am_6.pdf
PDF 2 MB Posted
- Attached to
- Utility Feed Industrial COmplex Infrastructure Federal contract opportunity
- Solicitation number
- W9126G11R0188
About this file
Amendment 6 Specs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| am6_dwgs_vol5.pdf | ||
| am6_dwgs_vol1.pdf | ||
| am6_dwgs_vol4.pdf | ||
| am6_dwgs_vol3.pdf | ||
| am6_dwgs_vol2.pdf | ||
| am_5.pdf | ||
| am4_geotech.pdf | ||
| am_4.pdf | ||
| am_3.pdf | ||
| drawings_am3.pdf | ||
| am_2.pdf | ||
| Volume2_Combined.pdf | ||
| Volume3_Combined.pdf | ||
| Volume1_Combined.pdf | ||
| g11r0188.pdf | ||
| am1_Volume5.pdf | ||
| am1_Volume4.pdf | ||
| am1_Volume3.pdf | ||
| am1_Volume2.pdf | ||
| am1_Volume1.pdf | ||
| am_1.pdf | ||
| g11r0188.zip | ZIP file |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for Industrial Complex Infrastructure PN69286, Fort Bliss Texas, is amended as follows:
See SF30 Continuation Sheet(s)
NOTE: This is a Post-Closing Amendment. The response date is 4 June 2012 at 2:00 PM local time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G-11-R-0188
X 9B. DATED (SEE ITEM 11)
12-Sep-2011
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
4-May-2012
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9126G-11-R-0188
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. 00 11 00 – CLIN SCHEDULE: Replace Section 00 11 00
2. SUBMITTAL REGISTER: a revised Submittal Register is provided with this amendment. See the attached bearing the notation “W9126G-11-R-0188, Amendment No. 0006”
3. Revised Sections: Replace the following sections with the attached revised sections bearing the notation “W9126G-11-R-0188, Amendment No. 0006”:
01 00 50 – SCOPE OF WORK
01 33 29 – EMF – LEED™ Documentation
12 93 00 – SITE FURNISHINGS
26 08 00 – APPARATUS INSPECTION AND TESTING
26 11 14.00 10 – MAIN ELECTRIC SUPPLY STATION AND SUBSTATION
26 12 19.10 – THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 00.00 20 – SF6 INSULATED PAD-MOUNTED SWITCHGEAR
26 20 00 – INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 – COORDINATED POWER SYSTEM PROTECTION
26 36 00.00 10 – AUTOMATIC TRANSFER SWITCH
26 41 01.00 10 – LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 – CATHODIC PROTECTION SYSTEM SACRIFICIAL ANODE
26 51 00 – INTERIOR LIGHTING
26 56 00 – EXTERIOR LIGHTING
28 31 63.00 – ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM
33 70 02.00 10 – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
33 71 01 – OVERHEAD TRANSMISSION AND DISTRIBUTION
33 82 00 – TELECOMMUNICATIONS OUTSIDE PLANT OSP
4. Deleted Drawings: Delete the following drawing sheets from the project in their entirety:
G-306, G-402, G-403, G-404, G-405, C-004, C-005, C-111, C-121, C-122, C-124, C-127, C-134, C-135, C-221, C-222, C-224, C-227, C-321, C-509, C-510, C-559, N-120, C-613, C-621, C-622, C-624, C-627, C-671, C-672, C-674, C-675, C-697, C-711, C-821, C-822, C-824, C-827, C-830, L-131, L-132, L-134, L-234, L-235, L-331, L-334, L-335, U-221, U-222, U-224, U-227, U-360, U-441, U-460.
5. Revised Drawings: Replace the following drawing sheets with the revised drawing sheets that accompany this amendment. Drawings are separated by volume. See the attached files
“am6_dwgs_vol1.pdf” , “am6_dwgs_vol2.pdf”, “am6_dwgs_vol3.pdf”, “am6_dwgs_vol4.pdf” , amd
“am6_dwgs_vol5.pdf” provided separately.
