Dwgs V-III - Pedestrian Bridge - RE-RTA.pdf

PDF 8 MB Posted

Attached to
Construct Recruit Housing and Training (Airmen Training Complex Dormitory #4) - Unrestricted Large Business Package
Solicitation number
W9126G-11-R-0216
Issued by

About this file

Solicitation Dwgs V-III - Pedestrian Bridge - RE-RTA

View the file

Other files

File Type Posted
2nd_Site_Visit_Attendee_List--03_2012.pdf PDF
1st_Site_Visit_Attendee_List--01_2012.pdf PDF
am_6.pdf PDF
am_5.pdf PDF
am_4.pdf PDF
am_3.zip ZIP file
am_2.pdf PDF
g11r0216_am_1.zip ZIP file
Dwgs V-II - ATC4 Large Business -RE- RTA.pdf PDF
g11r0216.zip ZIP file
Dwgs V-I - ATC4 Large Business - RE-RTA.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C on tr N o.

Fort Worth District

US Army Corps of Engineers

1 2 3 4 5

E

D

C

B

A

LACKLAND AIR FORCE BASE

SAN ANTONIO, TEXAS

PROJECT NUMBER MPLS 083737R4

CONTRACT NO.

AIRMEN TRAINING COMPLEX - EAST CAMPUS

AIRMEN TRAINING COMPLEX 4 (ATC4)

VOLUME III

SOLICITATION NO. W9126G-11-R-0216

DATED: SEPTEMBER 2011

LACKLAND DRAWING NO. LA 11-0017

VERIFICATION: VERIFY ALL DIMENSIONS, ELEVATIONS, SITE CONDITIONS, AND

EQUIPMENT BEFORE STARTING WORK OR PROCURING PRODUCTS OR EQUIPMENT.

CONFLICTS: IF CONFLICTS OCCUR, THE MORE RESTRICTIVE (INCLUDING

SPECIFICATIONS) SHALL TAKE PRECEDENCE.

CODES: ALL MATERIALS AND WORK SHALL CONFORM TO THE REQUIREMENTS OF THE

IBC 2009, UFC'S, NFPA CODES AND OTHER STANDARDS INDICATED OR SPECIFIED.

SIMILAR WORK: WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY

PART OF THE WORK, SUCH DETAILS SHALL BE THE SAME AS FOR SIMILAR WORK

SHOWN ON DRAWINGS.

PENETRATIONS: PIPES, DUCTS, SLEEVES, CONDUIT, CHASES, ETC.: REFER TO

DRAWINGS AND SPECIFICATIONS FOR REQUIREMENTS. PROVIDE SMOKE SEALING AND

FIRE STOPPING AT ALL FLOORS, SMOKE PARTITIONS AND FIRE RATED WALLS.

EXCAVATIONS: LOCATE AND PROTECT UNDERGROUND OR CONCEALED UTILITIES

INCLUDING CONDUIT, DUCT BANK AND PIPING WHERE NEW WORK IS BEING PERFORMED.

EQUIPMENT LOADS: MATERIAL LOADS SHALL NOT EXCEED THE ALLOWABLE LOADING

FOR THE SUPPORTING MEMBERS AND THEIR CONNECTIONS.

DRAWINGS: REFER TO ALL DRAWINGS FOR ITEMS WHICH REQUIRE COORDINATION AND

SPECIAL PROVISIONS FOR COMPLETE AND OPERATIONAL SYSTEMS.

CONSTRUCTION METHODS AND PROJECT SAFETY: THE CONTRACT DRAWINGS AND

SPECIFICATIONS REPRESENT THE FINISHED BUILDING AND DO NOT INDICATE METHODS

OR PROCEDURES. DRAWINGS AND SPECIFICATIONS DO NOT INDICATE SEQUENCE OF

CONSTRUCTION, EXCEPT FOR PHASING PLANS.

DEVIATION: ANY DEVIATION FROM THE APPROVED CONSTRUCTION DOCUMENTS SHALL

ONLY BE MADE AFTER WRITTEN APPROVAL BY THE CONTRACTING OFFICER.

COORDINATION: NON-DIMENSIONED DRAWINGS INDICATE ONLY THE APPROXIMATE

LOCATION OF ITEMS. THE FINAL POSITIONING OF THESE ITEMS IS DEPENDENT UPON

THE ACTUAL ITEMS PROVIDED BY CONTRACTOR IN ACCORDANCE WITH ALL RELEVANT

BUILDING CODES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING

WORK BETWEEN SUBCONTRACTORS AND CRAFTS AND PROVIDING NECESSARY SPACE

ALLOCATION AND DIMENSIONS IN A TIMELY MANNER TO ALL PARTIES INVOLVED TO

ENSURE PROPER COORDINATION.

SCALE: THE DRAWINGS SHALL NOT BE SCALED; REFER TO DIMENSIONS WHERE

PROVIDED.

GENERAL REQUIREMENTS

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

BID OPTIONS

PEDESTRIAN BRIDGE:

1a: PEDESTRIAN BRIDGE 1b: PEDESTRIAN BRIDGE STAINLESS STEEL PROTECTIVE MESH

EAST CAMPUS QUADRANGLE:

2a: MEDALLION WITH LIGHTING 2b: STONE MOSAIC PLAZA 2c: SIDEWALK TEXTURING 2d: ENHANCED LANDSCAPING 2e: GATEWAY MARKERS WITH LIGHTING 2f: DCF MARKERS WITH LIGHTING 2g: STONE VENEER ON TERRACED WALLS

ATC 4:

3: INSTALLATION OF GOVERNMENT FURNISHED LOCKABLE

TELECOMM CABINETS

4: CID (O&M)

DOCUMENT WAS AUTHORIZED

THE SEAL APPEARING ON THIS

BY DAVID EVANS

21459 ON 1 SEPTEMBER 2011

R

EG

IS

TERED ARCH

IT

EC

T

DA

V ID EVANS

95412 SAXETFOETAT

S

Sheet reference number

Sheet

U .S

. A R

M Y

E N

G

IN

E E

R D

IS

TR

IC

T, C O

R P

S O

F E

N G

IN

E

E R

S

FO

R T

W O

R

TH

, T E

X A

S

D es ig ne d by

D w n by

R ev ie w ed b y:

S ub m itt ed b y:

E N

G

IN

E E

R

D at e:

S ol

N o.

C on tr N o.

R ev

P lo t s ca le

P lo t d at e:

Fi le n am e:

C on tr N o.

D E

S

IG

N F

IL

E

Fort Worth District

US Army Corps of Engineers

1:

D A

V

ID

L U

K E

, P E of

LA

C

K

LA

N D

A

FB

, T E

X A

S

A

IR

M E

N T

R A

IN

IN

G C

O M

P

LE

X

E A

S T

C A

M P

U S

A

IR

M E

N T

R A

IN

IN

G C

O M

P

LE

X

(A

TC

4)

X X

X X

X

P lo t D at e H er e

S E

P

TE

M B

E R

1 2 3 4 5

D

C

B

A M P

LS

R

D R

A W

IN

G

N U

M B

E R

: L A

1 -

X X

X X

X X

X

D

C

B

A

1 2 3 4 5

W

G

-1 1-

R -0

/2

8/

1:

:4

A M

D A

V E

E V

A N

S

L U

IS

A

D A

V

IL

A

D A

V E

E V

A N

S

A4-G001

D R

AW

IN

G

IN

D

EX

, B

ID

O

PT

IO

N

S, A

N D

G

EN

ER

AL

R

EQ

U

IR

EM

EN

TS

VOLUME I

CIVIL

Sequence

No Sheet Number Sheet Name

23 A4-C101 DEMOLITION SITE PLAN

24 A4-C102 ELECTRICAL DEMOLITION SITE PLAN

25 A4-C103 COMMUNICATIONS DEMOLITION SITE PLAN

26 A4-C104 SURVEY CONTROL DATA PLAN

27 A4-C105 SITE LAYOUT PLAN

28 A4-C106 PAVING PLAN

29 A4-C107 GRADING SITE PLAN

30 A4-C108 UTILITY SITE PLAN

31 A4-C109 STORM WATER POLLUTION PREVENTION PLAN

32 A4-C110 GARY AVENUE PLAN AND PROFILE

33 A4-C111 DRAINAGE DITCH PLAN AND PROFILE

34 A4-C112 STORM DRAIN LINES A, A-1 AND A-2 PLANS AND PROFILES

35 A4-C113 STORM DRAIN LINE B PLAN AND PROFILE

36 A4-C114 STORM DRAIN LINES B-1, B-2 AND B-3 PLANS AND PROFILES

37 A4-C115 STORM DRAIN LINES C AND C-1 PLANS AND PROFILES

38 A4-C116 STORM DRAIN LINES C-2 AND D PLAN AND PROFILE

39 A4-C117 SANITARY SEWER LINES A AND B PLANS AND PROFILE

40 A4-C118 SANITARY SEWER LINES C, D AND E PLANS AND PROFILES

41 A4-C119 WATER LINE A PLAN AND PROFILE

42 A4-C120 WATER LINES A-1, A-2 AND B PLANS AND PROFILES

43 A4-C121 WATER LINE C PLAN AND PROFILE

44 A4-C122 WATER LINE D PLAN AND PROFILE

45 A4-C123 GAS LINE A PLAN AND PROFILE I

46 A4-C124 GAS LINE A PLAN AND PROFILE II

47 A4-C125 GAS LINE A PLAN AND PROFILE III

48 A4-C126 GAS LINE A-1 PLAN AND PROFILE

49 A4-C127 ELECTRICAL LINE A PLAN AND PROFILE

50 A4-C128 ELECTRICAL LINES B AND C PLANS AND PROFILES

51 A4-C129 ELECTRICAL LINE D PLAN AND PROFILE

52 A4-C130 ELECTRICAL LINE E PLAN AND PROFILE

53 A4-C131 COMMUNICATION LINE A PLAN AND PROFILE

54 A4-C401 ENLARGED BUILDING - ROOF DRAIN COLLECTION PLAN

55 A4-C402 SERVICE DRIVE AND SIDEWALK JOINTING PLAN

56 A4-C501 PAVING DETAILS

57 A4-C502 UTILITY DETAILS

58 A4-C503 DRAINAGE DETAILS

59 A4-C504 SANITARY SEWER DETAILS

60 A4-C505 REMOVABLE PIPE BOLLARD DETAILS

61 A4-C506 TEMPORARY EROSION SEDIMENT AND WATER POLLUTION CONTROL MEASURES

62 A4-C507 CONSTRUCTION FENCE DETAILS

63 A4-C508 FREE ZONE CONSTRUCTION FENCE DETAILS

64 A4-C509 JACKING AND BORING DETAILS

65 A4-ES101 ELECTRICAL SITE PLAN I

66 A4-ES102 ELECTRICAL SITE PLAN II

67 A4-ES501 ELECTRICAL ENLARGED TRANSFORMER YARD AND DETAILS

68 A4-ES502 ELECTRICAL DETAILS I

69 A4-ES503 ELECTRICAL DETAILS II

70 A4-ES504 ELECTRICAL DETAILS III

71 A4-ES505 JACKING AND BORING DETAILS

72 A4-ES506 POLE LINE DETAILS I

73 A4-ES507 POLE LINE DETAILS II

74 A4-ES508 POLE LINE DETAILS III

75 A4-ES509 POLE LINE DETAILS IV

76 A4-ES510 POLE LINE DETAILS V

A4-ES511 Unnamed

77 A4-ES601 ELECTRICAL SCHEDULES

78 A4-ES602 ELECTRICAL ONE-LINE DIAGRAM

STRUCTURAL

Sequence

No Sheet

Number Sheet Name

82 A4-S001 GENERAL NOTES

83 A4-S002 GENERAL NOTES

84 A4-S003 GENERAL NOTES AND ABBREVIATIONS

85 A4-S101 FOUNDATION OVERALL PLAN

86 A4-S102 FOUNDATION PLAN - AREA A

87 A4-S103 FOUNDATION PLAN - AREA B

88 A4-S104 FOUNDATION PLAN - AREA C

89 A4-S105 FOUNDATION PLAN - AREA D

90 A4-S106 GROUND FLOOR OVERALL SLAB PLAN

91 A4-S107 GROUND FLOOR SLAB PLAN - AREA A

92 A4-S108 GROUND FLOOR SLAB PLAN - AREA B

93 A4-S109 GROUND FLOOR SLAB PLAN - AREA C

94 A4-S110 GROUND FLOOR SLAB PLAN - AREA D

95 A4-S111 GROUND FLOOR TWO-WAY SLAB BOTTOM REINFORCING PLAN - AREA A

96 A4-S112 GROUND FLOOR TWO-WAY SLAB BOTTOM REINFORCING PLAN - AREA B

97 A4-S113 GROUND FLOOR TWO-WAY SLAB BOTTOM REINFORCING PLAN - AREA C

98 A4-S114 GROUND FLOOR TWO-WAY SLAB BOTTOM REINFORCING PLAN - AREA D

99 A4-S115 GROUND FLOOR TWO-WAY SLAB TOP REINFORCING PLAN - AREA A

100 A4-S116 GROUND FLOOR TWO-WAY SLAB TOP REINFORCING PLAN - AREA B

101 A4-S117 GROUND FLOOR TWO-WAY SLAB TOP REINFORCING PLAN - AREA C

102 A4-S118 GROUND FLOOR TWO-WAY SLAB TOP REINFORCING PLAN - AREA D

103 A4-S119 SECOND FLOOR OVERALL SLAB PLAN

104 A4-S120 SECOND FLOOR SLAB PLAN - AREA A

105 A4-S121 SECOND FLOOR SLAB PLAN - AREA B

106 A4-S122 SECOND FLOOR SLAB PLAN - AREA C

107 A4-S123 SECOND FLOOR SLAB PLAN - AREA D

108 A4-S124 SECOND FLOOR POST TENSIONING SLAB PLAN - AREA A

109 A4-S125 SECOND FLOOR POST TENSIONING SLAB PLAN - AREA B

110 A4-S126 SECOND FLOOR POST TENSIONING SLAB PLAN - AREA C

111 A4-S127 SECOND FLOOR POST TENSIONING SLAB PLAN - AREA D

112 A4-S128 THIRD AND FOURTH FLOOR OVERALL SLAB PLAN

113 A4-S129 THIRD AND FOURTH FLOOR SLAB PLAN - AREA A

114 A4-S130 THIRD AND FOURTH FLOOR SLAB PLAN - AREA B

115 A4-S131 THIRD AND FOURTH FLOOR SLAB PLAN - AREA C

116 A4-S132 THIRD AND FOURTH FLOOR SLAB PLAN - AREA D

117 A4-S133 THIRD AND FOURTH FLOOR POST TENSIONING SLAB PLAN - AREA A

118 A4-S134 THIRD AND FOURTH FLOOR POST TENSIONING SLAB PLAN - AREA B

119 A4-S135 THIRD AND FOURTH FLOOR POST TENSIONING SLAB PLAN - AREA C

120 A4-S136 THIRD AND FOURTH FLOOR POST TENSIONING SLAB PLAN - AREA D

121 A4-S137 PENTHOUSE OVERALL SLAB PLAN

122 A4-S138 PENTHOUSE SLAB PLAN - AREA A

123 A4-S139 PENTHOUSE SLAB PLAN - AREA B

124 A4-S140 PENTHOUSE SLAB PLAN - AREA C

125 A4-S141 PENTHOUSE SLAB PLAN - AREA D

126 A4-S142 PENTHOUSE POST TENSIONING SLAB PLAN - AREA A

127 A4-S143 PENTHOUSE POST TENSIONING SLAB PLAN - AREA B

128 A4-S144 PENTHOUSE POST TENSIONING SLAB PLAN - AREA C

129 A4-S145 PENTHOUSE POST TENSIONING SLAB PLAN - AREA D

130 A4-S146 ROOF OVERALL FRAMING PLAN

131 A4-S147 LOW ROOF FRAMING PLAN - AREA A

132 A4-S148 LOW ROOF FRAMING PLAN - AREA B

133 A4-S149 LOW ROOF FRAMING PLAN - AREA C

134 A4-S150 LOW ROOF FRAMING PLAN - AREA D

135 A4-S151 HIGH ROOF FRAMING PLAN

136 A4-S201 TRUSS ELEVATIONS

137 A4-S301 SHEAR WALL ELEVATIONS

138 A4-S302 SHEAR WALL ELEVATIONS

139 A4-S401 MECHANICAL YARD, STAIRS AND MISCELLANEOUS PLANS

140 A4-S402 ENLARGED HANGING TOILET PARTITION SUPPORT

141 A4-S501 TYPICAL CONCRETE DETAILS

142 A4-S502 CONCRETE DETAILS

143 A4-S503 TYPICAL COLUMN DETAILS

144 A4-S504 TYPICAL TWO-WAY SLAB DETAILS AT GROUND FLOOR

145 A4-S505 TWO-WAY SLAB DETAILS

146 A4-S506 TYPICAL POST TENSIONED SLAB DETAILS

147 A4-S507 TYPICAL CONCRETE BEAM SECTIONS AND DETAILS

148 A4-S508 TYPICAL MASONRY SECTIONS AND DETAILS

149 A4-S509 TYPICAL FRAMING DETAILS

150 A4-S510 TRUSS AND MISCELLANEOUS DETAILS

151 A4-S511 HIGH ROOF DETAILS

152 A4-S512 FRAMING DETAILS

153 A4-S513 FRAMING DETAILS

154 A4-S514 SECOND, THIRD AND FOURTH FLOOR BEAM TO COLUMN INTERSECTIONS

155 A4-S515 SECOND, THIRD, AND FOURTH FLOOR BEAM TO COLUMN INTERSECTIONS

156 A4-S516 PENTHOUSE BEAM TO COLUMN INTERSECTIONS

157 A4-S517 PENTHOUSE BEAM TO COLUMN INTERSECTIONS

158 A4-S518 SECOND, THIRD, FOURTH AND PENTHOUSE FLOOR BEAM TO COLUMN

INTERSECTIONS

159 A4-S601 WIND LOAD DIAGRAMS

160 A4-S602 CONCRETE COLUMN AND SHEAR WALL SCHEDULES

161 A4-S603 CONCRETE BEAM SCHEDULES

162 A4-S604 CONCRETE BEAM SCHEDULES

163 A4-S605 CONCRETE BEAM SCHEDULES

164 A4-S606 CONCRETE BEAM SCHEDULES

165 A4-S607 TYPICAL LIGHT GAGE STEEL SECTION, DETAILS AND SCHEDULES

INTERIORS

Sequence

No Sheet

Number Sheet Name

245 A4-I101 GROUND FLOOR FURNITURE PLAN

246 A4-I102 SECOND FLOOR FURNITURE PLAN - AREA A

247 A4-I201 INTERIOR ELEVATIONS

248 A4-I401 ENLARGED PLANS

249 A4-I402 ENLARGED PLANS

250 A4-I501 INTERIOR SECTIONS AND DETAILS

