Other files attached to Construct Recruit Housing and Training (Airmen Training Complex Dormitory #4) - Unrestricted Large Business Package, newest first.
File Type Posted
2nd_Site_Visit_Attendee_List--03_2012.pdf PDF
1st_Site_Visit_Attendee_List--01_2012.pdf PDF
am_5.pdf PDF
am_4.pdf PDF
am_3.zip ZIP file
am_2.pdf PDF
g11r0216_am_1.zip ZIP file
g11r0216.zip ZIP file
Dwgs V-I - ATC4 Large Business - RE-RTA.pdf PDF
Dwgs V-II - ATC4 Large Business -RE- RTA.pdf PDF
Dwgs V-III - Pedestrian Bridge - RE-RTA.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The request for proposals for Airmen Training Complex Dormitory #4 (ATC#4) (Volumes I and II) and Pedestrian Bridge (Volume III), Lackland AFB, Texas, is amended as follows:

See SF30 Continuation Sheet(s).

NOTE: Proposal receipt date and time remain March 21, 2012, 2:00 p.m., CST, as previously announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G-11-R-0216

X 9B. DATED (SEE ITEM 11)

16-December-2011

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, x is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Mar-2012

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL: TEL:

W9126G-11-R-0216

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO THE SPECIFICATIONS

1. Replacement Specifications.- Replace the specifications listed below with the attached new specifications of the same number and title, each bearing the notation “AM0006”:

Section No. Title 07 84 00 Firestopping 22 31 00 Water Softeners, Cation-Exchange (Sodium Cycle)

CHANGES TO THE DRAWINGS

2. Replacement Drawings.- Replace the drawings listed below with the attached new drawings of the same number and title, each bearing the notation "AM0006":

Sheet No. Drawing Title A4-A405 Elevator Plans, Sections and Details A4-A509 Details

End of Summary of Changes

Lackland ATC4 Large Business Amendment 0006 Solicitation - W9126G-11-R-0216

SECTION 07 84 00

FIRESTOPPING

05/10

<AM 0006>

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E 119 (2010a) Standard Test Methods for Fire Tests of Building Construction and Materials

ASTM E 1399 (1997; R 2009) Cyclic Movement and Measuring the Minimum and Maximum Joint Widths of Architectural Joint Systems

ASTM E 1966 (2007) Fire-Resistive Joint Systems

ASTM E 2174 (200) Standard Practice for On-Site Inspection of Installed Fire Stops

ASTM E 2307 (2004; E 2004) Standard Test Method for Determining Fire Resistance of Perimeter Fire Barrier Systems Using Intermediate-Scale, Multi-story Test Apparatus

ASTM E 2393 (2009) Standard Practice for On-Site Inspection of Installed Fire Resistive Joint Systems and Perimeter Fire Barriers

ASTM E 814 (2009) Standard Test Method for Fire Tests of Through-Penetration Fire Stops

ASTM E 84 (2010) Standard Test Method for Surface Burning Characteristics of Building Materials

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/CC_host/pages/public/custom

FM AS 4991 (2001) Approval of Firestop Contractors

UNDERWRITERS LABORATORIES (UL)

UL 1479 (2003; R thru 2010) Fire Tests of

SECTION 07 84 00 Page 1

Through-Penetration Firestops

UL 2079 (2004; R 2008) Tests for Fire Resistance of Building Joint Systems

UL 723 (2008) Test for Surface Burning Characteristics of Building Materials

UL Fire Resistance (2010) Fire Resistance Directory

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED (2009) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction

(LEED-NC)

LEED Reference Guide (2009) LEED-NC Reference Guide for New Construction

1.2 SYSTEM DESCRIPTION

1.2.1 General

Furnish and install tested and listed firestopping systems, combination of materials, or devices to form an effective barrier against the spread of flame, smoke and gases, and maintain the integrity of fire resistance rated walls, partitions, floors, and ceiling-floor assemblies, including through-penetrations and construction joints and gaps.

a. Through-penetrations include the annular space around pipes, tubes, conduit, wires, cables and vents.

b. Construction joints include those used to accommodate expansion, contraction, wind, or seismic movement; firestopping material shall not interfere with the required movement of the joint.

c. Gaps requiring firestopping include gaps between the precast concrete wall panels and the floor slab and between the top of the fire-rated walls and the roof or floor deck above and at the intersection of shaft assemblies and adjoining fire resistance rated assemblies.

1.2.2 Sequencing

Coordinate the specified work with other trades. Apply firestopping materials, at penetrations of pipes and ducts, prior to insulating, unless insulation meets requirements specified for firestopping. Apply firestopping materials at building joints and construction gaps, prior to completion of enclosing walls or assemblies. Cast-in-place firestop devices shall be located and installed in place before concrete placement.

Pipe, conduit or cable bundles shall be installed through cast-in-place device after concrete placement but before area is concealed or made inaccessible. Firestop material shall be inspected and approved prior to final completion and enclosing of any assemblies that may conceal installed firestop.

SECTION 07 84 00 Page 2

1.2.3 Submittals Requirements

a. Submit detail drawings including manufacturer's descriptive data, typical details conforming to UL Fire Resistance or other details certified by another nationally recognized testing laboratory, installation instructions or UL listing details for a firestopping assembly in lieu of fire-test data or report. For those firestop applications for which no UL tested system is available through a manufacturer, a manufacturer's engineering judgement, derived from similar UL system designs or other tests, shall be submitted for review and approval prior to installation. Submittal shall indicate the firestopping material to be provided for each type of application.

