Performance Work Statement (PWS)
Base Operations Refuse Collection and Disposal Post Wide
Annex A
(Revised 13 February 2019)
Introduction. This is a non-personal services contract to provide requirement for a contractor to perform Municipal Solid Waste removal and disposal post wide. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform all operations for the collection, transportation, recycling, for removal, transport, and dispose of an estimated average of 26,500 tons per year (this number could increase or decrease dependent upon troop deployments/redeployments and/or an increase of installation personnel numbers), of Municipal Solid Waste (MSW). The contractor shall dispose of all refuse in troop areas located inside and outside the Cantonment area of Ft Bragg North Carolina to include but not limited to the following areas, all range training areas, Aberdeen Training Facility, Smith Lake Travel Park, Simmons Army Airfield, Camp Mackall, the Airborne Special Operations Museum and Linden Oaks Housing Area, (excluding family quarters). The Contractor shall deliver recyclable materials to the Environmental Recycle Building 3-1240 unless otherwise directed by the COR. The estimated quantities of work for this requirement are identified in TE-3, Workload Estimates, as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this PWS and contract.
Background. Fort Bragg has established strategic goals to reduce materials in the waste stream through programs such as recycling. The implementation of these programs may reduce the estimated annual total tonnage of MSW. The historical workload data in TE 3 indicates a fluctuating monthly MSW disposal tonnage that has ranged from an estimated low of 1,766.8 tons per month to an estimated high of 2,678.9 tons per month.
Fort Bragg is located in Cumberland County, North Carolina and consists of approximately (162,816) acres and (5870) buildings. The population base consists of approximately (73,443) military, Government civilian, and Contactor personnel, as well as (71,259) resident family members. The MSW shall immediately become the Contractor’s responsibility once it has been deposited into collection containers at the various collections points.
Objectives. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the publications in Section 7, Related Documents. The basic service objective is to perform pickup, collection, transportation and disposal (waste management services) of refuse at areas specified within PWS Annexes A and E.
The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.
The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost effective ways to fulfill Refuse collection and their component needs, emphasizing innovation and commercial best practices.
Climatic Conditions. The average annual rainfall is 45 inches; with the wettest months being June - September. The average annual snowfall is 3 inches, with snowfall expected during the period of December – March. The average annual maximum and minimum temperatures are approximately 72 and 49 degrees Fahrenheit, respectively.
Monthly normal temperatures ranged from a low of 40 degrees in the month of January to a high of 91 degrees in the month of July. Summer temperatures often reach 90 degrees Fahrenheit, while sub-freezing weather is common during the winter months.
Traffic Flow. N/A
1.5 Drainage. N/A
1.6 Restoration of Landscape Damage. Trees or other landscape features damaged by the Contractor’s operations shall be restored at no additional cost to the Government.
The COR/ACOR will decide the method of restoration for trees or whether damaged trees will be removed.
1.7 Dust Suppression. N/A
2.0 Requirements.
2.1 Description of Services. See Section 5.0 for the specific CLS or Functional Area
(FA).
2.1.1 Non-Personal Services. The personnel rendering the services are not subject;
either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.2 General Information.
2.1.2.1 Period of Performance (PoP). The PoP consists of 5 years, including options.
The PoP is as follows:
Phase-in/out Period 30 Days Base Period 9 Months Option Period I 12 Months Option Period II 12 Months Option Period III 12 Months Option Period IV 12 Months
2.1.3 Place of Performance and Hours of Operation.
2.1.3.1 Place of Performance. Contractor shall have routine access to Government-controlled facilities. The work to be performed under this contract shall be accomplished at all areas inside and outside the Cantonment area of Ft Bragg, North Carolina, to include but not limited to the following areas, all range training areas, Aberdeen Training Facility, Smith Lake Travel Park, Simmons Army Airfield, Camp MacKall, the Airborne Special Operations Museum and Linden Oaks Housing Area, (excluding quarters), North Carolina.
2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from 0630 – 1700 hours, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours unless otherwise approved by the COR. The contractor is reminded that no employee shall work more than a 40 hour work week.