251 A4-I601 FINISH SELECTIONS AND FINISH SCHEDULE #1

252 A4-I602 FINISH SCHEDULE #2

253 A4-I603 FINISH SCHEDULE #3

ARCHITECTURAL

Sequence

No Sheet

Number Sheet Name

166 A4-A001 ABBREVIATIONS AND ARCHITECTURAL SYMBOLS

167 A4-A002 LIFE SAFETY PLAN GROUND FLOOR

168 A4-A003 LIFE SAFETY PLAN FLOORS 2 - 4 TYPICAL AREA

169 A4-A004 PENTHOUSE LIFE SAFETY PLAN

170 A4-A101 CRAWL SPACE OVERALL PLAN

171 A4-A102 GROUND FLOOR OVERALL PLAN

172 A4-A103 GROUND FLOOR PLAN - AREA A

173 A4-A104 GROUND FLOOR PLAN - AREA B

174 A4-A105 GROUND FLOOR PLAN - AREA C

175 A4-A106 GROUND FLOOR PLAN - AREA D

176 A4-A107 SECOND FLOOR OVERALL PLAN

177 A4-A108 SECOND FLOOR PLAN - AREA A

178 A4-A109 SECOND FLOOR PLAN - AREA B

179 A4-A110 SECOND FLOOR PLAN - AREA C

180 A4-A111 SECOND FLOOR PLAN - AREA D

181 A4-A112 THIRD FLOOR OVERALL PLAN

182 A4-A113 THIRD FLOOR PLAN - AREA A

183 A4-A114 THIRD FLOOR PLAN - AREA B

184 A4-A115 THIRD FLOOR PLAN - AREA C

185 A4-A116 THIRD FLOOR PLAN - AREA D

186 A4-A117 FOURTH FLOOR OVERALL PLAN

187 A4-A118 FOURTH FLOOR PLAN - AREA A

188 A4-A119 FOURTH FLOOR PLAN - AREA B

189 A4-A120 FOURTH FLOOR PLAN - AREA C

190 A4-A121 FOURTH FLOOR PLAN - AREA D

191 A4-A122 PENTHOUSE PLAN

192 A4-A123 ROOF PLAN

193 A4-A124 GROUND FLOOR OVERALL REFLECTED CEILING PLAN

194 A4-A125 GROUND FLOOR REFLECTED CEILING PLAN - AREA A

195 A4-A126 GROUND FLOOR REFLECTED CEILING PLAN - AREA B

196 A4-A127 GROUND FLOOR REFLECTED CEILING PLAN - AREA C

197 A4-A128 GROUND FLOOR REFLECTED CEILING PLAN - AREA D

198 A4-A129 SECOND AND THIRD FLOOR OVERALL REFLECTED CEILING PLAN

199 A4-A130 SECOND AND THIRD FLOOR REFLECTED CEILING PLAN - AREA A

200 A4-A131 SECOND AND THIRD FLOOR REFLECTED CEILING PLAN - AREA B

201 A4-A132 SECOND AND THIRD FLOOR REFLECTED CEILING PLAN - AREA C

202 A4-A133 SECOND AND THIRD FLOOR REFLECTED CEILING PLAN - AREA D

203 A4-A134 FOURTH FLOOR OVERALL REFLECTED CEILING PLAN

204 A4-A135 FOURTH FLOOR REFLECTED CEILING PLAN - AREA A

205 A4-A136 FOURTH FLOOR REFLECTED CEILING PLAN - AREA B

206 A4-A137 FOURTH FLOOR REFLECTED CEILING PLAN - AREA C

207 A4-A138 FOURTH FLOOR REFLECTED CEILING PLAN - AREA D

208 A4-A139 PENTHOUSE REFLECTED CEILING PLAN

209 A4-A201 SOUTH AND EAST EXTERIOR ELEVATIONS

210 A4-A202 NORTH AND WEST EXTERIOR ELEVATIONS

211 A4-A203 EXTERIOR ELEVATIONS GROUND FLOOR

212 A4-A301 BUILDING SECTIONS

213 A4-A401 ENLARGED PLANS

214 A4-A402 ENLARGED PLANS

215 A4-A403 CANOPY PLANS, ELEVATIONS AND DETAILS

216 A4-A404 ENLARGED ORIEL WINDOW PLANS AND ELEVATION

217 A4-A405 ELEVATOR PLANS, SECTIONS AND DETAILS

218 A4-A406 STAIR B PLANS AND SECTIONS

219 A4-A407 STAIR A PLANS AND SECTIONS

220 A4-A408 STAIR DETAILS

221 A4-A409 MECHANICAL YARD AND TRANSFORMER YARD PLANS AND ELEVATIONS

222 A4-A410 ENLARGED WINDOW PLANS AND ELEVATIONS

223 A4-A411 ENLARGED WINDOW PLANS AND ELEVATIONS

224 A4-A412 ENLARGED PLANS

225 A4-A413 ENLARGED PLANS

226 A4-A501 PARTITION TYPES

227 A4-A502 DETAILS

228 A4-A503 EXTERIOR WALL SECTIONS

229 A4-A504 WALL SECTIONS

230 A4-A505 WALL SECTION AND DETAILS

231 A4-A506 PLAN DETAILS

232 A4-A507 PLAN DETAILS

233 A4-A508 SECTION DETAILS

234 A4-A509 DETAILS

235 A4-A510 ROOF HATCH ENLARGED PLAN, DETAILS AND CEILING DETAILS

236 A4-A511 ROOF HATCH AND DORMER DETAILS

237 A4-A512 ROOF DETAILS

238 A4-A513 SKYLIGHT PLAN, ELEVATIONS AND DETAILS

239 A4-A601 DOOR SCHEDULE GROUND FLOOR, FRAME TYPES, DOOR TYPES AND SIGN DETAILS

240 A4-A602 DOOR SCHEDULE SECOND FLOOR

241 A4-A603 DOOR SCHEDULE THIRD FLOOR

242 A4-A604 DOOR SCHEDULE FOURTH FLOOR AND PENTHOUSE

243 A4-A605 WINDOW SCHEDULE AND DETAILS

244 A4-A606 DOOR DETAILS

GENERAL

Sequence

No Sheet

Number Sheet Name

1 A4-G001 DRAWING INDEX, BID OPTIONS, AND GENERAL REQUIREMENTS

2 A4-G002 DRAWING INDEX

3 A4-G003 PROJECT LOCATION PLAN

4 A4-G004 EAST CAMPUS LAYOUT PLAN

5 A4-G005 CAMPUS PHASING PLAN

6 A4-G006 CONSTRUCTION PHASING PLAN

7 A4-G007 CONSTRUCTION PHASING PHASE 4A AND 4B PLANS

8 A4-G008 CONSTRUCTION PHASING PHASE 4C, 4D, 4E AND 4F PLAN

9 A4-G009 TEMPORARY UTILITY SITE PLAN

79 A4-CS101 COMMUNICATIONS SITE PLAN

80 A4-CS501 COMMUNICATIONS MANHOLE DETAILS

81 A4-CS502 CONCRETE ENCASED CONDUIT DETAILS

CIVIL-TOPOGRAPHICAL

Sequence

No Sheet Number Sheet Name

15 A4-V101 TOPOGRAPHICAL SURVEY SHEET 1 OF 4

16 A4-V102 TOPOGRAPHICAL SURVEY SHEET 2 OF 4

17 A4-V103 TOPOGRAPHICAL SURVEY SHEET 3 OF 4

18 A4-V104 TOPOGRAPHICAL SURVEY SHEET 4 OF 4

CIVIL- AD SERIES

Sequence

No Sheet Number Sheet Name

19 A4-AD101 BUILDING 6275 FIRST FLOOR DEMOLITION PLAN

20 A4-AD102 BUILDING 6275 SECOND FLOOR DEMOLITION PLAN

21 A4-AD103 BUILDING 6275 THIRD FLOOR DEMOLITION PLAN

22 A4-AD104 BUILDING 6359 DEMOLITION FLOOR PLAN

BORING LOGS

Sequence

No Sheet

Number Sheet Name

10 A4-B101 BORING LOCATIONS

11 A4-B201 LOGS OF BORINGS - 1 OF 4

12 A4-B202 LOGS OF BORINGS - 2 OF 4

13 A4-B203 LOGS OF BORINGS - 3 OF 4

14 A4-B204 LOGS OF BORINGS - 4 OF 4

N o.

D es cr ip tio n

D .O

.N o.

A ct io n

D at e

DOCUMENT WAS AUTHORIZED

THE SEAL APPEARING ON THIS

BY DAVID EVANS

21459 ON 1 SEPTEMBER 2011

R

EG

IS

TERED ARCH

IT

EC

T

DA

V ID EVANS

95412 SAXETFOETAT

S

Sheet reference number

Sheet

U .S

. A R

M Y

E N

G

IN

E E

R D

IS

TR

IC

T, C O

R P

S O

F E

N G

IN

E

E R

S

FO

R T

W O

R

TH

, T E

X A

S

D es ig ne d by

D w n by

R ev ie w ed b y:

S ub m itt ed b y:

E N

G

IN

E E

R

D at e:

S ol

N o.

C on tr N o.

R ev

P lo t s ca le

P lo t d at e:

Fi le n am e:

C on tr N o.

D E

S

IG

N F

IL

E

Fort Worth District

US Army Corps of Engineers

1:

D A

V

ID

L U

K E

, P E of

LA

C

K

LA

N D

A

FB

, T E

X A

S

A

IR

M E

N T

R A

IN

IN

G C

O M

P

LE

X

E A

S T

C A

M P

U S

A

IR

M E

N T

R A

IN

IN

G C

O M

P

LE

X

(A

TC

4)

X X

X X

X

P lo t D at e H er e

S E

P

TE

M B

E R

1 2 3 4 5

D

C

B

A M P

LS

R

D R

A W

IN

G

N U

M B

E R

: L A

1 -

X X

X X

X X

X

D

C

B

A

1 2 3 4 5

W

G

-1 1-

R -0

8/

/2

3:

:2

P

M

D A

V E

E V

A N

S

L U

IS

A

D A

V

IL

A

D A

V E

E V

A N

S

A4-G002

D R

AW

IN

G

IN

D

EX

VOLUME II

406 A4-TN101 GROUND FLOOR TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREA A

407 A4-TN102 GROUND FLOOR TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREA B

408 A4-TN103 GROUND FLOOR TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREA C

409 A4-TN104 GROUND FLOOR TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREA D

410 A4-TN105 SECOND FLOOR TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREA A

411 A4-TN106 SECOND FLOOR TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREA B

412 A4-TN107 SECOND FLOOR TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREA C

413 A4-TN108 SECOND FLOOR TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREA D

414 A4-TN109 THIRD FLOOR OVERALL TELECOMMUNICATION AND SECURITY SYSTEMS PLAN

415 A4-TN110 FOURTH FLOOR OVERALL TELECOMMUNICATION AND SECURITY SYSTEMS PLAN

416 A4-TN111 PENTHOUSE TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREAS A AND B 417 A4-TN112 PENTHOUSE TELECOMMUNICATION AND SECURITY SYSTEMS PLAN - AREAS C AND D

