Amendment_0003_W91247-15-R-0005.pdf

PDF 330 KB Posted

Attached to
SATMO Aviation IDIQ RFP W91247-15-R-0005 (With Amendments 0001-0006)
Solicitation number
W9124715R0005
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.GREGORY.A.HAYNES

GREGORY.A.HAYNES.CIV@MAIL.MIL

PHONE: 907-4742

FAX: 396-7872

FORT BRAGG NC 28310

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of the amendment is to incorporate revisions in the folllow ing (highlighted yellow ):

a. Sections C, G, H, L, and M;

b. Delete the follow ing FAR clauses from Section I: 52.219.8; 52.219-9 Alt II; 52.222.41; 52.222.43; and 52.222.44;

c. Revise FAR Clause 52.217-9 and DFAR Clause 252.216-7006;

d. Incorporate Questions and Answ ers, Revised STO 1, 2, and 3, and CAP Labor Rate Matrixn in Section J; and

e. Revise CLINs 0001, 0002, and 0003.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 46

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Feb-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91247-15-R-0005

X 9B. DATED (SEE ITEM 11)

13-May-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Feb-2016

CODE

MICC CENTER - FORT BRAGG

MICC - FORT BRAGG

2175 REILLY ROAD STOP A

FORT BRAGG NC 28310-5000

W91247 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W91247

FACILITY CODECODE

EMAIL:TEL:

W91247-15-R-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The standard size code $27,500,000 has been added.

The required response date/time has changed from 16-Jun-2015 10:00 AM to 22-Mar-

2016 10:00 AM.

The order period end date 27-Jul-2021 has been added.

The order period start date 28-Jul-2016 has been added.

The organization for offers to be sent to has changed from

.SERENA DAVIDSON

SERENA.A.DAVIDSON.CIV@MAIL.MIL

FORT BRAGG NC 28310

to

.GREGORY.A.HAYNES

GREGORY.A.HAYNES.CIV@MAIL.MIL

PHONE: 907-4742

FAX: 396-7872

FORT BRAGG NC 28310

The following have been modified:

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time 16 June-2015 02:00 PM has been deleted.

(End of Summary of Changes)

SECTION B - SUPPLIES OR SERVICES AND PRICES

Global Changes

CLIN 0001 -- CLIN 0003

The IDC type has changed from N/A to Indefinite Quantity.

CLIN 0001

The CLIN extended description has changed from:

The contractor shall provide support services for the U.S. Army Security Assistance Training Management Organization (USASATMO). The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform aviation security assistance training to host-nations as defined in the Performance Work Statement (PWS) and each individual Task Order (TO).

Detailed Contract Line Item specifications shall be included in each individual TO. The quantities specified in this CLIN are for administrative purposes only and represent the total ceiling for the entire program which is $240M.

The quantities shown DO NOT represent actual or potential requirements.

To:

The contractor shall provide support services for the U.S. Army Security Assistance Training Management Organization (USASATMO). The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform aviation security assistance training to host-nations as defined in the Performance Work Statement (PWS) and each individual Task Order (TO).

Detailed Contract Line Item specifications shall be included in each individual TO. The quantities specified in this CLIN are for administrative purposes only and represent the total maximum for the entire program which is $249M.

The quantities shown DO NOT represent actual or potential requirements..

The pricing detail quantity has increased by 5,000,000.00 from 236,000,000.00 to 241,000,000.00.

CLIN 0002

Individual TOs will provide Other Direct Costs requirements. This category includes, reproduction, purchase of items necessary to accomplish the mission outlined in the TO, shipping, non-exempt tariff’s charged by the purchasing/beneficiary country and visits to contractor facilities. Contractor shall ensure all ODC’s are pre-approved by the COR prior to expenditure of funds. Detailed specifications shall be included in each individual TO.

The quantities specified in this CLIN are for administrative purposes only as a Not to Exceed amount of $2,000,000.00. The quantities shown DO NOT represent actual or potential requirements.

To:

Individual TOs will provide Other Direct Costs requirements. This category includes, reproduction, purchase of items necessary to accomplish the mission outlined in the TO, shipping, non-exempt tariff’s charged by the purchasing/beneficiary country and visits to contractor facilities. Contractor shall ensure all ODC’s are pre-approved by the COR prior to expenditure of funds. Detailed specifications shall be included in each individual TO..

The pricing detail quantity has changed from UNDEFINED to 4,000,000.00.

The unit of issue has changed from Cost to Each.

CLIN 0003

The Contractor may be required to travel OCONUS for the performance of this contract and travel within the host country to attend meetings and training locations. Contractor will be authorized travel expenses consistent with FAR 31.205-46 Travel Costs. All travel requires Government approval/authorization and notification to the COR.

Detailed Contract Line Item specifications shall be included in each individual TO. The quantities specified in this CLIN are for administrative purposes only as a Not to Exceed amount of $2,000,000.00. The quantities shown DO NOT represent actual or potential requirements.

To:

The Contractor may be required to travel OCONUS for the performance of this contract and travel within the host country to attend meetings and training locations. Contractor will be authorized travel expenses consistent with FAR 31.205-46 Travel Costs. All travel requires Government approval/authorization and notification to the COR.

Detailed Contract Line Item specifications shall be included in each individual TO..

The pricing detail quantity has changed from UNDEFINED to 4,000,000.00.

The unit of issue has changed from Cost to Each.

ADDITIONAL INFORMATION

B.1. The total contract maximum for the Security Assistance Training Management Organization (SATMO) Aviation Training, Multiple Award Indefinite Delivery/Indefinite Quantity (ID/IQ) suite of contracts is $249,000,000, which includes the five (5) year ordering period. The Government may, by bilateral modification, extend the ordering period of this contract for up to an additional five (5) years provided the estimated maximum (total contract maximum) designated in the Schedule has not been exceeded. The contractor shall agree to execute the modification prior to the expiration of the contract, provided the modification does not increase the maximum quantity in the Schedule or otherwise change any other term or condition of the contract. The total duration of the ordering period of this contract, including the extension, shall not exceed 10 years. Any order issued during the effective period of this contract, if extended, shall be completed by the Contractor within the time specified in the order, provided, that the Contractor shall not be required to make any deliveries under this contract after 27 July 2027.

B.2. In accordance with Section I clause 52.216-22 entitled “Indefinite Quantity”, the minimum guaranteed value under this contract is $5,000 per contract for the five (5) year ordering period. This contract minimum will be met by the issuance of an individual task orders (TO) per contract. In addition to the contract minimum, the Government may order additional quantities up to the Multiple Award Indefinite Delivery/Indefinite Quantity (ID/IQ) contract maximum of $249,000,000. The Multiple Award Indefinite Delivery/Indefinite Quantity (ID/IQ) contract maximum represents the total requirement for the life of the contract.

B.3. The Contract Line Item Number (CLIN) structure shall be established individually at the Task Order (TO) level. The Pricing of TOs shall be pursuant to the instructions and limitations provided at Section H, Special Contract Requirements.

B.4. For administrative purposes only, all CLINs have been prefilled.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

U.S. Army Security Assistance Training Management Organization (USASATMO) Ft. Bragg, North Carolina 28310-5000

Part 1

General Information

1. GENERAL: This is a non-personal services contract to provide Security Assistance Training (SAT) in support of U.S. Army Security Assistance Training Management (USASATMO). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor personnel.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Security Assistance Training and Advisory support to customer-nations, as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.

1.1.1. Program Goals. To provide agile, specialized and cost effective Security Assistance Teams (SATs) in order to facilitate security assistance programs that build partnership capacity as well as defense and security relationships;

that promote specific U.S. security interests, including all security assistance activities; develop allied and friendly military capabilities for self-defense and multinational operations; and provide U.S. forces with peacetime and contingency access to host nations in support of United States Army Campaign Plan and U.S. national security objectives.

1.2 Background: USASATMO is a subordinate command under the U. S. Army Security Assistance Command (USASAC), a Major Subordinate Command (MSC) of Army Material Command (AMC). USASATMO executes the overseas portion of the U.S. Army’s Security Assistance Enterprise Outside Continental United States (OCONUS) training and technical assistance mission. USASATMO plans, forms, prepares, deploys, sustains and re-deploys Continental United States (CONUS)-based (from the continental U.S.) Security Assistance Teams (SATs) to execute OCONUS (overseas) Security Cooperation missions in support of Geographic Combatant Command Theater Security Cooperation Programs and U.S. foreign policy (For the purposes herein, the terms “Security Assistance” and “Security Cooperation” mean “Foreign Military Aid.”).

1.2.1. USASATMO staffs teams with active component Army, active component members of other services, reserve component Army, reserve component members of other services and DoD civilians. USASATMO may use contractor services if none of these are available for a given SAT mission. Because of long lead-times for non-contract personnel, and current operations tempo, USASATMO anticipates an increasing requirement for contractor support. Specific skill requirements will be identified at the Task Order (TO) level. When it is known that uniformed personnel will not be available, contractor support will become the first option considered. In other cases, the more rapid reaction time of Contractor may be a governing factor in using contractor teams. SATs deployed as a result of this contract may be a single Contractor employee, a combination of Department of Defense personnel and Contractor employee(s), or entirely Contractor employees.

1.2.2. USASATMO requires a variety of expertise while preparing to deploy an Aviation SAT, during the Aviation SAT execution phase and during the post deployment stage of an Aviation SAT mission cycle.

The aviation services required are divided into two (2) categories: training related services and technical assistance related services.

1.3 Objectives: The basic service objectives include the following:

1.3.1. Training provided to increase the military capability and capacity of the purchasing nation or agency.

1.3.2. Technical advice to improve the military readiness of the host-nation.

1.3.3. Develop and build-on long term relationships between the U.S. Government and the host-nation.

1.4 Scope: Contractor shall provide services, either in the form of aviation training or technical advice (hereafter referred to collectively as “services”), to approved foreign countries. Services shall be performed on site of the purchasing country. Services performed will be wide reaching in scope from basic flight crew skills to highly technical flight and operational planning skills. The contractor may be required to provide briefings at the request of the U.S. Country Team to representatives or leaders of the host nation on the progress of the training or aviation operations in general.

1.5 Ordering Period: The ordering period shall be for five (5) years, unless the Government extends ordering period by bilateral modification IAW Section B.1 of the RFP at which time CAP Labor Rates may be re-negotiated.

1.6 General Information:

1.6.1 Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1 Contractor Inspection Requirements).

1.6.1.1. Quality Control Program: Quality Control Program: The Government is committed to a highly interactive relationship between quality control by the Contractor and quality assurance by the government recipient of services. This relationship shall be achieved through an effective Prevention Based Quality Control Program dedicated to ensuring the best possible products and services to end users. The Contractor shall provide their final written Quality Control Plan (QCP) at the TO level no later than (NLT) 30 days after issuance of the TO unless otherwise specified in the TO. The QCP shall be in writing and shall be submitted to the Contracting Officer (KO) and Contracting Officer’s Representative (COR) via electronic mail or U.S. Postal Service. Format will be Microsoft Word document. Any changes to the QCP will be provided to the KO and COR within 5 working days. The Contractor shall obtain the KO’s acceptance of the QCP in writing. (See Technical Exhibit 2, Contract Data Requirements List.

1.6.1.1.1. The Contractor’s quality program shall demonstrate its prevention-based outlook by meeting the objectives stated in the PWS throughout all areas of performance. The QCP shall be developed to specify the Contractor’s responsibility for management and quality control actions to meet the terms of the contract. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints.

1.6.1.1.2. Within five (5) days of completion, and/or upon request from the COR, the Contractor shall provide, all reports generated as a result of the Contractor’s quality control efforts. This shall include any summary information used to track quality control, including any charts/graphs.

1.6.1.1.3. The Contractor’s QCP shall be incorporated into and become part of this contract after the plan has been accepted by the KO. Proposed changes made after KO acceptance shall be submitted in writing through the COR to the KO for review and acceptance prior to implementing any revision. The Contractor’s QCP shall be maintained throughout the life of the contract and shall include the Contractor’s procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract.

1.6.1.2. Contractor Discrepancy Report (CDR): When the Contractor's performance is unsatisfactory, a CDR will be issued. The Contractor shall reply in writing within five (5) work days from the date of receipt of the CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.

1.6.1.3. Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP) provided for each Task Order (TO). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s) utilizing the DA Form 5475 COR/QAE Surveillance Schedule, DA Form 5477 Customer Complaint Record and DA Form 5479 Contract Discrepancy Report.

1.6.2. Property Management System: The Contractor shall establish a system to manage Government Furnished Material (GFM) in its possession to control, use, preserve, protect, repair and maintain. The Property Management System (PMS) must be adequate to satisfy the requirements of Property Management in accordance with (IAW) FAR clause 52.245-1 Government Property.

1.6.3 Recognized Holidays: The contractor will be required to work on the “normal” workdays of the purchasing country or agency. The holiday schedule will be identified in the task order.

1.6.4 Hours of Operation: To be defined at the TO level.

1.6.5 Place of Performance: To be defined at the TO level.

1.6.6 Security Requirements: Security Requirements: Each TO will specify the security requirements necessary to accomplish the requirement. Contractor Personnel shall have the specified clearance as stated in TO prior to commencement of work and must maintain the level for the life of the TO. The security requirements are in accordance with the DD254 in technical exhibit 4 and will be identified if required at the TO level. Contractor personnel shall comply with all applicable security and safety regulations, guidance, and procedures, including local, referenced in the TO and in effect at the work sites. All personnel must meet requirements in accordance with Department of Defense Directive (DODD) 8570.

1.6.6.1 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

1.6.7. Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. These procedures shall be included in the Contractor’s QCP. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately, within 24 hours, report any occurrences of lost or duplicate keys/key cards to the KO and COR.

1.6.7.1. In the event keys other than master keys are lost or duplicated, the Contractor shall, upon direction of the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than Contractor’s personnel. The Contractor shall prohibit the opening of locked areas by Contractor personnel to permit entrance of persons other than Contractor personnel engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.

1.6.7.3. Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.6.8. Special Qualifications. The Contractor shall provide personnel who meet the minimum qualifications and certifications as required and outlined in each individual TO. These qualifications will be reviewed and verified by USASATMO to ensure individuals meet customer-nation training and advisory requirements. Aviation flight personnel must provide Aviation Flight Record (equivalent to DA Form 3515) for review to ensure personnel meet the minimum qualification requirement for each TO.

1.6.8.1. General: This subsection is applicable to ALL Contractor personnel unless specified differently at the TO level.

1.6.8.1.1. The Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current certifications as indicated in PWS 1.6.6: security requirements during the execution of this contract.

1.6.8.1.2. Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements. They shall have a command of both the written and spoken English language to properly clearly, and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.

1.6.8.1.3. Contractor personnel performing work under this contract shall be U.S. citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non-U.S. citizen to perform the required support.

1.6.8.1.4. Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current Information Assurance Technician (IAT) Level I professional certification during the execution of this contract.

1.6.8.1.5. Access and General Protection/Security Policy and Procedures: All Contractor personnel performing work under this contract shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative.

Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor personnel must comply with all personal identity verification requirements as directed by DoD, HQDA or local policies. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes. Specific host country security procedures and access control will be identified in the task order

1.6.8.1.6. Anti-Terrorism Program

1.6.8.1.6.1. Anti-Terrorism (AT) Level I Training. Contractor personnel performing work under this contract that require access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after issuance of task order unless specified at TO level. The Contractor shall submit certificates of completion for each affected employee to the COR within 30 calendar days after completion of training by all Contractor personnel. AT Level I awareness training is available at the following website:

https://atlevel1.dtic.mil/at.

1.6.8.1.7. iWATCH Training. The Contractor shall brief all personnel performing work under this contract on the local iWATCH program [training standards provided by the requiring activity Anti Terrorism Office (ATO)]. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of issuance of TO unless specified differently at the TO and within 60 calendar days of new employees commencing performance of work under this contract, with the results reported to the COR NLT 45 calendar days after issuance of TO .

1.6.8.1.8. Contractor personnel shall have a favorable National Agency Check (NAC) with inquiry in accordance with Security definition for personnel who occupy “ADP (Automated Data Processing) Sensitive” positions, as per AR 380-67, paragraph 3-601, “The Personnel Security Program.”

1.6.8.1.9. All Contractor personnel shall meet the minimum qualifications outlined in the individual Task Orders.

However, the majority of the tasks involve the qualifications/skills detailed in the various Military Occupation Specialty Codes (MOSC) or Federal Service classifications, and will usually specify experience instructing courses at an Army service school.

1.6.8.1.10. Contractor shall have all necessary passports, visas, entry permits, and other documents required for Contractor personnel to enter and exit the foreign country, including those required for in-transit countries.

1.6.8.1.11. Contractor personnel shall possess valid U.S. (State) and /or international driver’s licenses that remain valid for the entire deployment period depending on the country of origin specified in the TO.

1.6.8.1.12. The missions outlined in the individual Task Orders support U.S. foreign policy. Contractor actions and statements, on and off duty, can have a lasting effect on U.S. relations with the host nation. Accordingly, all Contractor personnel must be motivated, mature and stable. They must possess diplomatic and cultural skills to deal with foreign military staff and diplomatic corps level personnel, as well as with any foreigners with whom they interact. Upon notification, the Contractor shall remove personnel whose behavior in any way embarrasses the United States, misbehaves or threatens the health, safety, welfare, etc. of U.S. and Host Nation personnel and replace them as soon as possible. Removal of an employee does not relieve the Contractor of any responsibility to continue performance. Replacement personnel shall have the same or similar qualifications/experience and shall be approved by the Contracting Officer in consultation with SATMO prior to start of work.

1.6.8.1.13. Trainees are normally proficient enough in English to understand U.S. training. However, some Task Orders may require foreign language capabilities for one or more team members. In these cases, TOs may specify Defense Language Institute’s language proficiency levels or other generally accepted certifications of language proficiency. Where interpreters may be used, Contractor will have training or experience with the use of tourist, consecutive or simultaneous interpreters. Some TOs may require translation of U.S. materials into the trainee’s target language, or the creation of training materials in the foreign target language.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) 42.5, Post-award Orientation. This requirement may be accomplished by teleconference to eliminate training distracters and reduce expenditures. The Contracting Officer, COR, and other Government personnel, as appropriate, will meet quarterly with the Contractor to review the Contractor's performance. At these meetings, the contracting officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

1.6.10 Contracting Officer’s Representative (COR): The COR will be identified by separate letter of appointment.

The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including government drawings, designs, specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

1.6.11 Key Personnel:

1.6.11.1 The following are considered key personnel at the Multiple Award Task Order Contract (MATOC) level by the Government: The Contractor shall provide a primary point of contact (POC) who shall be responsible for the performance of the work under this contract. The name of this person, and an Alternate POC, who shall act for the Contractor when the primary POC is absent, shall be designated in writing to the KO at the post award conference.

The POC shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. Additionally, key personnel may be required at the Task Order level.

1.6.12 Contractor Personnel: This subsection applies to ALL Contractor personnel.

1.6.12.1. Identification of Contractor Personnel: All Contract personnel attending meetings, answering government telephones, sending official e-mail messages, and working in other situations where their Contractor status is not obvious to third parties, are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. They must also ensure that all documents or reports produced by Contractor are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. Additionally, US Contractor personnel shall be required to obtain a Government Common Access Card (CAC) prior to deployment in order to access government facilities and computer systems. To obtain a CAC, employees at a minimum, must have a valid National Agency Check with Inquiries (NACI) investigation that has been active within the last two (2) years. The employee will not have a current suspended, revoked or denied eligibility nor be a subject of a criminal investigation or negative inquiry. Contractor’s clearance and eligibility information will be verified through Joint Personnel Adjudication System (JPAS).

1.6.12.1.1. The Contractor shall develop, maintain, and provide to the COR an updated roster which shall include names and positions of all Contractor personnel as well as indicating which employees were issued CAC or other forms of government identification cards. The Contractor shall submit initial roster to the COR within 10 calendar days after commencement of period of performance on each TO.

1.6.12.1.2. The Contractor shall immediately report any lost CAC or government issued identification cards to the COR and Military and/or DoD police agencies. The Contractor shall immediately collect the CAC and other government issued forms of identification upon termination of employee, or at the end of the contract performance period. The CAC and other government issued forms of identification shall be returned to the COR within five (5) days of employee termination, or at the end of contract performance period.

1.6.12.2. Contractor Personnel Appearance and Performance: It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal or un-prescribed drugs or any other incapacitating agents.

Contractor personnel shall be neatly groomed and present a professional appearance at all times. Appropriate professional attire requirements will vary based on the TO, mission, and local environment; i.e., business wear may be appropriate for interacting with senior foreign officials while polo shirt with khakis may be appropriate for classroom instruction and military flight uniforms are required when performing flight duties

1.6.13 Contractor Travel: Contractor Travel: Contractor will be required to travel OCONUS for the performance of this contract. The Contractor may be required to travel while in the host country to attend meetings and to training locations within the host nation in support of this contract. Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires advanced approval/authorization by the COR.

1.6.14. Other Direct Costs (ODC): Individual TOs will provide Other Direct Costs (ODC) requirements. This category may include various requirements determined to be ODCs such as purchase of items necessary to accomplish the mission outlined in the TO, shipping, non-exempt tariffs charged by the purchasing/beneficiary country, and visits to contractor facilities. The Contractor shall submit requests for ODCs (other than travel) to the COR. Contractor shall ensure all ODCs are pre-approved by the KO prior to expenditure of funds. Invoice submitted through Wide Area Workflow (WAWF) must clearly identify the specifics of the costs (e.g., who, what, where, when).

1.6.15 Data Rights: All training-related materials delivered under this contract will be considered to be special works for purposes of DFARS 252.227-7020, the entirety of which is applicable to this contract. Of specific note, that clause includes the following: "License rights. (1) The Government shall have unlimited rights in works first produced, created, or generated and required to be delivered under this contract. (2) When a work is first produced, created, or generated under this contract, and such work is required to be delivered under this contract, the Contractor shall assign copyright in those works to the Government. The Contractor grants to the Government a royalty-free, world-wide, nonexclusive, irrevocable license to reproduce, prepare derivative works from, distribute, perform, or display, and to have or authorize others to do so, the Contractor's copyrighted works not first produced, created, or generated under this contract that have been incorporated into the works deliverable under this contract."

Additionally, to the extent permitted by law, the Government shall own and/or have unlimited rights in all deliverables under this contract."

1.6.16. Phase-In/Phase-Out Periods:

1.6.16.1. Phase-In: The Phase In period and specific tasks will be specified at the TO level. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of services. During the phase in period, the Contractor shall become familiar with performance requirements for full performance of services following the Phase In. The Contractor and Government shall conduct a joint inventory of government Furnished Property (GFP) with the COR prior to commencing work under this effort. This inventory shall detail the material description and quantities of all GFP and determine the condition of the GFP. The Contractor shall certify the findings of this inventory and assume accountability.

1.6.16.2. Phase-Out: Phase Out period will be specified at the TO level. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of services. Prior to the completion of this contract, an observation period shall occur, at which time Key Personnel of the incoming Contractor may observe operations. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of services. The Contractor is ultimately responsible for performing full services IAW the contract, during the phase-out period, and shall not defer any requirements for the purpose of avoiding responsibility or of transferring, such responsibility to the succeeding Contractor. The outgoing Contractor shall fully cooperate with the succeeding Contractor and the Government, so as not to interfere with their work or duties.

1.6.16.2.1. To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have all personnel on board during the phase-out period. The Contractor shall be prepared to transition the work load to the newly selected Contractor during the phase-out period, which will occur at the end of the period of performance of the contractual effort.

1.6.16.2.2. Phase-Out Plan. The Contractor shall develop a phase-out plan to affect a smooth and orderly transfer of contract responsibility to a successor. The plan shall fully describe the Contractor’s approach to the following issues, at a minimum: Inventories and turn-over of government property; removal of Contractor property;

reconciliation of all property accounts; turn-in of excess property; data and information transfer; clean-up of Contractor work areas; and security debriefings in accordance with AR 380-5 for incumbent personnel holding security clearances; and any other actions required to ensure continuity of operations. The Contractor shall provide the plan to the COR sixty (60) days before the phase-out period commences unless a different timeframe is determined at TO level.

1.6.17. Security Assistance Team (SAT) Orientation Training: Unless stated differently in the applicable TO, Contractor personnel will report to USASATMO Headquarters Building at Fort Bragg, NC, for the Security Assistance Team Training and Orientation Course (SATTOC) prior to deployment. SATTOC is a five-day training and orientation course designed to prepare a SAT and its members for the upcoming mission. USASATMO may waive some or all of this training.

1.7 Medical/Dental Requirements.

1.7.1. All individual Contractor personnel medical and dental, including emergency care shall be the responsibility of the Contractor.

1.7.2 In the event that Contractor personnel are evacuated as a result of hostile action, the U.S. government will provide transportation to the nearest U.S. military installation that can perform treatment.

1.7.3 If contract personnel are pronounced medically unfit to return to duty, the vendor shall replace them within specified timeframe at the TO level (30 calendar days, unless otherwise specified in the TO level) after notification, with the same or similar qualifications and skills.

1.7.4 Contractor shall ensure, and provide verification upon request of USASATMO, that all personnel are currently medically fit for the contracted mission. At a minimum these records shall include:

1.7.4.1 A statement from a physician that the SAT member is in good physical condition and able to work within the environmental conditions cited in the individual Task Order.

1.7.4.2. Documentation that the contractor member has no chronic lung problems, high blood pressure or known alcohol/drug problems.

1.7.4.3. An immunization record showing current immunizations as specified in the individual Task Order.

1.7.4.4. A negative HIV test result performed within the last six months of the deployment.

1.8. Non-Disclosure.

1.8.1. In addition to any organizational conflict of interest provision, Contractor employees assigned to this project may be required at the TO level, prior to working, to sign a non-disclosure statement, that will be provided at the TO level, for the Government agreeing not to share any information or data with other contractor personnel not assigned to the project or, if assigned to the project, who has not signed a non-disclosure statement. The signed non-disclosure statements shall be furnished to the Contracting Officer prior to contract performance.

1.9. Synchronized Pre-deployment and Operational Tracker (SPOT).

1.9.1. SPOT has been designated as the Joint Enterprise contractor management and accountability system to provide a central source of contingency contractor information and a summary of contract services IAW DoDI

3020.41. Government representatives are required to maintain by-name contractor accountability within SPOT.

Contractor company administrators are required to register for a SPOT account at https://spot.dmdc.mil and, after access is granted, enter all required information in the format provided at the SPOT website for each deploying contractor. All contractor data must be entered into the SPOT database for all contractors traveling to any AMC CONUS or OCONUS location. They are further required to coordinate in person with the respective AMC Forward Commanders, Logistic Support Elements, or Logistic Assistance Offices.

1.9.2 Contractor personnel must have a Synchronized Pre-deployment and Operational Tracker (SPOT)-generated letter of authorization (LOA) signed by the Contracting Officer in order to complete pre-deployment processing or to travel to, from, or within the designated operational area. The letter of authorization also will identify any additional authorizations, privileges, or Government support that contractor personnel are entitled to under this contract.

1.10 Other Requirements/Administrative Information.

1.10.1 Each individual Task Order will specify duty site, title, period of performance, duty-day, work hours, observed holidays, appropriate duty attire and off-duty attire. An After Action Report (AAR) shall be submitted to the SATMO COR within one week of country departure.

1.10.2 If there are no DoD personnel on the team, the Task Order may designate that one Contractor employee serve as Team Chief. The Team Chief shall be required to meet the qualifications for the specialty at the equivalency of the military grade/DoD civilian grade. Additionally, the Team Chief shall perform the following functions:

1.10.2.1 Work closely with specified representatives addressed in the individual Task Order, and/or service schools or host-nation representatives to resolve any training/mission related issues.

1.10.2.2 Provide advice, direction, supervision, administration for the daily mission of the SAT.

1.10.2.3 Brief specified representatives on the effectiveness of the SAT before departure from the country, or training site, as well as prepare a written After Action Report (AAR).

1.10.2.4 Maintain accountability for property and its authorized use under the procedures established by the service school, the SCO or USASATMO as identified in the individual TO.

1.10.2.5 Submit monthly updates on mission progress, expenditures, and hours worked and other management data specified in the individual TOs. Security situations within the customer-nation may require more frequent reporting and accountability, i.e. daily or weekly.

1.10.2.6 Provide administrative and technical data in accordance with each individual TO.

1.10.3 SATMO Teams operate under the operational oversight of the Security Cooperation Officer (SCO) in country. This person provides day-to-day information and feedback to the Contractor as to the routine aspects of mission performance. Each team also has a CONUS-based SATMO SAT Manager assigned to monitor and assist the team in the performance of the SATMO mission along with the COR that monitors contract compliance.

Situations may also require that the team chief to interact with other SATMO personnel, Unified Combatant Command personnel and other Security Assistance Commands (both CONUS and OCONUS) and foreign country representatives.

1.10.4 Quality Control and Curriculum Maintenance. The Contractor shall be responsible for establishing, maintaining, and monitoring the quality control of the services provided. Contractor employees shall conduct training in accordance with the quality control plan using the learning materials provided and the instructional methodologies listed in the course control documents.

1.10.5 The Contractor shall take no firearms, ammunition, alcohol, drugs (other than those prescribed by a doctor) or sexually explicit material into any foreign country.

1.10.6 Contract personnel shall respect customer-nation religious practices and adhere to the cultural and behavioral expectations appropriate for gender subject to the provisions in DFARS 252.225-7028 and FAR 52.222-26.

1.10.7 Removed.

1.10.8 Defense Base Act (DBA). As this contract provides services authorized under the Foreign Assistance Act, the Contractor shall provide DBA coverage for all US Citizens working outside the United States.

1.10.8.1. When the Defense Base Act applies (see 42 U.S.C. 1651, et seq.) to these employees, the benefits of the Longshoremen’s and Harbor Worker’s Compensation Act are extended through operation of the War Hazards Compensation Act (42 U.S.C. 170, et seq) to protect the employees against the risk of war hazards (injury, death, capture, or detention). When, by means of an insurance policy or a self-insurance program, the Contractor provides the Worker’s Compensation coverage required by the Defense Base Act, the Contractor’s employees automatically receive war-hazard risk protection.

1.10.8.2. Where TOs, issued under this contract for performance in oversea areas outside of the United States, are silent or otherwise fail to specify applicability of the Defense Base Act, Contractors shall assume that the Act does, nonetheless apply, and responsibility for carrying war hazard compensation insurance, or otherwise required by the contract, shall remain the responsibility of the Contractor. To the extent that the Act is not considered to apply, the TO shall expressly so state.

1.10.9. Proof of Insurance. Within 15 days after award of any TO under this contract, unless specified differently at the TO level, requiring a status of Contractor performance in a foreign overseas area (i.e., outside the United States, its territories and possessions), the Contractor shall furnish the Contracting Officer a certificate of insurance as evidence of the existence of insurance coverage in amounts not less than that required by the Defense Base Act. See FAR 52.228-5, “INSURANCE – WORK ON A GOVERNMENT INSTALLATION” for Contractor notification requirements necessary to cancel such coverage.