2.1.4 Federal Holidays. The Contractor’s performance shall not be required on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
2.1.4.1 The Contractor shall provide personnel support within 2 hours of notification for emergency situations. Any call for emergency support received after 2pm EST, shall be performed the next business duty day. Prior to performance of services. The Project Manager shall be available after normal hours to serve as the central point of contact for Contractor operations. Contractor personnel shall not be scheduled for overtime work.
2.1.4.2 Installation Closures. The Project Manager shall be designated to handle emergency essential refuse collections during installation closures IAW DFARS 237.76.
2.1.4.3 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the COR/KO if inclement weather suspends operations within 2 hours. The Contractor shall suspend collection and disposal operations because of inclement weather only after receiving approval from the KO or as a result of the Garrison Commander closing Fort Bragg due to Inclement Weather. The Contractor shall resume operations with KO approval or upon the reopening of the Fort Bragg installation.
2.1.5 Travel/Temporary Duty. N/A
2.1.6 Emergency Services.
2.1.6.1 The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO and COR/ACOR immediately, not later than (NLT) two (2) hours of the incident.
2.1.6.2 The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.
2.1.7 Contract Administration and management.
2.1.7.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. The KO and COR/ACOR will meet quarterly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Government and signed by both the Program Manager and the KO. The written minutes will be distributed within five (5) workdays after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.
2.1.7.2 Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.1.7.3 The following provides the roles and their respective authority during the performance of the contract:
2.1.7.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO.
In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO.
Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.
2.1.7.3.2 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.
2.1.7.3.2.1 COR Authority. A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.1.7.3.3. The Contractor shall not in any way represent the United States (U.S.)
Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.1.8 COR/ACOR Functions. The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;
maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.
2.1.9 Quality Control (QC). Quality Control is the responsibility of the Contractor. The Contractor shall provide a Quality Control Plan (QCP) five (5) business days before contract start. The Contractor shall provide and maintain a QCP that is acceptable to the KO/COR/ACOR. Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within five (5) business days prior to implementation.
2.1.9.1 The Contracting Officer Representative Tracking (CORT) Tool (https://wawf.eb.mil/xhtml/auth/home/home.xhtml#) shall be used for nomination, tracking, documentation, and management of CORs IAW DoDI 5000.72, DFARS 201.602-2 and PGI 201.602-2.
2.1.10 Subcontract Management. The Contractor shall be accountable to the Government for Contractor or subcontractor personnel. The contractor shall develop, implement and maintain a system to inspect their services as well as their subcontractor services and products to ensure compliance with PWS requirements, and applicable laws and regulations.
2.1.11 Contractor Employees.
Key Personnel. Key personnel shall not be added to or removed from the contract without express acknowledgement of the KO/COR. Any changes to the working status of these key personnel shall be transmitted (in writing) to the KO/COR within ten (10) work days of the proposed change. If, for any reason, any of the key personnel becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days the contractor shall promptly replace personnel with personnel who possess qualifications equal to or better than that of the original employee. The Contractor shall ensure all key personnel terminated or released from employment under this contract are replaced within ten (10) work days of the termination.
The following are considered key personnel by the Government: The Contractor shall provide a Project Manager (PM), and an Alternate PM (APM), who shall act for the Contractor when the PM is absent, shall be designated in writing to the KO at the post award conference. The PM or APM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
2.1.11.1.1 The Contractor shall provide a Project Manager who is responsible for the performance of the work. The Project Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The name of https://wawf.eb.mil/xhtml/auth/home/home.xhtml the Project Manager shall be provided by the Contractor to the KO. The PM shall be the focal point for all issues in this program and shall keep the COR fully informed verbally and in writing of significant events. The Contractor shall provide PM support that will fully integrate, manage, control, report, and document all phases of the contract requirements stated herein. The PM shall be the overall responsible agent for Contract award execution, deliverables, and communication with the COR. The PM shall assist the COR in executing projects, programs, and other requirements as outlined in this PWS. The Project Manager shall be available between 0630 - 1600 hours, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons. Contractor personnel performing work under this contract do not require a security clearance. The Project Manager and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
2.1.11.1.2 The Contractor shall provide an Alternate Project Manager who is responsible for the performance of the work in the absence of the PM. The APM shall act for the Contractor when the PM is absent and shall be designated in writing to the COR at the Post-Award Conference. The PM or Alternate PM shall have the same required qualifications as the PM and shall have full authority to act on behalf of the Contractor on all contractual matters relating to daily operations. The PM or Alternate PM shall be available between 6:30 a.m. to 4:00 p.m. Monday through Friday, except Federal holidays or when the Government facility is closed for administrative reasons, unless otherwise stated herein. Contractor personnel performing work under this contract do not require a security clearance. The APM and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
2.1.11.1.3 All Contractor employees shall be legal U.S. residents. The Contractor shall immediately remove any employee that is not a legal U.S. resident. The Contractor personnel shall be able to communicate clearly in the English language.
2.1.11.1.4 Qualification Standards. The Contractor shall utilize properly trained, skilled, and qualified employees or subcontractor personnel. The Contractor shall provide objective evidence of key personnel qualifications and years of experience to the KO for review and acceptance. The contractor is responsible for ensuring all employees possess and maintain all applicable Licenses and certification(s) during the contract.
2.1.11.1.4.1 Project Manager (PM): The PM shall meet or exceed the following minimum qualifications three (3) years of experience in management and supervision of personnel providing refuse support services.
2.1.11.1.4.2 Alternate PM: The APM shall meet or exceed the following minimum qualifications three (3) years of experience in management and supervision of personnel providing refuse support services.
2.1.11.1.5 Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed. The contractor shall wear uniforms clearly displaying company name and employee’s name.
2.1.11.1.6 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal prescribed drugs or any other incapacitating agents. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
2.1.11.1.7 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.
2.1.11.1.8 Organizational Conflict of Interest (OCI). The contractor shall not employ any person or perform a contract in a situation where the existence of conflicting roles may bias the contractor's judgement or prevent unfair competitive advantage in accordance with Organizational Conflict of Interest Rules in FAR 9.5
2.1.12 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR/ACOR corrective action plans, timely identification of issues, and effective management of subcontractors within two (2) days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.2 Not Applicable to this requirement.
2.2.1 Not Applicable to this requirement.
2.2.2 Not Applicable to this requirement.
2.2.2.1 Not applicable to this requirement.
2.2.2.2 Not applicable to this requirement.
2.2.2.3 Not applicable to this requirement.
2.2.2.4 Not applicable to this requirement.
2.2.2.4.1 Not applicable to this requirement.
2.3 Not applicable to this requirement.
2.3.1 Not applicable to this requirement.
2.3.1.1 Not applicable to this requirement.
2.3.1.2 Not applicable to this requirement.
2.3.2 Not applicable to this requirement.
2.3.3 Not applicable to this requirement.
2.3.4 Not applicable to this requirement.
2.3.5 Not applicable to this requirement.
2.3.6 Not applicable to this requirement.
2.4 Not applicable to this requirement.
2.4.1 Repair and Replacement. The Contractor shall report damages to Government property to the COR/ACOR within two (2) hours. Deteriorated solid waste containers shall be repaired by the Contractor. The contractor is encouraged to utilize parts from other containers located at the refuse container graveyard located across from Lamont Landfill, Fort Bragg prior to replacing with new. If the container is considered non-economically repairable, the contractor shall replace the container with another Government furnished container. The Contractor shall replace containers within two (2) working days of receiving notification. Any call for emergency work that come in after 2:00 PM ETS shall be performed the next duty day. The Contractor shall continue working until the work is complete.
2.5 Special Requirements.
2.5.1 Security.
2.5.1.1 Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. The COR/ACOR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.
2.5.1.2 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.
2.5.1.3 Contractor Vehicle Registration. The Contractor shall register all Contractor-owned or operated vehicles and trailers operating on the installation within ten (10) working days of contract start date. The Contractor shall complete all applications with the Provost Marshal Vehicle Registration section located at the All-American ACP.
Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
2.5.1.3.1 Sponsoring organizations, activities, and persons will be responsible for monitoring contractor access by submitting a completed and approved DES Form 118 to the Installation All American VCC 5 detailing the contracted services to be performed, location of services, and duration of the contract. Contractors requesting access for less than one year may receive an AIE visitor card on a case by case basis, or a temporary vehicle pass for 90 days. Contractor cards will be issued for periods of one to three years depending on the terms of their contract. AIE card expirations may be updated to reflect a new contract period by submitting an approved DES Form 118 to the All American VCC.
Renewed short term passes must be re-processed at the All American VCC. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.
2.5.1.4 The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or Security Office.
2.5.1.5 Physical Security. The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. The Contractor shall secure Government facilities, equipment, and materials at the close of each work period.
2.5.1.6. Accidents and Injuries: The Contractor shall submit a written report within 3 workdays of occurrence to the Contracting Officer, COR and the Fort Bragg Safety Officer, the events, and facts applicable to all accidents or injuries to Contractor personnel or to any Government property damaged while on the installations. The written report shall be completed using the DA Form 285, http://www.apd.army.mil/ U.S. Army Accident Investigation Report and shall be submitted to the COR within three work days after action or injury.
2.5.1.6.1. Emergency Medical Treatment: Medical services for Contractor personnel are the responsibility of the Contractor. However, the Government will provide, on an emergency basis, medical services for injuries while an employee is performing under this contract. Emergency medical care is available to Contractor employees at Womack Army Medical Center. For emergency ambulance service, call 911. Such emergency medical care will be limited to those services necessary to prevent undue suffering or loss of life, and will be provided only during the period of emergency. In such circumstances, action shall be taken to transfer employees of the Contractor to a civilian health care provider as soon as the emergency period ends. The Contractor shall reimburse the Government for emergency medical services provided upon receipt of an invoice from Womack Army Medical Center, Fort Bragg, North Carolina, as specified in www.apd.army.mil/pdffiles/r40_400.pdf, Para 3-55. Failure to make payment may result in the Contracting Officer deducting the invoiced amount from future payments.
2.5.2 Security Training.
2.5.2.1 iWATCH Training. The Contractor shall brief the local iWATCH program (training standards provided by the RA’s Anti-Terrorism Officer (ATO) to all of the Contractor’s employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/ACOR. The Contractor shall complete the training within thirty (30) calendar days of contract award and within ten (10) calendar days of new employees commencing performance with the results reported to the COR/ACOR NLT forty-five (45) calendar days after contract award.
2.5.3 Safety. The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
2.5.3.1 Safety Plan. The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within ten (10) days of commencement of work. Revisions to the Safety Plan shall be submitted five (5) calendar days prior to the effective date of change.
http://www.apd.army.mil/
2.5.3.2 Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.
2.5.4 Training, Physical Requirements, or other Expertise Required.
2.5.4.1 The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed in the specific areas required by the State of North Carolina. The Contractor shall ensure employees are certified or licensed in the appropriate Environmental Protection Agency (EPA) areas required. The Contractor shall ensure all required documentation of certification and/or licensure for Contractor personnel are filed with the COR/ACOR within twenty-four (24) hours prior to employees commencing performance.
2.5.5 Environmental Requirements.
2.5.5.1 Green Procurement. Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) requires the use of recycled and recovered products identified in the EPA’s Comprehensive Procurement Guidelines.
2.5.5.2 Waste Management Plan: The Contractor shall ensure that all waste is controlled and disposed of IAW all local, state, and Federal, environmental, and occupational safety laws, rules and regulations. The Contractor shall submit the Waste Management Plan to the Contracting Officer for approval within 10 days after contract start date. An updated copy shall be provided to the Contracting Officer and the COR as changes occur.
2.5.5.3 Environmental Compliance. The Contractor shall comply with local, state, Federal, environmental, laws, rules, plans, policies and Occupational Safety and Health ACT (OSHA) http://www.osha.gov/,rules, and regulations. All pertinent provisions of the publication 29 CFR 1910 to provide safe control, protection of life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract.
The contractor’s safety plan shall comply with applicable OSHA requirements, and shall be updated as changes occur. Any fines incurred by the contractor for non-compliance shall be the responsibility of the contractor. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufactures' recommendations. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR/ACOR. The Contractor shall provide upon request from the COR/ACOR all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the COR/ACOR.
2.5.5.4 Spill Contingency Plan. The Contractor shall notify the COR/ACOR within one
(1) hour, if the Contractor spills or releases any hazardous substances, i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification. The Contractor shall submit a Spill Contingency Plan to the KO 30 days after contract award for approval. The Contractor shall develop and implement a spill contingency plan in compliance with the Fort Bragg Spill Contingency Plan; obtain a copy of Fort Bragg’s Spill Contingency Plan, upon request, by contacting the installation Hazardous Waste Program Manager at the Directorate of Public Works, Environmental Division (IMBG-PWE-C), telephone (910) 396-2141. The Contractor’s plan shall include, but not limited to, properly reporting and cleaning up all spills, releases caused by his operation and address proper certifications of employees certified to clean such spill. Changes shall be made to the Contractor’s plan as are necessitated for environmental compliance as directed by the DPW, Environmental Division. Any subsequent changes to the Contractor’s Spill Contingency Plan that are incorporated and made a part of this contract shall be submitted to the Contracting Officer for approval prior to implementation. The contractor shall respond to all spills immediately and begin cleanup within 2 hours. If the Government has to clean up a contractor spill the contractor will be billed for the cleanup of the governments’ expense.
2.5.6 Contingency Plans.
2.5.6.1 Spill Contingency Plan: The Contractor shall develop and implement a spill contingency plan in compliance with the Fort Bragg Spill Contingency Plan; obtain a copy of Fort Bragg’s Spill Contingency Plan, upon request, by contacting the installation Hazardous Waste Program Manager at the Directorate of Public Works, Environmental Division (IMBG-PWE-C), telephone (910) 396-2141. The Contractor’s plan shall include, but not limited to, properly reporting and cleaning up all spills and releases caused by his operation. Changes shall be made to the Contractor’s plan as are necessitated for environmental compliance as directed by the DPW, Environmental Division. Any subsequent changes to the Contractor’s Spill Contingency Plan that are incorporated and made a part of this contract shall be submitted to the Contracting Officer for approval prior to implementation.
2.5.6.2 Not applicable to this requirement.
2.5.6.3 Not applicable to this requirement.
2.5.6.4 Not applicable to this requirement.
2.5.6.5 Not applicable to this requirement.
2.6 Not applicable to this requirement.
2.6.1 Not applicable to this requirement.
3.0 Performance Requirements and Standards.
3.1 High Level Objectives (HLO).
3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels
(AQLs).
3.1.1.1 Damage Caused by Contractor. Damages caused by Contractor employees shall be repaired at no cost to the Government. The Contractor shall notify the COR/ACOR and return the damaged area to its previous condition. The Contractor shall furnish all labor, materials, and equipment to perform the repair work including cultivating and applying seed, sprigging, or placing sod. The Contractor shall maintain all turf repair work to ensure successful growth.
3.1.1.1.2 Damage Report. The Contractor shall submit a monthly damage report to the COR/ACOR that annotates the damage, corrective action, and date corrected.
3.2 Transition (Phase In/Phase Out). The Contractor shall prepare and submit a Phase In/Phase Out Plan to be implemented by the Contractor. The Contractor shall have key personnel on board, during the 30 day transition periods. The plan shall specify a training program and a date for transferring responsibilities for the work and shall be subject to the KO's approval. The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency.
3.2.1 Phase-In: To minimize any decreases in productivity and to prevent possible negative impact on additional services, the Contractor shall have all key personnel on board, during the 30 day phase-in period. During the phase-in period, the Contractor shall become familiar with performance requirements, in order to commence full performance of services on the start of the base period of performance. The Contractor shall inventory all GFE refuse containers and familiarize his employees with all aspects of routes and PWS requirements. The Contractor and COR will take inventory of all GFE provided to the contractor. This requirement shall take place during the 15 day phase-in period.
3.2.2 Phase-Out: Prior to the completion of this contract, an observation period shall occur, at which time team management personnel of the incoming Contractor may observe operations. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of services. The outgoing Contractor is ultimately responsible for performing full services IAW the contract, during the 30 day phase-out period, and shall not defer any requirements for the purpose of avoiding responsibility or of transferring, such responsibility to the succeeding Contractor. The outgoing Contractor shall fully cooperate with the succeeding Contractor and the Government, so as not to interfere with their work or duties.
3.2.3 Phase-Out Plan. The incoming Contractor shall develop a phase-out plan to affect a smooth and orderly transfer of contract responsibility to a successor. The plan shall fully describe the Contractor’s approach to the following issues, at a minimum: the outgoing contractor shall coordinate with the COR and the in-coming contractor prior to removal of containers to insure that not more than one day lapses between removal by outgoing contractor and placement of new Government owned containers by incoming contractor. Inventories and turn-over of government property; removal of Contractor property; reconciliation of all property accounts; turn-in of excess property; data and information transfer; clean-up of Contractor work areas; and any other actions required to ensure continuity of operations shall be completed during this time. The Contractor shall provide the plan to the COR thirty (30) days before the phase-out period commences.
3.3 Contractor Manpower Reporting Application (CMRA). Contractor Manpower Reporting: The contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services.
Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website at http://www.ecmra.mil. The required data fields include:
(1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;
(2) Contract number, including task and delivery order number;
(3) Beginning and ending dates covered by reporting period;
(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;
(5) Estimated direct labor hours (including sub-contractors);
(6) Estimated direct labor dollars paid this reporting period (including sub-contractors);
(7) Total payments (including sub-contractors);
(8) Predominant Product Service Code (PSC)/Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant PSC/FSC for each sub-contractor if different);
(9) Estimated data collection cost;
http://www.ecmra.mil/ http://www.ecmra.mil/
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);
(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
(12) Presence of deployment or contingency contract language; and
(13) Number of contractor, and sub-contractor employees deployed in theater this reporting period (by country).
As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.
3.3.1 Reporting Labor Hours. The Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report all Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address:
https://CMRA.ARMY.MIL.
The required information includes the following:
a. Names of the KO and COR;
b. Contract number, including task and delivery order number;
c. Beginning and ending dates covered by reporting period;
d. Contractor's name, address, phone number, e-mail address, identity of
Contractor employee entering data;
e. Estimated direct labor hours (including subcontractors);
f. Estimated direct labor dollars paid this reporting period (including subcontractors);
g. Total payments (including subcontractors);
h. Predominant Federal Service Code (FSC) reflecting services provided by
Contractor (and separate predominant FSC for each subcontractor if different);
i. Estimated data collection cost;
j. Organizational title associated with the Unit Identification Code (UIC) for the
Army Requiring Activity (RA) (the Army RA is responsible for providing the Contractor with its UIC for the purposes of reporting this information);
k. Locations where Contractor and subcontractors perform the work (specified by zip code in the U.S. and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
l. Presence of deployment or contingency contract language; and
m. Number of Contractor and subcontractor employees deployed in theater this reporting period (by country).
As part of its submission, the Contractor shall provide the estimated total cost incurred to comply with this reporting requirement.
https://cmra.army.mil/
Reporting period shall be the PoP not to exceed twelve (12) months ending thirty (30) September of each Government FY and must be reported by 31 October of each calendar year. The Contractor shall use a direct data transfer to the database server or fill in the fields on the website. The direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The Contractor shall report the required information to the CMR system’s secure database.
The COR/ACOR is responsible for verifying that the Contractor has reported the required data.
4.0 Performance Requirements Summary (PRS) Matrix.¶
Required Services
Performance Standard
Acceptable Quality Level (AQL)
Incentive (Positive and/or Negative)
# 1.
Refuse Collection: The Contractor shall provide refuse collection according to the schedule and specified points of collection as described herein.
The Contractor shall provide services IAW PWS Annex E Section 2.
2% Deviation from performance Standard;
% calculated by dividing the number of defects by the number of observations.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;
Contractor shall re-perform the service.
# 2.
The Contractor shall provide personnel support within 2 hours of notification outside the normal hours of operation as required for emergency situations
The Contractor shall provide a central point of contact IAW PWS annex E para.
2.6.2.1
Zero Deviation from performance standard
Non-conforming services will result in Non-Conforming Reports issued to Contractor and potential negative CPARS report.
#3.
The Contractor shall develop and maintain a Quality Control Plan approved by the KO.
The Contractor shall provide a QCP IAW PWS Annex A, para, 2.1.9 performance standard.
Reports issued and a potential negative CPARS narrative.
# 4.
The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.
Employee conduct complies with 41 U.S.C. 423, Procurement Integrity, IAW PWS Annex A para.
2.1.11.1.6.
performance standard.
Reports issued to Contractor and potential equitable adjustment by the Contracting Officer.
#5.
Damages caused by Contractor employees shall be repaired at no cost to the Government.
The Contractor shall notify the COR/ACOR and return the damaged area to its previous condition IAW PWS Annex A para. 3.1.1.1.
Reports issued and a potential negative CPARS narrative.
#6.
The Contractor will ensure that the licenses or certificates and training of Contractor personnel are kept current. Copies of these licenses or certifications will be provided to the
COR/ACOR.
The Contractor shall perform IAW PWS Annex A, para.
7.11.2.
(Risk assessed high risk)
Non-conforming services will result in Non-Conforming Reports issued and a potential negative CPARS narrative
4.1 Quality Assurance. The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP).
QASPs are considered to be "living documents," dynamic, adaptable, and subject to modification based on Contractor performance surveillance results. The QASP is not part of the PWS and will not be issued with the solicitation. The QASP focuses on the procedures and processes the Government will implement to assure the Contractor is performing IAW the performance standards within the PWS. The Government plan defines the criteria of how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the Performance Requirements Summary (PRS). The Government retains the right to evaluate all services required by the contract.
The Government will perform inspections and tests in a manner that will not unduly delay the work. If any of the services performed do not conform to contract requirements, the Contractor shall perform the services again at no additional cost to the Government.
4.2 Quality Control Plan (QCP). Quality control is the responsibility of the Contractor.
The Contractor shall develop, implement, and maintain an effective quality control program which shall be documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify and prevent the recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The QCP shall be constructed in such a manner that each CLS service can be extracted and used for that function only and not contain extraneous information. The Contractor's QCP shall include a separate section, which addresses the Contractor's method of managing quality of work.
The QCP shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor’s inspectors. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the KO for acceptance within thirty (30) calendar days after the contract is awarded. The Contractor shall submit any proposed changes in the QCP to the KO for written approval five (5) working days prior to implementation.
5.0 Common Levels of Service (CLS).
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions of the Base Operations specified below. This shall be done IAW all the terms, conditions, general and special provisions, specifications, drawings, attachments, and exhibits contained herein or incorporated by reference.
The Contractor shall ensure that all work meets or exceeds the specifications for the listed
CLS.
CLS Service Title Attachment No.
403 Solid Waste Management Annex E Attachment 02
6.0 Deliverables¶.
Deliverable Frequency Format Submit To
QCP
PWS Annex A 2.1.9.
Once within 30 days of contract award
Electronic KO and COR
Permits and Licenses PWS Annex A 7.11
1 copy of disposal permit(s)/approval(s) from permitted/suitable D landfill(s)/transfer system as part of the bid
Electronic COR and KO
I-Watch Training PWS Annex A 2.5.2.1
Within 30 days of contract award to COR within 45 calendar days New Employees within 10 days of work
Electronic, COR
Post Award Meeting/periodic meetings PWS Annex A 2.1.7.1
After award of contract and once a quarter-provide copies of minutes Provide emergency numbers…