G-101 – COVER SHEET VOLUME 1
G-201 – INDEX SHEET 1
G-202 – INDEX SHEET 2
G-203 – INDEX SHEET 3
G-301 – PROJECT LOCATION MAP
G-302 – PROJECT LOCATION MAP & STOCKPILE LOCATION
G-303 – OPTION LAYOUT 1-4
G-304 – OPTION LAYOUT 5, 6, 7
G-305 – INDUSTRIAL COMPLEX SITE PLAN
G-307 – BUILDING PAD ROUGH GRADING
G-308 – OPTION LAYOUT
G-310 – GENERAL NOTES
G-320 – OPTION LAYOUT 9
G-321 – OPTION LAYOUT 10
G-400 – LEED DOCUMENTATION
G-401 – LEED DOCUMENTATION
G-601 – ACCESS ROAD
H-106 – EROSION CONTROL PLAN GRID B-01
H-108 – EROSION CONTROL PLAN GRID B-03
H-110 – EROSION CONTROL PLAN GRID B-05
H-111 – EROSION CONTROL PLAN GRID B-06
H-114 – EROSION CONTROL PLAN GRID B-09
H-115 – EROSION CONTROL PLAN GRID B-10
C-000 – DEMOLITION PLAN KEY MAP
C-100 – DIMENSION CONTROL PLAN AND CONTROL MONUMENTATION KEY MAP
C-106 – DIMENSION CONTROL PLAN GRID A-06
C-107 – DIMENSION CONTROL PLAN GRID A-07
C-108 – DIMENSION CONTROL PLAN GRID A-08
C-120 – EMF DIMENSION CONTROL PLAN KEY MAP
C-125 – EMF DIMENSION CONTROL PLAN GRID P-05
C-128 – EMF DIMENSION CONTROL PLAN GRID P-08
C-200 – GRADING PLAN KEY MAP
C-206 – GRADING PLAN GRID B-01
C-207 – GRADING PLAN TRUCK TURNAROUND GRADING DETAIL
C-208 – GRADING PLAN GRID B-03
C-210 – GRADING PLAN GRID B-05
C-211 – GRADING PLAN GRID B-06
C-212 – GRADING PLAN GRID B-07
C-214 – GRADING PLAN GRID B-09
C-215 - GRADING PLAN GRID B-10
C-220 – EMF GRADING PLAN KEY MAP
C-225 – EMF GRADING PLAN GRID P-05
C-226 – EMF GRADING PLAN GRID P-06
C-228 – EMF GRADING PLAN GRID P-08
C-300 – FENCING & SLEEVING PLAN KEY MAP
C-306 – FENCING & SLEEVING PLAN GRID B-01
C-308 – FENCING & SLEEVING PLAN GRID B-03
C-310 – FENCING & SLEEVING PLAN GRID B-05
C-311 – FENCING & SLEEVING PLAN GRID B-06
C-314 – FENCING & SLEEVING PLAN GRID B-09
C-322 – FENCING & SLEEVING PLAN GRID B-10
G-102 – COVER SHEET – VOLUME 2
C-500 – WATER PLAN KEY MAP
C-503 – WATER PLAN LINE “W-1”
C-504 – WATER PLAN LINE “W-1”
C-507 – EMF WATER PLAN LINE “W-2”
C-508 – EMF WATER PLAN LINE “W-2”
C-532 – EMF WATER PROFILES
C-550 – SANITARY SEWER PLAN KEY MAP
C-556 – SANITARY SEWER PLAN LINE “SS-3”
C-560 – EMF SANITARY SEWER PLAN LINE “SS-4”
C-570 – SANITARY SEWER LATERALS
N-100 - GAS PLAN KEY MAP
N-108 – GAS PLAN LINE “MG-1”
N-121 – GAS PLAN LINE “MG-2”
C-600 – PAVING PLAN KEY MAP
C-606 – PAVING PLAN GRID A-06
C-607 – PAVING PLAN GRID A-06
C-608 – PAVING PLAN GRID A-07
C-610 – PAVING PLAN GRID A-08
C-620 – EMF PAVING PLAN KEY MAP
C-625 – EMF PAVING GRID P-05
C-628 – EMF PAVING PLAN GRID P-08
C-650 – SIGNAGE & STRIPING PLAN KEY MAP
C-656 – SIGNAGE & STRIPING PLAN GRID A-06
C-657 – SIGNAGE & STRIPING PLAN GRID A-07
C-658 – SIGNAGE & STRIPING PLAN GRID A-08
C-660 – SIGNAGE & STRIPING PLAN GRID A-10
C-670 – EMF SIGNAGE & STRIPING PLAN KEY MAP
C-690 – EMF GROUNDING ROD PLAN KEY MAP
C-695 – EMF GROUNDING ROD PLAN GRID P-05
C-698 – EMF GROUNDING ROD PLAN GRID P-08
C-700 – STORM PLAN KEY MAP
C-701 – STORM PLAN & PROFILE LINE “A”
C-702 – STORM PLAN & PROFILE LATERALS “A” LINE “L”
C-706 – STORM PLAN & PROFILE LINE “F”, “G”, “H”
C-709 – EMF STORM PLAN & PROFILE LINE “O”
C-710 – EMF STORM PLAN & PROFILE LINE “O”
C-712 – EMF STORM PLAN & PROFILE LINE “P”
C-713 – EMF STORM PLAN & PROFILE LINE “Q”
C-820 – EMF JOINTING PLAN KEY MAP
C-825 – EMF JOINTING PLAN GRID P-05
C-828 – EMF JOINTING PLAN GRID P-08
G-103 – COVER SHEET VOLUME 3
C-936 – CIVIL DETAILS UTILITY ISLAND LAYOUTS
C-951 – CIVIL DETAILS PAVEMENT & MARKING DETAILS
C-990 – CIVIL DETAILS JOINTING DETAILS
L-104 – LANDSCAPE PLANTING PLAN GRID A-04
L-105 – LANDSCAPE PLANTING PLAN GRID A-05
L-106 – LANDSCAPE PLANTING PLAN GRID A-06
L-130 – EMF LANDSCAPE PLANTING PLAN KEY MAP
L-135 – EMF LANDSCAPE PLANTING PLAN GRID P-05
L-136 – EMF LANDSCAPE PLANTING PLAN GRID P-06
L-138 – EMF LANDSCAPE PLANTING PLAN GRID P-08
L-139 – EMF LANDSCAPE PLANTING PLAN GRID P-09
L-230 – LANDSCAPE SITE PLAN KEY MAP
L-236 – LANDSCAPE SITE PLAN GRID P-06
L-304 – LANDSCAPE IRRIGATION PLAN GRID A-04
L-330 – EMF LANDSCAPE IRRIGATION PLAN KEY MAP
L-336 – EMF LANDSCAPE IRRIGATION PLAN GRID P-06
L-408 – LANDSCAPE DETAILS, PLANTING DETAILS, AND PLANT SCHEDULE
G-104 – COVER SHEET VOLUME 4
U-200 – KEY PLAN KEY MAP
U-204 – LIGHTING PLAN GRID A-03
U-205 – LIGHTING PLAN GRID A-04
U-206 – LIGHTING PLAN GRID A-05
U-207 – LIGHTING PLAN GRID A-06
U-208 – LIGHTING PLAN GRID A-07
U-209 – LIGHTING PLAN GRID A-08
U-210 – LIGHTING PLAN GRID A-09
U-211 – LIGHTING PLAN GRID A-11