When more than a total of 5 penetrations and/or construction joints are to receive firestopping, provide drawings that indicate location, "F" "T" and "L" ratings, and type of application.

b. Submit certificates attesting that firestopping material complies with the specified requirements. In lieu of certificates, drawings showing UL classified materials as part of a tested assembly may be provided. Drawings showing evidence of testing by an alternate nationally recognized independent laboratory may be substituted. For all intumescent firestop materials used in through penetration systems, manufacturer shall provide certification from UL of passing the "Aging and Environmental Exposure Testing " portion of UL 1479.

c. Submit documentation of training and experience for Installer.

d. Submit manufacturer's representative certification stating that firestopping work has been inspected and found to be applied according to the manufacturer's recommendations and the specified requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Firestopping Materials

SD-07 Certificates

Firestopping Materials Installer Qualifications Inspection

SD-11 Closeout Submittals

Sealants (LEED)

LEED documentation relative to low emitting materials credit in accordance with the LEED Reference Guide. Include in LEED Documentation Notes.

SECTION 07 84 00 Page 3

1.4 QUALITY ASSURANCE

Engage an experienced Installer who is:

a. FM Research approved in accordance with FM AS 4991, operating as a UL Certified Firestop Contractor, or

b. Certified, licensed, or otherwise qualified by the firestopping manufacturer as having the necessary staff, training, and a minimum of 3 years experience in the installation of manufacturer's products in accordance with specified requirements. A manufacturer's willingness to sell its firestopping products to the Contractor or to an installer engaged by the Contractor does not in itself confer installer qualifications on the buyer. The Installer shall have been trained by a direct representative of the manufacturer (not distributor or agent) in the proper selection and installation procedures. The installer shall obtain from the manufacturer written certification of training, and retain proof of certification for duration of firestop installation.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver materials in the original unopened packages or containers showing name of the manufacturer and the brand name. Store materials off the ground, protected from damage and exposure to elements. Remove damaged or deteriorated materials from the site.

PART 2 PRODUCTS

2.1 FIRESTOPPING MATERIALS

Provide firestopping materials, supplied from a single domestic manufacturer, consisting of commercially manufactured, asbestos-free, nontoxic, water-based, noncombustible products FM APP GUIDE approved, or UL listed, for use with applicable construction and penetrating items, complying with the following minimum requirements:

2.1.1 Fire Hazard Classification

Material shall have a flame spread of 25 or less, and a smoke developed rating of 50 or less, when tested in accordance with ASTM E 84 or UL 723.

Material shall be an approved firestopping material as listed in UL Fire Resistance or by a nationally recognized testing laboratory.

2.1.2 Toxicity

Material shall be nontoxic and carcinogen free to humans at all stages of application or during fire conditions and shall not contain hazardous chemicals or require harmful chemicals to clean material or equipment.

Firestop material must be free from Ethylene Glycol, PCB, MEK, or other types of hazardous chemicals.

2.1.3 Fire Resistance Rating

Firestop systems shall be UL Fire Resistance listed or FM APP GUIDE approved with "F" rating at least equal to fire-rating of fire wall or floor in which penetrated openings are to be protected. Where required, firestop systems shall also have "T" rating at least equal to the fire-rated floor in which the openings are to be protected.

SECTION 07 84 00 Page 4

2.1.3.1 Through-Penetrations

Firestopping materials for through-penetrations, as described in paragraph SYSTEM DESCRIPTION, shall provide "F", "T" and "L" fire resistance ratings in accordance with ASTM E 814 or UL 1479. Fire resistance ratings shall be as follows:

a. Penetrations of Fire Resistance Rated Walls and Partitions: F Rating = Rating of wall or partition being penetrated.

b. Penetrations of Fire Resistance Rated Floors, Floor-Ceiling Assemblies and the ceiling membrane of Roof-Ceiling Assemblies: F Rating = 2 hour, T Rating = 2 hour. Where the penetrating item is outside of a wall cavity the F rating and T rating must be equal to the fire resistance rating of the floor penetrated.

2.1.3.2 Construction Joints and Gaps

Fire resistance ratings of construction joints, as described in paragraph SYSTEM DESCRIPTION, and gaps such as those between floor slabs or roof decks and exterior walls shall be the same as the construction in which they occur. Construction joints and gaps shall be provided with firestopping materials and systems, including sealants that have been tested in accordance with ASTM E 119, ASTM E 1966 or UL 2079 to meet the required fire resistance rating. Wall joints shall be provided with firestopping materials and systems that have been tested in accordance with ASTM E 2307 to meet the required fire resistance rating. Systems installed at construction joints shall meet the cycling requirements of ASTM E 1399 or UL 2079. All joints at the intersection of the top of a fire resistance rated wall and the underside of a fire-rated floor, floor ceiling, or roof ceiling assembly shall provide a minimum class II movement capability.

2.1.4 Material Performance

All firestop materials are subject to these minimum standards of performance.

a. Firestop material shall be capable of installation at temperatures of 35 to 120 degrees F.

b. Material must be able to be frozen, thawed and still maintain manufacturer approval for installation.

c. Firestop material must convey a manufacturer's written warranty guaranteeing the performance of the material for the sustainable lifetime of the structure.

d. Material must maintain a shelf life of no less than 2 years form date of manufacturing.

e. Acceptable firestop cast-in-place devices are factory assembled intumescent lined round or oval plastic cylinders capable of protecting plastic, metallic, cable, and blank openings through the cast-in-place device equal to the fire-resistance rating of the floor.

2.1.5 Fire Rated Floor Closures

Provide floor closures in indicated configuration, fire rated to minimum 2 hours and providing a smoke seal. Provide any manufacturer's product that

SECTION 07 84 00 Page 5 meets specified requirement and indicated configuration for opening as constructed.

Design Basis Product: <AM 0006> System FW-D-10-12 <AM 0006> manufactured by <AM 0006> Hilti, Inc.Construction Specialties, Inc.<AM 0006>.

