File Type: Vendor Questions & Answers #1 for a federal contract solicitation
This document contains official responses to 21 vendor inquiries regarding solicitation W9124C-27-Q-A005 for OmniMetrix Cellular Generator Monitors at Fort Jackson. The contract is an IDIQ (Indefinite Delivery/Indefinite Quantity) with a guaranteed minimum of 1 month to 120 months duration and quantities ranging from 1 to 5 units (CLIN 0001) and 1 to 60 units (CLIN 0002), with listed quantities identified as estimates rather than guaranteed purchases. The Period of Performance begins January 1, 2027, and encompasses monitoring services, replacement equipment, activation, shipping, and installation. The Government clarified that equivalent OmniMetrix monitor models are acceptable provided they are compatible with the OmniView portal and supply required generator monitoring data. Existing 14 monitors (with one additional generator coming online) are currently inactive and require activation under the contract.
Key requirements include ensuring all replacement monitors function properly with data recorded and available on OmniView, a 72-hour service technician response time for service calls, and 30-day replacement part availability under normal circumstances. Site access requires contractor personnel to obtain local installation security passes/badges through the Fort Jackson Visitor Control Center; a Common Access Card (CAC) is not required. The solicitation number is W9124C-27-Q-A005 (correcting references to W9124C26QA034), the quotation deadline is November 20, 2026, at 10:00 AM Eastern Standard Time, and no government-led site visit will be conducted due to the expedited schedule. All replacement equipment, activation, shipping, and installation costs must be included in applicable CLIN prices.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OmniMetrix Cellular Generator Monitors
W9124C-27-Q-A005
VENDOR QUESTIONS & ANSWERS #1
Q1. Can the proposed subcontractor team's generator-monitoring experience satisfy Technical Element 1, or must the prime itself show three years in this business? We understand the separate past-performance factor allows a neutral rating.
Response. Please refer to the Solicitation and FAR Clause 52.219-14
Q2. Does the base period begin January 1, 2027 as shown in Section F, or November 1, 2026 as stated in PWS 1.5?
Response. Period of Performance will begin 01January2027 per the Solicitation STANDARD FORM 1449. The PWS 1.5 is updated to reflect the correct date.
Q3. What are the IDIQ guaranteed minimum and maximum? Are the listed quantities estimates, rather than guaranteed purchases?
Response. The IDIQ guaranteed minimum and maximum quantities are as follows:
1 month -120 months 1 each – 5 each 1 each – 60 each
The listed quantities are estimates.
Q4. CLIN 0001 includes incidental hardware replacement, while CLIN 0002 separately prices replacement monitors. Which replacements belong in each line?
Response. Incidental hardware replacements would be included in the total number of monitors. To clarify, we could have up 1 monitor that breaks that need replacement and then potentially still upgrade 4 other monitors if needed.
Q5. Should all proposal labels use W9124C27QA005? The instructions and price file refer to W9124C26QA034.
Response. The solicitation number shown on the SF 1449 and published SAM.gov notice is W9124C27QA005. Offerors should use W9124C27QA005 on proposal labels and correspondence.
Q6. Existing equipment inventory: For each of the approximately 15 installed monitoring systems, could you provide the OmniMetrix monitor model and part number, serial number (if releasable), firmware version, and associated generator make, model, rating (kW/kVA), and controller make/model?
Response. I have a spreadsheet attached (Fort Jackson Generator List 2026) with Generator information, Monitor Unit ID numbers and Controller Type. I only have the serial number and model number for one unit right now. I do not know how to obtain the firmware version.
Q7. Replacement equipment: Is there a required OmniMetrix replacement model or approved part number for the up to five replacement/additional units? Are equivalent models acceptable, and is manufacturer authorization or certification required?
Response. Equivalent models are acceptable provided the monitors are compatible with the omnimetrix portal (OmniView) and provide the data needed to properly monitor the generators.
Q8. Physical and electrical specifications: Could you provide monitor dimensions and mounting arrangement, enclosure/IP or NEMA rating, available mounting space, input supply voltage and power requirements, wiring diagrams, connector/pinout details, harness part numbers and lengths, and any required sensors, antennas, or accessories?
Response. Monitor dimensions are demonstrated in the attached photos. I do not have the other information requested.
Q9. Communications and software: What cellular carrier/network and antenna arrangements are currently used? Are there site-specific signal limitations? What OmniView/OmniMetrix portal licenses, account permissions, activation, data plans, alarm configurations, and historical data retention or transfer requirements apply?
Response. I do not have any information on the cellular carrier network. That is up to the contractor. There is no preference provided cellular coverage is reliable. We are not aware of any site-specific signal limitations. We need to have access to the OmniView portal and have the ability to create logins for uses. We need to be the administrator of the site. We would like to retain access to our historical data. I do not know if there are transfer requirements that apply.