U-220 – EMF LIGHTING PLAN KEY MAP
U-225 – EMF LIGHTING PLAN GRID P-05
U-226 – EMF LIGHTING PLAN GRID P-06
U-228 – EMF LIGHTING PLAN GRID P-08
U-300 – ELECTRICAL SITE PLAN OVERALL INDEX
U-301 – ELECTRICAL SITE PLAN GRID A-01
U-303 – ELECTRICAL SITE PLAN GRID A-03
U-304 – ELECTRICAL SITE PLAN GRID A-04
U-305 – ELECTRICAL SITE PLAN GRID A-05
U-306 – ELECTRICAL SITE PLAN GRID A-06
U-308 – ELECTRICAL SITE PLAN GRID A-08
U-310 – ELECTRICAL SITE PLAN GRID A-10
U-321 – ELECTRICAL SITE PLAN GRID A-01 BID OPTION 1
U-324 – ELECTRICAL SITE PLAN GRID A-04 BID OPTION 1
U-331 – ELECTRICAL SITE PLAN GRID A-01 BID OPTION 2
U-334 – ELECTRICAL SITE PLAN GRID A-04 BID OPTION 2
U-340 – EMF ELECTRICAL PLAN KEY MAP
U-342 – EMF ELECTRICAL PLAN GRID P-11
U-350 – ELECTRICAL DUCT BANK PROFILE
U-351 – ELECTRICAL DUCT BANK PROFILE
U-352 – ELECTRICAL DUCT BANK PROFILE
U-353 – ELECTRICAL DUCT BANK PROFILE
U-354 – ELECTRICAL DUCT BANK PROFILE SUBSTATION YARD
U-355 – ELECTRICAL DUCT BANK PROFILE SUBSTATION YARD
U-356 – ELECTRICAL DUCT BANK PROFILE
U-401 – COMMUNICATIONS SITE PLAN GRID A-01
U-403 – COMMUNICATIONS SITE PLAN GRID A-03
U-404 – COMMUNICATIONS SITE PLAN GRID A-04
U-406 – COMMUNICATIONS SITE PLAN GRID A-06
U-407 – COMMUNICATIONS SITE PLAN GRID A-07
U-421 – COMMUNICATIONS SITE PLAN GRID A-01 BID OPTION 1
U-424 – COMMUNICATIONS SITE PLAN GRID A-04 BID OPTION 1
U-440 – COMMUNICATIONS SITE PLAN EMF\VMF
U-442 – COMMUNICATIONS SITE PLAN GRID P-11
U-450 – COMMUNICATIONS DUCT BANK PROFILE
U-451 – COMMUNICATIONS DUCT BANK PROFILE
U-452 – COMMUNICATIONS DUCT BANK PROFILE
U-601 – ELECTRICAL DUCT BANK WIRING DIAGRAM
U-602 – ELECTRICAL DUCT BANK WIRING DIAGRAM BID OPTION 10
U-603 – ELECTRICAL DUCT BANK WIRING DIAGRAM BID OPTION 9
U-604 – ELECTRICAL DUCT BANK WIRING DIAGRAM BID OPTION 8
U-605 – ELECTRICAL DETAILS
U-606 – ELECTRICAL DUCT BANK WIRING DIAGRAM BID OPTION 1
U-607 – ELECTRICAL DUCT BANK WIRING DIAGRAM BID OPTION 2
U-610 – COMMUNICATION DUCT BANK ONE-LINE DIAGRAM
U-611 – COMMUNICATION DUCT BANK ONE-LINE DIAGRAM BID OPTION 10
U-612 – COMMUNICATION DUCT BANK ONE-LINE DIAGRAM BID OPTION 8
U-613 – COMMUNICATION DUCT BANK ONE-LINE DIAGRAM BID OPTION 1
U-615 – COMMUNICATION DUCT BANK ONE-LINE DIAGRAM
U-621 – LIGHTING DETAILS
U-622 – LIGHTING DETAILS
U-623 – LIGHTING DETAILS
U-839 – ELECTRICAL DETAILS MANHOLE FOLD-OUTS
U-840 – ELECTRICAL DETAILS MANHOLE FOLD-OUTS BID OPTION 1
U-841 – ELECTRICAL DETAILS OVERHEAD POLES
U-842 – ELECTRICAL DETAILS OVERHEAD POLES
U-843 – ELECTRICAL DETAILS OVERHEAD POLES
U-850 – LIGHTING DETAILS
U-851 – LIGHTING DETAILS
U-874 – COMMUNICATIONS DETAILS MANHOLE FOLD-OUTS
U-880 – COMMUNICATIONS DETAILS MANHOLE FOLD-OUTS
G-105 – COVER SHEET VOLUME 5
E-105 – ELECTRICAL – SUBSTATION YARD EQUIPMENT LAYOUT PLAN BID OPTION 10
S-101 – STRUCTURAL – SWITCHGEAR BUILDING FOUNDATION PLAN BID OPTION 10
S-102 – STRUCTURAL – SWITCHGEAR BUILDING SLAB ON GRADE PLAN BID OPTION 10
S-103 – STRUCTURAL – SWITCHGEAR BUILDING ROOF FRAMING PLAN BID OPTION 10
S-104 – STRUCTURAL – SUBSTATION TRANSFORMER PLANS BID OPTION 10
S-105 – STURCTURAL – SUBSTATION MISC PLAN AND SECTIONS BID OPTION 10
S-501 – STRUCTURAL – SWITCHGEAR BUILDING DETAILS AND SECTIONS BID OPTION 10
S-502 – STRUCTURAL – SWITCHGEAR BUILDING DETAILS AND SECTIONS BID OPTION 10
S-503 – STRUCTURAL – SWITCHGEAR BUILDING DETAILS AND SECTIONS BID OPTION 10
S-506 – STRUCTURAL – SWITCHGEAR BUILDING DETAILS AND SECTIONS BID OPTION 10
S-507 – STRUCTURAL – SWITCHGEAR BUILDING DETAILS AND SECTIONS BID OPTION 10
S-508 – STRUCTURAL – SWITCHGEAR BUILDING DETAILS AND SECTIONS BID OPTION 10
S-509 – STRUCTURAL – SWITCHGEAR BUILDING DETAILS AND SECTIONS BID OPTION 10
End of Summary of Changes
INDUSTRIAL COMPLEX INFRASTRUCTURE (PN 69286) DP113
EMF INFRASTRUCTURE (PN 68993) AM “g”
Section 00 11 00 Page 1
SECTION 00 11 00
BIDDING SCHEDULE
INDUSTRIAL COMPLEX INFRASTRUCTURE, PN 69286
EMF INFRASTRUCTURE, PN 68993
FORT BLISS, TEXAS
BIDDING SCHEDULE
Item No. Description Quantity Unit Unit Price Amount
INFRASTRUCTURE BASE BID
0001 The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Base Bid including preparation, implementation and maintenance of a Master SWPPP for the overall project area, installation/maintenance of erosion control devices;
retention pond excavation;
existing pavement, sidewalk, curb and gutter demolition;
existing utility demolition and or relocation; sign relocation;
