Amendment 002 23R0006 Questions Answers Chemical Toilets 6 March 2023.pdf
PDF 382 KB Posted
- Attached to
- Chemical Portable Toilets
- Solicitation number
- W9124C23R0006
About this file
This amendment modifies a solicitation for chemical portable toilet services. The solicitation seeks to increase the quantity of toilets serviced from 844 to 898, and extend the response date from March 3rd to March 10th, 2023. Additional details include increasing the monthly servicing period from ten to twelve months for multiple contract line items. The amendment also changes the description and pricing of line items for replacing damaged toilets and additional cleaning, with the latter now priced per unit rather than monthly. The contracting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. The purpose of Amendment 0002,solicitation, W9124C23R0006 is to update Option CLIN's 1009 and 4009 the description from Replace Damaged Chemical Toilets for 12 months to Additional Cleaning of Portable Toilets of 500 each. 3. Changed quantity of 10 months to 12 months in CLIN's 1002, 2002, 3002, and 4002. 4. Revised PWS to reflect changes per solicitation questions. 5. Changed the quantity of Toilets from 845 to 898 in accordance w ith the attached Revised Performance Work Statement. 6. The closing date has been extended to 10 March 2023 at 10:00 am Eastern Time. 7. After this Amendment is released all other terms and conditions remain the same. 8. See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Mar-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9124C23R0006
X 9B. DATED (SEE ITEM 11)
22-Feb-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Mar-2023
CODE
MICC - FT JACKSON
4340 MAGRUDER AVE
FORT JACKSON SC 29207
W9124C 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9124C23R0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 03-Mar-2023 10:00 AM to 10-Mar-2023 10:00 AM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0016
The CLIN extended description has changed from:
(Quantity 219) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 219 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional information.
To:
(Quantity 223) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 223 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional
CLIN 1002
The pricing detail quantity has increased by 2.00 from 10.00 to 12.00.
CLIN 1009
The CLIN description has changed from Replace Damaged Chemical Toilets to Additional Cleaning of Portable Toilets.
The CLIN extended description has changed from:
(Cost to replace damaged Chemical Toilets) The contractor must submit the cost to replace the chemical toilets throughout the Fort Jackson's Training Sites. In accordance with the attached Performance Work Statement.
Additional cleaning of individual portable chemical toilets. This additional cleaning order shall be above what is specified in the Performance Work Statement (PWS) and resulting contract. This additional cleaning is to be ordered as needed by the Contracting Officer or Ordering Officer only. See attached Performance Work Statement.
The pricing detail quantity has increased by 488.00 from 12.00 to 500.00.
The unit of issue has changed from Months to Each.
CLIN 1015
(Quantity 219) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 219 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional
(Quantity 223) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 223 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional
CLIN 2002
CLIN 2015
(Quantity 219) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 219 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional
(Quantity 223) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 223 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional
CLIN 3002
CLIN 3015
(Quantity 219) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 219 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional
(Quantity 223) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 223 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional
CLIN 4002
CLIN 4009
The CLIN description has changed from Replace Damaged Chemical Toilets to Additional Cleaning of Portable Toilets.
(Cost to replace damaged Chemical Toilets) The contractor must submit the cost to replace the chemical toilets throughout the Fort Jackson's Training Sites. In accordance with the attached Performance Work Statement.
Additional cleaning of individual portable chemical toilets. This additional cleaning order shall be above what is specified in the Performance Work Statement (PWS) and resulting contract. This additional cleaning is to be ordered as needed by the Contracting Officer or Ordering Officer only. See attached Performance Work Statement.
The pricing detail quantity has increased by 488.00 from 12.00 to 500.00.
The unit of issue has changed from Months to Each.
CLIN 4015
(Quantity 219) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 219 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional
(Quantity 223) Leave/Service Chemical Portable Toilets. The contractor must furnish and maintain 223 single seat, portable chemical toilets to be placed at permanent locations throughout Fort Jackson. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed, as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, latch and coat hook. Permanent locations are listed in Technical Exhibit (TE) 3 and the sign in roster is listed in Technical Exhibit TE-4. See Performance Work Statement for additional
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been deleted:
ATTACHMENT 2, PWS
PERFORMANCE WORK STATEMENT
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 1009 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 02-APR-2024 TO
01-APR-2025
N/A CLIFFORD SAUNDERS
MARTIN WOOD
2562 ESSAYONS WAY
FT JACKSON, SC SC 29207
803-751-7070 EXT 6654
FOB: Destination
W37N02
CAGE
POP 02-APR-2024 TO
01-APR-2025
N/A CLIFFORD SAUNDERS
MARTIN WOOD
2562 ESSAYONS WAY
FT JACKSON, SC SC 29207
803-751-7070 EXT 6654
The following Delivery Schedule item for CLIN 4009 has been changed from:
CAGE
POP 02-APR-2027 TO
01-APR-2028
N/A CLIFFORD SAUNDERS
MARTIN WOOD
2562 ESSAYONS WAY
FT JACKSON, SC SC 29207
803-751-7070 EXT 6654
CAGE
POP 02-APR-2027 TO
01-APR-2028
N/A CLIFFORD SAUNDERS
MARTIN WOOD
2562 ESSAYONS WAY
FT JACKSON, SC SC 29207
803-751-7070 EXT 6654
(End of Summary of Changes)
File details come from the government source that posted it. Updated .