AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment identif ies questions asked by potential offerors regarding the requirements for this contract / task order and the Government responses to those questions, and revises 52.228-13. See continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Apr-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-08-R-0246

X 9B. DATED (SEE ITEM 11)

24-Mar-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Apr-2009

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G-08-R-0246

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION SF30 - CONTINUATION PAGE

SUMMARY OF CHANGES

This amendment list questions asked by potential offerors and Government responses, which the Government feels may have an impact on proposals, and revises 52.228-13:

1. Is the contractor responsible for the permits on the Horse Feed barn task? This project is on US Navy property.

If a permit is required, the contractor will be required to coordinate its approval. The Government will pay the cost for any required permit. The performance period includes a reasonable amount of time for coordinating permits.

2. Where is the existing power source? Who will be responsible for utility connections and/or coordination and contracts with the utility provider?

The contractor shall provide electrical inside the building, the panel and connection point for existing utility tie-in on the exterior. The Government will be responsible for coordinating with the utility provider and arranging the connection from the existing power source to the building.

3. Are Shop Drawings required as part of the Technical Proposal?

Shop drawings are not required unless the contractor proposes to self-perform fabrication and erection of the metal building. Applicable manufacturer's data and drawings are required for a pre-fab metal building.

4. Do past performance questionnaires count as part of the Technical Proposal?

The Government expects Past Performance Questionnaires to be submitted by other organizations, not the offeror. Past Performance Questionnaires received from prior contract points of contact, not included in Volume II of the proposal submission, will not count against the page limitations for the documents included in Volume II of the proposal submission.

5. What is the minimum and maximum number of performance questionnaires required for this proposal?

There is no minimum or maximum number of performance questionnaires required, however, offerors are highly encouraged to solicit responses from prior contract points of contact for all contracts identified the proposal submission.

6. Can you clarify the term "self-performing"?

The term "self-performing" means "without subcontracting any of the work"

7. Are all Work Plan Submittal items identified in the SATOC SOW to be included with the technical proposal?

The Work Plan is a living document designed to develop throughout the life of a project. Some items will be submitted with the initial proposal, and aid the Government in determining the proposal is adequate. Other items will be submitted at other stages of the project. The Government expectation for the Work Plan Submittal for the initial proposal of this task order is:

1. Table of Contents

2. Work Plan Narrative

3. Schedule

W9126G-08-R-0246

4. Task Order specific Organizational structure

5. Site Specific QC Plan

6. Site Specific Safety Plan

7. Specifications if contractor proposes to self-perform fabrication and erection of metal building.

8. Manufacturer's data and applicable information for pre-fab metal building

7. Will the contractor be responsible for any soils testing and/or sub grade restoration etc.?

No.

SECTION 00 72 00 - CONTRACT CLAUSES

The following has been modified:

52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)

(a) For task orders over $30,000.00 up to $100,000.00, the contractor shall submit one of the following payment protections:

(i) A payment bond.

(ii) An irrevocable letter of credit (ILC).

(iii) Certificates of deposit. The contractor deposits certificates of deposit from a federally insured financial institution with the contracting officer, in an acceptable form, executable by the contracting officer.

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 7 calendar days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(End of clause)

(End of Summary of Changes)