AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment extends the period of performance for task order 0001. See continuation sheet

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Apr-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-08-R-0246

X 9B. DATED (SEE ITEM 11)

24-Mar-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Apr-2009

CODE

US ARMY ENGINEER DISTRICT MOBILE

P.O. BOX 2288

MOBILE AL 36628-0001

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G-08-R-0246

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO THE TASK ORDER.

Replace the following sections with the attached new sections of the same number and title, each bearing the notation “Amendment No. 0001:”

01 00 00.00 44 CONSTRUCTION SCHEDULE

(TASK ORDER) STATEMENT OF WORK

(End of Summary of Changes)

R and A SATOC US CBP, San Diego Sector BP246 Amendment No. 0001

SECTION 01 00 00.00 44

CONSTRUCTION SCHEDULE

AM#9

PART 1 GENERAL

1.1 SCHEDULE

Commence, prosecute, and complete the work under this contract in accordance with the following schedule and Section 00 72 00 CONTRACT CLAUSES, paragraph COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK and

LIQUIDATED DAMAGES:

Commencement Completion Liquidated of Work of Work Damages (calendar (calendar per calendar Item of Work days) days) day _

(1) All work Within 10 calendar days following receipt of Notice to (AM#9) Proceed 150 60 $1,000.00

(2) Final Record Drawings ** ** **

** Record Drawings: See Section 01 78 02.00 44 CLOSEOUT SUBMITTALS, paragraph titled RECORD DRAWINGS.

1.2 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

See Section 00 72 00 CONTRACT CLAUSES.

1.3 WORK RESTRICTIONS

1.3.1 Working Hours

See the Task Order Statement of Work.

1.3.2 Security Requirements

See Section 00 72 00 CONTRACT CLAUSES.

SECTION 01 00 00.00 44 Page 1

R and A SATOC US CBP, San Diego Sector BP246 Amendment No. 0001

1.4 UTILITIES

1.4.1 Payment for Utility Services

Electricity and potable water will be provided to the Contractor without charge.

1.5.1 Utility Outages

The Contractor shall coordinate all requests for utility outages with the Contracting Officer in writing 7 days prior to date of requested outage.

1.5 STREET CLOSINGS

The Contractor shall coordinate all requests for street closings with the Contracting Officer.

1.6 SITE SAFETY AND HEALTH OFFICER REQUIREMENTS AND QUALIFICATIONS

See Section 01 35 26 Governmental Safety Requirements.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

SECTION 01 00 00.00 44 Page 2

Amendment No. 0009

R and A, CBP, San Diego Sector W9126G-08-R-0246

(Task Order) Statement of Work CBP Horse Feed Building

PTS-3927

AM#9

1. Project Title: Construct a Horse Feed Building

2. Location: Customs and Border Protection (CBP), 1802 Saturn Blvd, Imperial Beach, CA 92154

3. Scope of Work: Provide all labor, materials, equipment, and transportation required to construct a new horse feed building. The contractor shall submit a detailed price proposal and a work plan in accordance with the contract section 01 10 00, SATOC Statement of Work. The work plan shall include a schedule that outlines the construction.

4. Specific Requirements:

a. The building shall be three sided, 60-foot by 20-foot by 15-foot high interior clear height pre-engineered galvanized metal building that will be used for the storage of horse feed.

b. The flooring shall be constructed of 4” minimum thickness, reinforced concrete with 2”x 8” wood covering, the outer board anchored to the concrete.

c. Walls shall have a 12-foot high plywood wainscot.

d. The roof shall be single slope, with slope of 1:12. Trim with two downspouts.

e. The structure shall have lights on both inside and exterior.

f. Provide one outlet on the exterior of the building.

g. Provide option for two 12 foot sliding doors and wall on open side of building

h. Provide shop drawings on the building and foundation, and electrical installation.

i. Provide adequate natural ventilation to the interior, through roof vents and/or openings in the walls, to prevent hay stacks from overheating due to biological or chemical processes.

5. Permits. The contractor shall pay for and obtain all permits required for the successful execution of this project (e.g., air quality permits, building permits, welding permits, burn permits, etc.).

6. Submittals. The Contractor shall submit all data, samples, statements, certificates, qualifications and reports as specified in the contract documents (basic contract guide specifications). The Contractor shall submit sufficient information for the USACE to determine the types and quantities of materials to be used. This may include manufacturer cut sheets and specifications. Submittals must be approved by the Government prior to performance of work. The Government shall have 15 calendar days for review of each submittal. With reference to Basic Specification Section 013300, the contractor is not required to have an independent Registered Professional Engineer review and stamp submittals on this task order. Contractor

Amendment No. 0009

R and A, CBP, San Diego Sector W9126G-08-R-0246

Quality Control review is acceptable. In addition to the above, the following specific items will require submittals:

a. Building structure and foundation drawings

b. Electrical installation drawing

c. Building siding and structural material manufacturer’s data

7. Work Hours. The Government’s regular (normal) working hours are between 6:00 am and 5:00 pm Monday through Friday, except for the following federal holidays:

New Year’s Day, Martin Luther King Jr’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day. Any request to deviate from the normal working hours shall be submitted to the Contracting Officer’s Representative in writing a minimum of 48 hours in advance of the proposed variation.

8. Utility Outages. The existing facility must be able to continue normal operations while the repairs are being made. Therefore, all work must be scheduled in such a way as to minimize impact on the tenant, i.e. minimize the quantity and duration of all system outages.

9. Testing. The Contractor shall perform Quality Control Testing, as appropriate, for each feature of work as specified by the basic contract technical specifications.

10. Performance Time. Reference FAR 52.211-10, “Commencement, Prosecution, and

Completion of Work”. The Contractor shall be required to commence work under this Task Order upon receipt of Notice to Proceed (NTP) in writing. The contractor shall prosecute the work diligently, and complete all work, including final cleanup within (AM#9) 150 60 calendar days from notice to proceed.

11. Liquidated Damages. Reference FAR 52.211-12, Liquidated Damages -

Construction. The liquidated damages for this task order will be $1,000 per day.

12. Magnitude: The magnitude of this task order is between $25,000 and $100,000.

End of (Task Order) Statement of Work

AMENDMENT NO. 0009
SUMMARY OF CHANGES
01 00 00.00 44 - CONSTRUCTION SCHEDULE
(TASK ORDER) STATEMENT OF WORK

File details come from the government source that posted it. Updated .