VENDOR QUESTIONS & ANSWERS #1
Q10. Installation conditions: Are there available photographs, as-built drawings, installation locations, equipment schedules, and site-access or work-hour restrictions? Is a pre-bid site visit possible?
Response. I have attached photo of an example of the monitor and antenna. All of the monitors are the same size and similar models. All monitors are installed similarly in the generators. We do not have as-built drawings. I do not understand the question concerning equipment schedules. Site access is controlled and all contractors must be able to pass a background check to enter the installation. Site hours are normal business hours (0800-1600).. I have no issue with a pre-bid site visit if allowed by MICC.
Q11. Scope and quantities: Please clarify whether the five units represent estimated annual replacement quantities or a required initial purchase, whether the existing 15 subscriptions are active and transferable, and whether replacement equipment, activation, shipping, and installation should all be included in the applicable CLIN prices.
Response. The five units is an estimated replacement quantity. We may not replace any monitors in a year or we may replace up to five. The existing 14 (we only have 14 generators now but will have one more coming on- line this year) monitors are currently not active. Yes, the replacement equipment, activation, shipping, and installation should all be included in the applicable CLIN prices.
Q12. Acceptance and service: What functional testing, commissioning, documentation, warranty, and performance criteria will be used to accept replacement monitors? Please confirm the required response times and whether any additional spare inventory must be maintained.
Response. The contractor must show that the monitor is functioning through by ensuring all data is being recorded and is available on OmniView. The installation expects a service technician to respond within 72 hours of a service call. Additional spare inventory is the choice of the contractor. Fort Jackson would expect a replacement part be available within 30 days unless extreme circumstances occur (pandemic, breakdown of supply chain, etc.)
Q13. Drawings and Photographs: Are equipment photographs, wiring diagrams, installation drawings, or site layouts available? If so, please provide them to assist with accurate pricing.
Response. Wiring diagrams, installation diagrams and site layouts are not available.
Photos may be available if given time to acquire.
VENDOR QUESTIONS & ANSWERS #1
Q14. OEM/Compatibility Requirements: Must the contractor maintain the existing OmniMetrix portal and hardware, or are equivalent monitoring solutions acceptable? Is OEM authorization required to maintain the system and provide replacement equipment?
Response. The monitors must be Omnimetrix and the portal must be OmniView.
Q15. CLIN Clarification: Please clarify which repairs and replacement components are included under the monthly monitoring CLIN (0001), which are separately payable under the replacement-unit CLIN (0002), and what qualifies as a separately billable emergency service call (0003).
Response. See Question 4 above.
Q16. Response and Repair Requirements: Please clarify the required technician location within a one-hour drive, the 72-hour on-site response requirement, and how the 30-day repair requirement applies when replacement components are unavailable.
Response. See Question 12 above.
Q17. Site Visit: Will the Government allow a site visit or equipment inspection before quotation submission? If so, please provide the scheduling and registration procedures.
Response: Due to the expedited turnaround schedule for this requirement, no government-led site visit will be conducted.
Q18. Security and Badging: The PWS indicates that badges are not required, while the attached Fort Jackson Vetting Policy identifies contractor badging requirements. Please clarify the applicable policy and whether personnel vetting must be completed before proposal submission or after award.
Response: Per the PWS, a Common Access Card (CAC) is not required, and contractor personnel will not be issued a CAC. For physical access to Fort Jackson, contractor personnel must obtain local installation security passes/badges through the Fort Jackson Visitor Control Center. Detailed badge application procedures and security screening will be coordinated with the awarded contractor following contract award.
Q19. Insurance: The insurance addendum includes medical liability coverage of $1 million per occurrence and $3 million aggregate. Please confirm whether this coverage applies to the generator monitoring services contract.
Response: Please refer to FAR Clause 52.228-5
Q20. Cybersecurity: Please confirm the applicability of DFARS 252.204-7012 and 252.204- 7020 to this requirement and whether any specific cybersecurity certifications or assessment must be submitted with the quotation.
Response: Offerors are advised that all clauses and provisions incorporated by reference or provided in full text within the solicitation carry full legal force and effect. The Government will not provide individual interpretations or mater determinations regarding clause applicability on behalf of prospective contractors. Offers are responsible for reviewing the full text of each referenced clause, including DFARS 252.204-7012 and DFARS 252.204-7020, to determine its applicability, operational terms, conditions, and regulatory obligations as applied to their company and proposed approach.
With respect to proposal preparation, the only documented required for submission are strictly those identified and enumerated in Addendum 52.212-1 (Instructions to Offerors) and Addendum 52.212-2 (Evaluation).
Q21. Submission Deadline: Please confirm the applicable time zone for the quotation deadline of November 20, 2026, at 10:00AM, and advise whether any amendments or official Q&A have changed the submission requirements.
Response: As stated under the General Information section on this announcement, the time zone is Eastern Standard Time (EST). No amendments or official Q&A have changed this submission requirement.