PART 3 EXECUTION

3.1 PREPARATION

Areas to receive firestopping shall be free of dirt, grease, oil, or loose materials which may affect the fitting or fire resistance of the firestopping system. For cast-in-place firestop devices, formwork or metal deck to receive device prior to concrete placement shall be sound and capable of supporting device. Prepare surfaces as recommended by the manufacturer.

3.2 INSTALLATION

Completely fill void spaces with firestopping material regardless of geometric configuration, subject to tolerance established by the manufacturer. Firestopping systems for filling floor voids 4 inches or more in any direction shall be capable of supporting the same load as the floor is designed to support or shall be protected by a permanent barrier to prevent loading or traffic in the firestopped area. Install firestopping in accordance with manufacturer's written instructions.

Provide tested and listed firestop systems in the following locations, except in floor slabs on grade:

a. Penetrations of duct, conduit, tubing, cable and pipe through floors and through fire-resistance rated walls, partitions, and ceiling-floor assemblies.

b. Penetrations of vertical shafts such as pipe chases, elevator shafts, and utility chutes.

c. Gaps at the intersection of floor slabs and curtain walls, including inside of hollow curtain walls at the floor slab.

d. Gaps at perimeter of fire-resistance rated walls and partitions, such as between the top of the walls and the bottom of roof decks.

e. Construction joints in floors and fire rated walls and partitions.

f. Other locations where required to maintain fire resistance rating of the construction.

3.2.1 Insulated Pipes and Ducts

Thermal insulation shall be cut and removed where pipes or ducts pass through firestopping, unless insulation meets requirements specified for firestopping. Replace thermal insulation with a material having equal thermal insulating and firestopping characteristics.

3.2.2 Fire Dampers

Install and firestop fire dampers in accordance with Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEM. Firestop installed with fire damper must be tested and approved for use in fire damper

SECTION 07 84 00 Page 6 system. Firestop installed with fire damper must be tested and approved for use in fire damper system.

3.2.3 Data and Communication Cabling

Cabling for data and communication applications shall be sealed with re-enterable firestopping products. Firestopping devices shall be pre-manufactured modular devices, containing built-in self-sealing intumescent inserts. Firestopping devices shall allow for cable moves, additionss or changes without the need to remove or replace any firestop materials. Devices must be capable of maintaining the fire resistance rating of the penetrated membrane at 0% to 100% visual fill of penetrants;

while maintaining "L" rating of <5 cfm/sf at 0% to 100% visual fill. Each device must be capable of retrofit applications and be available in square and round configurations, with single, double, triple and six-plex bracket systems provided. Firestop devices must also allow for plastic pipe, metallic pipe, and mixed multiple penetrations plastic, metallic, insulated metallic, and cable through a single device.

3.3 INSPECTION

3.3.1 General Requirements

For all projects, the firestopped areas shall not be covered or enclosed until inspection is complete and approved by the manufacturer's technical representative. The manufacturer's representative shall inspect the applications initially to ensure adequate preparations (clean surfaces suitable for application, etc.) and periodically during the work to assure that the completed work has been accomplished according to the manufacturer's written instructions and the specified requirements. Submit written reports indicating locations of and types of penetrations and types of firestopping used at each location; type shall be recorded by UL listed printed numbers.

3.3.2 Inspection Standards

Inspect all firestopping in accordance to ASTM standards for firestop inspection, and document inspection results to be submitted to GC, Architect and Owner.

a. ASTM E 2393

b. ASTM E 2174

-- End of Section --

SECTION 07 84 00 Page 7

SECTION 22 31 00

WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)

02/09

<AM 0006>

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA 10084 (2005) Standard Methods for the Examination of Water and Wastewater

AWWA D102 (2006) Coating Steel Water-Storage Tanks

ASME INTERNATIONAL (ASME)

ASME B1.1 (2003; R 2008) Unified Inch Screw Threads (UN and UNR Thread Form)

ASME B16.39 (2009) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300

ASME B40.100 (2006) Pressure Gauges and Gauge Attachments

ASME BPVC SEC VIII D1 (2010) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1

ASTM INTERNATIONAL (ASTM)

ASTM A 123/A 123M (2009) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A 153/A 153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A 6/A 6M (2010) Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling

ASTM D 1785 (2006) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120

SECTION 22 31 00 Page 1

ASTM D 2241 (2009) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)

ASTM D 3299 (2008) Filament-Wound Glass-Fiber-Reinforced Thermoset Resin Corrosion-Resistant Tanks

ASTM E 100 (2005) ASTM Hydrometers

ASTM E 126 (2005a) Inspection and Verification of Hydrometers

ASTM F 593 (2002; R 2008) Stainless Steel Bolts, Hex Cap Screws, and Studs

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-70 (2006) Standard for Cast Iron Gate Valves, Flanged and Threaded Ends

MSS SP-80 (2008) Bronze Gate, Globe, Angle and Check Valves

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA ICS 1 (2000; R 2005; R 2008) Standard for Industrial Control and Systems: General Requirements

NEMA MG 1 (2009) Motors and Generators

NSF INTERNATIONAL (NSF)

NSF 61 (2008) Drinking Water System Components - Health Effects

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Installation

Drawings showing complete wiring and schematic diagrams and any other details required to demonstrate that the system has been coordinated and will properly function as a unit. Drawings shall show proposed layout and anchorage of equipment and appurtenances, and equipment relationship to other parts of the work including clearances for maintenance and operation.

SD-03 Product Data

SECTION 22 31 00 Page 2

Softening Equipment

A complete list of equipment and material, including manufacturer's descriptive and technical literature; performance charts and curves; catalog cuts; and installation instructions.

Spare Parts

Spare parts data for each different item of material and equipment, as specified.