clearing, grubbing, grading for all base bid areas including base bid communication ductbank outside the base bid roadway grading area; grading for roadways, and POV lots;
installation of proposed water distribution system, from Street “R” road station 85+00 to Liberty Avenue, water mains and services running through the EMF site; proposed gas distribution system; proposed sanitary sewer system, except Line “SS-2”;
proposed storm drain system Line “D” and “E”, eight (8) lf of Storm Line ‘A” and those storm systems running through the EMF site; paving for Street R from Station 85+00 to Liberty Avenue including work in Liberty Avenue median; paving for organizational and POV lots;
site lighting for organizational and POV lots; striping and signage for Street R from Station 85+00 to Liberty Avenue including work in Liberty Avenue
W9126G-11-R-0188, Amendment No. 0006
Section 00 11 00 Page 2 median; permanent fencing;
temporary construction fencing;
temporary traffic control;
aggregate, landscape, hardscape, irrigation, streetscape for Street R from station 85+00 to station 92+81.29 and the EMF site landscape and hardscape;
coordination of work and schedules with multiple ongoing separate contracts and other items defined in the contract documents. The electrical and communications distribution system includes installation of proposed electric distribution system located outside the substation fence, generally described as follows: proposed electric system from Street “R” road station 85+00 to 93+50, electrical system running to and into the EMF site; electrical system to and including connection to an existing overhead power source near the South IBCT ACP; proposed communication system running from Street “R” road station 76+50 to 93+50, communication system running along Street”S”;
communication system running to and into the EMF site;
communication system to and including connection to an existing communication ductbank southwest of the site near the South IBCT ACP;communication system wiring running through the new and an existing ductbank system from the site to the BCT3 ADN; coordination with Fort Bliss DPW for connection to the existing utility system for construction trailers;
adjustment of new medium voltage switch settings, coordination with ISEC and NEC for connection to the existing communications system and other items as defined in the contract documents. This item should not include the work specifically called for in Bid Option 1, 2, 8, 9 and 10, but must be installed in an manner that allows the installation of Bid Options 1, 2, 8, 9 and 10 whether those options are selected or not. 1 LS *** $__________
Section 00 11 00 Page 3
0002 Operation and Maintenance Manuals for the Base Bid area and all awarded option areas. 1 LS *** $ 5,000.00
0003 Final Record Drawings in AutoCAD for the Base Bid and all awarded option areas. 1 LS *** $ 20,000.00
BASE BID TOTAL $__ ______
BID OPTION 1
0004 Electrical Distribution
Bid Option 1 The work consists of providing materials, equipment, and labor for the construction of the Electric Distribution System for the Industrial Complex that is indicated as Bid Option 1 work on the construction documents; and other items as defined in the contract documents. This work is primarily located as shown on Sheet G-303 of the contract documents, interconnecting the pieces of the Bid Option 8 power ductbank system. This work must be installed in a manner that allows the installation of Bid Option 2, whether Bid Option 2 is selected or not. 1 LS *** $__________
0005 Communication System
Bid Option 1 The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Communication System indicated as Bid Option 1 work on the drawings. This work is primarily located as shown on Sheet G-303 of the contract documents, interconnecting the pieces of the Bid Option 8 communication ductbank system. 1 LS *** $__________
BID OPTION 1 TOTAL $__
BID OPTION 2
0006 Electric Distribution System Bid Option 2
The work consists of providing materials, equipment, and labor for the construction of the
Section 00 11 00 Page 4
Electric Distribution System for the Industrial Complex electrical system indicated as Bid Option 2 work on the drawings. This work is primarily located as shown on Sheet G-303 of the contract documents extending the ductbank contract, the 13.8 kv distribution system feeder and providing additional pad-mounted 15kV switchgear.
