PWS ATC G8 Office Cubicle Upgrade v4 2 Sep 2026.pdf
PDF 1 MB Posted
- Attached to
- ATC G8 Cubicle Office Upgrade
- Solicitation number
- W9124C26QA0220002
About this file
This is a Performance Work Statement (PWS) for the Army Training Center Fort Jackson ATC G8 Office Cubicle Upgrade, effective 09/2/2026.
The contract requires the contractor to provide non-personal services for the disassembly, transfer, and installation of office cubicles at Building 2400, Room 114, located at Fort Jackson, SC 29207. Specifically, the contractor must disassemble 18 existing cubicle workstations (8' x 6'5") and transfer 63 cubicle panels and desk attachments to the G4 DLA warehouse at 1901 Ewell Rd, Fort Jackson, SC 29207 for storage. The contractor must then purchase, deliver, and install 12 new cubicle workstations consisting of 64 new panels, 12 desk attachments, 12 existing door panels, 30 existing panels, 24 standalone cabinets, and 12 hanging shelves. The new cubicles will include 10 workstations measuring 8' x 10'6" and 2 measuring 10'9" x 10'6", all with 85-inch high panel walls. New panels must match the existing Openplan Systems Power Retro Kit model in cream color. Installation includes electrical power (minimum 3 outlets per cubicle) and ethernet connectivity to each workstation. The contractor must also reconfigure an existing conference room using specified panel measurements. Work is performed at Building 2400, Jackson Road, Fort Jackson, SC 29207, with contractor support hours from 0800 to 1530, Monday through Friday, excluding federal holidays. The contractor shall furnish all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary for performance. The Government will provide a Contracting Officer's Representative (COR), existing cubicle stations, and electrical outlet sources. The contractor must submit a Quality Control Plan within 10 days of contract award and provide analysis of quality control within 5 days of completion. Service contract reporting via the System for Award Management (SAM) is required, with all labor hours reported no later than September 30 of the awarded calendar year. The contract includes standard requirements for safety compliance (OSHA standards, fire prevention per AR 420-90), security clearance (not required for unclassified systems), background checks, and multiple training requirements including Anti-Terrorism Level I, OPSEC, iWATCH, and Information Assurance training within specified timeframes.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
ARMY TRAINING CENTER FORT JACKSON
ATC G8 OFFICE CUBICLE UPGRADE
09/2/2026
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide the disassembly/transfer of 18 cubicles workstations (Includes old panels and desk attachments) from building 2400 to the G4 DLA warehouse (1901 Ewell Rd, Fort Jackson, SC 29207) and the purchase, delivery and installation of 12 new cubicles workstations (includes new purchased cubicle desks, existing cubicle shelves and free standing file drawers and existing door panels from the G8 directorate office (BLDG 2400 RM 114) located on the first floor of the building. New panels may be downloaded in front of the building and brought in through front double doors into the G8 Directorate. Installation will also include the electrical portion of running power to cubicles and internet connections. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractors who, in turn is responsible to the Government.
1.2 Background: The US Army Training Center and Fort Jackson (USATC & FJ) G8 are going through a transformation of workspace and personnel. To carry out this action, workspace throughout the sections is being reconfigured to better suit office operations within the directorate.
1.3 Scope: The Contractor shall provide non-personal service(s). The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform all the work in connection with the disassembly, transfer and installation of all cubicles stations and cubicle attachments as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.
Newly purchased panels should match existing panels that will remain for use. Existing panels are from Openplan systems model: Power Retro Kit (see Exhibit D page 26 for pictures and model label). Panels are in a cream color. Once installed cubicles should have no less than 3 separate outlets and 1 ethernet outlet. Below is a breakdown of each requested task:
• BLDG 2400 (Room 114) G8:
1. Existing Cubicles: Disassemble 18 existing cubicles workstations (8’ x 6’5”).
Transfer 63 cubicles panels (18 (65/60”), 12 (65/42”), 30 (65/30”), 1 (65/24”), (85/24”), 7 Door panels (85/48”) with all 18 desk attachments to the G4 DLA warehouse located at 1901 Ewell Rd, Fort Jackson, SC 29207. Remaining 30 panels and 12 door panels will be used to create new cubicle workstation offices.
