-02 Shop Drawings 1.5Glazed curtain wall system
SD-03 Product Data 1.5Glazed curtain wall system
SD-05 Design Data 1.3Calculations
1.5.6 GStructural calculations for
deflection
1.4.2.1 GDesign Analysis
1.5.6.1 GDesign Analysis
1.5.6.2 GDesign Analysis
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 91 PAGES
08 44 00 SD-06 Test Reports
1.4.2.1 GStandard Airblast Test
1.5.6.3 GStandard Airblast Test
SD-07 Certificates
1.11.5 GNFRC validated Project Label
Certificate SD-08 Manufacturer’s Instructions
1.5Glazed curtain wall system SD-11 Closeout Submittals
1.8WARRANTY
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.10Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.2.8.1 GHardware
1.11 GWindow performance
1.7.1Local/Regional Materials
SD-04 Samples 1.4.2.1Finish Sample
SD-05 Design Data
1.4.3 GDesign Analysis
SD-06 Test Reports 1.4.4Minimum condensation resistance factor
1.11.2.3 GStandard Airblast Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 91 PAGES
08 51 13 SD-07 Certificates
1.11.5 GNFRC validated Project Label
Certificate 08 60 45 SD-02 Shop Drawings
3.2 GShop Drawings
SD-03 Product Data
2.1 GSKYLIGHTS
1.6Warranty
SD-06 Test Reports 2.1Test Reports
SD-07 Certificates 2.4Systems 1.4Qualifications
08 71 00 SD-02 Shop Drawings
1.5 GHardware Schedule
2.3.6.1Keying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting 08 81 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 91 PAGES
08 81 00 1.7.1Insulating Glass 3.2.4Fire Rated Glass 2.1.7Fire Rated Glass Framing 1.3Glazing Accessories 1.6.1Local/Regional Materials
SD-04 Samples 2.1.6translucent laminated glass
SD-11 Closeout Submittals 1.6.1Local/Regional Materials
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
09 24 23 SD-03 Product Data 1.4Materials 2.1Recycled Content 2.1Regional Material
SD-04 Samples 1.3Sample Panel
SD-05 Design Data
2.9.1 GManufactured Suspension
System 09 29 00 SD-03 Product Data
2.1.1Gypsum Board 2.1.4Cementitious backer units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 91 PAGES
09 29 00 2.1.1Recycled Content 2.1.7Adhesives 2.1.5Joint Treatment Materials 1.5.1Local/Regional Materials
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-11 Closeout Submittals 1.5.1Local/Regional Materials 2.1.1Gypsum Board 2.1.7Adhesives
09 51 00 SD-03 Product Data 1.2.3Acoustical Ceiling Systems
SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
09 65 00 SD-03 Product Data 2.8Resilient Flooring and
Accessories 2.4Adhesives 2.1Vinyl Composition Tile 2.2Wall Base 1.2.1Local/Regional Materials 1.4Certification
SD-04 Samples
2.8 GResilient Flooring and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 91 PAGES
09 65 00 SD-06 Test Reports 3.3Moisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data
2.8Resilient Flooring and Accessories
SD-11 Closeout Submittals 1.2.1Local/Regional Materials 2.8Resilient Flooring and
Accessories 2.4Adhesives 2.2Wall Base
09 67 23.14 SD-02 Shop Drawings
2.1 GFlooring
SD-03 Product Data
2.1 GTapered Cementitious Topping
2.6.1 GTapered Cementitious Topping
2.1 GWaterproofing Membrane
2.6.2 GWaterproofing Membrane
2.3 GSealer and Resin
3.3.2 GFloor Surfacing
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 91 PAGES
09 67 23.14 2.2 GFlooring Systems SD-07 Certificates
1.3.1 GQualifications of Installer
SD-08 Manufacturer’s Instructions
3.3Application SD-10 Operation and Maintenance Data
2.2Flooring Systems 09 68 00 SD-02 Shop Drawings
3.4Installation 2.4Moldings
SD-03 Product Data 2.1Carpet 2.4Moldings 3.1Surface Preparation 3.4Installation 1.4Regulatory Requirements 2.1.1Physical Characteristics 1.2.1Local/Regional Materials 1.2.2Environmental Data
SD-04 Samples
2.1 GCarpet
2.4 GMoldings
SD-06 Test Reports 3.2Moisture and Alkalinity Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 91 PAGES
09 68 00 SD-10 Operation and Maintenance Data
2.1Carpet 3.5Cleaning and Protection
SD-11 Closeout Submittals 1.2.1Local/Regional Materials 2.1Carpet 2.3Adhesives and Concrete Primer
09 83 13 SD-03 Product Data 3.2Installation
2.1 GAcoustical Wall Panels
SD-04 Samples
2.1 GAcoustical Wall Panels
SD-07 Certificates 2.1Acoustical Wall Panels
SD-11 Closeout Submittals 1.2.1LEED Documentation
09 90 00 SD-03 Product Data 1.4.2Certification 1.9.1Local/Regional Materials 2.1Materials
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets SD-04 Samples
1.11 GColor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N…