W9123824Q0054 Solicitation.pdf

PDF 1 MB Posted

Attached to
USFS IFG HVAC Rpr & Maint Project
Solicitation number
W9123824Q0054
Issued by

About this file

This document is a Solicitation for a contract to repair and replace HVAC equipment for the Mirov Lab/Conference Room Building at the U.S. Forest Service Institute of Forest Genetics located in Placerville, California. The key objectives are to replace the existing hot water boiler, service the associated air handler, ductwork, and control system to restore full HVAC system functionality for the lab spaces.

The solicitation requires the contractor to perform an audit of the existing equipment, conduct a test and balance survey, replace the boiler, perform air-side and controls system repairs, and complete retro-commissioning and user training. The period of performance is 3 months, and the work is to be performed during normal business hours Monday through Friday, excluding federal holidays. Offers are due by 11:00 AM Pacific Time on August 15, 2024. A site visit is scheduled for July 31, 2024 at 11:30 AM Pacific Time. This is a Firm-Fixed-Price contract with evaluation based on price only.

View the file

Other files

File Type Posted
Amendment 0001 - Cancellation.pdf PDF
IFG HVAC Site Visit Pictures.pdf PDF
Site Visit Sign in Sheet.pdf PDF
Placerville HVAC Q and A .pdf PDF
Appendix E.pdf PDF
Appendix C.pdf PDF
Appendix B.pdf PDF
Appendix D.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9123824Q0054 16-Jul-2024

b. TELEPHONE NUMBER

(916) 557-7599

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 15 Aug 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912389. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MARY M NOONAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W91238 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

U.S. FOREST SERVICE

JENNY HU

REDWOOD SCIENCES LABORATORY

1700 BAYVIEW DRIVE

ARCATA CA 95521

TEL: 916-758-1288 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

333415

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF76

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9123824Q0054

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Audit of existing equipment

FFP

FOB: Destination

PSC CD: J041

NET AMT

0002 1 Job Audit - test and balance survey

FFP

0003 1 Job Provide & Install new boiler

FFP

0004 1 Job Air-side repair work

FFP

0005 1 Job HVAC Control Work

FFP

0006 1 Job Retro-Commissioning

FFP

0007 1 Job User Training

FFP

SITE VISIT

A site visit has been set up for 31 Jul 2024 at 11:30 AM Pacific Time. Contractors must be US citizens with valid ID. All will meet at the U.S. Forest Service, Institute of Forest Genetics 2480 Carson Road Placerville, CA 95667. The POC is Sylvia Qi who will meet everyone at the afore mentioned location and escort them to the area where the work will take place. We encourage everyone to show up 15 minutes early to check in. Once the time for the site visit begins we will go into the site.

PWS

PERFORMANCE WORK STATEMENT

U.S. FOREST SERVICE PACIFIC SOUTHWEST RESEARCH STATION

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

PLACERVILLE, CALIFORNIA

Date: 11 July 2024

1.0 GENERAL STATEMENT OF SERVICES

1.1 Introduction and Purpose. The contractor shall furnish all necessary labor, material, equipment, and operating personnel for this service contract to repair and replace HVAC equipment for the Mirov Lab/Conference Room Building at the Institute of Forest Genetics (IFG) located in Placerville, California. It is recommended that vendors inspect the job site prior to submitting a quote.

1.2 Location.

U.S. Forest Service, Institute of Forest Genetics 2480 Carson Road Placerville, CA 95667

1.3 Security Requirements. The Contractor will be required to comply with all U.S. Forest Service (USFS) Pacific Southwest (PSW) Research Station entrance and security requirements. Contractor shall coordinate access to the building with onsite personnel through the Contracting Officer Representative (COR).

2.0 OBJECTIVE

The existing hot water boiler is out of service, and the associated air handler, ductwork, and control system requires maintenance to adequately condition the lab spaces. The objective of the contract is to replace and/or repair the equipment to restore full operation to the HVAC system.

3.0 DETAILED DESCRIPTION OF SERVICES

3.1 General Requirements. All work performed by the Contractor shall be designed and implemented in a manner which conforms to the requirements in, this PWS, all applicable Federal, and state and local regulations, and all accepted Work Plans and submittals. If there is a conflict between Federal, state, and local regulations and the PWS, the Contractors shall immediately inform the Contracting Officer Representative COR. If a conflict does arise, the most stringent rule will apply.

3.2 Period of Performance. The Period of Performance for this contract will be 3 Months following the date of contract award.

3.3 Inspection. Bidders are expected to inspect the job site where services are to be performed to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract prior to submitting bids.

In no event will failure to inspect the site constitute grounds for withdrawal of a bid after opening or for a claim after award of the contract.

