BaseYear(KY)-PRICE LIST

IDIQ CONTRACT FOR CONSTRUCTION, REPAIR, RESTORATION AND REHABILATION OF ROADWAYS AND HARDSTANDS1.11-Sep-17
FE10236-5J
KENTUCKY PRICE SHEET
ITEM NODESCRIPTIONESTIMATED QUANTITYUNITUNIT PRICEESTIMATED AMOUNT
0001GENERAL REQUIREMENTS, SITE PREPARATION AND DEMOLITION
0001AASEDIMENT AND EROSION CONTROL PLAN MANAGEMENT15EA$ - 0$ 1.00$ - 030
0001ABSILT FENCE5000LF$ - 0$ 2.07$ - 010,000
0001ACGEOTEXTILE BAG WITH GRAVEL10EA$ - 0$ 28.75$ - 020
0001ADEROSION CONTROL BLANKET500SY$ - 0$ 1.75$ - 01,000
0001AERIPRAP CHECK DAM ( 2 CF PER FOOT PER LF)2500LF$ - 0$ 18.08$ - 05,000
0001AFSQUARE FRAME AND FILTER ASSEMBLY5EA$ - 0

enrique.d.vazquez: enrique.d.vazquez:

FILTER PRICE IS CLOSE AT 110. BUT THE FRAME PRICE IS A ROUGH ESTIMATE$ - 010
0001AGCONSTRUCTION LAYOUT9.5AC$ - 0$ - 019
0001AHCORE SAMPLES50EA$ - 0$ 75.00$ - 0100
0001AICLEARING AND GRUBBING ( INCLUDES TREES LESS THAN 4" DIA.)2500SY$ - 0$ 4.11$ - 05,000
0001AJTREE REMOVAL - GREATER THAN 4" DIA.5EA$ - 0$ - 010
0001AKFURNISH AND INSTALL CONCRETE JERSEY BARRIER2EA$ - 0$ - 04
0001ALRELOCATE AND INSTALL CONCRETE JERSEY BARRIER1EA$ - 0$ - 02
0001AMTRAFFIC SIGNAL DETECTION LOOP4EA$ - 0$ - 08
0001ANPORTABLE DYNAMIC/VARIABLE MESSAGE SIGNS50DAY$ - 0$ - 0100
0001AOGENERAL DEMOLITION2500LF$ - 0$ - 05,000
0001APSELECTIVE DEMOLITION2500SF$ - 0$ - 05,000
0002EXCAVATION AND SUBGRADE PREPARATION
0002AAEXCAVATION - STOCKPILED ON SITE5000CY$ - 0$ 29.20$ - 010,000
0002ABEXCAVATION - EXCESS HAULED14000CY$ - 0$ 8.81$ - 028,000
0002ACPLACE FILL DIRT FROM ON SITE5000CY$ - 0$ 30.90$ - 010,000
0002ADPLACE FILL DIRT FROM BORROW PIT15000CY$ - 0$ 42.92$ - 030,000
0002AEDITCHING AND SHOULDERING12500LF$ - 0$ 6.66$ - 025,000
0002AFGEOTEXTILE FABRIC50000SY$ - 0$ 1.83$ - 0100,000
0002AGTRENCH BOX (4'X10')2.5EA$ - 0$ - 05
0002AHTRENCH BOX (6'X10')2.5EA$ - 0$ - 05
0002AITRENCH BOX (6'X14')2.5EA$ - 0$ - 05
0002AJTRENCH BOX (6'X16')2.5EA$ - 0$ - 05
0002AKSUBGRADE RESHAPING AND COMPACTION12500SY$ - 0$ - 025,000
0003FINAL GRADING AND TURF ESTABLISHMENT
0003AATOP SOIL - PLACED FROM ON SITE STOCKPILE7500CY$ - 0$ 18.72$ - 015,000
0003ABTOP SOIL - HAULED AND PLACED FROM BORROW PIT15000CY$ - 0$ 18.72$ - 030,000
0003ACTOP SOIL - PURCHASED FROM OUTSIDE SOURCE101251.5SY$ - 0$ 1.00$ - 0202,503
0003ADSEEDING26999.5SY$ - 0$ - 053,999
0003AEHYDRO-SEEDING6750SY$ - 0$ - 013,500
0003AFSODDING1250SY$ - 0$ - 02,500
0004STABILIZED AGGREGATE & GRAVEL
0004AANO. 57 AGGREGATE - DRAINAGE LAYER4000Ton$ - 0$ 49.51$ - 08,000
0004ABNO. 8 AGGREGATE - PIPE BEDDING1250Ton$ - 0$ 25.74$ - 02,500
0004ACCRUSHED STONE BASE - DRAINAGE LAYER5000Ton$ - 0$ 25.74$ - 010,000
0004ADNO. 2 AGGREGATE1250Ton$ - 0$ 25.74$ - 02,500
0004AEDENSE GRADED AGGREGATE BASE (DGA)10000Ton$ - 0$ 49.51$ - 020,000
0004AFNATURAL SAND FOR DRAINAGE AND BACKFILL250Ton$ - 0$ 25.74$ - 0500
0004AGCRUSHED CONCRETE HAULING FROM LANDFILL2500Ton$ - 0$ 13.74$ - 05,000
0004AHSLOPE PROTECTION AND CHANNEL LINING CLASS II750Ton$ - 0$ 35.74$ - 0ORIG ($ / ton)2013 ($ / ton)2014 ($ / ton)2015 ($ / ton)1,500
0004AISLOPE PROTECTION AND CHANNEL LINING CLASS III750Ton$ - 0$ - 0$615.45$561.50$556.00$479.501,500
0004AJGEOGRID REINFORCEMENT7498.5SY$ - 0$ - 0$ - 014,997
0005ASPHALT PAVEMENTS AND ASSOCIATED WORK0.9298720.9227230.8232840.1077673493
0005AAMESH PAVEMENT REINFORCEMENT GLASGRID1250SY$ - 0$ 10.94$ - 02,500
0005ABTACK COAT (SS-1H)50000SY$ - 0$ 0.14$ - 0100,000
0005ACPRIME COAT (SS-1H)37500SY$ - 0$ 0.84$ - 075,000
0005ADINSTALL BITUMINOUS CONCRETE SURFACE COURSE (1" DEPTH)2500SY$ - 0$ 3.65$ - 0$3.65$3.40$3.37$3.015,000
0005AEINSTALL BITUMINOUS CONCRETE SURFACE COURSE (2” DEPTH)50000SY$ - 0$ - 0$3.61$3.36$3.34$2.981" Binder100,000
0005AFINSTALL BITUMINOUS CONCRETE SURFACE COURSE (3” DEPTH)25000SY$ - 0$ - 050,000
0005AGINSTALL BITUMINOUS CONCRETE SURFACE COURSE (4” DEPTH)1000SY$ - 0$ - 02,000
0005AHINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFIELDS (1" DEPTH)500SY$ - 0$ 3.65$ - 01,000
0005AIINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFIELDS (2” DEPTH)500SY$ - 0$ - 01,000
0005AJINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFILEDS (3” DEPTH)500SY$ - 0$ - 01,000
0005AKINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFIELDS (4” DEPTH)7500SY$ - 0$ - 0$7.30$6.80$6.74$6.0115,000
0005ALINSTALL BITUMINOUS CONCRETE BASE COURSE (1" DEPTH)500SY$ - 0$ - 01,000
0005AMINSTALL BITUMINOUS CONCRETE BASE COURSE (2” DEPTH)2500SY$ - 0$ - 0$10.95$10.20$10.11$9.025,000
0005ANINSTALL BITUMINOUS CONCRETE BASE COURSE (3” DEPTH)2500SY$ - 0$ - 0$14.60$13.60$13.48$12.025,000
0005AOINSTALL BITUMINOUS CONCRETE BASE COURSE (4” DEPTH)37500SY$ - 0$ - 0$18.25$16.99$16.84$15.0375,000
0005APINSTALL BITUMINOUS CONCRETE BASE COURSE (5” DEPTH)1250SY$ - 0$ - 0$21.90$20.39$20.21$18.032,500
0005AQINSTALL BITUMINOUS CONCRETE BASE COURSE (6” DEPTH)500SY$ - 0$ - 0$25.55$23.79$23.58$21.041,000
0005ARINSTALL BITUMINOUS CONCRETE BASE COURSE (7” DEPTH)500SY$ - 0$ - 0$29.20$27.19$26.95$24.041,000
0005ASINSTALL BITUMINOUS CONCRETE BASE COURSE (8” DEPTH)500SY$ - 0$ - 0$32.85$30.59$30.32$27.051,000
0005ATINSTALL BITUMINOUS CONCRETE BASE COURSE (9” DEPTH)500SY$ - 0$ - 0$36.50$33.99$33.68$30.051,000
0005AUINSTALL BITUMINOUS CONCRETE BASE COURSE (10” DEPTH)500SY$ - 0$ - 0$40.15$37.39$37.05$33.061,000
0005AVINSTALL BITUMINOUS CONCRETE BASE COURSE (11” DEPTH)500SY$ - 0$ - 0$43.80$40.79$40.42$36.061,000
0005AWINSTALL BITUMINOUS CONCRETE BASE COURSE (12” DEPTH)425SY$ - 0$ - 0$7.22$6.72$6.67$5.95850
0005AXINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (1" DEPTH)500SY$ - 0$ - 0$10.83$10.08$10.00$8.921,000
0005AYINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (2” DEPTH)500SY$ - 0$ - 0$14.44$13.45$13.33$11.891,000
0005AZINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (3” DEPTH)500SY$ - 0$ - 0$18.05$16.81$16.66$14.871,000
0005BAINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (4” DEPTH)500SY$ - 0$ - 0$21.66$20.17$19.99$17.841,000
0005BBINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (5” DEPTH)500SY$ - 0$ - 0$25.27$23.53$23.32$20.811,000
0005BCINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (6” DEPTH)500SY$ - 0$ - 0$28.88$26.89$26.65$23.781,000
0005BDINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (7” DEPTH)500SY$ - 0$ - 0$32.49$30.25$29.98$26.751,000
0005BEINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFILEDS (8” DEPTH)500SY$ - 0$ - 0$36.10$33.62$33.32$29.731,000
0005BFINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (9” DEPTH)500SY$ - 0$ - 0$39.71$36.98$36.65$32.701,000
0005BGINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFILEDS (10” DEPTH)500SY$ - 0$ - 0$43.32$40.34$39.98$35.671,000
0005BHINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFILEDS (11” DEPTH)500SY$ - 0$ - 01,000
0005BIINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (12” DEPTH)500SY$ - 0$ - 01,000
0005BJASPHALT PAVEMENT RIDE QUALITY5LN-MI$ - 0$ - 010
0005BKADJUSTMENT OF MANHOLES/DRAINAGE STRUCTURES AND UTILITY BOXES10EA$ - 0$ - 020
0005BLASPHALT WEDGE CURB50LF$ - 0$ - 0100
0006COLD MILLING OF BITUMINOUS PAVEMENTS
0006AAPAVEMENT MILLINGS HAULED TO WOODLAWN LANDFILL5000SY-I$ - 0$ - 010,000
0006ABPAVEMENT MILLINGS HAULED OUTSIDE OF FT CAMPBELL2500SY-I$ - 0$ - 05,000
0006ACPAVEMENT MILLINGS RETAINED BY CONTRACTOR50000SY-I$ - 0$ - 0100,000
0007ROADWAY SURFACE REHABILITATION
0007AACRACK SEALING IN BITUMINOUS PAVEMENTS 1/8" TO 1/2"4002.5LF$ - 0$ 0.92$ - 08,005
0007ABCRACK SEALING IN BITUMINOUS PAVEMENTS 5/8" TO 1"2000LF$ - 0$ 1.30$ - 04,000
0007ACASPHALT REJUVENATOR15000SY$ - 0$ - 030,000
0007ADRUBBERIZED SEAL COAT7500SY$ - 0$ 1.12$ - 015,000
0007AEMICRO-SURFACING SURFACE COURSE7500SY$ - 0$ 2.07$ - 015,000
0007AFMICRO-SURFACING RUT FILL COURSE75Ton$ - 0$ 12.33$ - 0150
0007AGSAWCUT EXISTING ASPHALT SURFACE4000LF$ - 0$ 12.33$ - 08,000
0007AHRUNWAY RUBBER REMOVAL AND DISPOSAL50000.5SY$ - 0$ 12.33$ - 0100,001
0007AIFULL DEPTH RECLAMATION OF FLEXIBLE PAVEMENT7500SY$ - 0$ - 015,000
0008CONCRETE WORK
0008AASAWCUT EXISTING CONCRETE SURFACE1500LF$ - 0$ - 03,000
0008ABSIDEWALK C.I.P CONCRETE 4000PSI (4" DEPTH)500SY$ - 0$ 23.34$ - 01,000
0008ACSIDEWALK C.I.P CONCRETE 4000PSI (6" DEPTH)500SY$ - 0$ - 01,000
0008ADNORMAL WEIGTH CONCRETE 4000PSI MIN.500CY$ - 0$ - 01,000
0008AEHIGHEARLY STRENGTH CONCRETE 4000PSI MIN.250CY$ - 0$ 12.95$ - 0500
0008AFSTEEL REINFORCEMENT15TON$ - 0$ - 01.0630
0008AGWELDED WIRE REINFORCEMENT500SF$ - 0$ - 021201,000
0008AHSMOOTH DOWEL BARS 3/4" DIA. 12" LONG25EA$ - 0$ - 0$ - 050
0008AISTAINED CONCRETE ADMIXTURE250SY$ - 0$ - 0$ - 0500
0008AJSTENCILED (STAMPED-STACKED) CONCRETE250SY$ - 0$ 55.00$ - 0500
0008AKCONSTRUCTION JOINTS500LF$ - 0$ 1,100.00$ - 01,000
0008ALEXPANSION JOINTS500LF$ - 0$ - 0$ - 01,000
0008AMSELF-LEVELING JOINT SEALANT500LF$ - 0$ - 0$ - 01,000
0008ANNON-SAG JOINT SEALANT FOR AIRFIELDS250LF$ - 0$ - 0500
0008AOPRECAST PARKING VEHICLE STOP5EA$ - 0$ - 010
0008APRELOCATE GOVERNMENT OWNED PARKING VEHICLE STOP10EA$ - 0$ - 020
0008AQPERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT500SF$ - 0$ - 01,000
0008ARSTANDARD CONCRETE CURB AND GUTTER250LF$ - 0$ 31.66$ - 0500
0008ASSTANDARD HEADER CURB250.5LF$ - 0$ 31.66$ - 0501
0008ATK4 BOLLARD5EA$ - 0$ - 010
0008AUCLSM -FLOWABLE FILL10CY$ - 0$ - 020
0009PAVEMENT MARKINGS
0009AATHERMOPLASTIC MARKING 4" WHITE OR YELLOW STRIPE35000LF$ - 0$ 0.71$ - 070,000
0009ABTHERMOPLASTIC MARKING 6" WHITE OR YELLOW STRIPE13500LF$ - 0$ 1.44$ - 027,000
0009ACTHERMOPLASTIC MARKING 12" WHITE OR YELLOW STRIPE1250LF$ - 0$ 2.04$ - 02,500
0009ADTHERMOPLASTIC MARKING 24" WHITE OR YELLOW STRIPE2500LF$ - 0$ - 05,000
0009AETHERMOPLASTIC SYMBOL GRADE (RAILROAD) CROSSING5EA$ - 0$ 369.70$ - 010
0009AFTHERMOPLASTIC SYMBOL SCHOOL CROSSING2.5LF$ - 0$ 10.97$ - 05
0009AGTHERMOPLASTIC SYMBOL TURN LANE ARROW10EA$ - 0$ 196.26$ - 020
0009AHTHERMOPLASTIC SYMBOL STRAIGHT LANE ARROW10EA$ - 0$ 196.26$ - 020
0009AITHERMOPLASTIC SYMBOL STRAIGHT AND TURN LANE ARROW10EA$ - 0$ 311.50$ - 020
0009AJTHERMOPLASTIC SYMBOL STRAIGHT AND 2-TURN LANE ARROW5EA$ - 0$ 336.82$ - 010
0009AKTHERMOPLASTIC SYMBOL ADA (HANDICAPPED) PARKING5EA$ - 0$ 280.69$ - 010
0009ALTHERMOPLASTIC SYMBOL BICYCLE LANE5EA$ - 0$ 196.26$ - 010
0009AMPERMANENT PAVEMENT MARKING STRIPE 4" WHITE, YELLOW, OR RED STRIPE35000LF$ - 0$ 0.22$ - 070,000
0009ANPERMANENT PAVEMENT MARKING SYMBOL ADA (HANDICAPPED) PARKING6EA$ - 0$ 59.33$ - 012
0009AOPERMANENT PAVEMENT MARKING SYMBOL BICYCLE LANE6EA$ - 0$ 59.33$ - 012
0009APPERMANENT PAVEMENT MARKING SYMBOL DIRECTIONAL ARROW7.5EA$ - 0$ 59.33$ - 015
0009AQPERMANENT PAVEMENT MARKING LETTERS 12" MIN5EA$ - 0$ 59.33$ - 010
0009ARAIRFIELD MARKING25000SF$ - 0$ 0.67$ - 050,000
0009ASTEMPORARY STRIPING2500LF$ - 0$ 0.67$ - 05,000
0009ATPAVEMENT MARKING REMOVAL SYMBOL5000SF$ - 0$ 2.16$ - 010,000
0009AUPAVEMENT MARKING REMOVAL STRIPING18500LF$ - 0$ 1.36$ - 037,000
0009AVDETECTABLE WARNING PADS50SF$ - 0$ 1.36$ - 0100
0009AWRAISED PAVEMENT MARKERS (MONO-DIRECTIONAL)50EA$ - 0$ - 0100
0009AXRAISED PAVEMENT MARKERS (BI-DIRECTIONAL)50EA$ - 0$ - 0100
0009AYREMOVAL OF RAISED PAVEMENT MARKERS25EA$ - 0$ - 050
0009AZFLEXIBLE DELINEATOR5EA$ - 0$ - 010
0010CORRUGATED METAL PIPE (CMP)
0010AACMP 12"100LF$ - 0$ 21.89$ - 0200
0010ABCMP 15"100LF$ - 0$ 26.85$ - 0200
0010ACCMP 18"50LF$ - 0$ 34.80$ - 0100
0010ADCMP 24"37.5LF$ - 0$ 42.80$ - 075
0010AECMP 36"37.5LF$ - 0$ 58.76$ - 075
0010AFCMP 48"37LF$ - 0$ - 074
0010AGRELOCATE EXISTING CMP (24" OR LESS)50LF$ - 0