1 LS *** $__________
BID OPTION 2 TOTAL $__
BID OPTION 3
0007 Reinforced Concrete Paving, (with Integral Curb), in lieu of HMAC paving option.
The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 3 including reinforced concrete pavement with integral curb for all areas up to the transition from a 4-lane divided road to a 2-lane undivided road (just north of the SSA Warehouse sites), in lieu of using the Base Bid specified asphalt pavement and other items as defined in the contract documents. 1 LS *** $__________
BID OPTION 3 TOTAL $__
BID OPTION 4a
0008 Landscape and Urban Design
The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 4A (Landscape and Urban Design) Streetscape from approximately Street “R” road station 92+81.29 to Liberty Avenue and including work on Liberty Avenue median.
Work includes aggregate;
landscape and other items as
Section 00 11 00 Page 5
BID OPTION 4a TOTAL $__
BID OPTION 4b
0009 Landscape and Urban Design
(Bid Option 8 Area) The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 4B (Landscape and Urban design) Streetscape from approximately Street “R” road station 62+57.25 to road station 76+63.87. Work includes aggregate; landscape;
irrigation and other items as
BID OPTION 4b TOTAL $__
BID OPTION 5a
0010 Street lighting The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 5A (Street Lighting). Area of work defined as Street R from approximately road station 85+00 to Liberty Avenue and including work on Liberty Avenue median.
Work to include light poles, light fixtures, wiring, conduit, transformers and connections to existing systems and other items as defined in the contract
BID OPTION 5a TOTAL $__
BID OPTION 5b
0011 Street lighting The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 5B (Street Lighting). Area of work defined as Street “R” from approximately road station
Section 00 11 00 Page 6
62+57.25 to road station 76+63.87. Work to include light poles, light fixtures, wiring, conduit, transformers and connections to existing systems and other items as defined in the contract documents. 1 LS *** $__________
BID OPTION 5b TOTAL $__
BID OPTION 6
0012 Street R (2-lane extension) The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 6 (Street R 2-lane extension) Area of work defined as Street R from Torch Street to Station 62+57.25, including work on Torch Street. Work to include erosion control; clearing and grubbing; grading; paving; storm drainage; signage and striping and street lighting and other items as defined in the contract
BID OPTION 6 TOTAL $__
BID OPTION 7
0013 SCADA System (within the
Substation Switchgear Bldg.)
The work consists of providing materials, equipment, and labor for the construction of the SCADA system within the Substation Switchgear Building as indicated as Bid Option 7 on the construction documents and other items as
BID OPTION 7 TOTAL $__
BID OPTION 8
0014 Street R (4-lane divided roadway) The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 8
Section 00 11 00 Page 7
(Street R 4-lane divided roadway) Work to include Sanitary Sewer Line “SS-2”; as well as erosion control;
clearing and grubbing; grading;
paving; storm drainage; signage and striping; electric duct bank and communications ductbank and other items as defined in the contract documents. Area of work generally defined as Street R from approximately road station 62+57.25 to road station 76+63.87, including the area for truck turn around.
1 LS *** $__________
BID OPTION 8 TOTAL $__
BID OPTION 9
0015 Street R (station 76+63.87 to station 85+00) The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 9.
Work to include erosion control;
clearing and grubbing; grading;
paving; storm drainage; water mains; signage and striping;
light poles, light fixtures, wiring, conduit, and connections to existing systems; landscape edging, aggregate and boulders;
electric duct bank and other items as defined as Bid Option 9 in the contract documents. Area of work generally defined as Street R from approximately road station 76+63.87 to road station
85+00. 1 LS *** $__________
BID OPTION 9 TOTAL $__
BID OPTION 10
0016 Electric Substation (including sitework and access drive) This work consists of providing material, equipment and labor for construction of the electric substation and substation building work consists of coordination with El Paso Electric Company (EPE) for connection to the existing 115 kv EPE system; coordination with
Section 00 11 00 Page 8 the EPE for power and controls to their new EPE Control House, and other items as defined in the contract documents. This work includes, but is not limited to the Substation Building and Building Systems, substation transformer, building transformers, second power feed from Liberty Avenue to EPE Control House, power and communications from the substation to street R, power along street R indicated as Option 10 on the construction documents, medium voltage buss and 115 kv buss structures, feeders, controls and control wiring, battery backup system, interior switchgear, adjusting relay settings, medium and low voltage feeders, lightning protection, exterior lighting, grounding grid, rock, fence, structures, equipment piers, footings and pads. This work also includes anything within the Substation fence that is not specifically included in other bid items. The work does not include the installation of ground grid, rock, 115kV bus, 115kV circuit breakers, EPE control house and associated foundations inside the 115kV substation yard fence.