Field Instructions

Proposed diagrams, instructions, and other sheets, prior to posting. Framed instructions under glass or in laminated plastic, including wiring and control diagrams showing the complete layout of the entire system, shall be posted where directed. Condensed operating instructions explaining preventive maintenance procedures, methods of checking the system for normal safe operation, and procedures for safely starting and stopping the system shall be prepared in typed form, framed as specified above for the wiring and control diagrams and posted beside the diagrams. The framed instructions shall be posted before acceptance testing of the systems.

SD-06 Test Reports

Softening Equipment Piping

Test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, upon completion and testing of the installed system. Each test report shall indicate the final position of controls.

SD-10 Operation and Maintenance Data

Operating and Maintenance Instructions

Six complete copies of operating instructions outlining the step-by-step procedures required for system startup, operation and shutdown. The instructions shall include the manufacturer's name, model number, service manual, parts list, and brief description of all equipment and their basic operation features. Six complete copies of maintenance instructions listing routine maintenance procedures, possible breakdowns and repairs, and troubleshooting guides. The instructions shall include simplified wiring, layout, and control diagrams of the system as installed.

1.3 DELIVERY, STORAGE, AND HANDLING

Protect all equipment delivered and placed in storage from the weather, humidity and temperature variations, dirt and dust, or other contaminants.

1.4 EXTRA MATERIALS

a. Submit spare parts data for each different item of material and equipment, after approval of the detail drawings and not later than 1

SECTION 22 31 00 Page 3 month prior to the date of beneficial occupancy. Data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of the parts recommended by the manufacturer to be replaced after 1 and 3 year(s) of service.

b. Provide, for each type of equipment furnished, special tools necessary for adjustment, operation, maintenance, and disassembly; a grease gun or other lubricating device for each type of grease required; and one or more steel cases mounted on the wall complete with flat key locks, two keys, and clips or hooks to hold each tool in a convenient location. Tools shall be high-grade, smooth, forged, alloy, tool steel. Grease guns shall be lever type. Tools shall be delivered at the same time as the equipment and handed over on completion of the work.

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

a. Provide materials and equipment which are the standard products of a manufacturer regularly engaged in the manufacture of the products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Equipment shall be supported by a service organization that is, in the opinion of the Contracting Officer, reasonably convenient to the site.

b. Pumps and motors shall have the manufacturer's name, address, type or style, model or serial number, and catalog number on a plate secured to the item of equipment.

2.2 SOFTENING EQUIPMENT

Softener battery shall consist of 3 water-softener units. Performance specified shall refer to each unit and not to the battery as a whole.

2.2.1 Equipment Capacity

Each unit shall be a fully automatic downflow pressure-type water softener, having a <AM 0006> system <AM 0006> capacity to soften <AM 0006> 2,055 gpm 250 gallons<AM 0006> of water with a maximum influent total hardness of 6 grains per gallon during the interval between successive regenerations, to a maximum effluent total hardness of 7 grains per gallon. Intervals between successive generations shall be controlled and scheduled automatically by the unit.

2.2.2 Softener Tank

Tank shall be of buttwelded steel construction conforming to the ASME BPVC SEC VIII D1. Shell shall be designed for a working pressure of 125 psi. Tank shall be lined with nontoxic epoxy or rubber conforming to AWWA D102. Coatings for potable water tanks shall also conform to NSF 61.

The upper head of each tank shall be provided with an access opening 11 inches by 15 inches or larger. Lower side shell of each tank shall be provided with an access opening 4 by 6 inches or larger. Tank shall have angle leg supports of cast-iron or steel.

2.2.3 Underdrain System

A system shall be provided within the softener tank for collecting softened

SECTION 22 31 00 Page 4 water and distributing backwash water. The system shall be header-lateral-distributor head type. Underdrain system shall distribute the backwash water uniformly over the entire filter area, and at such velocities that will prevent the channeling of the filter bed.

2.2.3.1 Header-Lateral-Distributor Head Type

Header-lateral-distributor head type shall consist of a central manifold or header, connected to laterals provided with strainer heads or strainers with openings placed radially so as to discharge horizontally or downward.

System shall be supported by gravel bed. Where the system will permit the loss of the exchange material during the filtering cycle, the system shall be provided with a gravel bed. All bolts and attaching hardware shall be stainless steel, conforming with ASTM F 593. Headers and laterals shall be polyvinyl chloride, conforming to ASTM D 1785 or ASTM D 2241. Strainer heads and strainers shall be manufactured of materials compatible with the header-lateral system, and shall be stainless steel. Laterals and strainer heads, after being placed, shall not protrude into the header or laterals.

2.2.4 Gravel Bed

Supporting bed shall be placed above the underdrain systems. Gravel shall be free from clay, loam, dirt, and calcareous or other foreign materials and shall be free of flat or elongated particles. Gravel bed shall be properly graduated to distribute the backwash water, to prevent loss of exchange materials, and to prevent migration of the material in the gravel bed during operation and backwashing. Gravel bed shall not be less than 9 inches in depth. Where the void size of the top layer of gravel is greater than the smallest particle size of the exchange material, a 3 inch layer of ilmenite or garnet sand shall be added to the gravel bed.

2.2.5 Exchange Material

Exchange material shall be of styrene-resinous type, washed, processed, graded, and suitable for water softening purposes. All granules shall be clean and hard, and the material shall be free from defects that affect the serviceability and appearance of the finished product. Exchange material shall not require dosing or the adding of any chemical mixture or solution to the water to be or to the water used for backwashing or regeneration other than sodium chloride, except for a cleaner additive recommended by the Exchange Material Manufacturer. Material shall conform to the following:

a. Uniformity coefficient not greater than 2.0.

b. Not more than 1 percent by weight to pass 50-mesh US standard screen.

Bed depth shall not be less than 30 inches. Application rate shall not exceed 2 gpm per cubic foot of exchange material. Minimum freeboard above exchanger bed shall be not less than 50 percent of bed depth.