418 A4-TN401 GROUND FLOOR COMMUNICATIONS ROOMS - ENLARGED PLANS AND ELEVATIONS

419 A4-TN402 SECOND FLOOR COMMUNICATIONS ROOMS - ENLARGED PLANS AND ELEVATIONS

420 A4-TN501 TELECOMMUNICATION SYSTEM DETAILS

421 A4-TN502 A/V SYSTEM AND CATV SYSTEM RISER DIAGRAMS

422 A4-TN601 GROUND FLOOR TELECOMMUNICATION SYSTEM RISER DIAGRAM

423 A4-TN602 SECOND FLOOR TELECOMMUNICATION SYSTEM RISER DIAGRAM

424 A4-TN603 THIRD FLOOR TELECOMMUNICATION SYSTEM RISER DIAGRAM

425 A4-TN604 FOURTH FLOOR TELECOMMUNICATION SYSTEM RISER DIAGRAM

426 A4-TN605 TELECOMMUNICATION SYSTEM BACKBONE AND GROUNDING RISER DIAGRAM

427 A4-TN606 CCTV SYSTEM RISER DIAGRAM

428 A4-TN607 SECURITY SYSTEM RISER DIAGRAM

429 A4-TN608 INTERCOM PAGING RISER DIAGRAM

390 A4-FA101 GROUND FLOOR FIRE ALARM / MASS NOTIFICATION PLAN - AREA A

391 A4-FA102 GROUND FLOOR FIRE ALARM / MASS NOTIFICATION PLAN - AREA B

392 A4-FA103 GROUND FLOOR FIRE ALARM / MASS NOTIFICATION PLAN - AREA C

393 A4-FA104 GROUND FLOOR FIRE ALARM / MASS NOTIFICATION PLAN - AREA D

394 A4-FA105 SECOND FLOOR FIRE ALARM / MASS NOTIFICATION PLAN - AREA A

395 A4-FA106 SECOND FLOOR FIRE ALARM / MASS NOTIFICATION PLAN - AREA B

396 A4-FA107 SECOND FLOOR FIRE ALARM / MASS NOTIFICATION PLAN - AREA C

397 A4-FA108 SECOND FLOOR FIRE ALARM / MASS NOTIFICATION PLAN - AREA D

398 A4-FA109 THIRD FLOOR OVERALL FIRE ALARM / MASS NOTIFICATION PLAN

399 A4-FA110 FOURTH FLOOR OVERALL FIRE ALARM / MASS NOTIFICATION PLAN

400 A4-FA111 PENTHOUSE FIRE ALARM / MASS NOTIFICATION PLAN - AREAS A AND B

401 A4-FA112 PENTHOUSE FIRE ALARM / MASS NOTIFICATION PLAN - AREAS C AND D

402 A4-FA601 GROUND AND SECOND FLOORS FIRE ALARM / MASS NOTIFICATION SYSTEMS RISER

DIAGRAM

403 A4-FA602 THIRD FLOOR FIRE ALARM / MASS NOTIFICATION SYSTEMS RISER DIAGRAM

404 A4-FA603 FOURTH FLOOR AND PENTHOUSE FIRE ALARM / MASS NOTIFICATION SYSTEMS RISER

DIAGRAM

405 A4-FA604 FIRE ALARM / MASS NOTIFICATION CONTROL MATRIX AND DETAILS

PEDESTRIAN BRIDGE

BID OPTION 1a

EAST CAMPUS QUADRANGLE

EAST CAMPUS - STRUCTURAL

Sequence

No Sheet

Number Sheet Name

39 EC-S001 GENERAL NOTES

40 EC-S100 PLAZA PLAN AND SECTION - BASE BID

41 EC-S101 PLAZA PLAN AND SECTION - BID OPTION 2A

42 EC-S501 TYPICAL CONCRETE DETAILS - BASE BID

43 EC-S502 TYPICAL CONCRETE DETAILS - BID OPTIONS 2A, 2E AND 2F

EAST CAMPUS - LANDSCAPE

Sequence

No Sheet

Number Sheet Name

24 EC-L101 LANDSCAPE LAYOUT PLAN

25 EC-L102 PLANTING PLAN BASE BID

26 EC-L103 PLANTING PLAN BID OPTION 2D

27 EC-L104 LANDSCAPE UNDERGROUND IRRIGATION PLAN BASE BID

28 EC-L105 LANDSCAPE UNDERGROUND IRRIGATION PLAN BID OPTION 2D

29 EC-L301 SECTION ELEVATIONS

30 EC-L401 SITE PLAN ENLARGEMENT - AREA A

31 EC-L402 SITE PLAN ENLARGEMENT - AREA B

32 EC-L403 SITE PLAN ENLARGEMENT - AREA C

33 EC-L404 SITE PLAN ENLARGEMENT - AREA D

34 EC-L501 SITE DETAILS

35 EC-L502 SITE DETAILS

36 EC-L503 PLANTING NOTES AND DETAILS

37 EC-L504 LANDSCAPE UNDERGROUND IRRIGATION DETAILS

38 EC-L505 LANDSCAPE UNDERGROUND IRRIGATION NOTES

EAST CAMPUS - ELECTRICAL

Sequence

No Sheet

Number Sheet Name

50 EC-ES100 ELECTRICAL SITE PLAN OVERALL AND LEGEND

51 EC-ES101 ELECTRICAL SITE PLAN AREA A

52 EC-ES102 ELECTRICAL SITE PLAN AREA B

53 EC-ES103 ELECTRICAL SITE PLAN AREA C

54 EC-ES104 ELECTRICAL SITE PLAN AREA D

55 EC-ES501 SITE ELECTRICAL DETAILS

EAST CAMPUS - CIVIL

Sequence

No Sheet

Number Sheet Name

9 EC-B101 EAST CAMPUS QUADRANGLE BORING LOCATIONS AND LOGS OF

BORINGS

10 EC-C101 EAST CAMPUS QUADRANGLE DEMOLITION SITE PLAN

11 EC-C102 EAST CAMPUS QUADRANGLE SITE LAYOUT PLAN

12 EC-C103 EAST CAMPUS QUADRANGLE PAVING PLAN

13 EC-C104 EAST CAMPUS QUADRANGLE GRADING SITE PLAN

14 EC-C105 EAST CAMPUS QUADRANGLE UTILITY SITE PLAN

15 EC-C106 EAST CAMPUS QUADRANGLE STORM WATER POLLUTION PREVENTION

PLAN

16 EC-C107 EAST CAMPUS SIDEWALK A PLAN AND PROFILE

17 EC-C108 EAST CAMPUS SIDEWALK B PLAN AND PROFILE

18 EC-C109 EAST CAMPUS QUADRANGLE - STORM DRAIN LINE A - PLAN AND PROFILE

19 EC-C110 EAST CAMPUS QUADRANGLE - STORM DRAIN LINES B AND C - PLAN AND

PROFILE

20 EC-C401 EAST CAMPUS QUADRANGLE ENLARGED SUBDRAIN LINE PLAN AND

DETAILS

21 EC-C402 EAST CAMPUS QUADRANGLE ENLARGED GRADING PLAN

22 EC-C501 EAST CAMPUS QUADRANGLE MISCELLANEOUS DETAILS

23 EC-C502 EAST CAMPUS QUADRANGLE TEMPORARY EROSION SEDIMENT AND

WATER POLLUTION CONTROL MEASURES

EAST CAMPUS - ARCHITECTURAL (SITE FEATURES ELEMENTS DESIGN)

