Attachment 7 - Section 32 01 16 73 Coal Tar Concentrate Pavement Sealer.pdf

PDF 7 KB Posted

Attached to
IDIQ Paving
Solicitation number
W9124G-20-B-0001
Issued by

About this file

This document provides details on a solicitation for asphalt paving services under an indefinite-delivery, indefinite-quantity contract. The solicitation will be issued on an unrestricted basis and seeks bids for a base period of 12 months from the award date plus four additional one-year option periods. A minimum of $100,000 in work will be required for the base year under firm-fixed price with economic price adjustment terms. The NAICS code is 237310 and small businesses must have average annual receipts of $35.9 million or less to qualify as small. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis is the contracting agency. The bid closing date is March 3, 2020 at 3:00 pm with opening at 3:15 pm. Potential bidders should monitor the SAM.gov website for any amendments to the solicitation package. The point of contact for any questions is the listed contracting specialist.

The attached document provides product specifications for coal tar concentrate pavement sealer, including physical and chemical requirements, installation procedures, and limitations on conditions for application.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 32 01 16 73 Coal Tar Concentrate Pavement Sealer

Description of Work Cost shall cover the furnishing and installing of coal tar sealer on airfield pavements, roads, streets, parking areas, and other general applications. Installation procedures shall be in accordance with the product manufacturer’s recommendations. Demolition and removals of materials shall be as required to support the work.

Submittals required for each type of product indicated.

Products:

Product should be a highly concentrated material intended to be mixed with water and mineral aggregate to form a ready to use pavement sealer. (Polymer additives can be added as an option) Based on 100 gallons for ease of calculations) Coal Tar Concentrate Sealer 100 gals Water 25-50 gals Sealer V. M. Polymer 1-2 gal (optional) Sand 300-500 lbs (30-70 mesh AFS rating)

Physical/Chemical Properties: Coal Tar Concentrate is a premium quality pavement sealer that meets the following material requirements when tested in accordance with ASTM D 140, ASTM D 466, ASTM D 490, ASTM B117, ASTM D 529, ASTM D 2939, and ASTM D244 procedures. Material shall be homogenous and show no separation or coagulation that cannot be overcome by moderate stirring.

Chemical & Physical Analysis -Non Volatiles % 47% Minumum -Ash Non Volatiles % 30-40% -Solubility of Non Volatiles in CS2% 20 Minimum -Specific Gravity 25°C 1.20 Minimum Drying Time 8Hr. Max Adhesion &Resistance to Water No Penetration or Loss of Adhesion Resistance to Heat No Blistering or Sagging Flexibility No Cracking or Flaking Resistance to Impact No Chipping, Flacking or Cracking Resistance to Volatilization 10% Loss in Weight Max.

Wet Film Continuity Smooth, Nongranular Free from Coarse Particles Resistance to Kerosene No Loss of adhesion or penetration P-625 Fuel Resistance Test Pass Evaluation of Fuel Resistance P-630 Fuel Resistance Test Pass Evaluation of Fuel Resistance P-631 Fuel Resistance Test Pass Evaluation of Fuel Resistance

Installation Preparatory Work:

The asphalt surface must be structurally sound, surface cured, and free from all loose or foreign matter prior to the application.

Methods:

Place with mechanical equipment specifically designed for this purpose. Due to the heavy bodied nature of the slurry-mixed, application by means of specialized equipment is required. This equipment can be of two types, high volume positive displacement airless spray or mechanical squeegee. Both types must be capable of keeping material thoroughly mixed and homogenous throughout the application process by continuous agitation. All equipment used must be capable of supplying a sufficient quantity of material for uniform application over the entire width of the application mechanism to provide a uniformly coated surface.

Limitations:

Products shall not be applied when temperatures is expected to drop below 60°F or stricter product requirements at any time within a 24 hour period after applications