2.3 BRINE APPLICATION SYSTEM

A brine application system, comprising one brine "day" tank, one 10 ton salt storage silo, and brine making system, shall be provided for each installation. Minimum capacity of the system shall be such as to provide sufficient salt storage for three months of operation.

SECTION 22 31 00 Page 5

2.3.1 Tanks

Each saturator, brine or combined-purpose tank shall be fabricated from steel conforming to ASTM A 6/A 6M not less than 3/16 inch thick, lined with enamel, or of fiber glass filament-wound reinforced plastic construction, conforming to ASTM D 3299. Comply with EPA requirements in accordance with Section 01 62 35 RECYCLED / RECOVERED MATERIALS. Each tank shall be equipped with an underdrain system manufactured from polyvinyl chloride conforming to ASTM D 1785 or ASTM D 2241 and provided with a layer of graded gravel or screens for filtering the brine. Screens shall be manufactured from stainless steel. Water inlet valves and switches shall be mounted externally. Floats and probes may be mounted internally or externally, in such a manner that the stored salt shall not interfere with their operation. All devices in contact with or subject to splashing of brine solution shall be fabricated from red brass or polyvinyl chloride.

2.3.2 Hydraulic System

A motor-driven centrifugal pump of all bronze construction with valves, piping, and connections shall be provided for lifting brine from the brine or combined tank. Motor-driven pump shall have sufficient capacity to permit a 2 to 1 variation in the concentrated brine rate of flow.

Hydraulic pumping system shall be equipped with a manual rate-set valve, a check valve, and a brine measuring meter on the discharge of the pump.

Brine measuring meter shall be electrically interlocked with the pump starter so that after the discharge of a set quantity of brine, the pump motor shall shut down. Set point shall be infinitely adjustable over a 2 to 1 range. Dilution water shall be mixed with the concentrated brine through use of a mixing tee. Water inflow to the mixing tee shall be controlled by means of a manual rate-set valve. System shall be capable of automatically flushing out the dilute brine piping system on completion of the brine regeneration cycle. The dilution water supply shall be protected from inflow of brine by means of back flow prevention device.

2.4 CONTROLS

2.4.1 Valves

Transfer of water and brine solution to and from the water softener shall be accomplished by a single-unit multiple-port valve or by a package-type valve nest for automatic operation. Design of the valve mechanisms shall be such that gradually increasing flows will be attained as ports are opened and initial surges and sudden inrushes of water or brine are avoided. A dial pointer shall indicate each step of the operation.

2.4.1.1 Multiple-Port Valve

Multiple-port valve shall consist of an assembly of nonsticking, nonleaking, water-lubricated valve ports that connect to the hard-water inlet, soft-water outlet, backwash inlet and outlet, and brine inlet, all enclosed in a single casing. Design shall permit the various steps of operation service, backwash, brine flow, and rinse to be accomplished by the rotation of a shaft that drives the mechanism causing the opening and closing of ports in correct sequence.

2.4.1.2 Package-Type Valve

Package-type valve nest shall consist of a pilot valve connected with fittings as may be required to each one of a nest of valves hydraulically

SECTION 22 31 00 Page 6 or pneumatically operated. Nest of valves shall have connections to hard-water inlet, soft-water outlet, backwash inlet and outlet, and brine inlet.

2.4.2 Operation

Control of softener regeneration shall be fully automatic initiated by a control switch connected to an automatic hardness tester. Use of fully automatic controls shall permit regeneration to proceed automatically with no manual assistance other than replenishment of salt storage. Controls shall be subject to convenient and accurate manual adjustment and shall be designed for manual operation in the event of failure of the electrical equipment. An interlocking system shall be provided to prevent regeneration of more than one unit at a time. Backwash, brine injection, displacement, rinsing, and return to service shall be controlled manually by the operator by turning the multiport valve or pilot valve. A manual-reset electric alarm timer shall be provided for timing the several regeneration cycles.

2.5 ELECTRICAL WORK

Electrical motor-driven equipment specified shall be provided complete with motors motor starters and controls. Motor starters shall be provided complete with properly sized thermal overload protection and other appurtenances necessary for the motor specified. Electrical work shall be as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Manual or automatic control and protective or signal devices required for the operation specified and any control wiring required for controls and devices, shall be provided.

2.6 BOLTS, NUTS, AND FASTENERS

All bolts, anchor bolts, nuts, washers, plates, bolt sleeves, and all other types of supports necessary for the installation of the equipment shall be furnished with the equipment and shall be galvanized unless otherwise indicated. Expansion bolts shall have malleable-iron and lead composition elements. Unless otherwise specified, stud, tap, and machine bolts shall be of refined bar iron. All threads shall conform to ASME B1.1. Bolts, anchor bolts, nuts, and washers specified to be galvanized, shall be zinc coated, after being threaded, by the hot-dip process in conformity with ASTM A 123/A 123M or ASTM A 153/A 153M. Bolts, anchor bolts, nuts, and washers specified to be stainless steel shall be Type 316 stainless steel.

Where indicated, specified, or required, anchor bolts shall be provided with square plates at least 4 by 4 by 3/8 inch or shall have square heads and washers and be set in the concrete forms with suitable pipe sleeves.

2.7 AUXILIARY EQUIPMENT

2.7.1 Automatic Hardness Tester

A hardness tester for automatically testing the hardness of the water shall be installed in the soft-water line leading from each softener unit.

Automatic hardness tester shall be wall mounted and shall be capable of carrying out intermittent tests on the softened water and of giving visual warning that the residual hardness present exceeds a predetermined limit.

Tester shall be equipped with necessary wiring and electrical controls for automatic regeneration when the hardness of the water delivered by the softener unit exceeds 7 grains per gallon.

SECTION 22 31 00 Page 7

2.7.2 Electric Motors

Motors shall be single-phase, suitable for operation on 115-volt, single-phase, 60 cycle, alternating current conforming to NEMA MG 1. Each motor shall be designed for operation in a 40-degree C ambient temperature. Motor controls shall conform to NEMA ICS 1.

2.7.3 Valves and Unions

Gate valves smaller than 4 inches shall be PVC with screwed ends, conforming to MSS SP-80 and valves 4 inches or larger shall be PVC with flanged ends, conforming to MSS SP-70. Valves shall open counterclockwise, and the operating wheel shall have an arrow, cast in the metal, indicating the direction of opening. Unions shall conform to ASME B16.39.

2.7.4 Gauges and Cocks

Pressure gauges and sampling cocks shall be furnished on each softener unit connected to the hard-water inlet and soft-water outlet to indicate the pressure loss through the softener and its pipe, valve, and fitting assembly, and to sample the hard and soft water. A sampling cock shall also be provided on the brine system which will permit sampling of the dilute brine solution. Gauges shall be precision type with bronze Bourdon tube and phenolic case and an accuracy of plus or minus 1/2 percent conforming to ASME B40.100. Sampling cocks shall be of brass, ground key, lever handle, faucet type.

2.7.5 Water and Brine Testing Equipment

A complete water-testing set recommended by the manufacturer shall be provided with the softener. The set shall include complete instructions for conducting tests for hardness in accordance with AWWA 10084. Two Baume hydrometers conforming to ASTM E 100 and ASTM E 126, and calibrated for the range necessary for testing saturated brine solution and three glass cylinders of heat-resistant glass to hold sufficient brine for testing shall also be provided.

2.8 FACTORY PAINTING

Factory painting shall conform to manufacturer's standard factory finish for the intended service.

PART 3 EXECUTION

3.1 EXAMINATION

After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

3.2 INSTALLATION

3.2.1 Softener and Brine Tanks

Softener and brine tanks shall be anchored to a concrete mat. Anchor brackets, anchor rods or straps shall be provided to hold the tank to the anchors in the mat.

SECTION 22 31 00 Page 8

3.2.2 Valves

Install valves as nearly as possible in the position indicated consistent with convenience of operating the hand wheel. Carefully erect and support all valves in their respective position free from all distortion and strain on appurtenances during handling and installation. All material shall be carefully inspected for defects in workmanship and material, and debris and foreign material cleaned out of valve openings and seats, all operating mechanisms operated to check their proper functioning, and all nuts and bolts checked for tightness. Valves and other equipment which do not operate easily or are otherwise defective shall be repaired or replaced.

3.2.3 Pumps

Pump and motor shall be mounted on a common monoblock. The monoblock shall be anchored to a concrete mat. Anchor brackets, anchor rods, or straps shall be provided to hold the monoblock to the anchors in the mat.

3.2.4 Piping

Install piping to accurate lines and grades and, where possible, parallel to building walls. Where temporary supports are used, they shall be sufficiently rigid to prevent shifting or distortion of the pipe.

Provision shall be made for expansion where necessary. All piping shall pitch toward low points, and provision shall be made for draining these low points. A sufficient number of unions or flanges shall be used to allow for the dismantling of all water pipe, valves, and equipment. Installation of piping including cleaning, cutting, threading and jointing, shall be in accordance with Section 22 00 00 PLUMBING, GENERAL PURPOSE.

3.3 MANUFACTURER'S SERVICES

3.3.1 Manufacturer's Representative

Provide services by a manufacturer's representative who is experienced in the installation, adjustment, and operation of the equipment specified.

Representative shall supervise the installing, adjusting, and testing of equipment.

3.3.2 Field Training

Conduct training course for operating staff as designated by the Contracting Officer. The training period, for a total of 4 hours of normal working time, shall start after the system is functionally completed but prior to final acceptance tests. The field instructions shall cover all of the items contained in the Operating and Maintenance Instructions.

3.4 TESTING AND PERFORMANCE

After installation of the water softener, operating tests shall be carried out to assure that the water softener system operates properly. If any deficiencies are revealed during any tests, such deficiencies shall be corrected and the tests reconducted.

3.4.1 Softeners

Run each softener to exhaustion and regenerate it to full capacity in accordance with manufacturer's instructions before test is started.

Softener shall be put through a complete cycle of operation at a constant

SECTION 22 31 00 Page 9 flow rate of approximately <AM0006>2,055 gpm2,058 gpm<AM0006> for capacity test. During capacity test, the softened water shall be wasted to the sewer if necessary to maintain the required flow rate. Total grains of equivalent calcium carbonate removed shall be determined by test of the hard water at such intervals as will give a representative calcium carbonate content.

a. After each run, the unit shall be regenerated using salt brine delivered from the measuring tank in the amount called for by operating instructions. Near the end of the brine rinse and beginning of production of zero soft-water, samples of the water shall be taken every 2.5 minutes, the meter read, and the reading recorded. Samples shall be titrated for chlorides, and zero soft-water production shall be considered to begin when chlorides, as chloride radicals, are not in excess of 20 milligrams per liter above the chloride content of the hard-water. When the required number of gallons of hard water of specified hardness have been run through the softener, a quart sample shall be taken of the softened water and tested.

b. Results of the test shall be used in determining the capacity and performance of the softener. A sample of hard-water shall be taken and tested in a similar manner. A complete log of each test run shall be made, giving the following data: date, time or readings, total water softened, and pounds of salt used per regeneration. All samples shall be collected in clean, glass-stoppered bottles. Bottles shall be thoroughly rinsed with water being sampled, and all samples shall be plainly marked for identification.

c. Supply the salt required for regeneration of the exchange material after each of the above test runs. Under actual operating conditions the exchange material shall not be washed out of the apparatus, the turbidity and color of the soft water shall not exceed the turbidity and color of the hard water, and during any softening run, slugs of dirty or turbid water shall not be delivered regardless of the change of demand rate up to the maximum on the apparatus. During the specified test of the softener, the soft-water sampling cock shall remain open and a stream of softened water shall be run through a rubber hose, discharging at the bottom of a wide mouth, 1 gallon glass jar or bottle set against a white background so that the color and turbidity may be under observation at all times.

3.4.2 Piping

After installation, test all pipelines for watertightness. For these tests furnish testing plugs or caps, all necessary pressure pumps, pipe connections, gauges, other equipment, and all labor required. Test pressures shall be indicated in the process pipe schedule shown. Test of joints of air lines shall be made using a soapy water solution to detect leaks. The obtaining of water, electric power and other utility items as well as the disposal of water drainage are also the responsibilities of Contractor.

3.5 FIELD PAINTING

Equipment which did not receive a factory finish shall be painted as specified in Section 09 90 00 PAINTS AND COATINGS. Factory painted items requiring touching up in the field shall be thoroughly cleaned of all foreign material and shall be primed and top-coated with the manufacturer's standard factory finish.

SECTION 22 31 00 Page 10

-- End of Section --

SECTION 22 31 00 Page 11

J

J

J

MM

MMF

DH

DH

GROUND FLOOR

0"

SECOND FLOOR

15' - 0"

THIRD FLOOR

29' - 0"

FOURTH FLOOR

43' - 0"

PENTHOUSE

FLOOR

57' - 0"

TOP OF PARAPET

77' - 4"

A4-A405

'-0

'-0

'-0

'-0

'-0

LOUVER PENTHOUSE

VENTILATOR

A4-A405

SIM

HYDRAULIC PLUNGER

FOR ELEVATOR COORDINATE

WITH MANUFACTURER FOR SIZE

ELEVATOR PIT COORDINATE

WITH MANUFACTURER FOR

REQUIREMENTS

2 HR SPRAY APPLIED

FIREPROOFING ON METAL

DECK BOTH SIDES

A4-A405

A4-A405

A4-A512

GROUND FLOOR

0"

SECOND FLOOR

15' - 0"

F

THIRD FLOOR

29' - 0"

FOURTH FLOOR

43' - 0"

PENTHOUSE

FLOOR

57' - 0"

TOP OF PARAPET

77' - 4"

A4-A405

SILL ASSEMBLY

BY ELEVATOR

MANUFACTURER

CONCRETE SLAB-RE:

STRUCTURAL

DRAWINGS

8" CMU PARTITION

8" CMU

PARTITION

6" CMU

LOUVER

PENTHOUSE

VENTILATOR

LADDER FOR

ELEVATOR PIT

ACCESS

HYDRAULIC PLUNGER

FOR ELEVATOR

RAIL BRACKET

A4-A405

2 HR SPRAY FIRE PROOFING ON METAL

DECK BOTH SIDES AND BEAM

'-0

TO

TA

L R

IS

E

'-0

'-0

'-0

'-0

'-4

'-0

"14 '-8

A4-A405

A4-A405

PROVIDE

BENTONITE GROUT

AT WALL CASING

A4-A405

TYP.

F1 A4-A405

A4-A405

ELEV EQUIP RM

A125

ELEV 1A

A124

SILL BY ELEVATOR

MANUFACTURER

8" CMU

CURB AT

DOOR

1'-5"

10'-3"

'-8

3/ 4"

5'-

1/ 8"

7 5 /8"

8'- 2"

11'-11" 7"

2'- 8"

4'- 8"

R .O

"16 '-4

3/ 4"

4'-0" R.O. 5'-6"

F

A4-A405

A4-A405

9 3/8" 7 5/8"

8'- 2"

7 5 /8"

A4-A405

11'-6 1/4" 10'-3"

F

A4-A405

A4-A405

11'-6 1/4" 9 3/8"

8'- 2"

10'-3"

A4-A405

SIMSIM

ELEVATOR CALL BUTTON IN HOISTWAY

ENTRANCE FRAME, COORDINATE WITH

ELEVATOR MFG.

ELECTROMAGNETIC

HOLD OPEN

EQ

RATED DOOR

AS SCHEDULED

16 GA STAINLESS STEEL

FRAME GROUT FILLED

ELEVATOR DOOR BY ELEVATOR

MFG.

8" CMU WALL

6" CMU WALL

ELECTROMAGNETIC

HOLD OPEN.

3 3 /4"

1'-4"

3 3 /4"

2'-10"

EQ 4'-8"

SECOND FLOOR

15' - 0"

SILL ASSEMBLY BY

ELEVATOR MFG.

CONCRETE FLOOR

RATED DOOR

8" CMU HOISTWAY

WALL

ELEVATOR HOISTWAY

ENTRANCE FRAME

BEYOND

6" CMU WALL BEYOND

HOISTWAY

DOOR

FRAME

8" CMU

HOISTWAY WALL

6" CMU WALL

STAINLESS HOLLOW

METAL DOOR FRAME,

GROUT FILLED

DOOR AS

SCHEDULED

2 LAYERS

TYPE X 5/8"

GWB

1" SHAFT LINER

MASONRY

SHAFT WALL

FIRE STOP ALL

PENETRATIONS

6", 20 GA C-H

STUDS AT 12" O.C.

DUCT AND PIPE.

RE: MECHANICAL

CONCRETE

FLOOR SLAB

PROVIDE 2-HOUR FIRE

RATING, UL ASSEMBLY U

415, U438, U467 OR U492

ALIGN STUD

LOCATIONS WITH

JOIST LOCATIONS,

RE: FRAMING

PLANS A4-A122.

VE

RI

FY

D

IM

. W

IT

H

ME

CH

MI

N.

