Sheet1
| Reference | Question | Answer | Contractor | |
| 1 | Annex A, 2.1.2.1 Period Of Performance & 3.2 Transition |
“Phase-in/out Period 30 Days” “30 day transition period” These sections refer to a 30-day Phase-in/Transition period, however CLIN 0001 Phase-In has a Quantity of 0.50 Months. Will the Phase-in period be 30 days or 15 days? 15 Days
2 Annex A, 7.8 Vehicles - The Contractor shall provide an adequate number of vehicles.
7.8.1 - The Contractor shall have sufficient equipment readily available for backup
How many of each of the designated types of vehicles has historically been sufficient to service the requirements? Trucks: 8-Front load trash trucks; 5-Roll-off trash trucks; 1-wash truck; 1-Maintenace truck; 2-manager trucks (4x4); 2-QA trucks; 1-tractor truck and trailer to hall tires unless the plan is to remove tires by a different means in accordance with environmental considerations.
3 Annex A, 7.8.2.6. Vehicle for Recycling - The Contractor shall provide all equipment and collection vehicles necessary to collect recyclable materials only and shall not be used to collect MSW to prevent contamination of cardboard How many of each of the designated types of vehicles has historically been sufficient to service the requirements? Trucks: 2-Front load trash trucks. Contractor may utilize any other vehicle; however, the trucks must be cleaned as to not contaminate the recycleable materials.
4 Annex A, 7.11.4. Vehicle Licenses and Permits - The Contractor shall ensure that all drivers have current and valid North Carolina commercial driver’s license (CDL Class A) Will the Government please include CDL Class B to this requirement as this classification is legal for the operation of the type of vehicles contemplated? Refer to PWS Annex A 7.11.3, The contractor shall have appropriate certifications to operate the required equipment. Contractor is reminded that commercial driver's license (CDL) requirement is specific to the type of vehicle contract employees are driving. The Government has determined that both Class A and Class B licensures are required for this requirement. Contractor's are to ensure that their Managment Plan addresses the proper licensures for proposed Full Time Equivalents.
5 Annex E, 1.5.1 General Information - All replacement item costs associated with the performance of this contract shall be reimbursed under CLIN X0008. CLIN X0008 is for a monthly charge for Compactor maintenance not replacement cost reimbursement, please clarify? Annex E, Section 1.5.1 has been deleted. Amendment 0003 change this to CLIN 0008 - Item Replacement ODC. This CLIN is for the invoicing of compacting unit and container parts, this is a Not to Exceed CLIN.
6 Annex E, 1.5.1 General Information - Travel Contract Line Item Number (CLIN). All scheduled travel requires advanced notice and approval by the COR Please explain what travel expenses will be reimbursed. There is no traveling requirement for this contract. Section 1.5.1 of Annex E has been deleted.
7 Annex E, 1.5.2 General Information - The Contractor shall submit monthly invoices for reimbursement citing the appropriate CLIN. Each individual travel instance must be capture. Please explain what travel expenses will be reimbursed. There is no traveling requirement for this contract. Section 1.5.2 of Annex E has been deleted.
8 Annex E, 2.1, Scope - The Contractor shall track and report to the COR/ACOR all container weights and number of services per week. Will the Government please confirm that container weights are relative to open top and compactor containers only? Yes, the contractor is responsible for turning in ALL weight tickets for all types of dumpsters/compactors serviced.
9 Annex E, 2.3.1 Co-Mingled Recyclables - Fort Bragg is to begin co-mingling recyclables, which means all recyclable materials will be put into the same container for dumping. (Question 1) Will the Government please provide specifications for co-mingling program as there are no specifications listed in TE 5? (Question2) Co-mingling “all recyclable materials” including the woody debris, wood pallets and Electronics with the cardboard, plastics, paper and aluminum/tin cans may make the material un-recyclable. Will the government please consider only co-mingling the cardboard, plastics, paper and aluminum/tin cans, rather than “all recyclable materials” defined in section 2.1 Scope? Co-mingling is defined as plastics, paper, aluminum/tin cans, and cardboard. Woody debris and wood pallets are not considered co-mingled and are a by request service by units thru COR to direct a separate container. Currently this this includes cardboard containers, but will eventually include plastic bottles, cans, paper.
10 Annex E, 2.3.1.1 Cardboard/Co-mingled recyclables - The Contractor shall collect cardboard from troop barracks and other building residents receiving furniture and other items, including cardboard left by Contractor (Question1) Will these materials be placed in a container for collection or are they to be collected loose from outside the buildings? Cardboard will be placed in cardboard containers only/and must be broken down. Cardboard collection is included in the contractors schedule.
(Question 2) How will the contractor be notified that this material has been set out for collection?
11 Annex E, 2.3.1.9 Tires - Fort Bragg will make reasonable effort to remove tires from the waste stream that is to be transported and disposed of by the Contractor. However, if a tire(s) is found in the MSW while at the Contractor’s disposal site, the Contractor shall notify the COR and Contracting Officer. The COR and Contracting Officer will submit a request to the contracting officer via email correspondence to ensure the removal is logged and documented. Once approval from either the COR or Contracting Officer, the contractor shall secure and dispose of the tire(s) at the rate specified on the bid schedule for transportation and disposal of tires. The Contractor shall separate any tires found with rims and dispose the rim as recyclable metal. The contractor shall submit an invoice under CLIN X0009 Transportation and Disposal of Tires, (X indicated the contract year), to ensure payment is received (Question 1) Will the Government please alter this description for tire disposal payment? It is a regular, normal occurrence for tires to be placed in Front End Load (8yd) containers. The servicing of these containers does not permit the driver to view the contents of the container; therefore, tires would most likely be identified at the disposal location. At that point the contractor would be charged the applicable tire disposal fee without the time to “notify” the COR for disposal approval. The Contractor would be able to provide documentation for the government. Tires are collected at the Fort Bragg landfill in a trailer which will be transported by the contractor to the off post site. In the case where a tire is found either during pick up or after dumping at the disposal site that may have come from an 8cy dumpster the contractor will take appropriate action to dispose and ensure the COR is notified and provided the appropriate weight ticket.
(Question 2) CLIN X0009 is not for the transportation and disposal of tires, please correct. CLIN 0009 and all outlying CLINs have been removed. CLIN 0010 and corresponding CLINS are identified for transportation and disposal of tires.
12 Annex E, 2.3.1.3, Hazardous Items - Items such as refrigerators, freezers, and window air conditioner units may contain chlorofluorocarbon (CFC). Items containing CFCs shall be coordinated with the COR. Will the Government please specify if the refrigerant removal will be the financial responsibility of the Government or the Contractor? Annex E PWS 2.3.1.3. states "If special and/or hazardous wastes are discovered by the Contractor, the Contractor shall immediately notify the COR or Environmental Division (DPW, Environmental). These special wastes should not be transported once detected because they are subject to restrictions governing hazardous waste, such as a hazmat indorse commercial driver’s license, labeling, and placarding." This will be a government responsibilty, contractor is not to transport or dispose.
13 Annex E, 2.4.2.1 and 2.4.1.1 - Changes, either increases or decreases, exceeding 20% of the total number of containers or collections may require negotiation to adjust the contract price, as necessary to compensate for the changes. Will the Government please reduce the “changes” percentage to 10%? The cost fluctuation on such a large workload will require the small business to assume that significant capital expense may be incurred with no option to cover the expense. No, the Government will keep the 20%; however, the contractor is allowed to submit a Request for Equitable adjustment should the contractor find that there is a significant capital expense for the increase.
14 Annex E 2.4.2.4 - Contractor provided refuse containers shall be ordered from bid schedule. We could not find a CLIN to price for the Contractor provided refuse containers, is this a bid item or will Contractor provide pricing as and when the Government requests additional/replacement containers? The Government will be responsible for ordering all new containers. This is not a contractor duty/responsibility. Annex A and E have been corrected to address that the containers are a Government responsibility.
15 Annex E, 2.5.3, Scales - Collection equipment of the types used for the collection, storage, and transportation of MSW shall meet the standards established by the American National Standards Institute (as of the effective date(s) established in ANSI Z245.1, Safety Standards for Refuse Collection Equipment). Will the Government please interpret this requirement? The title is “Scales” though the body is relative to equipment specifications All refuse equipment must meet ANSI requirements in ANSI Z245.1-2017 Mobile Wastes and Recyclable Materials Collection, Transportation, and Compaction Equipment. The contractor shall meet these requirments.
16 Annex E, 3.3 Container Upkeep and 3.3.1 Other Direct Costs - The Contractor shall provide routine maintenance, repairs, and replacement to Government-owned vertical compactors, horizontal compactors, vertical balers, horizontal balers, dumpsters, litter cans, shredders, tippers, roll off containers, and roll away cover assemblies. Please confirm that the Government only intends to reimburse the cost parts used to repair/upkeep compactors and not the cost of parts used to repair/upkeep the other Government owned containers, e.g. lids, doors, rollers hinges etc? Governemt will reimburse for all replacement items for both compactors and containers, labor is all inclusive.
17 Section B CLIN X0005 Section B CLIN X0005 states a quantity of 400 units, though Annex E, Para 2.6 lists a quantity of 2000. Will the Government please clarify quantity? Quantity is 2,000, Annex E has been corrected to read 2,000.
18 Section B CLIN X0006 CLIN X0006 Special Collection II (42-cubic yards) restricts this CLIN to 42 CY container services, however, Annex A, Para 7.4.4.4 list other size roll off containers (30 & 20 CY). Are the other sized containers ever used for Special collections per 2.6.2 and if so can they be charged for under this CLIN? This CLIN should be for all size roll offs (20, 30, 32 and 42) and Compactors
19 Solicitation, Pg. 73 of 76 - Volume III, ii - Pricing for CLIN 0008, 2008, 3008, and 4008 Will the Government agree that 1008 should be included in this sentence? Yes, the Government agrees that 1008 was inadvertantely omitted.
20 Specifications - call for only 319 Front End Load, 8yd Cardboard container services per week. The specifications call for only 319 Front End Load, 8yd Cardboard container services per week. This workload does not efficiently require an exclusive FEL vehicle. Will the Government please eliminate the need for an exclusive FEL vehicle for this work? It is typically common practice to have a designated FEL for cardboard so not to contaminate the cardboard unless the contractor plans on washing out the truck which is also used for trash prior to servicing cardboard containers. See Annex E Section 2.3 Recycle Support.
21 CLIN X0008 - is for a monthly charge for Compactor maintenance not replacement cost reimbursement, please clarify? Is for a monthly charge for Compactor maintenance not replacement cost reimbursement, please clarify? CLIN 0008 has been identified as a - Item Replacement ODC.
22 Container weights Will the Government please confirm that container weights are relative to open top and compactor containers only? Question addressed above in Question 8. Weight tickets are required for all containers being serviced.
23 CLIN to price for the Contractor provided refuse containers We could not find a CLIN to price for the Contractor provided refuse containers, is this a bid item or will Contractor provide pricing as and when the Government requests additional/replacement containers? All containers will be Government Provided, both Annex A and Annex E have been corrected to address this requirement.
24 Reimburse cost for repair parts Please confirm that the Government only intends to reimburse the cost parts used to repair/upkeep compactors and not the cost of parts used to repair/upkeep the other Government owned containers, e.g. lids, doors, rollers hinges etc? The Government is reimbursing the cost of parts used to repair/upkeep both the compactors and government owned containers- the OCD CLINs 0008, will be inclusive for the compactors and roll offs.
25 Fort Bragg has established strategic goals to reduce materials in the waste stream through programs such as recycling. Requirement says Fort Bragg has established strategic goals to reduce materials in the waste stream through programs such as recycling. The implementation of these programs may reduce the estimated annual total tonnage of MSW. Is there any incentive to the contractor certain goal is met from recycling? Also can contract sell for profits any recycled materials? Yes, the incentive is for the contractor to promote the recycling program, as the contractor will receive all proceeds from the recycle program. The more that is recyclabled the more profit the contractor receives. PWS Annex A 1.1 "the MSW shall immediately become the Contractor’s responsibility once it has been deposited into collection containers at the various collections points."
26 Current Contract What is the current incumbent contract number? W91247-13-D-0011 and W91247-14-D-0004
27 Employees and Labor Wage Codes How many employees are currently performing work on Base based on the existing roster? Can you indicate their labor rate wage codes? A total of 11 employees between both refuse contracts (W91247-14-D-0004 and W91247-13-D-0011). Labor codes are not available; however, the Service Contract Act is applicable to this requirement. Labor codes can be found in the Department of Labor website.
28 Fort Bragg Landfill It appears the Government maintains and owns disposal landfill for this contract. How do we coordinate disposal and waste acceptance at Landfill, including tipping fees if any Fort Bragg no longer maintains a active landfill. All MSW goes to surrounding county landfills.
29 Proposal Due Date Will the Government please extended for at least 10 days? After the site visit, and once questions are due to the Government, the Government only has 7 days to answer the questions before the bid is due. We also have to ship out the proposal AT LEAST 2 days before, and there is a weekend in between the 24th and the 31st. This is not enough time for the Government to answer questions and give the contractor enough time to digest the changes, especially since the site visit is being held 8 days before the due date. Proposal has been extended till 28 FEB 2019 @ 02:00PM EST.
30 Volume I RFP, page 71 Section 4 Proposal Content calls Volume I "General" however Table 1 on page 70 and the volume reference in 3 Proposal Preparation Instructions on page 69 calls Volume I "RFP Documents". Is the name of Volume I "General" or "RFP Documents"? Refer to RFP page 767"a. Volume I – RFP Documents."
31 PWS Annex A 7.11.2 PWS Annex A 7.11.2 states "As part of the proposal, the Contractor shall submit one copy of the disposal permit(s) or other written documentation of approval(s) and suitability for the NC permitted subtitle D landfill(s)/Transfer stations to be used for disposal of all MSW." In which volume would the Government like Offerors to include this document? Volume 2
32 PWS Annex A, 7.4.4.1 - Dumpsters Contractor is to maintain all government owned containers to industry standard. Will all government owned containers be brought to industry standard before start of solicited contract is to begin? Upon inspection of government owned containers during the site visit, multiple are not. No the government owned containers will not be brought to industry standard before the contract begins. However, provision have been made to replace unserviceable dumpster upon notifications. The Government currently has 150 containers available for replacements
33 RFP, page 70, Table 1. RFP, page 70, Table 1. We notices that this is the same contracting office that recently handled Fort Campbell solicitation W91248-18-R-0001. We recommend allowing the same electronic submission for this proposal. Can the Government please consider allowing the proposal in response to solicitation W91247-19-R-9001 be submitted via email? Section M of the Solicitation has been revised to direct that offerors submit their proposals via email to dewayne.a.grant.civ@mail.mil and anna.m.walker.civ@mail.mil
34 PWS Annex A Introduction PWS Annex A Introduction states "The contractor shall deliver recyclable materials to the Environmental Recycle Building 3-1240 unless otherwise directed by the COR. Solid Waste Management Annex E 2.3 Recycle Support states "The Contractor shall transport and dump uncontaminated recyclable to an off post recycling facility." Can the Government please clarify what Contractors should do with recyclable materials? The Contractor shall turn brass, scrap metal, scrap white goods (ie. refrigerator, washers), that are not government property to Environment Recycling Building 3-1240. Cardboard/comingle recyclable materials shall transport and dump to an off post recycling facility
35 RFP, page 71, 4. Proposal Content RFP, page 71, 4. Proposal Content, a. Volume I General Tab C states "Section SF 1449 - CONTINUATION SHEET shall be submitted fully completed and error free. It shall contain the offeror's prices for the established Contract Line Items Numbers (CLINS)." Can the Government please confirm that they want Section B (pages 3-28) completed to meet this requirement? Yes complete section B
36 RFP, page 73, 4. Proposal Content RFP, page 73, 4. Proposal Content, c. Volume III Price ii states "Pricing for CLIN 0008, 2008, 3008, and 4008 are not required as the Government will assign a not to exceed NTE amount." Pricing using Plug number SHALL be used is $10,000.00 provided in the Amendment P00003.
37 CLIN 1008 Replacement ODC Did the Government intent to include CLIN 1008 (Replacement ODC) in this list as well? CLIN 1008 is included.
38 CLIN 0008 Compactor Repair CLIN 0008 is Compactor Repair, whereas CLINS 2008, 3008, and 4008 are Replacement ODC. Can the Government please confirm that this difference was intended? CLIN 0008, 1008, 2008, 3008 and 4008 are now Replacement ODC CLINs, to be used for parts required for replacement and/or repair for both compactors and containers.
40 RFP, page 3 RFP, page 3 CLIN 0001 states that the Phase-In period is 15 days, however RFP, page 29 CLIN 0001 provides 16 days for Phase-in. Can the Government please specify is correct number of days for Phase-In? Phase-In period is 30 days.
41 Parking Contractor Owned Vehicles Will the government reconsider providing an area to park the trucks and equipment on post? This will allow the awardee to act faster on tasks and provide more efficient service to the government. The Government is not providing an area for the contractor to park trucks or equipment on post or a place to store/ work on containers. The Government is providing a place to pick up government provided containers (Warehouse 2)and to put the unservicable government -own containers in the dumpster graveyard off Lamont Road.
42 Current Dumping Locations Being Used What facilities is the current contractor taking the MSW, C&D, and all the recyclables? Current Contractor(s) use surrounding counties for services. Industry may use any facility they choose as long as they have a permit and follow county requirements for the following: Cumberland, Moore, Harnett, Hoke, Scotland
43 Current Landfill After speaking with Anderson Landfill, they have informed us that MSW and C&D materials collected in Cumberland County have to stay in Cumberland county. The acknowledged that the current Fort Bragg waste stream from this contract is coming to their landfill now. Please confirm the county/counties that Fort Bragg covers, because if it does not, It violates out of county landfills/transfer stations permits and puts their permits in danger. Fort Bragg Installation, Camp Mackall, Linden Oaks area covers Cumberland, Hoke, Harnett, Moore, Scotland
44 CLIN 0002 and CLIN 0003 Difference Will the Government please explain the difference between CLINS 0002 Refuse Collection and 003 Acceptable Waste Services, etc seq? These appear to cover the same requirements. Is one of these supposed to cover the landfill fees and the other cover the services? Please explain in great detail. CLIN 0002 is the refuse collection and CLIN 0003 covers the disposal.
| 45 | Phase-In Period | Will the Government allow for a 30 day phase in? | Contract will now have a 30-Day Phase-In incorporated. |
| 46 | SWO, Annex A, Annex E General Information | Which is the guiding document driving SWO, Annex A or Annex E? There are many contradictions between the two documents, please consider merging the two to make things easier to follow. | Cannot merge, ARMY IMCOM requirement. All are part of the document package, and have been corrected in hopes that all contradicitions have been corrected. |
47 Container Washing Can the contractor wash and clean containers on Base? If so, where is the wash rack? There is no place to wash or clean the containers on the installation for Contractor use.
48 Annex E 2.4.12 The Annex E section above states that containers at dining facilities, child development centers, medical facilities, schools, cafeterias and containers connected to compacting units etc. are to be cleaned weekly and all other containers “as needed.” TE 5 list of service by building number including a column specifying cleaning frequency. Would the Government please confirm that the cleaning frequency column in TE 5 can be removed? TE 5 only provides the frequency of cleaning ie 2 times weekly/ quarterly- The Contractor shall provide a Monthly Refuse Container Cleaning Schedule that shall include days of service and driver, each container location, container type, cleaning time, and cleaning method.
49 Containers This requirement has us to MAINTAIN the containers, that is, in the shape that we received them. If containers are unacceptable from the start is the newly awarded contractor responsible for the repairs/costs? The Government has made an effort to have current containers repaired prior to the current contract expiration. However, if a container(s) is found to need repairs such as lids plugs etc that have not previously been fixed the contractor shall get with the COR to establish a schedule to make the needed repairs. If the container will take extensive work the COR will make the decision to have the container replaced or attempt tosalvage the container.
50 Containers The contractor needs to know the shape of the containers in order to properly bid this requirement, will the Government please give us a list of the current containers serviceability status? The condition of the containers will be made available to the awardee at the Post Award Conference and a scheduled agreed upon after award.
51 Containers The contractor needs to know the shape of the containers in order to properly bid this requirement, will the Government please give us a list of the current containers serviceability status? The condition of the containers will be made available to the awardee at the Post Award Conference and a scheduled agreed upon after award.
52 Containers How does the Government determine when to scrap a container? The Contractor contacts the COR for disposition instructions and guidance, per Annex E 2.4.6; 2.4.81 and 2.4.9.
53 Annex E The Annex E section above states that containers at dining facilities, child development centers, medical facilities, schools, cafeterias and containers connected to compacting units etc. are to be cleaned weekly and all other containers "as needed." TE 5 list of service by building number including a column specifying cleaning frequency. Would the Government please confirm that the cleaning frequency column in TE 5 can be removed? The TE 5 cleaning frequency can be adjusted to remove the quarterly cleaning notes but will leave the ones that are to be cleaned weekly in accordance with the PWS- The Contractor shall provide a Monthly Refuse Container Cleaning Schedule that shall include days of service and driver, each container location, container type, cleaning time, and cleaning method.
54 Proposal Receiving Methods We respectfully request that the government accept electronic copies of submissions delivered via email. Electronic submissions were required in response to the previous solicitation for these services in 2013.Electronic submissions allows proposers additional time to complete their submission and avoids the potential of mail or courier delays caused by weather or other events. Proposals are to be emailed to dewayne.a.grant.civ@mail.mil and anna.m.walker.civ@mail.mil
55 Pricing Matrix We are uncertain as to what exactly is required in the Pricing Matrix. Could you please provide either a more detailed explanation of the government's expectation, a sample Pricing Matrix or a template that we could use? Pricing Matrix clarification has been added in Addendum to FAR 52.212-1, Section 4 Proposal Content, Section C Volume III ii.
56 Proposal Due Date We respectfully request that the Offer due date be extended to February 11 to allow proposers sufficient time after the site visit and the posting of responses to the many questions on the solicitation. Proposal closing is February 28, 2019 by 02:00PM EST.
57 Section B The substantial changes to the CLINS also changes most of Section B which needs to be completed and provided with Volumes I and III. Is the Government going to issue a conformed solicitation based on the changes from Amendment 0003? Conformed copy posted to FBO on 1 FEB 2019
58 Question and Answers Does the Government intend to issue a formal Q&A document addressing bidder’s questions? We sent numerous questions that need to be addressed Answers will be forthcoming in a modification to FBO. Approximate date is 11 February 2019
59 CLINs 1008 through 4008 Amendment 0003 did not change or adjust the original CLINs 1008, 2008, 3008, and 4008. Should these CLINs be deleted? CLINS listed in conformed copy.
60 CLIN 1011 Amendment 0003 Section F Deliveries or Performance added a Delivery Schedule for CLIN 1011, however there is no CLIN 1011 identified in Section B. Can the Government please reconcile? Amendment 0003 conformed copy has adjusted and CLINs are correct now.
| 61 | PCO Information | L.1.a changed the PCO to Mr. Anna Walker should this be Ms. Anna Walker? | PCO is Mrs. Anna Walker |
| 62 | Proposal Delivery Address | SF 33 Block 9 states the solicitation was issued by: MICC Center – Fort Bragg, MICC Fort Bragg – Bldg. 2-1731 Armistead St, Fort Bragg, NC 28310. The SF 30s all provide MICC Center – Fort Bragg, MICC Fort Bragg – 2175 Reilly Road Stop A, Fort Bragg, NC 28310-5000, as the issuing address, and Amendment 0003 changed the delivery address to Mission and Installation Contracting Command, Attn: CCMI-CBR-BR (Dewayne Grant or Anna M. Walker), 900th Contingency Contracting Battalion, 4300 Butner Road, Bldg. 3-1634, Fort Bragg, North Carolina 28310. Can the Government please clarify which is the correct address? | Proposals are to be emailed to dewayne.a.grant.civ@mail.mil and anna.m.walker.civ@mail.mil |
63 Proposal Due Date Will the Government please extended for at least 10 days? After the site visit, and once questions are due to the Government, the Government only has 7 days to answer the questions before the bid is due. We also have to ship out the proposal AT LEAST 2 days before, and there is a weekend in between the 24th and the 31st. This is not enough time for the Government to answer questions and give the contractor enough time to digest the changes, especially since the site visit is being held 8 days before the due date. Proposals are due February 28, 2019 by 02:00PM EST.
64 PWS Annex A / Annex E/Deliverables/PWS PWS Annex A 6.0 Deliverables references PWS 5.26 for All logs/records. Neither Annex A nor Annex E contain a 5.26. Can the Government please provide the correct reference? Reference is PWS Annex E 2.8 Reports
65 PWS Annex A, 7.11.2 PWS Annex A 7.11.2 states "As part of the proposal, the Contractor shall submit one copy of the disposal permit(s) or other written documentation of approval(s) and suitability for the NC permitted subtitle D landfill(s)/Transfer stations to be used for disposal of all MSW." In which volume would the Government like Offerors to include this document? This should be part of the technicable capability.
66 Landfill Tonage Is the landfill tonnage listed in historical data, TE-7, represent total tonnage disposed of from both current contracts, W91247-13-D-0011(Inside) and W91247-14-D-0004 (Outside)? If not, what is the total tonnage from both contracts and all landfill/transfer station used? The total tonnage is combined from both the inside and outside contracts in TE-7.
| 67 | Lamont Street Landfill | Is the contractor to perform any services at the Lamont Street Landfill/TS? | Only Pick Up Tires from the designated tire trailer Per. Annex |
| 68 | PRS | Performance Requirement Summary, (PRS), Attachment 1: located on page 2 of the PRS, there is a PDF attachment. Please provide as this attachment “can not locate the server application”. | Will upload into FBO with questions and answers solictaion amendment. |
69 Percentage Rule (%) With a contract of this size and scope, will the government consider lowering the +/- 20% rule to 5%? Industry and pervious solicitations currently uses 5%. 20% of this requirement exposes substantial high risk and can be detrimental to the success of this contract. See response to Question 13 above.
70 Landfill Is the Landfill cost part of the current contracts or is a pass through item of each? Landfill cost is part of the current contract. It is not passed through each item
71 Landfill Landfill tonnage numbers conflict each other within the PWS, Synopsis, and TE 7. Which tonnage numbers shall be used as it relates to CLIN XXX3? Total landfill tonnage numbers are estimates. They range from 15766 to 18856 per year
| 72 | PWS Versus attachments, Etc. | Which takes Precedence, TE attachments or verbiage within PWS Annexs? | PWS because it refers you to the referenced material. |
| 73 | Recycables On Post | Please clarify if recycle material collected can be dumped on base at the DPW recycle center or at an off post site. | The Contractor shall turn brass, scrap metal, scrap white goods (i.e. refrigerator), that are not government property to Environment Recycling Building 3-1240. Cardboard/comingle recyclable materials shall transport and dump to an off post recycling facility |
74 North Carolina Law - Tire Disposal Does the North Carolina Law apply within Fort Bragg Proper, which requires tires to be stored in an enclosed area? Please see Cumberland County website: http://www.co.cumberland.nc.us/departments/solid-waste-group/solid-waste-management/container-sites-information
75 Landfill It was noticed at the site visit a tractor trailer “trailer” is currently being used for store tires apparently for disposal. Who owns the trailer located at the Lamont Street Landfill? How is trailer serviced and frequency? The Contractor shall need to provide a trailer for the tires. The contractor services it at least once a month not exceed CLINS amount each month
| 76 | Locked Areas On Post | Are remotes areas locked and or secured with restricted times? | Yes there are some remote areas are locked and coordination for entry will be arranged between the occupant and contractor. |
| 77 | Fort Bragg Area Maps | 12. With the vast geographical area that Fort Bragg encompasses which lies within 5 counties and with multiple areas to be serviced some of which are 50 miles and others 30 miles one-way from main base, respectfully, can maps be provided? | The maps are provided to the Contractor at beginning of contract |
| 78 | Salvaging Parts - Containers | On the site visit, it was stated that the contract can salvage parts from the graveyard containers. Please confirm that this is ok to do. | Yes, this is authorized. |
| 79 | Tonage - Historical | From the historical data, the tonnage appears to be too low. Is the data from the inside alone or both inside and outside? Or do we use the 26500 tons provided as total. | MSW historical tonnage data of 26,500 includes both the inside and outside contracts. |
80 Commissary Compactor During site visit I noticed that the Commissary Compactor is leaking Hydraulic fluid and the reservoir appears to be contaminated with water. The hopper support mount is damaged. Will this and any other issues be corrected prior to contract being awarded? The Government will fix the Commissary Compactor before award of new contract. CLIN 0008 for repair parts for both compactor and containers.
81 Current Items Around Dumpsters Large bulk items around containers and inside enclosure. Will these items be removed prior to contract being awarded? Current items seen during site visit would have been removed on weekly scheduled visit. The new contract begins on March 27, 2019. Any waste at the refuse containers will be remove as part of the weekly refuse removal schedule
82 PWS 7.10 PWS 7.10. In addition, the Contractor shall provide the COR with a routine and emergency phone numbers to include the Project Manager, Quality Control personnel, and Alternate PM cellular phone number. QC personnel was not listed as key personal. Will this contract require a separate person other then PM or APM to perform QC duties? Yes - PWS Annex A 2.1.11 Contractor Employees
83 Current Job Titles Can you provide list of personnel (job tittles) and # of positions under the current contract? This is part of the Contractor's proposed Management Plan and Staffing Plan.
84 Collective Bargaining Agreement Any of the positions under a Collective Bargain Agreement Currently, this is requirement is not covered under a Collective Bargaining Agreement.
85 Containers There are 1,200 containers allocated on the contract that are provided by the government. Per the site visit we were informed that government just purchased 150 new containers. The remaining 1,050 containers we have seen most of the containers are in horrible condition. Will government provide a CLIN line item on this contact during the base year for bringing and fixing these containers in a usable condition. These should fall under pre-exiting condition of the existing contract. The Government is providing an ODC CLINS to provide for the reimbursment of parts for small repairs like lids, plugs, doors and some welding. If the container is more than 60% of replacement cost (i.e. bottom falls out) than the COR is notified for replacement
86 Repair Historically What is the total repair of each container a government is willing to pay before replacing it with a new one? Based on what we have seen during the site visit majority of them needs to be replaced. With the deferred maintenance the cost-effective solution for the government is to replace all. Life of these containers have exhausted and its worth for the government to replace then to do a temporary fix. 60% of the containers needs major repairs. The Government is providing an ODC CLINS to provide parts for small repairs like lids, plugs, doors and some welding. If the container is more than 60% of replacement cost (i.e. bottom falls out) than the COR is notified for replacement
| 87 | Fuel Clause - Escalation for Price Increase | Fuel escalation clause? I did not see any provision for escalation due to change in Fuel prices? | Fuel changes are not considered. |
| 88 | Security Clearance | Security or levels of clearance required of our personnel and management for access to any areas we are to service? | Security based on Fort Bragg installation. Coming on and off the post. Please see: https://home.army.mil/bragg/index.php/about/garrison/directorate-emergency-services/physical-security/physical-security-department-army-security-guards/access-control |
| 89 | Food Waste | Food stuff waste is it handled separately? Is this waste picked up by another contractor? If we collect food waste are their special handling requirements? | Food stuff waste is handled under a separate contract. |