Contractor is responsible for installation of the medium voltage feeders to the EPE control house service transformers, control wiring interface to the EPE control house, rough grading inside the 115kV substation yard fence and for installing the 115kV yard fencing as detailed on the documents. This work also includes all associated site work not within the 115kV substation fence, including but not necessarily limited to, clearing and grubbing; erosion control, rough and fine grading of the substation and full construction of the access drive from Street “R” to the substation fence line. Option 10 eliminates the need for the connection to the existing overhead power source near the south, IBCT ACP, price din the Base Bid. The price of this connection should be deducted
Section 00 00 10.02 Page 9 from the total price of Bid Option 10. 1 LS *** $__________
BID OPTION 10 TOTAL $__
TOTAL BID AMOUNT FOR BASE BID PLUS ALL OPTIONS $__
Section 00 00 10.02 Page 10
INDUSTRIAL COMPLEX INFRASTRUCTURE
PN 69286
BIDDING SCHEDULE (cont)
NOTES:
1. ARITHMETIC DISCREPANCIES (EFARS 14.407-2)
(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by bidders:
(1) Obviously misplaced decimal points will be corrected;
(2) In case of discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
and
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends his bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
2. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
3. Bidders must bid on all items.
4. Costs attributable to Division 01 - General Requirements are assumed to be prorated among bid items listed.
5. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.
Section 00 00 10.02 Page 11
INDUSTRIAL COMPLEX INFRASTRUCTURE
PN 69286
BIDDING SCHEDULE (cont)
NOTES: (cont)
6. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
(a) Except when it is determined in ac cordance with FAR 1 7.206(b) not to b e in the Government's best interests, the Government will evaluate offers for award purposes by a dding the total pri ce for all options to the total pric e for the basic requirement. E valuation of options will not obligate the Government to exercise the option(s).
(b) The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities.
An offer is unbala nced when it is bas ed on prices significantly less than cost for some work and prices which ar e significantly overstated for other work.
7. EXERCISE OF OPTIONS (SWDR 715-1-1 (16 January 1996))
The Government reserves the right to exercise the option(s) by written notice to the Contractor either singularly or in any combinati on for up to 120 calendar days after award of the Ba se Bid without an increase in the Offeror's Bid Price. Completion of ad ded items shall cont inue at the same schedule as the Base Bid unless otherwise noted in Section 01000 CONSTRUCTION SCHEDULE, paragraph 1 entitled SCHEDULE.
8. ABBREVIATIONS
For the purpose of this solicitation, the units of measure are represented as follows:
a. LS (lump sum)
(AM#0005) 9. AVAILABILITY OF FUNDS (APR 1984) (FAR 52.232-18) Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. (/AM#0005)
END OF BIDDING SCHEDULE
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 51 PAGES
INDUSTRIAL COMPLEX INFRA (PN69286)/VMF (PN68305) & EMF (PN68993)
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 33 29.10 SD-01 Preconstruction Submittals
1.4 GLEED Implementation Plan
SD-11 Closeout Submittals
1.5 GLEED Documentation Notebook
01 56 20 SD-01 Preconstruction Submittals
3.1 GDust Control
2.1 GProducts and Procedures
SD-02 Shop Drawings 1.6Recordkeeping
01 57 23 SD-01 Preconstruction Submittals 1.3.2Storm Water Pollution Prevention
Plan 3.1Storm Water Pollution Prevention
Plan 1.3.2Storm Water Notice of Intent
SD-07 Certificates 2.1.3Mill Certificate or Affidavit
01 57 24.00 44 SD-01 Preconstruction Submittals
5.6 GStorm Water Pollution Prevention
Plan 11.2Notice of Termination 11.2Notice of Termination
G; PER-EE
01 74 19 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 51 PAGES
01 74 19 1.6 GWaste Management Plan SD-07 Certificates
1.7 GWaste Diversion Report
SD-11 Closeout Submittals
1.7Records 01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan 1.5Spare Parts Data
SD-08 Manufacturer’s Instructions 1.6Preventative Maintenance 1.6Inspection 1.7.1Instructions
SD-10 Operation and Maintenance Data
1.8Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.3.1Record Drawings 1.3.1.1Record Drawings
02 41 00 SD-01 Preconstruction Submittals
1.9 GExisting Conditions
SD-07 Certificates
1.2.1 GDemolition Plan
03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 51 PAGES
03 15 00.00 10 2.2Waterstops SD-04 Samples
2.3.2Field-Molded Type SD-07 Certificates
2.2Preformed Expansion Joint Filler 2.3Sealant 2.2Waterstops
03 20 00.00 10 SD-02 Shop Drawings
3.1 GReinforcement
SD-03 Product Data 1.3.1Welding
SD-07 Certificates 2.2Reinforcing Steel
03 30 00.00 10 SD-03 Product Data Part 2Recycled Content Products 1.2Portland Cement 3.2.1Ready-Mixed Concrete 3.4.4.1Vapor Barrier 2.6Latex Bonding Agent 2.3Chemical Admixtures 2.7Epoxy Resin