D

IM

P

ER

M

EC

H.

FIRE DAMPER

SLEEVE

57' - 0"PENTHOUSE

6"

2 HR SPRAY

APPLIED

FIREPROOFING

METAL DECK

STEEL ANGLE

5/8" TYPE X

GYP. BD.

ATTACH TO

STRUCTURE

5/8" TYPE X GYP.

BD ON HAT

CHANNEL

BACKER ROD AND

SEALANT

JOIST, RE

STRUCTURAL

NOTE:

UL DESIGN P723

2 HR SPRAY

APPLIED

FIREPROOFING

METAL DECK

STEEL ANGLE

5/8" TYPE X

GYP. BD.

ATTACH TO

STRUCTURE

5/8" TYPE X GYP.

BD ON 3 5/8'

METAL STUD

BACKER ROD AND

SEALANT

8" CMU HOISTWAY

WALL

JOIST, RE:

STRUCTURAL

NOTE:

UL DESIGN P723

DOCUMENT WAS AUTHORIZED

THE SEAL APPEARING ON THIS

BY DAVID EVANS

21459 ON 1 SEPTEMBER 2011

R

EG

IS

TERED ARCH

IT

EC

T

DA

V ID EVANS

95412 SAXETFOETAT

S

Sheet reference number

Sheet

U.

S.

A

RM

Y

EN

G

IN

EE

R

DI

ST

RI

CT

CO

RP

S

O F

EN

G

IN

EE

RS

FO

RT

W

O

RT

H, T

EX

AS

De sig ne d by

Dw n by

Re vie we d by

Su bm itt ed b y:

EN

G

IN

EE

R

Da te

So l N o.

Co nt r N o.

Re v.

Pl ot s ca le

Pl ot d at e:

Fi le n am e:

Co nt r N o.

DE

SI

G N

FI

LE

Fort Worth District

US Army Corps of Engineers

1:

DA

VI

D

LU

KE

, P

E of

LA

CK

LA

ND

A

FB

, T

EX

AS

AI

RM

EN

T

RA

IN

IN

G C

O M

PL

EX

EA

ST

C

AM

PU

S

AI

RM

EN

T

RA

IN

IN

G C

O M

PL

EX

(A

TC

4)

X

XX

XX

Pl ot

D at e He re

SE

PT

EM

BE

R

1 2 3 4 5

D

C

B

A M

PL

S0

7R

D R

AW

IN

G N

U M

BE

R

: L A

-0

XX

XX

XX

X

D

C

B

A

1 2 3 4 5

W

G

-1 1-

R -0

3/ 7/

1:

:0

AM

D

AV

E E

VA

N

S

K

AR

IN

M

AS

O

N

D

AV

E E

VA

N

S

A4-A405

EL

EV

AT

OR

P

LA

NS

, S

EC

TI

ON

S

AN

D

DE

TA

ILS

A4-A405

1ELEVATOR SECTION

4' 8'0 2'

SCALE:1/4"=1'-0"

A4-A405

2ELEVATOR SECTION

4' 8'0 2'

SCALE:1/4"=1'-0"

A4-A405

5GROUND FLOOR ELEVATOR PLAN

A4-A405

42ND, 3RD, AND 4TH FLOOR ELEVATOR PLAN

A4-A405

3ELEVATOR PLAN PENTHOUSE

1' 2'0 6"

SCALE:1-1/2"=1'-0"

4' 8'0 2'

SCALE:1/4"=1'-0"

4' 8'0 2'

SCALE:1/4"=1'-0"

4' 8'0 2'

SCALE:1/4"=1'-0"

A4-A405

6ELEVATOR/FIRE DOOR JAMB DETAIL

A4-A405

8ELEVATOR SILL DETAIL

1' 2'0 6"

SCALE:1-1/2"=1'-0"

A4-A405

7ELEVATOR DOOR HEAD DETAIL

1' 2'0 6"

SCALE:1-1/2"=1'-0"

A4-A405

9SHAFT CAP DETAIL

SCALE:3/4"=1'-0"

0 1' 2' 3'

A4-A405

DETAIL AT ELEVATOR

HOISTWAY

1' 2'0 6"

SCALE:1-1/2"=1'-0"

A4-A405

DETAIL AT ELEVATOR

HOISTWAY

1' 2'0 6"

SCALE:1-1/2"=1'-0"

N o.

D es cr ip tio n

D .O

.N o.

Ac tio n D at e f D

ET

AI

L R

EV

IS

IO

N

S

AM

M

AR

f f f f f f

C

3'- 0"

PRECAST CONC.

PANEL

PANEL CONNECTION TO

STRUCTURAL

FLOOR SLAB BY PRECAST

PANEL MFG.

2 HOUR RATED

FLOOR CLOSURE

BACKER ROD

AND SEALANT

STRUCTURAL

FLOOR SLAB

7"1'-0"

A4-A507

SIM

OPP.H.

GRID

FLOOR ELEV.

GROUND FLOOR

0"

C

PRECAST CONCRETE

PANEL

CONCRETE FOUNDATION-

RE: STRUCTURAL.

FINISHED

GRADE, RE: CIVIL

7"1'-0"

COLUMN

CENTERLINE

BACKER ROD AND

SEALANT

SHIM AND GROUT

5/8" GWB ON 2 1/2"

STUDS AT 16 O.C. DOWNSPOUT AND

BOOT ATTACH TO

SLAB FOOTING

BELOW GRADE

A4-A509

GRID

PRECAST

CONCRETE PANEL

EMBED ATTACHMENT BY

PRECASTER

GALVANIZED STEEL PLATE 8" X

10" X 1/2" ON 1" SHIM AND

NONSHRINK GROUT WITH (2) 1/2"

STAINLESS BOLTS WITH 3 1/2" MIN.

EMBEDMENT

GATE…