Utility Feed Industrial COmplex Infrastructure Federal contract opportunity
Solicitation number
W9126G11R0188
Issued by
Department of the Army Corps of Engineers Engineering District Fort Worth

View the file

Other files for this federal contract opportunity

Other files attached to Utility Feed Industrial COmplex Infrastructure, newest first.
File Type Posted
am6_dwgs_vol3.pdf PDF
am_6.pdf PDF
am6_dwgs_vol2.pdf PDF
am6_dwgs_vol4.pdf PDF
am6_dwgs_vol5.pdf PDF
am6_dwgs_vol1.pdf PDF
am_5.pdf PDF
am_4.pdf PDF
am4_geotech.pdf PDF
am_3.pdf PDF
drawings_am3.pdf PDF
Volume2_Combined.pdf PDF
g11r0188.pdf PDF
Volume3_Combined.pdf PDF
Volume1_Combined.pdf PDF
am1_Volume5.pdf PDF
am1_Volume4.pdf PDF
am1_Volume3.pdf PDF
am1_Volume2.pdf PDF
am1_Volume1.pdf PDF
am_1.pdf PDF
g11r0188.zip ZIP file
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for Industrial Complex Infrastructure PN69286, Fort Bliss Texas, is amended as follows:

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is 12 October 2011, 2:00 p.m., local time, as previously announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G-11-R-0188

X 9B. DATED (SEE ITEM 11)

12-Sep-2011

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Sep-2011

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G-11-R-0188

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. Replacement Sections - Replace the following sections with the accompanying new sections of the same number and title, bearing the notation "ACCOMPANYING AMENDMENT NO. 0002 TO

SOLICITATION NO. W9126G-11-R-0188” :

00 11 00 – CONTRACT LINE ITEM SCHEDULE

2. The following paragraph has been added to Section 00 21 00 – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS :

SUBCONTRACTING PLAN/ SUBCONTRACTING GOALS REGARDING THE UTILIZATION OF

SMALL BUSINESS CONCERNS

(a) Application. This clause applies to all offerors submitting proposals.

(b) Federal Acquisition Regulations (FAR). Attention is directed to the following FAR and DFARS provisions contained in this solicitation:

52.219-8, Utilization of Small Business Concerns (Alternate I)

52.219-9, Small Business Sub Contracting Plan (Alternate I) (applies only to Large Business)

52.219-16, Liquidated Damages – Small Business Subcontracting Plan (applies only to Large Business)

252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns

(c) Goals. The U.S. Army Corps of Engineers considers the following goals reasonable and achievable for the performance of the resultant contract:

(i) [SB] % of subcontracted amount contract amount with small business concerns.

(ii) [SBD] % of subcontracted amount contract amount with those small business concerns owned and controlled by socially and economically disadvantaged individuals.

(iii) [WOB] % of subcontracted amount contract amount with those small business concerns owned and controlled by women.

(iv) [SDV] % of subcontracted amount contract amount with those small business concerns owned and controlled by Service-Disabled Veterans.

(v) [HUB] % of subcontracted amount contract amount with those small business concerns owned and controlled by HUBZones.

(vi) [MIBC] % of subcontracted amount contract amount with those minority institutions and historically black colleges and universities

W9126G-11-R-0188

3. New Attachments – The following attachmenst have been added to this solicitation, bearing the notation "ACCOMPANYING AMENDMENT NO. 0002 TO SOLICITATION NO. W9126G-11-R- 0188” :

Southwestern Division FY2011 Small Business Goals Map for Pre-Proposal meeting

End of Summary of Changes

INDUSTRIAL COMPLEX INFRASTRUCTURE (PN 69286) DP 113

Section 00 00 10.02 Page 1

SECTION 00 00 10.02

BIDDING SCHEDULE

INDUSTRIAL COMPLEX INFRASTRUCTURE

PN 69286

FORT BLISS, TEXAS

BIDDING SCHEDULE

Item No. Description Quantity Unit Unit Price Amount

INFRASTRUCTURE BASE BID

0001 The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Base Bid including preparation, implementation and maintenance of a Master SWPPP for the overall project area, installation/maintenance of erosion control devices;

retention pond excavation;

existing pavement, sidewalk, curb and gutter demolition;

existing utility demolition and or relocation; sign relocation;

grading for roadways, substation yard, substation access drive and POV lots; installation of proposed utility systems (water, gas, sanitary sewer, storm drainage, electric and communication concrete duct banks); paving for roadways, organizational and POV lots;

street lighting and site lighting for Organizational and POV lots; striping; signage;

permanent fencing; temporary construction fencing; temporary traffic control; aggregate;

landscape; irrigation;

coordination of work and schedules with multiple ongoing separate contracts and other items defined in the contract documents. 1 LS *** $__________