Sequence

No Sheet

Number Sheet Name

44 EC-A100 PLAZA AND WALK PLAN

45 EC-A101 PLAZA PLAN AND SECTIONS (BID OPTIONS)

46 EC-A102 PLAZA PLAN AND SECTIONS (BASE BID)

47 EC-A103 PLAZA PLAN (BID OPTIONS)

48 EC-A200 GATEWAY MARKERS AND DCF MARKERS (BID OPTIONS)

49 EC-A201 WALLS FINISH / VENEER DETAILS (BID OPTIONS 2G)

PEDESTRIAN BRIDGE - STRUCTURAL

Sequence

No Sheet

Number Sheet Name

14 P4-S001 GENERAL NOTES - BID OPTION 1A

15 P4-S002 GENERAL NOTES AND ABBREVIATIONS - BID OPTIONS 1A

16 P4-S101 FOUNDATION PLAN - BID OPTION 1A

17 P4-S102 PLAN AND ELEVATION - AREA A - BID OPTION 1A

18 P4-S103 PLAN AND ELEVATION - AREA B - BID OPTION 1A

19 P4-S201 ARCH ELEVATION - BID OPTION 1A

20 P4-S501 TYPICAL DETAILS - BID OPTION 1A

21 P4-S502 ABUTMENT PLAN, SECTIONS AND DETAILS - BID OPTION 1A

22 P4-S503 BENT PLAN, SECTIONS AND DETAILS - BID OPTION 1A

23 P4-S504 DECK SLAB AND CURB DETAILS - BID OPTION 1A

24 P4-S505 PRESTRESSED CONCRETE I-BEAM DETAILS - BID OPTION 1A

25 P4-S506 ELASTOMERIC BEARING AND BEAM END DETAILS - BID OPTION 1A

26 P4-S507 MISCELLANEOUS DETAILS - BID OPTION 1A

27 P4-S508 ARCH SECTIONS AND DETAILS - BID OPTION 1A

PEDESTRIAN BRIDGE - ELECTRICAL

Sequence

No Sheet

Number Sheet Name

32 P4-EL101 LIGHTING AND DETAILS BID OPTION 1A

VOLUME III

FIRE PROTECTION

Sequence

No Sheet

Number Sheet Name

254 A4-F001 FIRE PROTECTION LEGEND AND NOTES

255 A4-F100 GROUND FLOOR FIRE PROTECTION PLAN - AREA A

256 A4-F101 GROUND FLOOR FIRE PROTECTION PLAN - AREA B

257 A4-F102 GROUND FLOOR FIRE PROTECTION PLAN - AREA C

258 A4-F103 GROUND FLOOR FIRE PROTECTION PLAN - AREA D

259 A4-F104 SECOND THROUGH FOURTH FLOOR FIRE PROTECTION PLAN - AREA A

260 A4-F105 SECOND THROUGH FOURTH FLOOR FIRE PROTECTION PLAN - AREA B

261 A4-F106 SECOND THROUGH FOURTH FLOOR FIRE PROTECTION PLAN - AREA C

262 A4-F107 SECOND THROUGH FOURTH FLOOR FIRE PROTECTION PLAN - AREA D

263 A4-F108 PENTHOUSE FIRE PROTECTION PLAN - AREA A

264 A4-F109 PENTHOUSE FIRE PROTECTION PLAN - AREA B

265 A4-F110 PENTHOUSE FIRE PROTECTION PLAN - AREA C

266 A4-F111 PENTHOUSE FIRE PROTECTION PLAN - AREA D

267 A4-F501 FIRE PROTECTION DETAILS

268 A4-F601 FIRE PROTECTION OCCUPANCY SCHEDULE

269 A4-F602 FIRE PROTECTION OCCUPANCY SCHEDULE

PLUMBING

Sequence

No Sheet

Number Sheet Name

270 A4-P001 PLUMBING LEGEND

271 A4-P101 CRAWL SPACE OVERALL PLUMBING PLAN

272 A4-P102 GROUND FLOOR OVERALL PLUMBING PLAN

273 A4-P103 SECOND AND THIRD FLOOR OVERALL PLUMBING PLAN

274 A4-P104 FOURTH FLOOR OVERALL PLUMBING PLAN

275 A4-P105 PENTHOUSE OVERALL PLUMBING PLAN

276 A4-P106 MECHANICAL YARD PLUMBING PLAN

277 A4-P401 ENLARGED CRAWL SPACE RESTROOM PLANS

278 A4-P402 ENLARGED RESTROOM PLUMBING PLANS

279 A4-P403 ENLARGED PLUMBING PLANS

280 A4-P404 ENLARGED MECHANICAL ROOM PLUMBING PLANS

281 A4-P405 ENLARGED MECHANICAL ROOM PLANS

282 A4-P501 PLUMBING DETAILS

283 A4-P502 PLUMBING DETAILS

284 A4-P601 PLUMBING SCHEDULES

285 A4-P901 PLUMBING ISOMETRIC PLANS

286 A4-P902 PLUMBING ISOMETRIC PLANS

287 A4-P903 PLUMBING PIPING RISER ISOMETRIC PLANS - AREAS A - D

288 A4-P904 PLUMBING ISOMETRIC PLANS

289 A4-P905 PLUMBING ISOMETRIC PLANS

290 A4-P906 PLUMBING ISOMETRIC PLANS

291 A4-P907 PLUMBING ISOMETRIC PLANS

292 A4-P908 PLUMBING FUEL GAS ISOMETRIC PLAN

293 A4-P909 PLUMBING ISOMETRIC PLANS

MECHANICAL

Sequence

No Sheet

Number Sheet Name

294 A4-M001 HVAC LEGEND AND GENERAL NOTES

295 A4-M100 CRAWL SPACE OVERALL HVAC AND HYDRONIC PLAN

296 A4-M101 GROUND FLOOR OVERALL HVAC PLAN

297 A4-M102 SECOND FLOOR OVERALL HVAC PLAN

298 A4-M103 THIRD FLOOR OVERALL HVAC PLAN

299 A4-M104 FOURTH FLOOR OVERALL HVAC PLAN

300 A4-M105 PENTHOUSE OVERALL HVAC PLAN

301 A4-M106 GROUND FLOOR HVAC PLAN - AREA A

302 A4-M107 GROUND FLOOR HVAC PLAN - AREA D

303 A4-M108 SECOND THROUGH FOURTH FLOOR TYPICAL HVAC PLAN - AREA A

304 A4-M109 SECOND THROUGH FOURTH FLOOR TYPICAL HVAC PLAN - AREAS B, C AND D

305 A4-M110 PENTHOUSE HVAC FLOOR PLAN - AREA A

306 A4-M111 PENTHOUSE HVAC FLOOR PLAN - AREA B

307 A4-M112 PENTHOUSE HVAC FLOOR PLAN - AREA C

308 A4-M113 PENTHOUSE HVAC FLOOR PLAN - AREA D

309 A4-M114 GROUND FLOOR HYDRONIC PIPING PLAN - AREA A

310 A4-M115 GROUND FLOOR HYDRONIC PIPING PLAN - AREA D

311 A4-M116 PENTHOUSE HYDRONIC PIPING PLAN - AREA A

312 A4-M117 PENTHOUSE HYDRONIC PIPING PLAN - AREA B

313 A4-M118 PENTHOUSE HYDRONIC PIPING PLAN - AREA C

314 A4-M119 PENTHOUSE HYDRONIC PIPING PLAN - AREA D

315 A4-M301 HVAC SECTIONS

316 A4-M302 HYDRONIC PIPING SECTIONS

317 A4-M303 HVAC SECTIONS

318 A4-M304 HVAC SECTIONS

319 A4-M401 ENLARGED MECHANICAL ROOM PLANS AND SECTION

320 A4-M402 ENLARGED MECHANICAL PLANS

321 A4-M403 ENLARGED MECHANICAL PLANS

322 A4-M501 HVAC DETAILS

323 A4-M502 HVAC DETAILS

324 A4-M601 HVAC SCHEDULES

325 A4-M602 HVAC SCHEDULES

326 A4-M603 HEATING WATER FLOW DIAGRAM

327 A4-M604 CHILLED WATER FLOW DIAGRAM

328 A4-M605 HVAC CONTROLS

329 A4-M606 HVAC CONTROLS

330 A4-M607 HVAC CONTROLS

331 A4-M608 HVAC CONTROLS

332 A4-M609 HVAC CONTROLS

333 A4-M610 HVAC CONTROLS

ELECTRICAL

Sequence

No Sheet

Number Sheet Name

334 A4-E-001 ELECTRICAL SYMBOL LEGENDS AND ABBREVIATIONS

335 A4-EL101 GROUND FLOOR LIGHTING PLAN - AREA A

336 A4-EL102 GROUND FLOOR LIGHTING PLAN - AREA B

337 A4-EL103 GROUND FLOOR LIGHTING PLAN - AREA C

338 A4-EL104 GROUND FLOOR LIGHTING PLAN - AREA D

339 A4-EL105 SECOND FLOOR LIGHTING PLAN - AREA A

340 A4-EL106 SECOND FLOOR LIGHTING PLAN - AREA B

341 A4-EL107 SECOND FLOOR LIGHTING PLAN - AREA C

342 A4-EL108 SECOND FLOOR LIGHTING PLAN - AREA D

343 A4-EL109 THIRD FLOOR OVERALL LIGHTING PLAN

344 A4-EL110 FOURTH FLOOR OVERALL LIGHTING PLAN

345 A4-EL111 PENTHOUSE LIGHTING PLAN - AREAS A AND B

346 A4-EL112 PENTHOUSE LIGHTING PLAN - AREAS D AND C

347 A4-EL501 LIGHTING FIXTURE DETAILS

348 A4-EL502 LIGHTING FIXTURE DETAILS

349 A4-EL503 LIGHTING CONTROL DETAILS AND SCHEDULES

350 A4-EP101 GROUND FLOOR POWER PLAN - AREA A

351 A4-EP102 GROUND FLOOR POWER PLAN - AREA B

352 A4-EP103 GROUND FLOOR POWER PLAN - AREA C

353 A4-EP104 GROUND FLOOR POWER PLAN - AREA D

354 A4-EP105 SECOND FLOOR POWER PLAN - AREA A

355 A4-EP106 SECOND FLOOR POWER PLAN - AREA B

356 A4-EP107 SECOND FLOOR POWER PLAN - AREA C

357 A4-EP108 SECOND FLOOR POWER PLAN - AREA D

358 A4-EP109 THIRD FLOOR OVERALL POWER PLAN

359 A4-EP110 FOURTH FLOOR OVERALL POWER PLAN

360 A4-EP111 PENTHOUSE ENLARGED POWER PLAN - AREAS A AND B

361 A4-EP112 PENTHOUSE ENLARGED POWER PLAN - AREAS C AND D

362 A4-EP401 CRAWL SPACE POWER AND LIGHTING PLAN - AREAS A AND B

363 A4-EP402 CRAWL SPACE POWER AND LIGHTING PLAN - AREAS C AND D

364 A4-EP403 EQUIPMENT YARDS ENLARGED SITE POWER PLAN - AREA A

365 A4-EP404 GROUND FLOOR MECHANICAL AND ELECTRICAL ROOM ENLARGED POWER PLANS

366 A4-EP405 SECOND FLOOR MECHANICAL AND ELECTRICAL ROOM ENLARGED POWER PLANS

367 A4-EP406 THIRD FLOOR MECHANICAL AND ELECTRICAL ROOM ENLARGED POWER PLANS

368 A4-EP407 FOURTH FLOOR MECHANICAL AND ELECTRICAL ROOM ENLARGED POWER PLANS

369 A4-EP408 TYPICAL ELECTRICAL ROOM ELEVATIONS AND ENLARGED PLANS

370 A4-EP409 MAIN ELECTRICAL ROOM A123 ELEVATIONS

371 A4-EP501 ELECTRICAL DETAILS

372 A4-EP502 GENERATOR INSTALLATION DETAILS

373 A4-EP601 ELECTRICAL ONE-LINE DIAGRAM

374 A4-EP602 ELECTRICAL SCHEDULES

375 A4-EP603 MECHANICAL EQUIPMENT SCHEDULES

376 A4-EP604 PANEL SCHEDULES

377 A4-EP605 PANEL SCHEDULES

378 A4-EP606 PANEL SCHEDULES

379 A4-EP607 PANEL SCHEDULES

380 A4-EP608 PANEL SCHEDULES

381 A4-EP609 PANEL SCHEDULES

382 A4-EP610 PANEL SCHEDULES

383 A4-EP611 PANEL SCHEDULES

384 A4-EP612 PANEL SCHEDULES

385 A4-EP613 PANEL SCHEDULES

386 A4-EP614 PANEL SCHEDULES

387 A4-EG101 ROOF LIGHTNING PROTECTION PLAN

388 A4-EG501 GROUNDING / LIGHTNING PROTECTION SYSTEM DETAILS

389 A4-EG601 GROUNDING SYSTEM RISER DIAGRAM

PEDESTRIAN BRIDGE - GENERAL - VOLUME III

Sequence

No Sheet

Number Sheet Name

1 A4-G001 DRAWING INDEX, BID OPTIONS, AND GENERAL REQUIREMENTS

2 A4-G002 DRAWING INDEX

EAST CAMPUS - GENERAL - VOLUME IV

Sequence

No Sheet

Number Sheet Name

1 A4-G001 DRAWING INDEX, BID OPTIONS, AND GENERAL REQUIREMENTS

2 A4-G002 DRAWING INDEX

3 EC-G003 EAST CAMPUS QUADRANGLE PROJECT LOCATION PLAN

4 EC-G004 EAST CAMPUS QUADRANGLE CONSTRUCTION AREA PLAN

5 EC-G005 EAST CAMPUS QUADRANGLE CONSTRUCTION FENCE PHASING PLANS I

6 EC-G006 EAST CAMPUS QUADRANGLE CONSTRUCTION FENCE PHASING PLANS II

7 EC-G007 EAST CAMPUS QUADRANGLE CONSTRUCTION FENCE PAHSING PLANS III

8 EC-G008 EAST CAMPUS QUADRANGLE - PHASING PLAN

VOLUME IV

PEDESTRIAN BRIDGE - CIVIL

Sequence

No Sheet

Number Sheet Name

6 P4-B101 BORING LOCATIONS AND LOGS OF BORINGS

7 P4-C101 BID OPTION 1A DEMOLITION SITE AND ELECTRICAL PLANS

8 P4-C102 BID OPTION 1A SITE LAYOUT AND GRADING PLANS

9 P4-C103 STORM DRAIN LINE - PLAN AND PROFILE

10 P4-C501 MISCELLANEOUS DETAILS

11 P4-C502 TEMPORARY EROSION SEDIMENT AND WATER POLLUTION CONTROL

MEASURES

12 P4-C503 CONSTRUCTION FENCE DETAILS

13 P4-C504 FREE ZONE CONSTRUCTION FENCE DETAILS

PEDESTRIAN BRIDGE - ARCHITECTURAL

Sequence

No Sheet

Number Sheet Name

28 P4-A100 PLANS

29 P4-A101 ELEVATIONS - BID OPTION 1A

30 P4-A501 DETAILS - BID OPTION 1A

31 P4-A502 DETAILS - BID OPTION 1A

GENERAL - VOLUME II

Sequence

No Sheet

Number Sheet Name

1 A4-G001 DRAWING INDEX, BID OPTIONS, AND GENERAL REQUIREMENTS

2 A4-G002 DRAWING INDEX

3 P4-G003 PROJECT LOCATION PLAN

4 P4-G004 CONSTRUCTION AREA PLAN

5 P4-G005 AREA PLAN - BID OPTION 1A

N o.

D es cr ip tio n

D .O

.N o.