2. Cubicle Purchase: Deliver 64 panels and 12 desk workstations attachments to complete 12 new cubicle workstations in the G8 Directorate (Room 114). 10 cubicle workstations will be 8’ x 10'6”, 85" High panel walls. 2 cubicle workstations will be 10’9”x10’6”, 85” high panel walls.
3. Needed Panel breakdown: 85/48” x 38ea; 85/30” x 7ea; 85/18” x 11ea; 47/48” x
5ea; 47/30 x 3ea.
4. Install new and existing cubicles: Assemble 12 cubicle workstations by using the 62 purchased panels and new desk attachments, 12 existing door panels, 30 existing panels, 24 standalone cabinets, and 12 hanging shelves. Install will include electrical power to two of the walls (3 outlets) in each cubicle workstation, and 1 ethernet cable outlet (LAN cables) routed to each cubicle station. (see pictures of the cabinets and shelves on Exhibit E page 27).
5. Cubicle Layout: See Technical Exhibit C on page 25. Layout may be subject to change depending on contractor recommendations.
6. Conference room: Existing cubicle conference room will be reconfigured.
Existing side doors on left wall will be removed and replaced by 3 existing panels measuring 85/24” (2ea), 85/48” (1ea), and 85/60” (1ea). 3 existing panels (85/30”, 85/42”, 85/30”) on left wall will be removed and replaced by 3 new panels measuring 85/48”. 2 existing panels dividing conference room from existing cubicles will be removed to extend conference room length. 1 panel measuring 85/60” will be removed and be replaced by 1 existing door panel measuring 85/48”, 2 existing panel measuring 85/36”, and 1 new panel measuring 85/18AB to create and entrance facing the walkway area. 2 panels on right side measuring 61/48” and 61/36” will be removed and replaced by 85/42” and 61/60” panels. Two panels will be placed at the window side area measuring 61/60” and 61/60”.
1.4 Objectives: The objective of this contract is to improve the workspace floorplan to assist customers visiting G8 for assistance and support.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 10 days. If the Government has provided comments, the Contractor shall then have 10 days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than 5 days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;
(e) How the Contractor will ensure all keys issued will remain controlled items
(Paragraph 1.7 Key Control);
(f) How the Contractor will inventory and track maintenance of all Government Provided Equipment / Materials;
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.5.1.1 An Analysis of Quality Control and Timeliness of Submittals shall be provided to the COR within 30 days upon completion of each option period or Task Order
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 48 hours of identifying those issues. Verbal reports shall be followed up by written reports within 48.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)
deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.
When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0730 to 1600, Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0730 to 1600, Monday through Friday. The Government facility is closed during local or national emergencies, administrative closings, or similar Government directed facility closings. Closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0800 to 1530, Monday through Friday. The facility is closed during local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.5 Place of Performance: The work to be performed under this contract will be performed at the BLDG 2400, Jackson Road, Fort Jackson, SC 29207.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Personnel Security Clearance Requirements: Contractors will work on unclassified system. Security clearance is not required.
1.6.2 Installation Access: Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.2.1 Common Access Cards (CAC) and CAC Log: Contractor onsite for one day only out of a year. The issue of a common access card will not be required. For contractor not eligible for CAC, but requires access to DOD facility or installation.
1.6.3 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).
1.6.4 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside the gates of the Consolidated Equipment Maintenance and Storage Facility where visible to the general public.
1.7 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.7.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.
Meetings may start or end outside of regular duty hours.
1.8 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.9 Key Personnel:
1.9.1 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.13 Contractor Travel: The Contractor may be authorized travel expenses at rates no higher than the substantive provisions of the Joint Travel Regulation (JTR), IAW FAR Part 31.205-46, and the limitation of funds specified in this contract. All travel requires Government approval and authorization 30 days prior to scheduled travel.
