Question and Answers_2_10 December 2025.pdf
PDF 66 KB Posted
- Attached to
- IMCOM Pest Control
- Solicitation number
- W9124C-26-Q-A-001
About this file
This document is a Question & Answers (Q&A) #2 for an IMCOM Pest Control contract, solicitation number W9124C-26-Q-A001. The Q&A provides clarifications for four key questions about the pest control service requirements. Respondents are directed to Technical Exhibit 3 of the Performance Work Statement (PWS) for details on the number of buildings and their sizes. The document also indicates that special pest services such as bed bug and flea treatments are detailed in specific PWS sections (1.1.1, 2.2.1.4, and 2.3.1). Additionally, the Q&A confirms that CMMC Level 2 certification is not required for this contract.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMCOM Pest Control
W9124C-26-Q-A001
Question & Answers #2
Question #1: Approximately how many buildings are included for pest control services?
Answer: Please see Technical Exhibit 3 of the PWS
Question #2: What is the size of the buildings?
Answer: Please see Technical Exhibit 3 of the PWS
Question #3: Are there any special services required, such as treatment of bed bugs, fleas, or other specific pests?
Answer: Please refer to sections 1.1.1, 2.2.1.4, and 2.3.1 of the PWS
Question #4: Is CMMC Level 2 required?
Answer: No