A ct io n

D

GENERAL REQUIREMENTS

DESIGN CRITERIA

VERIFICATION: VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE

STARTING WORK. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF ANY

CONFLICTS: NOTES AND DETAILS ON THE DRAWINGS TAKE PRECEDENCE OVER THE

CODES: ALL MATERIALS AND WORK SHALL CONFORM TO THE REQUIREMENTS OF THE

LATEST CODES, AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 5TH EDITION, AASHTO

SUBSTITUTIONS: PROVIDE MANUFACTURER'S ICC REPORTS AND A LIST OF ALL PROPOSED

SUBSTITUTIONS TO THE CONTRACTING OFFICER FOR REVIEW BEFORE FABRICATION.

SIMILAR WORK: WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY

PART OF THE WORK, SUCH DETAILS SHALL BE THE SAME AS FOR SIMILAR WORK SHOWN

PIPES, SLEEVES, ETC.: SHALL NOT BE PLACED IN SLABS OR BEAMS UNLESS SPECIFICALLY

SHOWN OR NOTED NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR PIPES , SLEEVES,

ETC., UNLESS SPECIFICALLY SHOWN. OBTAIN PRIOR WRITTEN OF APPROVAL FOR

INSTALLATION OF ANY ADDITIONAL PIPES OR SLEEVES, ETC.

EXCAVATIONS: LOCATE AND PROTECT UNDERGROUND OR CONCEALED CONDUIT,

PLUMBING OR OTHER UTILITIES WHERE NEW WORK IS BEING PERFORMED.

CONSTRUCTION LOADS: MATERIALS SHALL BE EVENLY DISTRIBUTED IF PLACED ON

BRIDGE DECK. LOADS SHALL NOT EXCEED THE ALLOWABLE LOADING FOR THE

SUPPORTING MEMBERS AND THEIR CONNECTIONS.

THE STRUCTURAL DRAWINGS ILLUSTRATE THE NEW STRUCTURAL MEMBERS, REFER

TO ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR NON-STRUCTURAL

ITEMS WHICH REQUIRE SPECIAL PROVISIONS DURING THE CONSTRUCTION OF

REFER TO ELECTRICAL PLANS FOR SLEEVES AND HANGERS FOR

PIPES, DUCTS AND EQUIPMENT.

CONSTRUCTION METHODS AND PROJECT SAFETY: THE CONTRACT DRAWINGS AND

SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE AND DO NOT INDICATE

METHODS, PROCEDURES OR SEQUENCE OF CONSTRUCTION. THE CONTRACTOR

SHALL TAKE NECESSARY PRECAUTIONS TO MAINTAIN AND INSURE THE INTEGRITY OF

CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING AND BRACING,

AND BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL

ANY DEVIATION FROM THE APPROVED SET OF STRUCTURAL DRAWINGS SHALL ONLY

BE MADE AFTER WRITTEN APPROVAL BY THE CONTRACTING OFFICER.

CONCRETE GRADE WALLS SHALL BE TEMPORARILY BRACED IF BACKFILL IS ONLY ON

ONE SIDE OR BACK FILLED ON BOTH SIDES SIMULTANEOUSLY, WHERE REQUIRED, TO

PREVENT DEFLECTION, CRACKING OR FAILURE OF CONCRETE GRADE WALLS.

IT IS THE CONTRACTORS RESPONSIBILITY TO COMPLY WITH ALL APPLICABLE LOCAL

SAFETY REQUIREMENTS, ALL OSHA REQUIREMENTS AND EM385-1-1.

EXPANSION ANCHORS CAN ONLY BE USED FOR FIELD REPAIRS AND REQUIRE APPROVAL

OF THE CONTRACTING OFFICER.

GRAVITY LOADS IN ACCORDANCE WITH AASHTO LRFD GUIDE SPECIFICATIONS FOR THE

DESIGN OF PEDESTRIAN BRIDGES, 2009

LIVE LOADS:

LATERAL LOADS:

WIND LOADS:

IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS FOR STRUCTURAL SUPPORTS

FOR HIGHWAY SIGNS, LUMINAIRES AND TRAFFIC SIGNALS, 2009, AASHTO LRFD BRIDGE

BASIC WIND SPEED

WIND IMPORTANCE FACTOR

SEISMIC CRITERIA FOR NEW STRUCTURE:

DETERMINED IN ACCORDANCE WITH AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS,

SITE CLASSIFICATION

SHORT PERIOD SPECTRAL ACCELERATION

ONE SECOND SPECTRAL ACCELERATION

SEISMIC DESIGN CATEGORY

SEISMIC IMPORTANCE FACTOR

RESPONSIBILITY OF SUCH ENGINEERING RESTS WITH THE PERSON SEALING THE

INSPECTOR FROM AN ESTABLISHED TESTING AGENCY. FOR MATERIAL SAMPLING

AND TESTING REQUIREMENTS, REFER TO THE PROJECT SPECIFICATIONS AND THE

SPECIFIC GENERAL NOTES SECTIONS. THE TESTING AGENCY SHALL SEND COPIES OF

ALL STRUCTURAL TESTING AND INSPECTION REPORTS DIRECTLY TO THE ARCHITECT,

STRUCTURAL ENGINEER, CONTRACTOR AND CONTRACTING OFFICER. ANY MATERIALS

BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. SPECIAL INSPECTION

TESTING REQUIREMENTS APPLY EQUALLY TO ALL BIDDER DESIGNED COMPONENTS.

SITE AT ALL TIMES OBSERVING THE WORK REQUIRING SPECIAL INSPECTION.

PERIODIC SPECIAL INSPECTION MEANS THAT THE SPECIAL INSPECTOR IS ON SITE AT

TIME INTERVALS NECESSARY TO CONFIRM THAT ALL WORK REQUIRING SPECIAL

INSPECTION IS IN COMPLIANCE.

SHOWN ON THE APPROVED CONSTRUCTION DOCUMENTS, SUCH AS BRACING,

STIFFENING MEMBER LOCATIONS AND PROPER APPLICATION OF JOINT DETAILS AT

OF A COMPARABLE APPROVED METHOD.

FLEXURAL AND AXIAL FORCES IN INTERMEDIATE AND SPECIAL MOMENT FRAMES,

REINFORCING IN BOUNDARY ELEMENTS OF SPECIAL REINFORCED CONCRETE SHEAR

WALLS AND SHEAR REINFORCEMENT PERIODIC INSPECTION MAY BE USED FOR OTHER

MATERIAL USED IN THE CONSTRUCTION TOOK PLACE ON SITE. CONTINUOUS INSPECTION

WILL NOT BE REQUIRED DURING PREFABRICATION IF THE APPROVED AGENCY CERTIFIES

THE CONSTRUCTION AND FURNISHES EVIDENCE OF COMPLIANCE.

ICC REPORT AND SHALL INCLUDE AS A MINIMUM VERIFICATION OF HOLE DEPTH AND

DIAMETER, CLEAN OUT, ALL MATERIALS AND INSTALLATION TORQUE.

SPECIAL INSPECTION

GOVERNMENTS AGENT.

1.

2.

3.

4.

5.

6.

7.

8.

9.

11.

12.

13.

16.

17.

20.

SPECIAL INSPECTOR: EMPLOYED BY THE CONTRACTOR AND ACTING AS THE

ON DRAWINGS.

STRUCTURAL MEMBERS.

THE STRUCTURE DURING CONSTRUCTION. THE CONTRACTOR SHALL DESIGN,

SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.

DO NOT SCALE DRAWINGS.

THE ITEMS CHECKED WITH AN "X" SHALL BE INSPECTED BY A CERTIFIED SPECIAL

WHICH FAIL TO MEET THE PROJECT SPECIFICATIONS SHALL IMMEDIATELY BE BROUGHT

CONTINUOUS SPECIAL INSPECTION MEANS THAT THE SPECIAL INSPECTOR IS ON THE

THE STEEL FRAME SHALL BE INSPECTED TO VERIFY COMPLIANCE WITH THE DETAILS

ALL WELDS SHALL BE VISUALLY INSPECTED.

ALL COMPLETE PENETRATION WELDS SHALL BE TESTED ULTRASONICALLY OR BY USE

CONTINUOUS INSPECTION IS REQUIRED FOR WELDING OF REINFORCING THAT RESISTS

INSPECTION FOR PREFABRICATED CONSTRUCTION SHALL BE THE SAME AS IF THE

INSPECTION/TESTING SHALL BE IN CONFORMANCE WITH THE ANCHOR MANUFACTURER'S

EACH CONNECTION.

WELDED REINFORCING.

ANY ENGINEERING SUBMITTED FOR REVIEW SHALL BE APPROPRIATELY SEALED. FULL

DESIGN.

"DRILLED CAISSON BELLED PIERS"

DRILLED PIERS FOUNDATIONS ARE DESIGNED BASED ON THE FOLLOWING INFORMATION:

CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING

SHEATHING, AND SHORING REQUIRED AND SHALL BE SOLELY RESPONSIBLY FOR ALL

EXCAVATION PROCEDURES INCLUDING LAGGING, SHORING AND PROTECTION OF

ADJACENT PROPERTY, STRUCTURES, STREETS AND UTILITIES IN ACCORDANCE WITH

ALL NATIONAL, STATE, AND LOCAL SAFETY ORDINANCES.

ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL BEHIND

RETAINING WALLS BEFORE CONCRETE OR GROUT HAS ATTAINED FULL DESIGN

STRENGTH. CONTRACTOR SHALL BRACE OR PROTECTALL BUILDING AND PIT WALLS

BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHED FLOORS ARE COMPLETELY IN

PLACE AND HAVE ATTAINED FULL STRENGTH. CONTRACTOR SHALL PROVIDE FOR

DESIGN, PERMITS, AND INSTALLATION OF SUCH BRACING.

ALLOWABLE LOAD PER: = 20 KSF END BEARING

PRECAUTIONS SHALL BE TAKEN DURING THE INSTALLATION OF PIERS TO THE POSSIBILITY

OF CAVING. CLOSELY SPACED PIERS SHALL BE DRILLED AND FILLED ALTERNATELY,

ALLOWING THE CONCRETE TO SET AT LEAST EIGHT HOURS BEFORE DRILLING AN ADJACENT

HOLE. PIER EXCAVATIONS SHALL BE FILLED WITH CONCRETE AS SOON AFTER DRILLING

AND INSPECTION AS POSSIBLE; THE HOLES SHALL NOT BE LEFT OPEN OVERNIGHT. A

DIFFICULTIES DUE TO WATER MAY BE REDUCED IF THE PIERS ARE CAST IMMEDIATELY

AFTER INSPECTION. ANY WATER SHALL BE PUMPED FROM THE EXCAVATIONS AND

THE CONCRETE PLACED IN THE DRY. GROUNDWATER SHALL BE ANTICIPATED DURING

MINIMUM PIER SHAFT DIAMETER SHALL BE 24".

CLEAR DISTANCE OF AT LEAST 20 FEET ± 6" SHALL BE MAINTAINED BETWEEN INDIVIDUAL

PIERS.