1.13.1 Other Direct Costs (ODCs): The contractor may be required to provide other direct materials in support of this PWS. Other direct materials/costs are costs not previously identified as direct material cost or indirect costs that can be identified specifically with a final cost objective. All contractor furnished materials requires Government approval and will be authorized to the extent that is necessary for performance of this requirement. Labor is not permitted to be proposed as an ODC. For proposal purposes, a Contract Line-Item Number (CUN) shall be established at an estimated Not-to-Exceed (NTE) amount for each year. Some typical ODCs are: medical exams, DBA insurance, internet costs for communications while deployed, and uplifts on pay, danger/post hardship.
1.14 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.15 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.16 1.16 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.19 Safety: The following provides information pertaining to Safety and Accident Prevention:
1.19.1 Fire and Safety Requirements:
1.19.1.1 Fire Prevention and Protection:
a. The Contractor and Contractor employees shall comply with AR 420-90, Fire and Emergency Services, and National Fire Prevention Association guidelines.
b. Installation fire prevention personnel may make periodic routine inspections for compliance.
1.19.1.2 Safety Program:
a. The Contractor shall implement a safety program to ensure that all operations and activities comply with Occupational Safety and Health Administration (OSHA) standards and other safety and health local general consensus standards. Contractor shall provide a copy of Site Specific Safety Plan to the government (Fort Jackson Installation Safety) for review prior to start of project work on Fort Jackson.
b. The Contractor shall be thoroughly familiar with all safety and health requirements of this PWS in accordance with OSHA national consensus standards, including the requirement to establish a site specific standard operating procedure in accordance with OSHA Directives CPL 02-00-124 and CPL 2-0.124--Multi-Employer Citation Policy (Dec. 10, 1999), Multi-employer Worksite Policy.
c. The Government has the right to inspect and test all services related to safety standards, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
1.19.1.3 Protective Items: To comply with OSHA, Contractor personnel shall use protective clothing and equipment whenever and wherever required in the performance of services as determined in the contractors standard operating procedures related to tasks included in this PWS.
1.19.1.4 Safety Instructions:
a. The Contractor shall provide initial indoctrination and continuing instruction to all employees to enable employees to conduct their work in a safe manner and to recognize and report hazardous conditions to the appropriate offices for corrective or abatement action. Initial indoctrination shall be provided for safe work practices; proper use, care, and maintenance of equipment; reporting hazards, accidents, and mishaps; unexploded ordnance; employee responsibility for accident prevention and fire prevention; fire evacuation routes and internal shelter areas.
b. Unexploded Ordnance training: Unexploded ordnance (UXO) items at Fort Jackson may exist throughout the post. All contractor personnel are required to take a short educational class (3Rs video) on what to do if they suspect unexploded ordnance at Fort Jackson. The video can be viewed at the following web site:
https://authoring.denix.osd.mil/uxo/3rs-training/
Once complete with the video training, download your completion certificate and provide to Fort Jackson Safety Office or your Contracting Officer Representative (COR).
1.19.1.5 Notification of Accidents and Damage to Government Equipment Property:
a. General requirements for reporting accidents and loss or damage to Government property are contained in AR 385-10, and DA PAM 385-40 for the Performance of Contract Property Administration.
b. Damage to Government property must be reported regardless of the dollar amount of damage.
The Contractor shall provide immediate notification of property damage to the hand receipt holder and the COR. The Contractor shall prepare a Report of Accident, U.S. Army Accident Report, DA Form 285. Forward the original and one copy to the KO within five (5) workdays after a reportable accident occurs.