SD-06 Test Reports
3.10 GTesting and Inspection for CQC
SD-07 Certificates 1.4Qualifications
03 30 53 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 51 PAGES
03 30 53 3.1.1Steel Reinforcement Drawings 1.5Installation Drawings
SD-03 Product Data 2.1.3.1Air-Entraining Admixture 2.1.3.1Air-Entraining Admixture 2.1.3.2Water-Reducing or Retarding
Admixture 2.1.11Curing Materials 2.1.6Expansion Joint Filler Strips, Premolded 2.1.7Waterstops 2.5.1Waterstops 3.2Conveying and Placing Concrete 2.1.8Formwork 2.4Forms 2.2Ready-Mix Concrete 2.2Mix Design Data 2.2Fly Ash 2.5Accessories 2.5.3Curing Compound 3.4.3.4Measurement of Floor
Tolerances 2.5.4Drilled-In Anchors
SD-06 Test Reports 2.1.2Aggregates 1.3.3Concrete Mixture Proportions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 51 PAGES
03 30 53 3.11Compressive Strength Testing 3.11Slump
SD-07 Certificates 2.1.1Cementitious Materials 2.1.2Aggregates 2.2Bill of Lading
03 40 00.00 10 SD-01 Preconstruction Submittals 1.5.2.2Quality Control Procedures
SD-02 Shop Drawings
1.4.1 GStandard Precast Units
1.4.2 GCustom-Made Precast Units
SD-03 Product Data 1.4.1Standard Precast Units 1.4.3Proprietary Precast Units 3.1.3Embedded Items 2.1.9Accessories
SD-05 Design Data 1.4.2Design Calculations 1.4.5.1Concrete Mix Proportions
SD-06 Test Reports 1.5.2.2Test Reports
SD-07 Certificates 1.5.2.2Quality Control Procedures
04 20 00 SD-03 Product Data
2.1 GConcrete Masonry Units (CMU)
2.5 GWater-Repellant Admixture
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 51 PAGES
04 20 00 SD-05 Design Data
1.2.1.1 GUnit Strength Method
SD-07 Certificates 2.1Concrete Masonry Units (CMU) 2.10Expansion-Joint Materials 2.8Joint Reinforcement 2.9Reinforcing Steel Bars and Rods 2.2Masonry Cement 2.4.1Admixtures for Masonry Mortar 2.6.1Admixtures for Grout
SD-08 Manufacturer’s Instructions 2.2Masonry Cement
05 05 23 SD-03 Product Data
1.5 GWelding Procedure Qualifications
1.5.5Welder, Welding Operator, and
Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures
SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination
SD-07 Certificates 1.5.1Certified Welding Procedure
Specifications (WPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 51 PAGES
05 05 23 1.5.1Certified Brazing Procedure Specifications (BPS)
1.5.1Certified Procedure Qualification Records (PQR)
1.5.1Certified Welder Performance Qualifications (WPQ)
1.5.1Certified Brazer Performance Qualifications (BPQ)
05 12 00 SD-02 Shop Drawings
1.6.2.2 GErection Plan
1.6.1 GFabrication drawings
SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.5Load indicator washers 2.3.2Non-Shrink Grout 2.2.6Load indicator bolts
SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers
SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 1.4AISC Quality Certification 1.6.2.1Overhead, top running crane rail beam
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 51 PAGES
05 12 00 1.6.2.3Welding procedures and qualifications
05 21 19 SD-01 Preconstruction Submittals 1.5.2Welder qualification 1.5.2Material Safety Data Sheet
SD-02 Shop Drawings
1.5.1 GSteel joist framing
SD-06 Test Reports 3.4.1Erection inspection 3.4.1Welding inspections
SD-07 Certificates 2.1Accessories 1.5.2Certification of Compliance
05 30 00 SD-02 Shop Drawings 1.3.4Fabrication Drawings 2.3.1.3Metal Closure Strips
SD-03 Product Data 2.2Accessories 2.3.1.1Cant Strips 2.1.6Flexible Closure Strips 2.3Flexible Closure Strips 2.1.5Galvanizing Repair Paint 2.1.4Joint Sealant Material 2.3Metal Roof Deck Units 2.3.1.2Ridge and Valley Plates 1.3.2Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 51 PAGES
05 30 00 1.3.2Welding Equipment 1.3.2Welding Rods and Accessories
SD-07 Certificates 1.3.2Welding Procedures 1.3.3.1Wind Storm Resistance
05 50 13 SD-02 Shop Drawings
2.3 GFloor gratings
2.4 Gangles and plates
05 51 00 SD-02 Shop Drawings 2.1Iron and Steel Hardware 2.1Steel Shapes, Plates, Bars and
Strips 2.16Metal Stair System
SD-03 Product Data 2.2Structural Steel Plates, Shapes, and Bars 2.3Structural Steel Tubing 2.6Hot-Rolled Carbon Steel Sheets and Strips 2.5Cold Finished Steel Bars 2.4Hot-Rolled Carbon Steel Bars 2.7Cold-Rolled Carbon Steel Sheets 2.8Galvanized Carbon Steel Sheets 2.9Cold-Drawn Steel Tubing 2.14Masonry Anchorage Devices 2.17Protective Coating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 51 PAGES
05 51 00 SD-07 Certificates 1.3Welding Procedures 1.3Welder Qualification
SD-08 Manufacturer’s Instructions 2.2Structural Steel Plates, Shapes, and Bars 2.3Structural Steel Tubing 2.6Hot-Rolled Carbon Steel Sheets and Strips 2.5Cold Finished Steel Bars 2.4Hot-Rolled Carbon Steel Bars 2.7Cold-Rolled Carbon Steel Sheets 2.8Galvanized Carbon Steel Sheets 2.9Cold-Drawn Steel Tubing 2.17Protective Coating 2.14Masonry Anchorage Devices
05 52 00 SD-02 Shop Drawings 2.1Iron and Steel Hardware 2.1Steel Shapes, Plates, Bars and
Strips 2.11Steel Railings and Handrails
