Appendix A - Daily Contractor QC Report

View the file

Other files

File Type Posted
SF_1409_W91248-17-B-0003.pdf PDF
SF_1410_W91248-17-B-0003.pdf PDF
W91248-17-B-0003-0002.pdf PDF
W91248-17-B-0003-0001.pdf PDF
Attachment_3__Bid_Schedule_Spreadsheet.xlsx XLSX spreadsheet
Attachment_1_-_List_of_Deliverables.pdf PDF
Attachment_2_-_List_of_Submittals.pdf PDF
Attachment_3__Bid_Schedule_Spreadsheet.xlsx XLSX spreadsheet
W91248-17-B-0003_FT._Campbell.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DAILY CONTRACTOR QUALITY CONTROL REPORT

CONTRACTOR’S

NAME (ADDRESS)

DAILY CONSTRUCTION QUALITY CONTROL

REPORT

DATE:_ REPORT NO.

Contract No.:

Description & Location of Work:

Weather (Clear) (P. Cloudy) (Cloudy): Temperature:_ Min:_ Max:

Rainfall_ Inch

Contractor/Subcontractors & Area of Responsibility:_ a.

b.

c.

d.

e.

f.

g.

1. Work Performed Today: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in table above.)

2. Results of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken. It is necessary to indicate the level of inspection; preparatory, initial, or follow-up for each item of work covered herein. In addition a signed narrative description of each preparatory inspection must be attached to this report.)

3. Tests Required by Plans and/or Specifications Performed & Results of Tests:

4. Verbal Instructions Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.

5. Remarks: (Cover any conflicts in Plans, Specifications, or Instructions.)

INSPECTOR

CONTRACTOR’S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

CONTRACTOR’S AUTHORIZED RESENTATIVE

DAILY CONTRACTOR QUALITY CONTROL REPORT
DAILY CONSTRUCTION QUALITY CONTROL REPORT
Contract No.:
Contractor/Subcontractors & Area of Responsibility:_
3. Tests Required by Plans and/or Specifications Performed & Results of Tests:
CONTRACTOR’S AUTHORIZED RESENTATIVE