1.19.1.6 Injuries: The Contractor shall immediately notify the designated Government representative of any injury to a Contractor employee. The Government will advise the Contractor if additional information or forms are required. The Contractor shall prepare an OSHA form 301 and forward to the COR and KO within five (5) workdays after a recordable https://authoring.denix.osd.mil/uxo/3rs-training/ accident occurs. OSHA Accident reporting for contracted employees will be the responsibility of the contractor in accordance with 29 CFR 1904 and 1925.
1.20 Required Training: The following provides information on training requirements.
1.20.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 calendar days contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer if a COR is not assigned) within 30 days after completion of this training by all employees and subcontractor personnel. AT Level I training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve (12) months as required by local AT policies. Contractor shall submit certificates of completion within 30 days after completion of this training.
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Certification of the training shall be provided to the COR within 30 days after completion of the training.
1.20.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within fourteen days of employment under this contract. Certification of the training shall be provided to the COR or Contract Officer within thirty days after completion of the training OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html.
Contractor personnel must complete refresher training every 12 months Certification of the training shall be provided to the COR within 30 days after completion of the training.
If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer.
1.20.3 Personally Identifiable Information (PII): RESERVED
1.20.4 iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within calendar days of new employees commencing performance with the results reported to the COR NLT calendar days after contract award.
https://jkodirect.jten.mil/
1.23 Information Assurance (IA) Training
1.23.1.1 All Contractor employees, including subcontractors, requiring access to
Government information systems shall complete the DoD IA Cyber Awareness Training within 30 days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 days after employment of new personnel.
Verification of the training shall be provided to the COR within 30 days after completion of the training.
1.23.2 All Contractor employees, including subcontractors, working information technology
(IT)/IA functions shall comply with DoD and Army training requirements per Information Assurance Training Certification and Workforce Management DoD Directive (DoDD) 8570.01, Information Assurance Workforce Improvement Program DoD 8570.01-M, and Information Assurance AR 25-2 within thirty (30) calendar days of employment. Training is available at https://ia.signal.army.mil/DoDIAA/default.asp .
1.23.3 All Contractor employees, including subcontractors, performing services under this contract with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS), the web address is p (requires CAC to access. Verification of registration shall be provided to the COR within 30 days after registration. Contractor personnel must complete refresher training every twelve (12) months. Verification of the training shall be provided to the COR within 30 days after completion of the training.
1.23.3.1 Personally Identifiable Information (PII): Contractor employees, including subcontractors, performing services under this contract with access to PII and Government information shall complete “Identifying and Safeguarding
PII” within 30 calendar days of employment. Contractor personnel shall complete refresher training every twelve (12) months from initial completion. The Contractor shall provide the COR a copy of the training certificates for its employees no later than five (5) days after completion. Training is available at http://iatraining.disa.mil/eta/piiv2/launchPage.html
1.24 Government Property and Services: Refer to Part 3 of this PWS for Government property (GP) for this contract. For all issued GP for this contract, the Contractor shall submit a Property Management Plan to the Contracting Officer and the Property Administrator via the COR within 30 days after date of contract award. The plan shall address the requirements as listed in PWS.
X. FIRE AND SAFETY REQUIREMENTS
X-1. Fire Prevention and Protection:
https://ia.signal.army.mil/DoDIAA/default.asp https://atc.us.army.mil/iastar/index.php http://iatraining.disa.mil/eta/piiv2/launchPage.html
a. The Contractor and Contractor employees shall comply with AR 420- 90, Fire and Emergency Services, and National Fire Prevention Association guidelines.
b. Installation fire prevention personnel may make periodic routine inspections for compliance.
X-2. Safety Program:
a. The Contractor shall implement a safety program to ensure that all operations and activities comply with Occupational Safety and Health Administration (OSHA) standards and other safety and health local general consensus standards. Contractor shall provide a copy of Site Specific Safety Plan to the government (Fort Jackson Installation Safety) for review prior to start of project work on Fort Jackson.
b. The Contractor shall be thoroughly familiar with all safety and health requirements of this PWS in accordance with OSHA national consensus standards, including the requirement to establish a site specific standard operating procedure in accordance with OSHA Directives CPL 02-00-124 and CPL 2-0.124--Multi-Employer Citation Policy (Dec. 10, 1999), Multi-employer Worksite Policy.
c. The Government has the right to inspect and test all services related to safety standards, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
X-3. Protective Items: To comply with OSHA, Contractor personnel shall use protective clothing and equipment whenever and wherever required in the performance of services as determined in the contractors standard operating procedures related to tasks included in this PWS.