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.402140$ - 0100
0011REINFORCED CONCRETE PIPE (RCP)
0011AARCP 12"100LF$ - 0$ - 0200
0011ABRCP 15"100LF$ - 0$ - 0200
0011ACRCP 18"50LF$ - 0$ - 0100
0011ADRCP 24"37.5LF$ - 0$ - 075
0011AERCP 36"37.5LF$ - 0$ - 075
0011AFRCP 48"37.5LF$ - 0$ - 075
0011AGRELOCATE EXISTING RCP (24" OR LESS)50LF$ - 0

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.602040

$ - 0100
0012MISCELLANEOUS DRAINAGE ITEMS
rob.mackay: Formula used to automatically hide headings containing items or not. Filter all rows containing zeros and blanks (not dashes).0012AACORRUGATED PERFORATED HDPE DRAIN PIPE 4” DIA37.5LF$ - 0$ - 075
0012ABCORRUGATED PERFORATED HDPE DRAIN PIPE 6” DIA37.5LF$ - 0$ - 075
0012AC8" PVC PIPE250LF$ - 0$ - 0500
0012AD12" PVC PIPE FOR DROP BOX INLET (DBI) 12A50LF$ - 0$ - 0100
0012AEDBI 12A (TRENCH DRAIN) - INCLUDES FRAME AND GRATE75LF$ - 0$ - 0150
0012AFDBI 13 GRADE CONDITION (STORMWATER STRUCTURE) - INCLUDES FRAME AND GRATE2EA$ - 0$ - 04
0012AGDBI 13 GRADE CONDITION RISER - DOES NOT INCLUDE FRAME AND GRATE2EA$ - 0$ - 04
0012AHDBI 13 GRADE CONDITION FRAME AND GRATE1EA$ - 0$ - 02
0012AIMANHOLE TYPE B1EA$ - 0$ - 02
0012AJMANHOLE GRADE RING OR BRICK FOR ADJUSTMENT1EA$ - 0$ - 02
0012AKMANHOLE FRAME AND LID TYPE 21EA$ - 0$ - 02
0012ALTRENCH DRAIN FRAME AND LID FOR SIDEWALKS124.5LF$ - 0$ - 0249
0012AMSTORMWATER CURB OPENING7.5EA$ - 0$ - 015
0013PRE-CAST REINFORCED CONCRETE BOX CULVERTS
0013AA4' X 4 ' PRE-CAST REINFORCED CONCRETE BOX CULVERT50LF$ - 0$ - 0$ - 0100
0013AB6' X 4' PRE-CAST REINFORCED CONCRETE BOX CULVERT50LF$ - 0$ - 0$ - 0100
0013AC8' X 4' PRE-CAST REINFORCED CONCRETE BOX CULVERT50LF$ - 0$ - 0$ - 0100
0013AD6' x 6' PRE-CAST REINFORCED CONCRETE BOX CULVERT25LF$ - 0$ - 050
0013AE10' X5 ' PRE-CAST REINFORCED CONCRETE BOX CULVERT25LF$ - 0$ - 0$ - 050
0014HEADWALLS
0014AAREINFORCED CONCRETE BOX CULVERT HEADWALL (BOX RISE 6' OR LESS)2EA$ - 0$ - 04
0014ABREINFORCED CONCRETE BOX CULVERT HEADWALL (BOX RISE 6' OR GREATER)1EA$ - 0$ - 02
0014ACSLOPED AND FLARED HEADWALL 12"3EA$ - 0$ - 06
0014ADSLOPED AND FLARED HEADWALL 15"2.5EA$ - 0$ - 05
0014AESLOPED AND FLARED HEADWALL 18"1EA$ - 0$ - 02
0014AFSLOPED AND FLARED HEADWALL 24"1EA$ - 0$ - 02
0014AGSLOPED AND FLARED HEADWALL 36"1EA$ - 0$ - 02
0014AHSLOPED AND FLARED HEADWALL 42"1EA$ - 0$ - 02
0014AISLOPED AND FLARED HEADWALL 48"1EA$ - 0$ - 02
0014AJSLOPE AND FLARED BOX INLET-OUTLET 18"1EA$ - 0$ - 02
0014AKSLOPE AND FLARED BOX INLET-OUTLET 24"1EA$ - 0$ - 02
0014ALSLOPE AND FLARED BOX INLET-OUTLET 36"1EA$ - 0$ - 02
0015GUARDRAIL SYSTEMS

rob.mackay: Formula used to automatically hide headings containing items or not. Filter all rows containing zeros and blanks (not dashes).

rob.mackay: Formula used to automatically hide headings containing items or not. Filter all rows containing zeros and blanks (not dashes).

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.402140 rob.mackay: Formula used to automatically hide headings containing items or not. Filter all rows containing zeros and blanks (not dashes).

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.602040 enrique.d.vazquez: enrique.d.vazquez:

FILTER PRICE IS CLOSE AT 110. BUT THE FRAME PRICE IS A ROUGH ESTIMATE0015AASTEEL BEAM GUARDRAIL (W-BEAM) SINGLE FACE200LF$ - 0$ - 0400
0015ABSTEEL BEAM GUARDRAIL (W-BEAM) DOUBLE FACE100LF$ - 0$ - 0200
0015ACREMOVE GUARDRAIL100LF$ - 0$ - 0200
0015ADGUARDRAIL END TREATMENT TYPE 13EA$ - 0$ - 06
0015AEGUARDRAIL END TREATMENT TYPE 2A3EA$ - 0$ - 06
0015AFGUARDRAIL TERMINAL SECTION NO. 22EA$ - 0$ - 04
0015AGCRASH CUSHION TYPE VI2EA$ - 0$ - 04
0016SIGNAGE
0016AATYPE I SIGN POST WITH TYPE D BREAKAWAY SYSTEM25EA$ - 0$ - 050
0016ABTRAFFIC SIGN25EA$ - 0$ - 050
0016ACREMOVE/RELOCATE TRAFFIC SIGN AND POST12.5EA$ - 0$ - 025
0017REQUIRED TRAINING
0017AAONE TIME UXO/EOD TRAINING (2 HR)0LS$716.96$0.00****PLEASE DISREGARD THIS LINE ITEM AS IT WAS A ONE TIME USE CLIN****
SUBTOTALTOTAL$ - 0

Night Time Multiplier* x.xx

TOTAL**$ - 0
NOTES:

*The Night Time Multiplier is given for projects with work (40% or greater) being performed outside of normal duty hours, as defined in the contract, at the request of the Governement. Contractor shall provide a value for the night time multiplier but it shall NOT be applied to the bid pricing.

**The total shown on the spreadsheet represents the total for the Base Year of each State. The first digit in the Item No. column of the spreadsheet shall represent the current year of work under the contract. So for the Base Year the Item No for Required Training line Item shall be 0017AA, for the 1st Option Year it shall be 1017AA, for the 2nd Option Year it shall be 2017AA and so on.

&F Page &P of &N &D

BaseYear(TN)-PRICE LIST

IDIQ CONTRACT FOR CONSTRUCTION, REPAIR, RESTORATION AND REHABILATION OF ROADWAYS AND HARDSTANDS1.11-Sep-17
FE10236-5J
TENNESSEE PRICE SHEET
ITEM NODESCRIPTIONESTIMATED QUANTITYUNITUNIT PRICEESTIMATED AMOUNT
0001GENERAL REQUIREMENTS, SITE PREPARATION AND DEMOLITION
0001AASEDIMENT AND EROSION CONTROL PLAN MANAGEMENT15EA$ - 0$ 1.00$ - 030$237.50$229.19
0001ABSILT FENCE5000LF$ - 0$ 2.07$ - 010,000$1.97$1.90
0001ACGEOTEXTILE BAG WITH GRAVEL10EA$ - 0$ 28.75$ - 020$122.85$118.55
0001ADEROSION CONTROL BLANKET500SY$ - 0$ 1.75$ - 01,000$1.66$1.60
0001AERIPRAP CHECK DAM ( 2 CF PER FOOT PER LF)2500LF$ - 0$ 18.08$ - 05,000$17.18$16.57
0001AFSQUARE FRAME AND FILTER ASSEMBLY5EA$ - 0

enrique.d.vazquez: enrique.d.vazquez:

FILTER PRICE IS CLOSE AT 110. BUT THE FRAME PRICE IS A ROUGH ESTIMATE $ - 0 10 $199.50 enrique.d.vazquez: enrique.d.vazquez:

FILTER PRICE IS CLOSE AT 110. BUT THE FRAME PRICE IS A ROUGH ESTIMATE$192.52
0001AGCONSTRUCTION LAYOUT9.5AC$ - 0$ - 019$950.00$916.75
0001AHCORE SAMPLES50EA$ - 0$ 75.00$ - 0100$47.50$45.84
0001AICLEARING AND GRUBBING ( INCLUDES TREES LESS THAN 4" DIA.)2500SY$ - 0$ 4.11$ - 05,000$2.00$1.93
0001AJTREE REMOVAL - GREATER THAN 4" DIA.5EA$ - 0$ - 010$475.00$458.38
0001AKFURNISH AND INSTALL CONCRETE JERSEY BARRIER2EA$ - 0$ - 04$860.94$830.80
0001ALRELOCATE AND INSTALL CONCRETE JERSEY BARRIER1EA$ - 0$ - 02$100.94$97.40
0001AMTRAFFIC SIGNAL DETECTION LOOP4EA$ - 0$ - 08$2,237.64$2,159.32
0001ANPORTABLE DYNAMIC/VARIABLE MESSAGE SIGNS50DAY$ - 0$ - 0100$228.00$220.02
0001AOGENERAL DEMOLITION2500LF$ - 0$ - 05,000$3.96$3.82
0001APSELECTIVE DEMOLITION2500SF$ - 0$ - 05,000$4.85$4.68
0002EXCAVATION AND SUBGRADE PREPARATION$0.00
0002AAEXCAVATION - STOCKPILED ON SITE5000CY$ - 0$ 29.20$ - 010,000$3.80$3.67
0002ABEXCAVATION - EXCESS HAULED14000CY$ - 0$ 8.81$ - 028,000$14.25$13.75
0002ACPLACE FILL DIRT FROM ON SITE5000CY$ - 0$ 30.90$ - 010,000$4.75$4.58
0002ADPLACE FILL DIRT FROM BORROW PIT15000CY$ - 0$ 42.92$ - 030,000$14.25$13.75
0002AEDITCHING AND SHOULDERING12500LF$ - 0$ 6.66$ - 025,000$3.96$3.82
0002AFGEOTEXTILE FABRIC50000SY$ - 0$ 1.83$ - 0100,000$1.44$1.39
0002AGTRENCH BOX (4'X10')2.5EA$ - 0$ - 05$1,425.00$1,375.13
0002AHTRENCH BOX (6'X10')2.5EA$ - 0$ - 05$1,710.00$1,650.15
0002AITRENCH BOX (6'X14')2.5EA$ - 0$ - 05$1,995.00$1,925.18
0002AJTRENCH BOX (6'X16')2.5EA$ - 0$ - 05$2,280.00$2,200.20
0002AKSUBGRADE RESHAPING AND COMPACTION12500SY$ - 0$ - 025,000$0.95$0.92
0003FINAL GRADING AND TURF ESTABLISHMENT$0.00
0003AATOP SOIL - PLACED FROM ON SITE STOCKPILE7500CY$ - 0$ 18.72$ - 015,000$4.75$4.58
0003ABTOP SOIL - HAULED AND PLACED FROM BORROW PIT15000CY$ - 0$ 18.72$ - 030,000$14.25$13.75
0003ACTOP SOIL - PURCHASED FROM OUTSIDE SOURCE101251.5SY$ - 0$ 1.00$ - 0202,503$0.95$0.92
0003ADSEEDING26999.5SY$ - 0$ - 053,999$2.61$2.52
0003AEHYDRO-SEEDING6750SY$ - 0$ - 013,500$5.14$4.96
0003AFSODDING1250SY$ - 0$ - 02,500$5.14$4.96
0004STABILIZED AGGREGATE & GRAVEL$0.00
0004AANO. 57 AGGREGATE - DRAINAGE LAYER4000Ton$ - 0$ 49.51$ - 08,000$33.86$32.67
0004ABNO. 8 AGGREGATE - PIPE BEDDING1250Ton$ - 0$ 25.74$ - 02,500$33.92$32.73
0004ACCRUSHED STONE BASE - DRAINAGE LAYER5000Ton$ - 0$ 25.74$ - 010,000$21.36$20.61
0004ADNO. 2 AGGREGATE1250Ton$ - 0$ 25.74$ - 02,500$18.24$17.60
0004AEDENSE GRADED AGGREGATE BASE (DGA)10000Ton$ - 0$ 49.51$ - 020,000$19.32$18.65
0004AFNATURAL SAND FOR DRAINAGE AND BACKFILL250Ton$ - 0$ 25.74$ - 0500$22.77$21.97
0004AGCRUSHED CONCRETE HAULING FROM LANDFILL2500Ton$ - 0$ 13.74$ - 05,000$7.04$6.79
0004AHSLOPE PROTECTION AND CHANNEL LINING CLASS II750Ton$ - 0$ 35.74$ - 0ORIG ($ / ton)2013 ($ / ton)2014 ($ / ton)2015 ($ / ton)1,500$26.89$25.94
0004AISLOPE PROTECTION AND CHANNEL LINING CLASS III750Ton$ - 0$ - 0$615.45$561.50$556.00$479.501,500$30.19$29.13
0004AJGEOGRID REINFORCEMENT7498.5SY$ - 0$ - 0$ - 014,997$2.36$2.27
0005ASPHALT PAVEMENTS AND ASSOCIATED WORK0.9298720.9227230.8232840.1077673493$0.00
0005AAMESH PAVEMENT REINFORCEMENT GLASGRID1250SY$ - 0$ 10.94$ - 02,500$10.39$10.03
0005ABTACK COAT (SS-1H)50000SY$ - 0$ 0.14$ - 0100,000$1.51$1.46
0005ACPRIME COAT (SS-1H)37500SY$ - 0$ 0.84$ - 075,000$3.06$2.95
0005ADINSTALL BITUMINOUS CONCRETE SURFACE COURSE (1" DEPTH)2500SY$ - 0$ 3.65$ - 0$3.65$3.40$3.37$3.015,000$2.86$2.76
0005AEINSTALL BITUMINOUS CONCRETE SURFACE COURSE (2” DEPTH)50000SY$ - 0$ - 0$3.61$3.36$3.34$2.981" Binder100,000$5.71$5.51
0005AFINSTALL BITUMINOUS CONCRETE SURFACE COURSE (3” DEPTH)25000SY$ - 0$ - 050,000$8.57$8.27
0005AGINSTALL BITUMINOUS CONCRETE SURFACE COURSE (4” DEPTH)1000SY$ - 0$ - 02,000$11.42$11.02
0005AHINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFIELDS (1" DEPTH)500SY$ - 0$ 3.65$ - 01,000$5.71$5.51
0005AIINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFIELDS (2” DEPTH)500SY$ - 0$ - 01,000$14.23$13.73
0005AJINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFILEDS (3” DEPTH)500SY$ - 0$ - 01,000$21.35$20.60
0005AKINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFIELDS (4” DEPTH)7500SY$ - 0$ - 0$7.30$6.80$6.74$6.0115,000$28.93$27.92
0005ALINSTALL BITUMINOUS CONCRETE BASE COURSE (1" DEPTH)500SY$ - 0$ - 01,000$2.83$2.73
0005AMINSTALL BITUMINOUS CONCRETE BASE COURSE (2” DEPTH)2500SY$ - 0$ - 0$10.95$10.20$10.11$9.025,000$5.65$5.45
0005ANINSTALL BITUMINOUS CONCRETE BASE COURSE (3” DEPTH)2500SY$ - 0$ - 0$14.60$13.60$13.48$12.025,000$8.47$8.18
0005AOINSTALL BITUMINOUS CONCRETE BASE COURSE (4” DEPTH)37500SY$ - 0$ - 0$18.25$16.99$16.84$15.0375,000$11.30$10.90
0005APINSTALL BITUMINOUS CONCRETE BASE COURSE (5” DEPTH)1250SY$ - 0$ - 0$21.90$20.39$20.21$18.032,500$14.13$13.63
0005AQINSTALL BITUMINOUS CONCRETE BASE COURSE (6” DEPTH)500SY$ - 0$ - 0$25.55$23.79$23.58$21.041,000$16.95$16.35
0005ARINSTALL BITUMINOUS CONCRETE BASE COURSE (7” DEPTH)500SY$ - 0$ - 0$29.20$27.19$26.95$24.041,000$19.77$19.08
0005ASINSTALL BITUMINOUS CONCRETE BASE COURSE (8” DEPTH)500SY$ - 0$ - 0$32.85$30.59$30.32$27.051,000$22.59$21.80
0005ATINSTALL BITUMINOUS CONCRETE BASE COURSE (9” DEPTH)500SY$ - 0$ - 0$36.50$33.99$33.68$30.051,000$25.41$24.52
0005AUINSTALL BITUMINOUS CONCRETE BASE COURSE (10” DEPTH)500SY$ - 0$ - 0$40.15$37.39$37.05$33.061,000$28.24$27.25
0005AVINSTALL BITUMINOUS CONCRETE BASE COURSE (11” DEPTH)500SY$ - 0$ - 0$43.80$40.79$40.42$36.061,000$31.07$29.98
0005AWINSTALL BITUMINOUS CONCRETE BASE COURSE (12” DEPTH)425SY$ - 0$ - 0$7.22$6.72$6.67$5.95850$33.89$32.70
0005AXINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (1" DEPTH)500SY$ - 0$ - 0$10.83$10.08$10.00$8.921,000$6.69$6.45
0005AYINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (2” DEPTH)500SY$ - 0$ - 0$14.44$13.45$13.33$11.891,000$13.37$12.90
0005AZINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (3” DEPTH)500SY$ - 0$ - 0$18.05$16.81$16.66$14.871,000$20.05$19.34
0005BAINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (4” DEPTH)500SY$ - 0$ - 0$21.66$20.17$19.99$17.841,000$26.72$25.79
0005BBINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (5” DEPTH)500SY$ - 0$ - 0$25.27$23.53$23.32$20.811,000$33.40$32.23
0005BCINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (6” DEPTH)500SY$ - 0$ - 0$28.88$26.89$26.65$23.781,000$40.08$38.68
0005BDINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (7” DEPTH)500SY$ - 0$ - 0$32.49$30.25$29.98$26.751,000$46.76$45.12
0005BEINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFILEDS (8” DEPTH)500SY$ - 0$ - 0$36.10$33.62$33.32$29.731,000$53.44$51.57
0005BFINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (9” DEPTH)500SY$ - 0$ - 0$39.71$36.98$36.65$32.701,000$60.12$58.01
0005BGINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFILEDS (10” DEPTH)500SY$ - 0$ - 0$43.32$40.34$39.98$35.671,000$66.79$64.46
0005BHINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFILEDS (11” DEPTH)500SY$ - 0$ - 01,000$73.47$70.90
0005BIINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (12” DEPTH)500SY$ - 0$ - 01,000$80.15$77.35
0005BJASPHALT PAVEMENT RIDE QUALITY5LN-MI$ - 0$ - 010$285.00$275.03
0005BKADJUSTMENT OF MANHOLES/DRAINAGE STRUCTURES AND UTILITY BOXES10EA$ - 0$ - 020$332.50$320.86
0005BLASPHALT WEDGE CURB50LF$ - 0$ - 0100$9.74$9.40
0006COLD MILLING OF BITUMINOUS PAVEMENTS$0.00
0006AAPAVEMENT MILLINGS HAULED TO WOODLAWN LANDFILL5000SY-I$ - 0$ - 010,000$3.81$3.68
0006ABPAVEMENT MILLINGS HAULED OUTSIDE OF FT CAMPBELL2500SY-I$ - 0$ - 05,000$5.07$4.90
0006ACPAVEMENT MILLINGS RETAINED BY CONTRACTOR50000SY-I$ - 0$ - 0100,000$2.54$2.45
0007ROADWAY SURFACE REHABILITATION$0.00
0007AACRACK SEALING IN BITUMINOUS PAVEMENTS 1/8" TO 1/2"4002.5LF$ - 0$ 0.92$ - 08,005$0.95$0.92
0007ABCRACK SEALING IN BITUMINOUS PAVEMENTS 5/8" TO 1"2000LF$ - 0$ 1.30$ - 04,000$2.08$2.01
0007ACASPHALT REJUVENATOR15000SY$ - 0$ - 030,000$0.95$0.92
0007ADRUBBERIZED SEAL COAT7500SY$ - 0$ 1.12$ - 015,000$1.40$1.35
0007AEMICRO-SURFACING SURFACE COURSE7500SY$ - 0$ 2.07$ - 015,000$5.57$5.37
0007AFMICRO-SURFACING RUT FILL COURSE75Ton$ - 0$ 12.33$ - 0150$463.60$447.37
0007AGSAWCUT EXISTING ASPHALT SURFACE4000LF$ - 0$ 12.33$ - 08,000$1.10$1.06
0007AHRUNWAY RUBBER REMOVAL AND DISPOSAL50000.5SY$ - 0$ 12.33$ - 0100,001$0.86$0.83
0007AIFULL DEPTH RECLAMATION OF FLEXIBLE PAVEMENT7500SY$ - 0$ - 015,000$4.18$4.03
0008CONCRETE WORK$0.00
0008AASAWCUT EXISTING CONCRETE SURFACE1500LF$ - 0$ - 03,000$1.45$1.40
0008ABSIDEWALK C.I.P CONCRETE 4000PSI (4" DEPTH)500SY$ - 0$ 23.34$ - 01,000$59.94$57.84
0008ACSIDEWALK C.I.P CONCRETE 4000PSI (6" DEPTH)500SY$ - 0$ - 01,000$104.88$101.21
0008ADNORMAL WEIGTH CONCRETE 4000PSI MIN.500CY$ - 0$ - 01,000$161.80$156.14
0008AEHIGHEARLY STRENGTH CONCRETE 4000PSI MIN.250CY$ - 0$ 12.95$ - 0500$107.35$103.59
0008AFSTEEL REINFORCEMENT15TON$ - 0$ - 01.0630$1,900.00$1,833.50
0008AGWELDED WIRE REINFORCEMENT500SF$ - 0$ - 021201,000$0.50$0.49
0008AHSMOOTH DOWEL BARS 3/4" DIA. 12" LONG25EA$ - 0$ - 0$ - 050$12.87$12.42
0008AISTAINED CONCRETE ADMIXTURE250SY$ - 0$ - 0$ - 0500$25.42$24.53
0008AJSTENCILED (STAMPED-STACKED) CONCRETE250SY$ - 0$ 55.00$ - 0500$98.15$94.72
0008AKCONSTRUCTION JOINTS500LF$ - 0$ 1,100.00$ - 01,000$0.80$0.77
0008ALEXPANSION JOINTS500LF$ - 0$ - 0$ - 01,000$1.81$1.75
0008AMSELF-LEVELING JOINT SEALANT500LF$ - 0$ - 0$ - 01,000$2.09$2.02
0008ANNON-SAG JOINT SEALANT FOR AIRFIELDS250LF$ - 0$ - 0500$2.25$2.17
0008AOPRECAST PARKING VEHICLE STOP5EA$ - 0$ - 010$58.14$56.11
0008APRELOCATE GOVERNMENT OWNED PARKING VEHICLE STOP10EA$ - 0$ - 020$19.38$18.70
0008AQPERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT500SF$ - 0$ - 01,000$13.30$12.83
0008ARSTANDARD CONCRETE CURB AND GUTTER250LF$ - 0$ 31.66$ - 0500$18.65$18.00
0008ASSTANDARD HEADER CURB250.5LF$ - 0$ 31.66$ - 0501$10.45$10.08
0008ATK4 BOLLARD5EA$ - 0$ - 010$1,900.00$1,833.50
0008AUCLSM -FLOWABLE FILL10CY$ - 0$ - 020$123.58$119.25
0009PAVEMENT MARKINGS$0.00
0009AATHERMOPLASTIC MARKING 4" WHITE OR YELLOW STRIPE35000LF$ - 0$ 0.71$ - 070,000$0.67$0.65
0009ABTHERMOPLASTIC MARKING 6" WHITE OR YELLOW STRIPE13500LF$ - 0$ 1.44$ - 027,000$1.37$1.32
0009ACTHERMOPLASTIC MARKING 12" WHITE OR YELLOW STRIPE1250LF$ - 0$ 2.04$ - 02,500$1.94$1.87
0009ADTHERMOPLASTIC MARKING 24" WHITE OR YELLOW STRIPE2500LF$ - 0$ - 05,000$3.88$3.74
0009AETHERMOPLASTIC SYMBOL GRADE (RAILROAD) CROSSING5EA$ - 0$ 369.70$ - 010$351.22$338.92
0009AFTHERMOPLASTIC SYMBOL SCHOOL CROSSING2.5LF$ - 0$ 10.97$ - 05$10.42$10.06
0009AGTHERMOPLASTIC SYMBOL TURN LANE ARROW10EA$ - 0$ 196.26$ - 020$186.45$179.92
0009AHTHERMOPLASTIC SYMBOL STRAIGHT LANE ARROW10EA$ - 0$ 196.26$ - 020$186.45$179.92
0009AITHERMOPLASTIC SYMBOL STRAIGHT AND TURN LANE ARROW10EA$ - 0$ 311.50$ - 020$295.93$285.57
0009AJTHERMOPLASTIC SYMBOL STRAIGHT AND 2-TURN LANE ARROW5EA$ - 0$ 336.82$ - 010$319.98$308.78
0009AKTHERMOPLASTIC SYMBOL ADA (HANDICAPPED) PARKING5EA$ - 0$ 280.69$ - 010$266.66$257.32
0009ALTHERMOPLASTIC SYMBOL BICYCLE LANE5EA$ - 0$ 196.26$ - 010$186.45$179.92
0009AMPERMANENT PAVEMENT MARKING STRIPE 4" WHITE, YELLOW, OR RED STRIPE35000LF$ - 0$ 0.22$ - 070,000$0.43$0.41
0009ANPERMANENT PAVEMENT MARKING SYMBOL ADA (HANDICAPPED) PARKING6EA$ - 0$ 59.33$ - 012$56.36$54.39
0009AOPERMANENT PAVEMENT MARKING SYMBOL BICYCLE LANE6EA$ - 0$ 59.33$ - 012$56.36$54.39
0009APPERMANENT PAVEMENT MARKING SYMBOL DIRECTIONAL ARROW7.5EA$ - 0$ 59.33$ - 015$56.36$54.39
0009AQPERMANENT PAVEMENT MARKING LETTERS 12" MIN5EA$ - 0$ 59.33$ - 010$8.65$8.35
0009ARAIRFIELD MARKING25000SF$ - 0$ 0.67$ - 050,000$0.64$0.61
0009ASTEMPORARY STRIPING2500LF$ - 0$ 0.67$ - 05,000$0.27$0.26
0009ATPAVEMENT MARKING REMOVAL SYMBOL5000SF$ - 0$ 2.16$ - 010,000$2.05$1.98
0009AUPAVEMENT MARKING REMOVAL STRIPING18500LF$ - 0$ 1.36$ - 037,000$1.29$1.25
0009AVDETECTABLE WARNING PADS50SF$ - 0$ 1.36$ - 0100$37.05$35.75
0009AWRAISED PAVEMENT MARKERS (MONO-DIRECTIONAL)50EA$ - 0$ - 0100$25.13$24.25
0009AXRAISED PAVEMENT MARKERS (BI-DIRECTIONAL)50EA$ - 0$ - 0100$23.10$22.30
0009AYREMOVAL OF RAISED PAVEMENT MARKERS25EA$ - 0$ - 050$6.85$6.61
0009AZFLEXIBLE DELINEATOR5EA$ - 0$ - 010$36.10$34.84
0010CORRUGATED METAL PIPE (CMP)$0.00
0010AACMP 12"100LF$ - 0$ 21.89$ - 0200$29.45$28.42
0010ABCMP 15"100LF$ - 0$ 26.85$ - 0200$36.10$34.84
0010ACCMP 18"50LF$ - 0$ 34.80$ - 0100$38.00$36.67
0010ADCMP 24"37.5LF$ - 0$ 42.80$ - 075$45.60$44.00
0010AECMP 36"37.5LF$ - 0$ 58.76$ - 075$70.30$67.84
0010AFCMP 48"37LF$ - 0$ - 074$97.85$94.43
0010AGRELOCATE EXISTING CMP (24" OR LESS)50LF$ - 0

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.402140 $ - 0 100 $12.53 enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.402140$12.09
0011REINFORCED CONCRETE PIPE (RCP)$0.00
0011AARCP 12"100LF$ - 0$ - 0200$32.78$31.63
0011ABRCP 15"100LF$ - 0$ - 0200$37.53$36.21
0011ACRCP 18"50LF$ - 0$ - 0100$44.65$43.09
0011ADRCP 24"37.5LF$ - 0$ - 075$60.33$58.21
0011AERCP 36"37.5LF$ - 0$ - 075$117.80$113.68
0011AFRCP 48"37.5LF$ - 0$ - 075$171.00$165.02
0011AGRELOCATE EXISTING RCP (24" OR LESS)50LF$ - 0

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.602040 $ - 0 100 $20.08 enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.602040

$19.38
0012MISCELLANEOUS DRAINAGE ITEMS
rob.mackay: Formula used to automatically hide headings containing items or not. Filter all rows containing zeros and blanks (not dashes).$0.00
0012AACORRUGATED PERFORATED HDPE DRAIN PIPE 4” DIA37.5LF$ - 0$ - 075$4.59$4.43
0012ABCORRUGATED PERFORATED HDPE DRAIN PIPE 6” DIA37.5LF$ - 0$ - 075$6.18$5.96
0012AC8" PVC PIPE250LF$ - 0$ - 0500$20.59$19.87
0012AD12" PVC PIPE FOR DROP BOX INLET (DBI) 12A50LF$ - 0$ - 0100$29.14$28.12
0012AEDBI 12A (TRENCH DRAIN) - INCLUDES FRAME AND GRATE75LF$ - 0$ - 0150$585.23$564.75
0012AFDBI 13 GRADE CONDITION (STORMWATER STRUCTURE) - INCLUDES FRAME AND GRATE2EA$ - 0$ - 04$3,132.19$3,022.56
0012AGDBI 13 GRADE CONDITION RISER - DOES NOT INCLUDE FRAME AND GRATE2EA$ - 0$ - 04$1,008.90$973.59
0012AHDBI 13 GRADE CONDITION FRAME AND GRATE1EA$ - 0$ - 02$489.25$472.13
0012AIMANHOLE TYPE B1EA$ - 0$ - 02$3,472.32$3,350.79
0012AJMANHOLE GRADE RING OR BRICK FOR ADJUSTMENT1EA$ - 0$ - 02$633.25$611.09
0012AKMANHOLE FRAME AND LID TYPE 21EA$ - 0$ - 02$988.00$953.42
0012ALTRENCH DRAIN FRAME AND LID FOR SIDEWALKS124.5LF$ - 0$ - 0249$285.00$275.03
0012AMSTORMWATER CURB OPENING7.5EA$ - 0$ - 015$494.00$476.71
0013PRE-CAST REINFORCED CONCRETE BOX CULVERTS$0.00
0013AA4' X 4 ' PRE-CAST REINFORCED CONCRETE BOX CULVERT50LF$ - 0$ - 0$ - 0100$755.25$728.82
0013AB6' X 4' PRE-CAST REINFORCED CONCRETE BOX CULVERT50LF$ - 0$ - 0$ - 0100$821.75$792.99
0013AC8' X 4' PRE-CAST REINFORCED CONCRETE BOX CULVERT50LF$ - 0$ - 0$ - 0100$927.69$895.22
0013AD6' x 6' PRE-CAST REINFORCED CONCRETE BOX CULVERT25LF$ - 0$ - 050$1,045.00$1,008.43
0013AE10' X5 ' PRE-CAST REINFORCED CONCRETE BOX CULVERT25LF$ - 0$ - 0$ - 050$1,258.75$1,214.69
0014HEADWALLS$0.00
0014AAREINFORCED CONCRETE BOX CULVERT HEADWALL (BOX RISE 6' OR LESS)2EA$ - 0$ - 04$2,739.70$2,643.81
0014ABREINFORCED CONCRETE BOX CULVERT HEADWALL (BOX RISE 6' OR GREATER)1EA$ - 0$ - 02$5,479.39$5,287.61
0014ACSLOPED AND FLARED HEADWALL 12"3EA$ - 0$ - 06$617.50$595.89
0014ADSLOPED AND FLARED HEADWALL 15"2.5EA$ - 0$ - 05$641.25$618.81
0014AESLOPED AND FLARED HEADWALL 18"1EA$ - 0$ - 02$712.50$687.56
0014AFSLOPED AND FLARED HEADWALL 24"1EA$ - 0$ - 02$807.50$779.24
0014AGSLOPED AND FLARED HEADWALL 36"1EA$ - 0$ - 02$855.00$825.08
0014AHSLOPED AND FLARED HEADWALL 42"1EA$ - 0$ - 02$902.50$870.91
0014AISLOPED AND FLARED HEADWALL 48"1EA$ - 0$ - 02$950.00$916.75
0014AJSLOPE AND FLARED BOX INLET-OUTLET 18"1EA$ - 0$ - 02$2,280.56$2,200.74
0014AKSLOPE AND FLARED BOX INLET-OUTLET 24"1EA$ - 0$ - 02$3,011.00$2,905.61
0014ALSLOPE AND FLARED BOX INLET-OUTLET 36"1EA$ - 0$ - 02$5,344.95$5,157.87
0015GUARDRAIL SYSTEMS

rob.mackay: Formula used to automatically hide headings containing items or not. Filter all rows containing zeros and blanks (not dashes).

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.402140 rob.mackay: Formula used to automatically hide headings containing items or not. Filter all rows containing zeros and blanks (not dashes).

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.402140 rob.mackay: Formula used to automatically hide headings containing items or not. Filter all rows containing zeros and blanks (not dashes).

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.602040 enrique.d.vazquez: enrique.d.vazquez:

FILTER PRICE IS CLOSE AT 110. BUT THE FRAME PRICE IS A ROUGH ESTIMATE

enrique.d.vazquez: enrique.d.vazquez:

Material and Labor from RS Means 33 41 13.602040 enrique.d.vazquez: enrique.d.vazquez:

FILTER PRICE IS CLOSE AT 110. BUT THE FRAME PRICE IS A ROUGH ESTIMATE$0.00
0015AASTEEL BEAM GUARDRAIL (W-BEAM) SINGLE FACE200LF$ - 0$ - 0400$18.32$17.67
0015ABSTEEL BEAM GUARDRAIL (W-BEAM) DOUBLE FACE100LF$ - 0$ - 0200$30.85$29.77
0015ACREMOVE GUARDRAIL100LF$ - 0$ - 0200$1.25$1.21
0015ADGUARDRAIL END TREATMENT TYPE 13EA$ - 0$ - 06$1,895.88$1,829.52
0015AEGUARDRAIL END TREATMENT TYPE 2A3EA$ - 0$ - 06$613.71$592.23
0015AFGUARDRAIL TERMINAL SECTION NO. 22EA$ - 0$ - 04$51.30$49.50
0015AGCRASH CUSHION TYPE VI2EA$ - 0$ - 04$10,980.64$10,596.32
0016SIGNAGE$0.00
0016AATYPE I SIGN POST WITH TYPE D BREAKAWAY SYSTEM25EA$ - 0$ - 050$57.00$55.01
0016ABTRAFFIC SIGN25EA$ - 0$ - 050$142.50$137.51
0016ACREMOVE/RELOCATE TRAFFIC SIGN AND POST12.5EA$ - 0$ - 025$42.75$41.25
0017REQUIRED TRAINING
0017AAONE TIME UXO/EOD TRAINING (2 HR)0LS$716.96$0.00****PLEASE DISREGARD THIS LINE ITEM AS IT WAS A ONE TIME USE CLIN****
SUBTOTALTOTAL$ - 0

Night Time Multiplier* x.xx

TOTAL**$ - 0
NOTES:

*The Night Time Multiplier is given for projects with work (40% or greater) being performed outside of normal duty hours, as defined in the contract, at the request of the Governement. Contractor shall provide a value for the night time multiplier but it shall NOT be applied to the bid pricing.

**The total shown on the spreadsheet represents the total for the Base Year of each State. The first digit in the Item No. column of the spreadsheet shall represent the current year of work under the contract. So for the Base Year the Item No for Required Training line Item shall be 0017AA, for the 1st Option Year it shall be 1017AA, for the 2nd Option Year it shall be 2017AA and so on.

&F Page &P of &N &D

Option Yr 1 (KY)-PRICE LIST

IDIQ CONTRACT FOR CONSTRUCTION, REPAIR, RESTORATION AND REHABILATION OF ROADWAYS AND HARDSTANDS1.11-Sep-17
FE10236-5J
KENTUCKY PRICE SHEET
ITEM NODESCRIPTIONESTIMATED QUANTITYUNITUNIT PRICEESTIMATED AMOUNT
1001GENERAL REQUIREMENTS, SITE PREPARATION AND DEMOLITION00011001
1001AASEDIMENT AND EROSION CONTROL PLAN MANAGEMENT15EA$ - 0$ 1.00$ - 0300001AA1001AA
1001ABSILT FENCE5000LF$ - 0$ 2.07$ - 010,0000001AB1001AB
1001ACGEOTEXTILE BAG WITH GRAVEL10EA$ - 0$ 28.75$ - 0200001AC1001AC
1001ADEROSION CONTROL BLANKET500SY$ - 0$ 1.75$ - 01,0000001AD1001AD
1001AERIPRAP CHECK DAM ( 2 CF PER FOOT PER LF)2500LF$ - 0$ 18.08$ - 05,0000001AE1001AE
1001AFSQUARE FRAME AND FILTER ASSEMBLY5EA$ - 0

enrique.d.vazquez: enrique.d.vazquez:

FILTER PRICE IS CLOSE AT 110. BUT THE FRAME PRICE IS A ROUGH ESTIMATE$ - 0100001AF1001AF
1001AGCONSTRUCTION LAYOUT9.5AC$ - 0$ - 0190001AG1001AG
1001AHCORE SAMPLES50EA$ - 0$ 75.00$ - 01000001AH1001AH
1001AICLEARING AND GRUBBING ( INCLUDES TREES LESS THAN 4" DIA.)2500SY$ - 0$ 4.11$ - 05,0000001AI1001AI
1001AJTREE REMOVAL - GREATER THAN 4" DIA.5EA$ - 0$ - 0100001AJ1001AJ
1001AKFURNISH AND INSTALL CONCRETE JERSEY BARRIER2EA$ - 0$ - 040001AK1001AK
1001ALRELOCATE AND INSTALL CONCRETE JERSEY BARRIER1EA$ - 0$ - 020001AL1001AL
1001AMTRAFFIC SIGNAL DETECTION LOOP4EA$ - 0$ - 080001AM1001AM
1001ANPORTABLE DYNAMIC/VARIABLE MESSAGE SIGNS50DAY$ - 0$ - 01000001AN1001AN
1001AOGENERAL DEMOLITION2500LF$ - 0$ - 05,0000001AO1001AO
1001APSELECTIVE DEMOLITION2500SF$ - 0$ - 05,0000001AP1001AP
1002EXCAVATION AND SUBGRADE PREPARATION00021002
1002AAEXCAVATION - STOCKPILED ON SITE5000CY$ - 0$ 29.20$ - 010,0000002AA1002AA
1002ABEXCAVATION - EXCESS HAULED14000CY$ - 0$ 8.81$ - 028,0000002AB1002AB
1002ACPLACE FILL DIRT FROM ON SITE5000CY$ - 0$ 30.90$ - 010,0000002AC1002AC
1002ADPLACE FILL DIRT FROM BORROW PIT15000CY$ - 0$ 42.92$ - 030,0000002AD1002AD
1002AEDITCHING AND SHOULDERING12500LF$ - 0$ 6.66$ - 025,0000002AE1002AE
1002AFGEOTEXTILE FABRIC50000SY$ - 0$ 1.83$ - 0100,0000002AF1002AF
1002AGTRENCH BOX (4'X10')2.5EA$ - 0$ - 050002AG1002AG
1002AHTRENCH BOX (6'X10')2.5EA$ - 0$ - 050002AH1002AH
1002AITRENCH BOX (6'X14')2.5EA$ - 0$ - 050002AI1002AI
1002AJTRENCH BOX (6'X16')2.5EA$ - 0$ - 050002AJ1002AJ
1002AKSUBGRADE RESHAPING AND COMPACTION12500SY$ - 0$ - 025,0000002AK1002AK
1003FINAL GRADING AND TURF ESTABLISHMENT00031003
1003AATOP SOIL - PLACED FROM ON SITE STOCKPILE7500CY$ - 0$ 18.72$ - 015,0000003AA1003AA
1003ABTOP SOIL - HAULED AND PLACED FROM BORROW PIT15000CY$ - 0$ 18.72$ - 030,0000003AB1003AB
1003ACTOP SOIL - PURCHASED FROM OUTSIDE SOURCE101251.5SY$ - 0$ 1.00$ - 0202,5030003AC1003AC
1003ADSEEDING26999.5SY$ - 0$ - 053,9990003AD1003AD
1003AEHYDRO-SEEDING6750SY$ - 0$ - 013,5000003AE1003AE
1003AFSODDING1250SY$ - 0$ - 02,5000003AF1003AF
1004STABILIZED AGGREGATE & GRAVEL00041004
1004AANO. 57 AGGREGATE - DRAINAGE LAYER4000Ton$ - 0$ 49.51$ - 08,0000004AA1004AA
1004ABNO. 8 AGGREGATE - PIPE BEDDING1250Ton$ - 0$ 25.74$ - 02,5000004AB1004AB
1004ACCRUSHED STONE BASE - DRAINAGE LAYER5000Ton$ - 0$ 25.74$ - 010,0000004AC1004AC
1004ADNO. 2 AGGREGATE1250Ton$ - 0$ 25.74$ - 02,5000004AD1004AD
1004AEDENSE GRADED AGGREGATE BASE (DGA)10000Ton$ - 0$ 49.51$ - 020,0000004AE1004AE
1004AFNATURAL SAND FOR DRAINAGE AND BACKFILL250Ton$ - 0$ 25.74$ - 05000004AF1004AF
1004AGCRUSHED CONCRETE HAULING FROM LANDFILL2500Ton$ - 0$ 13.74$ - 05,0000004AG1004AG
1004AHSLOPE PROTECTION AND CHANNEL LINING CLASS II750Ton$ - 0$ 35.74$ - 0ORIG ($ / ton)2013 ($ / ton)2014 ($ / ton)2015 ($ / ton)1,5000004AH1004AH
1004AISLOPE PROTECTION AND CHANNEL LINING CLASS III750Ton$ - 0$ - 0$615.45$561.50$556.00$479.501,5000004AI1004AI
1004AJGEOGRID REINFORCEMENT7498.5SY$ - 0$ - 0$ - 014,9970004AJ1004AJ
1005ASPHALT PAVEMENTS AND ASSOCIATED WORK0.9298720.9227230.8232840.107767349300051005
1005AAMESH PAVEMENT REINFORCEMENT GLASGRID1250SY$ - 0$ 10.94$ - 02,5000005AA1005AA
1005ABTACK COAT (SS-1H)50000SY$ - 0$ 0.14$ - 0100,0000005AB1005AB
1005ACPRIME COAT (SS-1H)37500SY$ - 0$ 0.84$ - 075,0000005AC1005AC
1005ADINSTALL BITUMINOUS CONCRETE SURFACE COURSE (1" DEPTH)2500SY$ - 0$ 3.65$ - 0$3.65$3.40$3.37$3.015,0000005AD1005AD
1005AEINSTALL BITUMINOUS CONCRETE SURFACE COURSE (2” DEPTH)50000SY$ - 0$ - 0$3.61$3.36$3.34$2.981" Binder100,0000005AE1005AE
1005AFINSTALL BITUMINOUS CONCRETE SURFACE COURSE (3” DEPTH)25000SY$ - 0$ - 050,0000005AF1005AF
1005AGINSTALL BITUMINOUS CONCRETE SURFACE COURSE (4” DEPTH)1000SY$ - 0$ - 02,0000005AG1005AG
1005AHINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFIELDS (1" DEPTH)500SY$ - 0$ 3.65$ - 01,0000005AH1005AH
1005AIINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFIELDS (2” DEPTH)500SY$ - 0$ - 01,0000005AI1005AI
1005AJINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFILEDS (3” DEPTH)500SY$ - 0$ - 01,0000005AJ1005AJ
1005AKINSTALL BITUMINOUS CONCRETE SURFACE COURSE FOR AIRFIELDS (4” DEPTH)7500SY$ - 0$ - 0$7.30$6.80$6.74$6.0115,0000005AK1005AK
1005ALINSTALL BITUMINOUS CONCRETE BASE COURSE (1" DEPTH)500SY$ - 0$ - 01,0000005AL1005AL
1005AMINSTALL BITUMINOUS CONCRETE BASE COURSE (2” DEPTH)2500SY$ - 0$ - 0$10.95$10.20$10.11$9.025,0000005AM1005AM
1005ANINSTALL BITUMINOUS CONCRETE BASE COURSE (3” DEPTH)2500SY$ - 0$ - 0$14.60$13.60$13.48$12.025,0000005AN1005AN
1005AOINSTALL BITUMINOUS CONCRETE BASE COURSE (4” DEPTH)37500SY$ - 0$ - 0$18.25$16.99$16.84$15.0375,0000005AO1005AO
1005APINSTALL BITUMINOUS CONCRETE BASE COURSE (5” DEPTH)1250SY$ - 0$ - 0$21.90$20.39$20.21$18.032,5000005AP1005AP
1005AQINSTALL BITUMINOUS CONCRETE BASE COURSE (6” DEPTH)500SY$ - 0$ - 0$25.55$23.79$23.58$21.041,0000005AQ1005AQ
1005ARINSTALL BITUMINOUS CONCRETE BASE COURSE (7” DEPTH)500SY$ - 0$ - 0$29.20$27.19$26.95$24.041,0000005AR1005AR
1005ASINSTALL BITUMINOUS CONCRETE BASE COURSE (8” DEPTH)500SY$ - 0$ - 0$32.85$30.59$30.32$27.051,0000005AS1005AS
1005ATINSTALL BITUMINOUS CONCRETE BASE COURSE (9” DEPTH)500SY$ - 0$ - 0$36.50$33.99$33.68$30.051,0000005AT1005AT
1005AUINSTALL BITUMINOUS CONCRETE BASE COURSE (10” DEPTH)500SY$ - 0$ - 0$40.15$37.39$37.05$33.061,0000005AU1005AU
1005AVINSTALL BITUMINOUS CONCRETE BASE COURSE (11” DEPTH)500SY$ - 0$ - 0$43.80$40.79$40.42$36.061,0000005AV1005AV
1005AWINSTALL BITUMINOUS CONCRETE BASE COURSE (12” DEPTH)425SY$ - 0$ - 0$7.22$6.72$6.67$5.958500005AW1005AW
1005AXINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (1" DEPTH)500SY$ - 0$ - 0$10.83$10.08$10.00$8.921,0000005AX1005AX
1005AYINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (2” DEPTH)500SY$ - 0$ - 0$14.44$13.45$13.33$11.891,0000005AY1005AY
1005AZINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (3” DEPTH)500SY$ - 0$ - 0$18.05$16.81$16.66$14.871,0000005AZ1005AZ
1005BAINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (4” DEPTH)500SY$ - 0$ - 0$21.66$20.17$19.99$17.841,0000005BA1005BA
1005BBINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (5” DEPTH)500SY$ - 0$ - 0$25.27$23.53$23.32$20.811,0000005BB1005BB
1005BCINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (6” DEPTH)500SY$ - 0$ - 0$28.88$26.89$26.65$23.781,0000005BC1005BC
1005BDINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (7” DEPTH)500SY$ - 0$ - 0$32.49$30.25$29.98$26.751,0000005BD1005BD
1005BEINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFILEDS (8” DEPTH)500SY$ - 0$ - 0$36.10$33.62$33.32$29.731,0000005BE1005BE
1005BFINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (9” DEPTH)500SY$ - 0$ - 0$39.71$36.98$36.65$32.701,0000005BF1005BF
1005BGINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFILEDS (10” DEPTH)500SY$ - 0$ - 0$43.32$40.34$39.98$35.671,0000005BG1005BG
1005BHINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFILEDS (11” DEPTH)500SY$ - 0$ - 01,0000005BH1005BH
1005BIINSTALL BITUMINOUS CONCRETE BASE COURSE FOR AIRFIELDS (12” DEPTH)500SY$ - 0$ - 01,0000005BI1005BI
1005BJASPHALT PAVEMENT RIDE QUALITY5LN-MI$ - 0$ - 0100005BJ1005BJ
1005BKADJUSTMENT OF MANHOLES/DRAINAGE STRUCTURES AND UTILITY BOXES10EA$ - 0$ - 0200005BK1005BK
1005BLASPHALT WEDGE CURB50LF$ - 0$ - 01000005BL1005BL
1006COLD MILLING OF BITUMINOUS PAVEMENTS00061006
1006AAPAVEMENT MILLINGS HAULED TO WOODLAWN LANDFILL5000SY-I$ - 0$ - 010,0000006AA1006AA
1006ABPAVEMENT MILLINGS HAULED OUTSIDE OF FT CAMPBELL2500SY-I$ - 0$ - 05,0000006AB1006AB