0002 Electric Distribution System The work consists of providing materials, equipment, and labor for the construction of the Electric Distribution System for the Industrial Complex Infrastructure Base Bid;

including installation of proposed electric distribution system located outside the

ACCOMPANYING AMENDMENT NO. 0002 TO SOLICITATION NO. W9126G-11-R-0188

Section 00 00 10.02 Page 2 substation fence; coordination with Fort Bliss DPW for connection to the existing utility system for construction trailers; adjustment of new medium voltage switch settings and other items as defined in the contract documents. This item should not include the work specifically called for in Bid Option 1 and 2, but must be installed in an manner that allows the installation of Bid Options 1 and 2 whether those options are selected or not. 1 LS *** $__________

0003 Electric Substation The work consists of providing materials, equipment, and labor for the construction of the Electrical Substation for the Industrial Complex Infrastructure Base Bid;

coordination with El Paso Electric Company (EPE) for connection to the existing 115 kv EPE system; coordination with the EPE for power and controls to their new EPE Control House, and other items as defined in the contract documents. This work includes, but is not limited to the substation transformer, building transformers, medium voltage buss and 115 kv buss structures, feeders, controls and control wiring, battery backup system, interior switchgear, medium and low voltage feeders, lightning protection, exterior lighting, grounding grid, rock, fence, structures, equipment piers, footings and pads. This work also includes anything within the Substation fence that is not included in the Electrical Substation Building and Building System Bid Schedule Item or anything specifically included in other bid items. The work does not include the installation of ground grid, rock, 115kV bus, 115kV circuit breakers, EPE control house and associated foundations inside the 115kV substation yard fence.

Contractor is responsible for installation of the medium voltage feeders to the EPE control house service transformers, control wiring

Section 00 00 10.02 Page 3 interface to the EPE control house, rough grading inside the 115kV substation yard fence and for installing the 115kV yard fencing as detailed on the documents. 1 LS *** $__________

0004 Electric Substation Building and Building Systems The work consists of providing materials, equipment, and labor for the construction of the Substation Building and Building Systems, as part of the Industrial Complex Infrastructure Base Bid; and other items as defined in the contract documents. This work includes, but is not limited to, the substation building, HVAC, building lighting, building power, and eye wash. 1 LS *** $__________

0005 Communication System The work consists of providing materials, equipment, and labor for the construction of the Communication System for the Industrial Complex Industrial Complex Infrastructure Base Bid;

installation of proposed communication system;

coordination with ISEC and NEC for connection to the existing system and other items as defined in the contract documents. This work must be installed in a manner that allows the installation of Bid Option 1 whether Bid Option 1 is selected or not. 1 LS *** $__________

0006 Operation and Maintenance Manuals for the Base Bid area and all awarded option areas. 1 LS *** $ 5,000.00

0007 Final Record Drawings in AutoCAD for the Base Bid and all awarded option areas. 1 LS *** $ 20,000.00

BASE BID TOTAL $__ ______

BID OPTION 1

0008 Electrical Distribution Bid Option 1

The work consists of providing materials, equipment, and labor

Section 00 00 10.02 Page 4 for the construction of the Electric Distribution System for the Industrial Complex that is indicated as Bid Option 1 work on the construction documents; and other items as defined in the contract documents. This work is primarily located on the west side of the site, interconnecting the pieces of the Base Bid power ductbank system. This work must be installed in a manner that allows the installation of Bid Option 2, whether Bid Option 2 is selected or not. 1 LS *** $__________

0009 Communication System Bid Option

The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Communication System indicated as Bid Option 1 work on the drawings. This work is primarily located on the west side of the site, interconnecting the pieces of the Base Bid communication ductbank system. 1 LS *** $__________

BID OPTION 1 TOTAL $__

BID OPTION 2

0010 Electric Distribution System Bid Option 2 The work consists of providing materials, equipment, and labor for the construction of the Electric Distribution System for the Industrial Complex electrical system indicated as Bid Option 2 work on the drawings. This work is primarily located on the west side of the site extending the ductbank, the 13.8 kv distribution system feeder and providing additional pad-mounted 15kV switchgear.

1 LS *** $__________

Section 00 00 10.02 Page 5

BID OPTION 2 TOTAL $__

BID OPTION 3

0011 Reinforced Concrete Paving (with Integral Curb) in lieu of HMAC paving option.

The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 3 including reinforced concrete pavement with integral curb for all areas up to the transition from a 4-lane divided road to a 2-lane undivided road (just north of the SSA Warehouse sites), in lieu of using the Base Bid specified asphalt pavement and other items as defined in the contract documents. 1 LS *** $__________

BID OPTION 3 TOTAL $__

BID OPTION 4

0012 Landscape and Urban Design The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 4 (Landscape and Urban design) including aggregate; landscape;

irrigation and other items as defined in the contract documents. 1 LS *** $__________

BID OPTION 4 TOTAL $__

BID OPTION 5

0013 Street lighting The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 5 (Street Lighting). Area of work defined as Street R from Station 62+57.25 to Liberty Avenue. Work

Section 00 00 10.02 Page 6 to include light poles, light fixtures, wiring, conduit, transformers and connections to existing systems and other items as defined in the contract documents. 1 LS *** $__________

BID OPTION 5 TOTAL $__

BID OPTION 6

0014 Street R (2-lane extension) The work consists of providing materials, equipment, and labor for the construction of the Industrial Complex Infrastructure Bid Option 6 (Street R 2-lane extension) Area of work defined as Street R from Torch Street to Station 62+57.25. Work to include erosion control; clearing and grubbing; grading; paving; storm drainage; signage and striping and street lighting and other items as defined in the contract documents. 1 LS *** $__________

BID OPTION 6 TOTAL $__

BID OPTION 7

0015 SCADA System (within the Substation Switchgear Bldg.)

The work consists of providing materials, equipment, and labor for the construction of the SCADA system within the Substation Switchgear Building as indicated as Bid Option 7 on the construction documents and other items as defined in the contract documents. 1 LS *** $__________

BID OPTION 7 TOTAL $__

TOTAL BID AMOUNT FOR BASE BID PLUS ALL OPTIONS $__

Section 00 00 10.02 Page 7

INDUSTRIAL COMPLEX INFRASTRUCTURE

PN 69286

FORT BLISS, TEXAS

BIDDING SCHEDULE (cont)

NOTES:

1. ARITHMETIC DISCREPANCIES (EFARS 14.407-2)

(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by bidders:

(1) Obviously misplaced decimal points will be corrected;

(2) In case of discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

and

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends his bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

2. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

3. Bidders must bid on all items.

4. Costs attributable to Division 01 - General Requirements are assumed to be prorated among bid items listed.

5. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

Section 00 00 10.02 Page 8

INDUSTRIAL COMPLEX INFRASTRUCTURE

PN 69286

FORT BLISS, TEXAS

BIDDING SCHEDULE (cont)

NOTES: (cont)

6. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

(a) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(b) The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities.

An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

7. EXERCISE OF OPTIONS (SWDR 715-1-1 (16 January 1996))

The Government reserves the right to exercise the option(s) by written notice to the Contractor either singularly or in any combination for up to 120 calendar days after award of the Base Bid without an increase in the Offeror's Bid Price. Completion of added items shall continue at the same schedule as the Base Bid unless otherwise noted in Section 01000 CONSTRUCTION SCHEDULE, paragraph 1 entitled SCHEDULE.

8. ABBREVIATIONS

For the purpose of this solicitation, the units of measure are represented as follows:

a. LS (lump sum)

END OF BIDDING SCHEDULE

(AM#0002)

9. AVAILABILITY OF FUNDS (APR 1984) (FAR 52.232-18)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. (/AM#0002)

END OF BIDDING SCHEDULE

INDUSTRIAL COMPLEX INFRA (PN69286)/VMF (PN68305) & EMF (PN68993) DP113

SECTION 01 00 50

SCOPE OF WORK

08/2008

PART 1 GENERAL

1.1 INCORPORATED CONTRACT PROVISIONS

All Division 01 - General Requirements portions of the Contractor's master MATOC Contract shall apply to this Task Order unless specifically modified for this RFP.

1.2 PROJECT TITLE AND LOCATION

Industrial Complex Infrastructure Project; Ft. Bliss, Texas

1.3 DESCRIPTION OF WORK

The work consists of providing material, equipment and labor for the construction of the Industrial Complex Infrastructure, which includes prepare/implement / maintain a Master SWPPP for the overall project area, installation/maintenance of erosion control devices; retention pond excavation; existing pavement, sidewalk, curb and gutter demolition;

existing utility demolition and or relocation; sign relocation; grading for roadways, substation yard, substation access drive and POV lots;

installation of proposed utility systems (water, gas, sanitary sewer, storm drainage, electric and communication concrete duct banks); paving for roadways, organizational and POV lots; street lighting and site lighting for Organizational and POV lots; striping; signage; permanent fencing;

temporary construction fencing; temporary traffic control; aggregate;

landscape; irrigation; coordination of work and schedules with multiple ongoing separate contracts and other items defined in the contract documents.

The scope of work includes providing materials, equipment, and labor for the construction of the Electrical Substation for the Industrial Complex Infrastructure Base Bid; coordination with El Paso Electric Company (EPE) for connection to the existing 115 kv EPE system; coordination with the EPE for power and controls to their new UP Control House, and other items as defined in the contract documents. This work includes, but is not limited to the construction of the Substation Building and Building Systems, as part of the substation transformer, building transformers, medium voltage buss and 115 kv buss structures, feeders, controls and control wiring, battery backup system, interior switchgear, medium and low voltage feeders, lightning protection, exterior lighting, grounding grid, rock, fence, structures, equipment piers, footings and pads. This work also includes anything within the Substation fence that is not included in the Electrical Substation Building and Building System Bid Schedule Item or anything specifically included in other bid items. The work does not include the installation of ground grid, rock, 115kV bus, 115kV circuit breakers, EPE control house and associated foundations inside the 115kV substation yard fence. Contractor is responsible for installation of the medium voltage feeders to the EPE control house service transformers, control wiring interface to the EPE control house, rough grading inside the 115kV substation yard fence and for installing the 115kV yard fencing as detailed

SECTION 01 00 50 Page 1 on the documents.

This scope of work includes providing and maintaining the overall Storm Water Pollution Prevention Plan for the entire project area impacted by construction operations under this contract, including base bid and all awarded options. At a minimum, the Contractor shall maintain the overall SWPPP for the entire contract duration listed below unless specific areas are released from the Contractor's responsibility by the Contracting Officer's Representative prior to the listed duration.

There are Seven Bid Options associated with this project. Refer to the Project Bid Schedule for complete break down of work associated with the Base Bid and each Bid Option.

1.4 PERIOD OF PERFORMANCE

All performance periods listed are in calendar days from the date of Notice to Proceed (NTP) for the project. The performance period to complete all work associated with this solicitation for each phase or listed work item as shown on the drawings shall be as follows:

A. All material, equipment and labor required for the construction of the Industrial Complex Infrastructure Base Bid, Bid Option 1, Bid Option 2, Bid Option 3, Bid Option 4, Bid Option 5, Bid Option 6 and Bid Option 7 - 365 calendar days from NTP..

B. Performance and Payment Bonds shall be provided not later that five

(5) calendar days after Notice To Proceed. This work is defined as Bid Item 001AD.

1.5 CONTRACTOR REQUIREMENTS

See Section 01 00 50.00 44, GENERAL REQUIREMENTS for additional requirements applicable to this Project.

1.6 PHASING REQUIREMENTS AND WORK RESTRICTIONS

a. . Access to project site is subject to base closures for security and military mission execution. Contract time extension without addition cost shall be granted on a day for day basis for periods when the contractor is denied access to the project site due to base closures. See Section 01 32

01.00 10 PROJECT SCHEDULE and Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS in the Master MATOC Contract for additional requirements. The Contractor can access the construction site from the North ACP from Loop 375 into the IBCT Complex; then access the project area from the North ACP via Liberty Avenue.

b. Working hours for this project shall be between 0700 and 1700, Monday through Friday. Requests to work at times other than the stated working hours, including scheduled utility outages discussed below, shall be submitted to the Contracting Officer for approval. Contractor shall not work outside of the above stated working hours without prior written approval of the Contracting Officer. See Section 01 32 01.00 10 PROJECT SCHEDULE in the Master MATOC Contract for additional requirements.

c. . The Contractor shall coordinate any required utility outages with the Contracting Officer. See Section 01 32 01.00 10 PROJECT SCHEDULE in the Master MATOC Contract.

SECTION 01 00 50 Page 2

d. In accordance with this Task Order work the standard work week is 5 days, 8 hours a day. If the Contractor wants to work double shifts on a 5, 6, or 7 day work week; then notify the Government 48 hours in advance. If proper security and oversight can be arranged and no other unforeseen problems prohibit approval, the Government may grant request. Approval is discretionary and not guaranteed.

1.7 REQUIRED COORDINATION

Contractor is advised that coordination with other Contractors and construction projects is required on this project. These other projects may include El Paso Electric's work on the Substation, VMF TEMF Building, EMF TEMF Building, SSA Warehouses and DRMO facility. Coordination is also required with building tenants and Fort Bliss Fire Department. Contractor must maintain Fire Department access to all building 24 hours/7 days a week. The Contractor under this Task Order shall plan all operations so that all other contractors working in the area have continuous access to their project sites at all times. Contractor is also responsible for maintaining access to these other work areas and for providing and maintaining temporary access when construction activities require interruption of the other contractor's primary access. Contractor shall notify all site contractors and affected tenants 14 days prior to any modification of their primary access route to their project site.

1.8 LIQUIDATED DAMAGES

The schedule duration/completion dates are stated in Paragraph 1.4 above.

The Liquidated Damages for each of them are stated below.

A. All material, equipment and labor required for the construction of the Industrial Complex Infrastructure Base Bid, Bid Option 1, Bid Option 2, Bid Option 3, Bid Option 4, Bid Option 5, Bid Option 6 and Bid Option 7 - $1,000.00 per calendar day.

-- End of Section --

SECTION 01 00 50 Page 3

Southwestern Division

FY2011 Small Business Goals

2007 2008 2009 Average 2010 FY2011

% Achieved 07 ‐ 09 YTD Goals

Small Business Achievements 33

SWD 35

Fort Worth District (SWD) 41.29 27.58 25.33 31.4 27.83 30

Galveston District (SWD) 53.91 32.53 50.32 45.6 24.81 35

Little Rock District (SWD) 26.31 44.01 53.57 41.3 54.63 45

Tulsa District (SWD) 32.66 32.01 41.14 35.3 44.66 40

Small Disadvantaged Business 18

SWD 18

Fort Worth District (SWD) 15.05 17.58 17.3 16.6 15.71 17

Galveston District (SWD) 38.87 16.99 19.77 25.2 12.42 18

Little Rock District (SWD) 15.36 31.37 18.8 21.8 34.81 18

Tulsa District (SWD) 24.3 18.36 30.42 24.4 23.83 19

Woman Owned Business 5.8

SWD 6

Fort Worth District (SWD) 4.62 4.08 2.41 3.7 3.81 5.8

Galveston District (SWD) 4.62 5.99 12.43 7.7 8.3 7

Little Rock District (SWD) 1.07 3.57 4.85 3.2 3.17 5

Tulsa District (SWD) 8.24 9.33 6.69 8.1 5.75 6.5

Southwestern Division

FY2011 Small Business Goals

Service‐Disabled Veteran‐Owned 10

SWD 3.2

Fort Worth District (SWD) 0.24 1.41 1.32 1.0 2.68 3

Galveston District (SWD) 5.37 4.28 1.88 3.8 ‐0.34 3

Little Rock District (SWD) 1.25 2.01 11.46 4.9 5.27 5

Tulsa District (SWD) 1.22 3.95 3.72 3.0 2.34 3

HUBZone 10

SWD 10.5

Fort Worth District (SWD) 8.38 7.34 5.9 7.2 12.97 9

Galveston District (SWD) 41.15 22.14 39.75 34.3 17.15 25

Little Rock District (SWD) 14 21.11 13.34 16.2 20.56 15

Tulsa District (SWD) 20.67 34.49 25.87 27.0 24.1 20

HBCU/MI 13

SWD 5

Fort Worth District (SWD) 0 0 0 0.0 0 5

Galveston District (SWD) 0 0 0 0.0 0 5

Little Rock District (SWD) 0 0 0 0.0 0 5

Tulsa District (SWD) 0 32.58 0 10.9 0 5

USACE – BIGGS AREA ENGINEER OFFICE

BIGGS ARMY AIRFIELD

BLDG T-0071

CORNER OF SAPPER STREET & VELEZ STREET

FORT BLISS, TX 79906

915-744-6040 (Receptionist)

El Paso Airport

Founders

Ai rp or t R oa d

Sergeant Major Blvd

Carl’s Jr.

Global Reach Entry Gate

BIGGS AREA OFFICE

Bldg T-0071

Annex Offices

Fred Wilson Blvd

AAFES Gas Station & Mini Mall

N 7-Eleven

Parking

Biggs Main Gate

F o rt B li ss

Biggs Army Airfield

Centennial

AMENDMENT NO. 0002
SUMMARY OF CHANGES
00 11 00 - CONTRACTLINE ITEM SCHEDULE
SOUTHWESTERN DIVISION FY2011 SMALL BUSINESS GOALS
MAP FOR PRE-PROPOSAL MEETING