X-4. Safety Instruction:
a. The Contractor shall provide initial indoctrination and continuing instruction to all employees to enable employees to conduct their work in a safe manner and to recognize and report hazardous conditions to the appropriate offices for corrective or abatement action. Initial indoctrination shall be provided for safe work practices; proper use, care, and maintenance of equipment; reporting hazards, accidents, and mishaps; unexploded ordnance; employee responsibility for accident prevention and fire prevention; fire evacuation routes and internal shelter areas.
b. Unexploded munitions training: Unexploded munitions items at Fort Jackson may exist throughout the post. All contractor personnel are required to take a short educational class (3Rs video) on what to do if they suspect unexploded munitions at Fort Jackson. The video can be viewed at the following web site:
Once complete with the video training, download your completion certificate and provide a copy to Fort Jackson Safety Office or your Contracting Officer Representative (COR).
Remember, munitions are dangerous.
X-5. Notification of Accidents and Damage to Government Equipment Property:
a. General requirements for reporting accidents and loss or damage to
Government property are contained in AR 385-10, and DA PAM 385-40 for the Performance of Contract Property Administration.
b. Damage to Government property must be reported regardless of the dollar amount of damage. The Contractor shall provide immediate notification of property damage to the hand receipt holder and the COR. The Contractor shall prepare a Report of Accident, U.S. Army Accident Report, DA Form 285. Forward the original and one copy to the KO within five (5) workdays after a reportable accident occurs.
X-6. Injuries: The Contractor shall immediately notify the designated Government representative of any injury to a Contractor employee. The Government will advise the Contractor if additional information or forms are required. The Contractor shall prepare an OSHA form 301 and forward to the COR and KO within five (5) workdays after a recordable accident occurs.
OSHA Accident reporting for contracted employees will be the responsibility of the contractor in accordance with 29 CFR 1904 and 1925
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line-item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – means anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Government Property - means all property owned or leased by the Government.
Government property includes both Government-furnished and Contractor-acquired property.
Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless otherwise specified.
2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.
ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CEMSF Consolidated Equipment Maintenance & Storage Facility CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center
DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICES
3. Government Property and Services
3.1 Services: The Government will provide a COR.
3.2 Facilities: N/A
3.3 Utilities: The Government will provide electrical outlet sources necessary for the Contractor to fulfill the work outlined in the PWS. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves, light switches, etc. after using the required amount to accomplish tasks requiring the use of the utilities.
3.4 Equipment: The Government will provide existing Cubicle stations to complete the G8 portion of this contract.
3.5 Training: The Government will provide the following training: AT Level 1 Awareness, OPSEC Training.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Services
4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services.
4.2 Materials: The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.
4.3 Vehicles and Equipment: Contractor shall furnish vehicle and equipment needed to perform work prescribed in this performance work statement.
4.4 Background Checks): The Contractor shall provide Background Checks in accordance with this PWS and as determined by the Government.
PART 5
SPECIFIC TASKS
5.1 Basic Services: The Contractor shall provide supply/service contract to provide cubicle disassembly, transfer, purchase, and assembly of existing and new cubicle stations in building 2400 (G8 directorate)
5.2 Tasks: Tasks consist of the following:
5.2.1 Cubicle delivery and installation: The Contractor shall provide non-personal service(s).
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform all the work in connection with the disassembly, transfer and installation of all cubicles stations and cubicle attachments as described in the PWS. Below is a breakdown of each requested task.
G8 ROOM 114: Disassemble 18 cubicle stations. Deliver and assemble 12 new cubicle stations with desks into new layout. Reconfigure existing G8 conference room.
(b) BLDG 1901: Transfer remaining cubicle station panels and desk attachments to 1901 Ewell Rd for storage.
5.3 Service Contract Reporting
5.3.1 System for Award Management (SAM) Service Contract Report (SCR): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the G8 Cubicle Office Upgrade via a secure data collection site. The Contractor is required to completely fill in all required data fields through the following web address: www.sam.gov. Reporting inputs will be for the labor executed during the period of performance (POP). While inputs may be reported any time during the POP, all data shall be reported no later than September 30 awarded calendar year.
Contractors may direct questions to the help desk by clicking “View Assistance for SAM.gov” which is located at the top of the SAM.gov website. From there, you can the select “Contact Our Service Desk” which will allow you to contact SAM.gov directly. If contract period of performance ends prior to September 30, the Contractor has 30 calendar days from end date of the contract to complete the SAM SCR requirement.
Steps for Submitting a Service Contract Report (SCR)
1. Go to www.sam.gov and log in.
2. Select Entity Registrations and then select Service Contract Reporting.
SAM displays your entities which have service contracts and meet the reporting criteria.
3. Select View by entity to see the service contracts for each entity.
4. Next, select Add for the service contract against which you want to create a Service Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.
5. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information:
http://www.sam.gov/ http://www.sam.gov/
• Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).
• Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.
6. Report any required Tier 1 subcontractor information by selecting the Add Tier 1.
7. Subcontract Information button.
8. When you are ready to submit the report, select Submit. This saves your report and returns you to the Select Service Contract page where you can create other SCRs or edit an existing SCR.
Steps for Editing a Submitted Report
1. Follow steps 1-4 above. Any previously submitted SCR will have a View/Edit button instead of an Add button.
2. Select View/Edit. You will be able to view the current SCR, edit available fields, and resubmit the record. You can also delete previously entered information altogether.
STD: All information provided by the Contractor shall be accurate, complete, and not exceed suspense dates noted in corresponding paragraph above.
AQL: 100% Compliance.
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.
6.1.1 Department Of Defense Contract Security Classification Specification (DD Form 254)
6.1.2 Department of Defense Security Agreement (DD Form 441)
6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)
6.1.4 Installation Access Control (AE Reg 190-16)
6.1.5 The Army Physical Security Program (AR 190-13)
6.1.6 Contractor Identification (AE Reg 27-715)
6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)
6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)
6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)
6.1.10 Information Assurance (AR 25-2)
6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)
6.1.12 Policies and Procedures for Property Accountability (AR 735-5)
6.1.13 Security of Unclassified Army Property (sensitive and Non-Sensitive) (AR 190-51)
6.1.14 Department of the Army Information Security Program (AR 380-5)
6.1.15 The Army Safety Program (AR 385-10)
6.1.16 Fire Prevention and Protective Services (AR 420-90)
6.1.17 Inventory Management Supply Policy Below Wholesale Level (AR 710-2)
PART 7
ATTACHMENT AND TECHNICAL EXHIBIT LISTING
7. Attachment and Technical Exhibit List
7.1 Technical Exhibit A – Performance Requirements Summary
7.2 Technical Exhibit B – Deliverables Schedule
TECHNICAL EXHIBIT A
Performance Requirements Summary (PRS)
PERFORMANCE
OBJECTIVE
STANDARD PERFORMANCE
THRESHOLD
ACCEPTABLE
QUALITY
LEVELS (AQLs)
METHOD OF
SURVEILLANCE
1.3 The contractor shall
provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform installation of cubicles, office space and office furniture.
Cubicles will be installed with IAW cubicle installation instructions
95% Compliance Zero Deviation from Standards 95% Compliance; no more than 2 discrepancies
Random Inspection, COR Validation
TECHNICAL EXHIBIT B
DELIVERABLES SCHEDULE
Deliverable…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .