IB08_Solicitation Amendment W9124D26QA0130001 SF 30.pdf
PDF 3 MB Posted
- Solicitation number
- W9124D26QA013
About this file
This is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) for a federal electrical installation project issued by the U.S. Army. The amendment includes significant changes to the original solicitation, specifically revising the Statement of Work to modify the electrical base feed quantities from 29 and 3 to thirty-two (32) new 120V electrical base feeds. Key modifications include clarifying that all work must be performed by licensed and certified electricians in accordance with North Chicago, IL local requirements, changing the NAICS code from 561621 to 238210, and shifting the response time zone from G Time Zone to Eastern Standard Time.
The solicitation involves electrical infrastructure work at a facility, with three floor plans to be used together for the full scope of work. The bid closing remains at 11:00 AM on 04 December 2025, and there is no incumbent contractor. The government has responded to several industry questions, including confirming no site visit will be conducted, explaining local licensing requirements, and noting that the construction cost estimate cannot be disclosed. The point of contact is Adam Buchert, and the solicitation includes attachments such as revised floor plans and a revised Statement of Work dated 24 November 2025.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1). Questions from industry with Government Block 14 (Description of Amendment/Modification):
responses are inserted by full text.
2). The Statement of Work is revised as follows:
Para. 1.0: Removed separately listed base feed quantities of 29 and 3. Replaced with "thirty-two (32) new 120V electrical base feeds (MBBF)."
Para. 2.1.2: Replaced 3 electrical base feeds with 32 electrical base feeds. Also clarified the attachment name for Drawing No. 257603888.
Para. 4.0: Clarified that all work shall be performed by electricians who are licensed and certified in accordance with North Chicago, IL local requirements and city ordinances.
Para. 5.0 & 9.0: Replaced 45 base feeds with 32 base feeds.
Attachment A, Row 1: Replaced 16 base feeds (MBBF) + 6 power whips with 3 base feeds (MBBF) + 6 power whips.
3). The NAICS code has changed from 561621 to 238210.
4). The time zone has changed from G time zone to Eastern Standard Time. The actual closing date and time remain unchanged.
5). Point of contact is Adam Buchert, adam.p.buchert.civ@army.mil.
Solicitation/Contract Form Continuation
The following changes have been made:
INFORMATION FROM TO
NAICS Code 561621 238210 Response Due Time Zone G Time Zone (UTC +7) Eastern Standard Time (UTC -5)
List of Contract Documents, Exhibits, or Attachments
The attachments table has changed from:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
IA02_J4 ROOM
127_25760388A - REVISED Floor Plan
Specification 20 Nov 2025 Attachment No
IA02_J3 Revised Floor Plan_2025
Specification 20 Nov 2025 Attachment No
IA02_J1 FINAL
Floor Plan_2025
Specification 20 Nov 2025 Attachment No
0005 Statement of Work Statement of Work 20 Nov 2025 Attachment No
To:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
IA02_J4 ROOM
127_25760388A - REVISED Floor Plan
Specification 20 Nov 2025 Attachment No
IA02_J3 Revised
W9124D26QA0130001
0003 Floor Plan_2025 Specification 20 Nov 2025 Attachment No
IA02_J1 FINAL
Floor Plan_2025
Specification 20 Nov 2025 Attachment No
Statement of Work Revised 24 November 2025
Statement of Work 24 Nov 2025 Attachment No
The following contract documents were added:
Statement of Work Revised 24 November 2025
The following contract documents were deleted:
Statement of Work
Miscellaneous text in this section has been added to:
Questions from Industry with Responses:
1. Will you realize a site visit?
Answer: There are no plans for a site visit, however if you have specific questions about the facility (such as measurements, conditions, etc.) please let us know and we will try to answer them as best we can.
2. Do I need a license from IL in order to bid on this project?
Answer: No. Illinois does not have a statewide electrical contractor license. These licenses are handled at the local level.
This project must be performed by electricians who are licensed and certified in accordance with North Chicago, IL local requirements and city ordinances.
3. Could you please confirm whether one of the three floor plans that are attached is the primary floor plan for the project, or if all three are intended to be used together for the full scope of work?
Answer: All three are intended to be used together for the full scope of work.
4. Is there an incumbent?
Answer: No
5. Could you please clarify the scope and deliverables? The quantities appear inconsistent. The scope describes installation of 29 new 120V electrical base feeds, along with three base feeds for workstation clusters and six modular power whips. However, the deliverables section requires installation of 45 operational base feeds and six power whips.
Can you confirm the correct number of base feeds required for this effort?
Answer: This has been updated. Please see the revised SOW dated 24 November 2025.
6. We are requesting the following information:
a. Plan holders list/bidders list or mandatory prebid list: Answer: None.
b. Confirm that the bid closing date and time are unchanged: Answer: The time zone has changed from
G Time Zone to Eastern Standard Time. The actual closing date and time remain unchanged at 11:00
AM on 04 December 2025.
c. Any addenda that have been released: Answer: Amendment 0001 and a revised SOW have been posted to SAM.
d. Construction cost estimate or a construction cost range for this project: Answer: We cannot provide this information.
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0001 |
| EffDate: 26 NOV 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W9124D |
| AdmCode: |
| IssuedBy: W6QM MICC-FT KNOX |
KO DIRECTORATE OF CONTRACTIN, BLDG 1109B RM 250
FORT KNOX, KY 40121-5000
UNITED STATES
ADAM BUCHERT, EMAIL: ADAM.P.BUCHERT.CIV@ARMY.MIL TELEPHONE: 520-945-9041
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W9124D26QA013 |
| SolDate: 20 NOV 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: AMY L. GAWARECKI |
| ContDate: |
| CODate: 26 NOV 2025 |
File details come from the government source that posted it. Updated .