Attachment 2- Benjamin Complex Design Drawings Revised 15-Jul-22.pdf
PDF 208 KB Posted
- Attached to
- SERE AV Surveillance System
- Solicitation number
- W9124G22R0007
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BENJAMIN COMPLEX
LAYOUT
FORT RUCKER, AL
SERE TAC-X TRAINING FACILITY
FENCED IN AREA- PTZ
VIDEO REQUIRED INSIDE
AND OUTSDIE FENCELINE
K-SHACK- VIDEO AND
AUDIO REQUIRED IN
OFFICE AREA
GUARD SHACK- AUDIO
REQUIRED IN VICINITY
OUTDOOR HUTS- VIDEO
AND AUDIO REQUIRED
(ALL INTERIOR/EXTERIOR
EQUIPMENT CONCEALED
FROM VIEW)
ASSEMBLY AREA- PTZ
VIDEO AND AUDIO
REQUIRED
BENJAMIN COMLEX YARD-
PTZ VIDEO REQUIRED
BENJAMIN COMPLEX
BUILDING- EXTERIOR
VIDEO REQUIRED; SEE
FLOOR PLAN FOR
INTERIOR DETAILS
BENJAMIN COMPLEX
BLDG LAYOUT
FORT RUCKER, AL
SERE TAC-X TRAINING FACILITY
INTERVIEW ROOMS/
MEDICAL EXAM ROOMS-
VIDEO AND AUDIO
REQUIRED
OPEN BAY TRAINING
AREA- PTZ VIDEO AND
AUDIO REQUIRED
ADMIN AREAS- DO NOT
REQUIRE VIDEO OR
AUDIO
| Slide Number 1 |
| Slide Number 2 |
File details come from the government source that posted it. Updated .