OPERATIONS, THEREFORE, THE CONTRACTOR SHALL HAVE TEMPORARY STEEL CASINGS

AND PUMPS AT THE JOB SITE PRIOR TO CONSTRUCTION OF DRILLING PIERS.

FOUNDATIONS SHALL BE PLACED AND ESTIMATED ACCORDING TO DEPTHS SHOWN ON

DRAWINGS SHOULD SOIL ENCOUNTERED AT THESE DEPTHS NOT BE APPROVED BY

CONTRACTING OFFICER, FOUNDATION ELEVATIONS WILL BE ALTERED BY CHANGE

ORDER.

FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN BUILDING AREA SHALL BE

MECHANICALLY COMPACTED IN LAYERS IN ACCORDANCE WITH THE SOILS REPORT AND

APPROVED BY THE CONTRACTING OFFICER.

ALL ABANDONED UTILITIES, ETC. SHALL BE REMOVED. NEW FOUNDATIONS MUST

EXTEND INTO UNDISTURBED SOILS.

DISCREPANCIES.

GENERAL NOTES AND TYPICAL DETAILS IN CASE OF CONFLICT.

V = 90 MPH

I = 1.15

C Ss = 0.05g S1 = 0.015g A 1.0

CONTINUOUS

(3)

XEXPANSION ANCHOR PLACEMENT

WELDING OF STAIRS/RAILING SYSTEMS

STRUCTURAL STEEL

HIGH STRENGTH BOLTING

FILLET WELDS > 5/16"

METAL DECK WELDING

SHOP WELDING (2)

EMBEDDED PLATES

PARTIAL/COMPLETE PENETRATION

SINGLE PASS FILLET WELDS < 5/16"

WELDING OF ANCHORS AND STUDS

ANCHOR BOLTS & INSERTS

PREPARATION OF TEST SPECIMENS

EPOXY ANCHOR PLACEMENT

CONCRETE PLACEMENT

FINAL FOUNDATION PREPARATION

REINFORCING WELDING

REINFORCING PLACEMENT

CONCRETE

GRADING, EXCAVATION & FILL

REINFORCING COUPLING

SOILS

ITEM

X

X

X

REF. SECTION 1704.3.3

REF. NOTE 4

REF. NOTE 4

REF. NOTE 5

BY GEOTECHNICAL ENGINEER

BY GEOTECHNICAL ENGINEER

REF. NOTE 6

COMMENTSPERIODIC

(3)

RECORD SLUMP, AIR CONTENT

AND TEMPERATURE

MATERIAL VERIFICATION

CURING

DETAIL CONFORMANCE REF. NOTE 3

REF. NOTE 8

REF. NOTE 8

X

X

SPECIAL INSPECTION PROGRAM

FIELD WELDING

LIGHT GAUGE METAL FRAMING WELDING

FILLET WELDS > 5/16"

PARTIAL/COMPLETE PENETRATION

SINGLE PASS FILLET WELDS < 5/16"

REF. NOTE 5

REF. NOTE 4

REF. NOTE 4

FLOOR AND ROOF DECK WELDS

PREFABRICATED CONSTRUCTION REF. NOTE 7

PRE-STRESSING STEEL PLACEMENT

PRE-STRESSING STEEL STRESSING

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

SPECIAL INSPECTION PROGRAM FOOTNOTES:

2.

3.

4.

5.

6.

7.

1.

8.

5.

FOUNDATION:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

ALL DRILLED PIER EXCAVATIONS SHALL BE INSPECTED BY THE CONTRACTING OFFICER

TO VERIFY THE DEPTH OF THE EXCAVATION AND THAT THE DESIRED PENETRATION INTO

NATURAL SOILS IS ACHIEVED. DRILLED PIERS SHALL BE AT 713.0 FEET (NGVD) AND BEAR

AT LEAST 3 FEET INTO TRANSITION ZONE PER REPORT. THE CONTRACTOR WILL HIRE A

PROCEED WITH BACK FILLING OPERATIONS IN A SAFE AND UNIFORM MANNER. SEE

SPECIFICATIONS FOR REQUIREMENTS.

18.

19.

9.

10.

* 1/3 INCREASE NOT ALLOWED FOR WIND OR SEISMIC LOADING.

TESTING LAB AND A LICENSED ENGINEER FOR THIS PURPOSE TO VERIFY THAT THE

ANTICIPATED STRATUM HAS BEEN HIT AND TO RECORD VERIFICATION INDEPENDENT

OF THE FOUNDATION CONTRACTOR IN A PIER LOG BEARING THE LICENSED ENGINEER'S

SIGNATURE. THE GOVERNMENT MAY ALSO PROVIDE INSPECTION, BUT THIS DOES NOT

RELIEVE CONTRACTOR OF RESPONSIBILITY FOR THE INDEPENDENT INSPECTION.

OBSERVATION

DRILLED PIERS & CASSIONS

X REF. NOTE 9

VERIFICATION X REF. NOTE 10

OBSERVE DRILLING OPERATIONS AND MAINTAIN COMPLETE AND ACCURATE RECORDS FOR

EACH PIER.

LRFD GUIDE SPECIFICATIONS FOR THE DESGN OF PEDESTRIAN BRIDGES, 2009, TXDOT

BRIDGE DESIGN MANUAL AND UFC 3-310-01.

90 PSF PEDESTRIAN LOAD

H10 TRUCK

DESIGN SPECIFICATIONS, 5TH EDITION.

5TH EDITION, BY INCORPORATING THE FOLLOWING PARAMETERS:

SUBMITTED TO THE CONTRACTING OFFICER. ALL DISCREPANCIES SHALL BE

BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR

CORRECTION; THEN, IF NOT CORRECTED, THE CONTRACTING OFFICER.

THE WORK UNLESS OTHERWISE SPECIFIED.

PERFORM THE TYPES OF SPECIAL INSPECTIONS SPECIFIED. A CERTIFICATE OF

SATISFACTORY COMPLETION OF WORK REQUIRING SPECIAL INSPECTION SHALL BE

COMPLETED AND SUBMITTED TO THE CONTRACTING OFFICER.

SUBMIT APPLICATION TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO

FABRICATION.

B)

CONTRACTING OFFICER PRIOR TO ERECTION OF PREFABRICATED COMPONENTS.

OFFICER. SPECIFICALLY INSPECTED WORK WHICH IS INSTALLED OR COVERED

WITHOUT THE APPROVAL OF THE CONTRACTING OFFICER AND THE SPECIAL

INSPECTOR IS SUBJECT TO REOPENING OR EXPOSURE.

SPECIAL INSPECTOR OR INSPECTION AGENCY AT LEAST ONE WORKING DAY

PRIOR TO PERFORMING ANY WORK THAT REQUIRES SPECIAL INSPECTION.

REPORTS: PREPARED BY THE INSPECTOR AND SIGNED BY A ENGINEER AND

THE SPECIAL INSPECTION IS TO BE CONTINUOUS DURING THE PERFORMANCE OF

CERTIFICATION: INSPECTOR SHALL BE CERTIFIED BY THE CONTRACTING OFFICER TO

OFF-SITE FABRICATION:

SUBMIT A CERTIFICATE OF COMPLIANCE FOR OFF-SITE FABRICATION TO THE

SPECIAL INSPECTION IS NOT A SUBSTITUTE FOR INSPECTION BY THE CONTRACTING

RESPONSIBILITY: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INFORM THE

A)

TO THESE REQUIREMENTS.

SPECIAL INSPECTION SHALL BE REQUIRED AS NOTED IN SPECIFICATIONS IN ADDITION

2.

3.

4.

5.

6.

7.

8.

1.

SHOP DRAWINGS/SUBMITTALS

VERIFY HIS DESIGN CONCEPT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK

CURSORY REVIEW SHOWS MAJOR ERRORS WHICH SHOULD HAVE BEEN FOUND BY

REQUIRED FOR SUBMITTAL FOR STRUCTURAL REVIEW IN ADDITION TO THAT

BY LOCATION PLAN IDENTIFYING THE MEMBERS INVOLVED AND CLOUDING AROUND

ADDED INFORMATION.

THE STRUCTURAL SHOP DRAWING REVIEW IS INTENDED TO HELP THE ENGINEER

THE STRUCTURAL SHOP DRAWINGS WILL BE RETURNED FOR RESUBMITTAL IF A

THE FOLLOWING SHOP DRAWINGS AND CALCULATIONS, WHEN APPLICABLE, ARE

ANY SUBMITTAL OF A DETAIL SHEET WITH ADDED INFORMATION SHALL BE ACCOMPANIED

CONCRETE MIX DESIGNS

PRECAST CONCRETE MEMBERS

WELDING PROCEDURE SPECIFICATIONS

STRUCTURAL STEEL SHOWN ON STRUCTURAL DRAWINGS

CONSTRUCTION JOINT LOCATIONS

HIS OWN SHOP DRAWINGS. SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTING

THE CONTRACTOR'S CHECKING.

OFFICER.

REQUIRED PER THE SPECIFICATIONS.

1.

2.

3.

A) B) C)

E) F)

4.

REINFORCING STEEL

D)

DIAMETERS (IF APPLICABLE), LENGTHS, EMBEDMENT INTO BEDROCK (IF APPLICABLE)

AND ADEQUATE END BEARING STRATA CAPACITY.

VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRM PIER DIAMETERS, BELL

"CONVENTIONAL AND MAT FOUNDATION"

SOILS INFORMATION BASED ON "AIRMAN TRAINING COMPLEX - DORMITORY 4 AND ATC

PEDESTRIAN BRIDGE AND ATC-EAST CAMPUS CENTER, LACKLAND AIR FORCE BASED,

TEXAS, BY CESWF-EC-DG, U.S. ARMY CORPS OF ENGINEERS, FORT WORTH DISTRICT",

FOUNDATION:

1.

FOOTINGS ARE DESIGNED BASED ON THE FOLLOWING INFORMATION:

ALLOWABLE BEARING * = 2000 PSF

2.

EQUIVALENT FLUID PRESSURE = 88 PCF : UNRESTRAINED EXPANSIVE SOIL

= 88 PCF : RESTRAINED EXPANSIVE SOIL

PASSIVE EARTH PRESSURE = 42 PCF : UNRESTRAINED NONEXPANSIVE SOIL

= 70 PCF : RESTRAINED NONEXPANSIVE SOIL

COEFFICIENT OF FRICTION = 0.3

MODULUS OF HORIZONTAL SUB

-GRADE REACTION = 100 PCI

* ALLOWABLE BEARING MAY NOT BE INCREASED BY 1/3 FOR WIND AND SEISMIC

LOAD CASES.

3. FOOTING SHALL BEAR ON FIRM SELECT FILL SOILS. MINIMUM DEPTH OF FOOTINGS

BELOW LOWEST ADJACENT FINAL GRADE SHALL BE 18". MINIMUM WIDTH OF FOOTING

SHALL BE 12".

4. CONTRACTOR SHALL PROVIDE FOR DE-WATERING OF EXCAVATIONS FOR EITHER

SURFACE WATER, GROUND WATER, OR SEEPAGE, IF REQUIRED.

5. CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING,

SHEATHING, AND SHORING REQUIRED AND SHALL BE SOLELY RESPONSIBLE FOR ALL

EXCAVATION PROCEDURES INCLUDING LAGGING, SHORING, AND PROTECTION OF

ADJACENT PROPERTY, STRUCTURES, STREETS, AND UTILITIES IN ACCORDANCE WITH

ALL NATIONAL, STATE, AND LOCAL SAFETY ORDINANCES.

6. ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL

BEHIND RETAINING WALLS BEFORE CONCRETE OR GROUT HAS ATTAINED FULL DESIGN

STRENGTH. CONTRACTOR SHALL BRACE OR PROTECT ALL BUILDING AND PIT WALLS

BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHED FLOORS ARE COMPLETELY IN

PLACE AND HAVE ATTAINED FULL STRENGTH. CONTRACTOR SHALL PROVIDE FOR

DESIGN, PERMITS, AND INSTALLATION OF SUCH BRACING.

7. SUBGRADE PREPARATION AND FILL REQUIREMENTS

SUBGRADE PREPARATION FOR SLAB ON GRADE FLOORS SHALL CONSIST OFA)

REMOVING AT LEAST 6 FOOT OF EXISTING MATERIAL, AND REPLACING WITH

COMPACTED NONEXPANSIVE BACKFILL MATERIAL, ANY ADDITIONAL FILL REQUIRED

TO REACH FINAL SUBGRADE ELEVATION BELOW THE BUILDING FLOOR SLAB SYSTEM

SHALL BE NONEXPANSIVE MATERIAL AS WELL. THE UPPER 6 INCHES OF EXISTING

SUBGRADE EXPOSED AFTER EXCAVATION OPERATIONS SHALL BE SCARIFIED,

MOISTENED, AND RECOMPACTED TO THE SAME DENSITY AS REQUIRED FOR

NONEXPANSIVE FILL. NONEXPANSIVE FILL SHALL BE PLACED IN CONTROLLED

LIFTS NOT EXCEEDING 8 INCHES IN LOOSE THICKNESS AND COMPACTED TO AT

LEAST 95 PERCENT OF LABORATORY MAXIMUM DENSITY AS DETERMINED IN

ACCORDANCE WITH ASTM D 1557.

TESTING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THATB)

THE SUBGRADE, FILL AND BACKFILL MATERIAL ARE PROPERLY COMPACTED. THE

FOLLOWING FREQUENCIES OF TESTING SHALL BE INCLUDED IN THE CONTRACT

AS A MINIMUM:

i) IN-PLACE DENSITY OF THE SUBGRADE, FILLS AND BACKFILLS SHALL BE

PERFORMED FOR EVERY 2500 SQUARE FEET PER LIFT IN ACCORDANCE WITH

ASTM D 1556 OR ASTM D 2922.

ii) OPTIMUM MOISTURE AND LABORATORY MAXIMUM DENSITY OF NONEXPANSIVE

FILL AND BACKFILL SHALL BE PERFORMED FOR EVERY 500 CUBIC YARDS OR

WHEN ANY CHANGE IN MATERIAL OCCURS.

8. FOUNDATIONS SHALL BE PLACED AND ESTIMATED ACCORDING TO DEPTHS SHOWN ON

DRAWINGS. SOIL ENCOUNTERED AT THESE DEPTHS SHALL BE APPROVED BY

THE CONTRACTING OFFICER.

9. FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN BUILDING AREA SHALL BE

MECHANICALLY COMPACTED IN LAYERS IN ACCORDANCE WITH THE SOILS REPORT

AND APPROVED BY THE INSPECTOR.

10. ALL ABANDONED UTILITIES, ETC. SHALL BE REMOVED. NEW FOOTINGS

MUST EXTEND INTO UNDISTURBRD SOILS.

11. SLABS ON GRADE SHALL BE SUPPORTED ON NATURAL GRADE OR COMPACTED FILL

PER THE RECOMMENDATIONS OF THE SOILS REPORT.

CEMENT

AGGREGATE

REINFORCEMENT

ASTM A - 706 GRADE 60 WELDED

ASTM F-1554 GRADE 36 ANCHOR BOLTS

THE CONCRETE STRENGTHS SHOWN IN THE FOLLOWING TABLE ARE THE MINIMUM

COMPRESSIVE STRENGTHS AT 28 DAYS AND THE WATER/CEMENT RATIO IS THE

MAXIMUM. THE SPECIFIED SLUMP IS THE MAXIMUM PRIOR TO THE ADDITION OF

ADMIXTURES. CONCRETE SHALL BE STANDARD WEIGHT CONCRETE (145 PCF).

ITEM OF

CONSTRUCTION

DRILLED PIERS

PRESTRESSED I-GIRDERS

BRIDGE SLAB

OF SEVENTY PERCENT OF THE SPECIFIED 28 DAY STRENGTH FOR ANY CONCRETE

CONSTRUCTION REQUIRING SHORING, BRACING OR TO RECEIVE CONSTRUCTION LOADS.

ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, MAY BE INCORPORATED

IN THE CONCRETE DESIGN MIXES. A HIGH-RANGE WATER-REDUCING (HRWR) ADMIXTURE

CONFORMING ASTM C494, TYPE F OR G, MAY BE USED IN CONCRETE MIXES PROVIDING

THAT SLUMP DOES NOT EXCEED 9". AN AIR-ENTRAINING AGENT CONFORMING TO ASTM

C260 SHALL BE USED IN CONCRETE MIXES FOR THE EXTERIOR HORIZONTAL SURFACES

MATERIALS:

CONCRETE STRENGTHS:

CONTINUOUS SPECIAL INSPECTION IS REQUIRED AS NOTED IN TABLE IN "SPECIAL

CONCRETE SHALL BE PROPORTIONED SUCH THAT 7 DAY STRENGTHS ARE A MINIMUM OF

A WATER-REDUCING ADMIXTURE CONFORMING TO ASTM C494, USED IN STRICT

VOLUME.

EXPOSED TO COLD WEATHER. THE AMOUNT OF ENTRAINED AIR SHALL BE 6% ± 1% BY

REINFORCED CONCRETE

1.

2.

3.

4.

5.

ASTM C - 150 TYPE I I OR I

ASTM C - 33 CRUSHED ROCK

ASTM A - 615 GRADE 60 TYPICAL

REINFORCEMENT

ANCHOR BOLTS

STRENGTH AGGREGATE SLUMP

(PSI) GRADE (IN) RATIO

3,600 5 5 1/2-7 1/2 0.60 5,000 5 4-6 1/2 0.45

3,600 5 3-5 0.45 4,000 4 4-5 1/2 0.45

FINE AGGREGATE......... ASTM C - 33 CRUSHED ROCK

4" SLUMP BEFORE WATER REDUCING AGENTS OR PLASTICIZERS ARE ADDED, 6"- 8"

SLUMP AFTER WATER REDUCING AGENTS OR PLASTICIZERS ARE ADDED.

6.

MAXIMUM

CONCRETE

CLASS

B H

S

BENT CAP AND COLUMNS.............C

3,600 5 3-5 0.45BRIDGE SUBSTRUCTURE..............C

TXDOT

315 AND ACI 318. SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTING

OFFICER BEFORE FABRICATION.

MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCEMENT:

MIN. COVER,

INCHES

CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH

CONCRETE EXPOSED TO EARTH OR WEATHER:

SLABS:

TOP MAT

BOTTOM MAT

BEAMS, COLUMNS:

PRIMARY REINFORCEMENT TIES;

REINFORCEMENT:

CAST-IN-PLACE CONCRETE (NON-PRESTRESSED). THE FOLLOWING

STIRRUPS, SPIRALS

7.

A) SHOP DRAWINGS, FABRICATION AND PLACING: SHALL CONFORM TO ACI

B)

1 1/4

1 1/2

INSPECTION" SECTION.

COURSE

DATED FEBRUARY 2011.

SOILS INFORMATION BASED ON "AIRMAN TRAINING COMPLEX - DORMITORY 4 AND ATC

PEDESTRIAN BRIDGE AND ATC-EAST CAMPUS CENTER, LACKLAND AIR FORCE BASED,

TEXAS, BY CESWF-EC-DG, U.S. ARMY CORPS OF ENGINEERS, FORT WORTH DISTRICT",

DATED FEBRUARY 2011.

THE SAME SIZE AND SPACING OF REINFORCEMENT AS SHOWN ON THE DRAWINGS

AND IN THE GENERAL NOTES.

BEAM SHALL EXTEND TO WITHIN 2" OF THE FACE AND HAVE A 90 DEGREE HOOK

UNLESS OTHERWISE SHOWN.

REINFORCING BARS BUNDLED IN CONTACT TO ACT AS A UNIT IN A LAYER SHALL

NOT BE LESS THAN 1-1/2 TIMES THE NOMINAL DIAMETER OF THE REINFORCEMENT

OR 1-1/2 TIMES MAXIMUM SIZE AGGREGATE, NOR LESS THAN 1-1/2". NORMAL

DIAMETER FOR A UNIT OF BUNDLED BARS SHALL BE THE EQUIVALENT DIAMETER

OF THE COMBINED AREAS OF THE BARS BUNDLED.

SPLICES IN OTHER BOTTOM REINFORCEMENT; STAGGER SPLICES FOR TOP

REINFORCEMENT SIMILARLY.

87 EQUIVALENT BAR DIAMETERS FOR BOTTOM BUNDLES AND 113 EQUIVALENT

BAR DIAMETERS FOR TOP BUNDLES, WHERE THE EQUIVALENT DIAMETER IS

BASED UPON THE COMBINED AREAS OF THE BARS BUNDLED. LAP LENGTHS

FOR BARS IN BUNDLES OF 4 OR MORE BARS SHALL BE INCREASES AN

ADDITIONAL 11 PERCENT.

WITH E90XX ELECTRODES.

CHAIRS, SPACERS AND SAND PLATES: AS REQUIRED TO MAINTAIN CONCRETE COVER.

VERTICAL REINFORCEMENT: SHALL BE DOWELED TO SUPPORTING MEMBERS WITH

HORIZONTAL REINFORCEMENT: ALL BARS ENDING AT THE FACE OF A WALL, COLUMN

SPACING: CLEAR DISTANCE BETWEEN PARALLEL REINFORCEMENT OR PARALLEL

TACK WELDING, WELDING, HEATING OR…