SD-03 Product Data 2.2Structural Steel Plates, Shapes, and Bars 2.3Structural Steel Tubing 2.4Cold-Drawn Steel Tubing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 51 PAGES
05 52 00 2.7Masonry Anchorage Devices 2.10Protective Coating 2.11Steel Railings and Handrails
SD-07 Certificates 1.3Welding Procedures 1.3Welder Qualification
SD-08 Manufacturer’s Instructions 2.2Structural Steel Plates, Shapes, and Bars 2.3Structural Steel Tubing 2.4Cold-Drawn Steel Tubing 2.10Protective Coating 2.7Masonry Anchorage Devices 2.11Steel Railings and Handrails
06 10 00 SD-02 Shop Drawings
2.2.1 GNailing Strips
3.2.1.1 GNailing Strips
3.2.1.1 GNailing Strips
SD-06 Test Reports 1.4.3Preservative-treated
SD-07 Certificates 1.9.1Certificates of grade 1.7Preservative treatment
07 22 00 SD-03 Product Data
2.4 GFasteners
2.1 GInsulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 51 PAGES
07 22 00 3.4Certification SD-06 Test Reports
1.4.1Flame spread and smoke developed ratings
SD-07 Certificates 1.3qualifications
SD-08 Manufacturer’s Instructions 2.4fasteners 2.1insulation
07 53 23 SD-02 Shop Drawings 1.3.1Roof Plan Drawing 1.3.1Wind Load Calculations 1.3.1Boundaries of Enhanced
Perimeter 1.3.1Corner Attachments of Roof
System Components 1.3.1Location of Perimeter
Half-Sheets 1.3.1Spacing of Perimeter, Corner, and Infield Fasteners 1.3.1Slopes and Drain Locations
SD-03 Product Data 2.2Cement
2.1.1 GEPDM Sheet
2.1.2Seam Tape 2.1.4Bonding Adhesive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 51 PAGES
07 53 23 2.1.3Lap Splice Adhesive 2.1.6Water Cutoff Mastic/Water Block 2.1.5Lap Cleaner, Lap Sealant, and
Edge Treatment 3.3Flashings 2.1.7Flashing Accessories 2.1.7.1Flashing Tape 2.1.8Fasteners and Plates 2.1.11Roof Insulation
1.8 Gwarranty
SD-05 Design Data
1.4.4 GWind Uplift Calculations
SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator
1.4.4 GWind Uplift Resistance
1.4.3 GFire Resistance
SD-08 Manufacturer’s Instructions
3.2 GApplication
3.2.3 GApplication Method
3.3.2 GMembrane Flashing
2.1.2Seam Tape 3.2.4Tape Seams / Lap Splices 3.2.5Adhesive Seams / Lap Splices 3.2.6Perimeter Attachment 3.2.4Primer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 51 PAGES
07 53 23 1.6 GCold Weather SD-11 Closeout Submittals
1.8Warranty 3.8Information Card 3.7Instructions To Government
Personnel 07 60 00 SD-02 Shop Drawings
3.1.2 GGutters
3.1.3 GDownspouts
3.1.1 GFascias
3.1.4 GFlashing at roof penetrations
SD-11 Closeout Submittals 3.4Quality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping Materials
SD-07 Certificates 2.1Firestopping Materials
1.4 GInstaller Qualifications
3.3 GInspection
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 51 PAGES
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.5Weatherstripping
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.5Weatherstripping
08 33 23 SD-02 Shop Drawings 2.1Overhead Coiling Doors 1.6Counterbalancing Mechanism 2.3Counterbalancing Mechanism 1.6Manual Door Operators 2.4Manual Door Operators 2.1.2Bottom Bar 1.5Guides 2.3.1Mounting Brackets 2.1.6Overhead Drum 1.6Hood 1.6Painting 1.5Installation Drawings
SD-03 Product Data 2.1Overhead Coiling Doors 2.2Hardware
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 51 PAGES
08 33 23 1.6Counterbalancing Mechanism 2.3Counterbalancing Mechanism 1.6Manual Door Operators 2.4Manual Door Operators
SD-05 Design Data 2.1Overhead Coiling Doors 2.2Hardware 1.6Counterbalancing Mechanism 2.3Counterbalancing Mechanism 1.6Manual Door Operators 2.4Manual Door Operators
SD-10 Operation and Maintenance Data
1.5Operation and Maintenance Manuals
1.6Overhead Coiling Door Assemblies
1.6Materials 1.6Devices 1.6Procedures 1.6Manufacture's Brochures 1.6Parts Lists 3.2.2Cleaning
08 71 00 SD-02 Shop Drawings
1.5 GHardware schedule
2.3.7 GHardware schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 51 PAGES
08 71 00 2.3.4Keying system SD-03 Product Data
2.3 GHardware items
SD-08 Manufacturer’s Instructions
3.1Installation SD-10 Operation and Maintenance Data
1.5 GHardware Schedule
2.3.7 GHardware Schedule
SD-11 Closeout Submittals 1.3Key Bitting
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data 2.1.1Glass Mat Gypsum Sheathing 2.1.4Accessories
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets
SD-10 Operation and Maintenance Data
2.1Manufacturer maintenance instructions
09 67 23.13 SD-02 Shop Drawings
1.3 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 51 PAGES
09 67 23.13 1.3 GFabrication Drawings SD-03 Product Data
1.3.1 GManufacturer's Catalog Data
2.1.2Cured Epoxy Binder 2.1.1Epoxy-Resin Binder/Matrix 2.1.3Aggregate 2.1.4Surface Sealing Coat
SD-04 Samples
1.4.2 GHardboard Mounted Epoxy
Flooring SD-05 Design Data
1.3.2 GDesign Mix Data
2.1.1 GEpoxy-Resin Binder/Matrix
SD-06 Test Reports
1.4 GRecords of Inspection
SD-07 Certificates 1.4.1Listing of Product Installations 1.4Referenced Standards
Certificates
3.6 GWarranty
09 90 00 SD-03 Product Data 2.1Materials
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets SD-04 Samples
SUBMITTAL REGISTER
CONT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .