Q & A
| DATE | 3/25/25 |
| Solicitation | PORTABLE TOILET SERVICES |
| RFP TITLE | |
Q&A # REFERENCE
P = PWS
A = Attachment
| G = General | REFERENCE (SOW PARAGRAPH, CLIN STRUCTURE, GFI etc) | QUESTIONS | RESPONSE | PM RESPONSE | |
| 1 | G | | Is there a current incumbent performing service? If so, what is the current | |
| contract award? | | Current contract information may be found at the link below. | | | |
| 3/25/25 | | | | https://www.usaspending.gov/award/CONT_AWD_W9124P20C0021_9700_-NONE-_-NONE- |
| 2 | G | Will there be a site visit? | No |
| 3/25/25 | | | |
| 3 | G | Will you confirm the amount of handwashing stations and |
| toilets you need rented and serviced? | | TE 4 Historical Workload Data reflects the historical averages. Quantities may vary but will not exceed the quantities in Section B of SF 1449. | |
| 3/25/25 | | |
| 4 | G | Will you confirm the amount that is government owned that also |
| needs servicing? | | There is one Government-owned Holding Tank listed in TE 4 that is already in place that will need to be serviced. | |
| 3/25/25 | | |
5 G When pricing, should proposals price according to SF 1449? Each Contract Line Item Number (CLIN) located on pages 4-18 should be priced.
3/25/25
6 P While TECHNICAL EXHIBIT 5 Estimated Workload Data gives some info regarding some events, TECHNICAL EXHIBIT 4 does not indicate those factors such as which units are government owned that require servicing only nor how long servicing will be needed. For the rental units provided by the contractor, the length of time units are required also needs to be specified.
Is it possible to provide a Delivery Schedule to get an idea of the total number of units required during each month, or each event?
For example: Technical Exhibit 4 lists Frisbee Golf with 3 portable toilets to be serviced 2x per week. How long will this be required - 3 month, four months? Since pricing for cleaning is provided on per monthly basis, knowing how long services are required is necessary. TE 3 lists the Contract Line Item Numbers (CLIN) that describe the required services for this solicitation. TE 3 describes the service and length of time required for any Special Events.
The total number of units required for each month is listed in TE 4 Historical Workload Data. Among the listed equipment on TE 4, the Holding Tank is the only Government owned equipment. TE 4 lists stationary units fixed in place year round and require servicing year round.
Events are listed in TE 5. TE 5 lists estimated events and estimated quantities throughout the year. TE 4 lists units that are fixed in place year round.
3/26/25
| 7 | P | TECHNICAL EXHIBIT 4 (TE 4) lists 46 locations where portable toilets, handwash stations and government owned units will be serviced during the period of performance. Is it possible to provide a map to get an idea of where these units will be located? | See RSA Map tab. |
| 3/26/25 | | | |
| 8 | G | Can you clarify what non-contractor owned means? | This is for any holding tank or portable toilet that is not the property of the contractor but is already in place and needing to be serviced. Currently there is only 1 holding tank. |
| 3/26/25 | | | |
| 9 | G | Is Non-scheduled Service an On Call service? | Essentially, yes. It is a service that is not a regularly scheduled service. i.e.- a standard portalet is contracted for 3x per week and they call for a 4th cleaning one week. |
| 3/26/25 | | | |
| 10 | G | Are the quantities for Special Events, Standard 250/Handicapped 20, the number of toilets to be provided? | Yes, that is the number of units, however this is an annual total. The most for any one event is Oktoberfest which is 40 standard(30 portalets and 10 handwash) and 10 handicapped units. |
| 3/26/25 | | | |
11 G Can the portable toilets be a mix of trailer type units and stand alone units as pictured? Reason-Trailers may cost less, and can have all three components in one trailer, wash station, handicap toilet, and men & women separate toilets. Can these be an option to the USG as well?
| See Question 11 tab for related pictures. | | The solicitation is for stand alone units only. |
| 3/28/25 | |
| 12 | G | Will the government provide the water? Electricity? | No |
| 3/28/25 | | | |
| 13 | G | Is waste dumping included on base? | No |
| 3/28/25 | | | |
| 14 | G | Is there a water treatment facility we can use? | No |
| 3/28/25 | | | |
| 15 | G | How many relocations are required each month historically? | Less than one per month. |
| 3/28/25 | | | |
16 G The PWS, TE3, describes the CLINs. The CLINs appear to be only for the services/ cleanings. How would you like us to account for the rental of the actual portable toilet or sink units? The PWS, TE3, describes the CLINs. The CLINs appear to be only for the services/ cleanings. How would you like us to account for the rental of the actual portable toilet or sink units?
| CLINs 0003- 0006 are clear. This question is for the long term unit rentals noted in TE 4 (CLINs 0001 and 0002). | | The rental price of the unit is included within the per service price. This CLIN is only for scheduled services of units in place for at least a month. Use the technical exhibit data to determine number of units and frequencies of service. If you want to calculate a rental price plus service price then it will have to be calculated as an average. example: 20 units @ 2 per week, 10 units @ 3 per week and 15 units @ 5 per week gives you 160 + 120 + 300 = 580 services. Your total price to provide those units and that many services divided by 580 would be your cost per service. unfortunately we are only granted one unit of measure to charge by and this is what we have decided to use. |
| 3/31/25 | |
| 17 | G | Does this contract want a price reflection of 1 FTE? | Contract proposals shall be based on Technical Exhibits included in the RFP and should reflect the appropriate FTE for labor hours necessary to perform the contract requirements. |
| 3/31/25 | | | |
| 18 | G | Standard unit/handwashing station – are all color options available or are specific ones required? | No color is specified in the RFP. |
| 3/31/25 | | | |
| 19 | G | Do handicapped units require a handwashing station? | Handwashing stations are a separate stand alone unit. |
| 3/31/25 | | | |
20 G Are there any specifications regarding the type of handwashing station required?
| • | Free standing or units that go inside the portable toilet | Handwashing stations are a separate stand alone unit. |
| 3/31/25 | |
| 21 | G | Are clin 0001, 1001, 2001, 3001, 4001 guaranteed monthly? | There is no guaranteed monthly minimum. TE 4 shows the monthly workload data. TE 4 could change depending on mission requirements. TE 4 has been the year round units over the previous contract. |
| 3/31/25 | | | |
| 22 | G | Is the quantity of 17,130 the accurate number for clin 0001? | Yes. The quantity is a estimated total not a guaranteed total. |
| 3/31/25 | | | |
| 23 | G | Does the unit amount need to encompass the cost for 1 portable toilet/Handwashing station for rent of 1 month with 8 cleanings for the contractor owned units? | Explanation and an example is provided in TE 3. |
| 3/31/25 | | | |
24 G Do the existing units covered in TE4 cost need to reflect the full month of cleanings or individual cleanings?
| • | Ex: bldg. 7232 has 1 unit and will need to be cleaned 2x per week- does the cost need to reflect the entire month (8 cleanings) or each individual cleaning. | TE 4 are the stationary units that historically are in place year round. The 2x per week cleaning requirement cost should be totaled for the entire year. The unit price should be per individual cleaning. |
| 3/31/25 | |
| 25 | G | What are the specifications for the gallon size of holding tanks? | Gallon size should be in accordance with the specified minimum unit size requirements referenced in Part 5 section 5.1 American National Standard for Sanitation ANSI/PSAI Z4.3-2016 Portable Facility Requirements Part 5 section 5.3. |
| 3/31/25 | | | |
| 26 | G | Is there a requirement of the number of holding tanks, portable toilets, handwash stations, and handicapped portable toilets the contractor must keep in inventory? | There is no inventory requirement. |
| 3/31/25 | | | |
| 27 | G | Are the existing portlets/holding tanks owned by the government? | Yes. Currently the Government owns 1 holding tank. |
| 3/31/25 | | | |
&"-,Bold"&14LOGISTIC SUPPORT FACILITY MANAGEMENT ACTIVITY (LSFMA) REQUEST FOR PROPOSAL (RFP) CONTRACTOR QUESTIONS https://www.usaspending.gov/award/CONT_AWD_W9124P20C0021_9700_-NONE-_-NONE- RSA Map
Question 11 Pictures Trailer 1 Trailer 2
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community image1.emf image2.png image3.png