3.4 Employees. The contractor shall furnish competent personnel. If employees furnished prove to be incompetent, in the opinion of the COR, the contractor shall remove them and furnish satisfactory employees. Contractor personnel shall obtain and maintain in good standing all certifications, inspections, and licenses necessary or appropriate to perform all work contained in this PWS. The Contractor shall maintain the training skills and qualifications of all personnel throughout the award period. The contractor is reminded that any attached Service Contract Act (SCA) Wage Rates must be strictly adhered to for employees. All persons performing under the contract shall remain employees of the Contractor and not of the Government. The Government has the right to restrict site access under the contract of any contractor employee, or prospective contractor employee, who is identified by the COR as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. All Contractor employees performing work under the contract shall be physically able to do their assigned work. The Contractor shall not allow any employee(s) to perform any work who is under the influence of alcohol or is incapacitated by any other substances. The COR may require the Contractor to remove from the job site any employee for misconduct or security reasons. The removal from the job site of such person shall not relieve the Contractor of the requirement to perform adequate and timely service. The Contractor shall cooperate with other contractors and Government personnel performing work at USFS.

3.5 Reserved.

3.6 Point of Contact. The point of contact for this action will be given at contract award.

3.7 Authorities/Technical Direction. The Contractor shall take no direction from any Government employee or any other person other than the Government Contracting Officer that changes the terms and conditions of this contract action, the scope, or any change that impacts the cost, price or schedule. Changes authorized by the Contracting Officer will be in the form of a written, official, signed modification to the contract action received by the Contractor before the Contractor will act upon those changes. The Contractor will comply with the Changes clause of this contract when the contractor believes direction has been given from persons other than the Government Contracting Officer that equate to a change by notifying the Contractor Officer as directed by the clause. Any direction given by any Government employee or any other person outside their authority must be reported to the Contracting Officer. The COR is limited to the authorities stated in the COR appointment letters.

3.8 Mutual Understanding (Preconstruction) Meeting. Prior to the start of work, a meeting will be held with the contractor, US Army Corps of Engineers (USACE) Contracting Officer or Contracting Officer Representative to discuss matters of mutual interest concerning the contract, general conditions, work schedule, phasing and coordination, security, safety, permits, and other matters pertinent to work accomplishments will be discussed in the meeting. The Contractor shall provide a Work Plan at the mutual understanding meeting that identifies in detail the work to be completed as indicated below.

3.10 Operating Hours. The Contractor shall perform the services required under this contract during the following hours: 8:00 a.m. to 4:30 p.m. Monday through Friday, excluding Federal holidays. The COR shall be notified by telephone (followed in writing by 10:00 a.m. the next workday) of all emergency work, which extends beyond normal working hours.

Federal Holidays. Except as otherwise specified, routine work shall not be scheduled on holidays.

Federal holidays observed are as follows:

New Years Day – January 1 M.L. King Birthday – 3rd Monday in January President’s Day – 3rd Monday in February Memorial Day – last Monday in May Juneteenth Day – June 19 Independence Day – July 4 Labor Day – 1st Monday of September Columbus Day – 2nd Monday of October Veterans Day – November 11 Thanksgiving Day – 4th Thursday of November Christmas Day – December 25

3.11 Invoices. Invoices for payment shall be submitted upon completion of tasks as outlined in the Payment Schedule of this contract. Invoices shall be submitted to:

Original invoice only WITHOUT additional information or supporting documentation:

USAED, FINANCE CINETER

ATTN: CEFC-AO-P

5270 Integrity Drive Millington, TN 38054-5005

One copy of each invoice WITH all required information including any necessary supporting documentation:

U.S. Army Corps of Engineers, Sacramento District

ATTN: CESPK

1325 J. Street, Sacramento, CA 95814

Phone: (916) 758-1255 Email: (POC email addresses will be provided at time of award)

NOTE: All invoices must reflect the contract order number and invoice number and the final invoice must be marked “FINAL”.

Contract Payments: The Government will pay the Contractor upon submission of proper invoices for services delivered and accepted for the portion of the work actually performed under the contract. Payment will be made as indicated in the contract's Payment Schedule not on percentage of completion. Deliverables as defined in the Payment Schedule of the contract must be accepted by the Government before payment will be made.

Invoices must be submitted no more often than monthly, and be billed by Contract Line Item Number (CLIN).

Please refer to the award document for necessary submittals prior to submitting invoices.

4.0 WORK TO BE PERFORMED

4.1 Service Scheduling. Within seven (7) days after award of contract, the contractor shall submit to the COR for acceptance a service schedule indicating the time and sequence of work. If unforeseen events cause a variation in the scheduled service, the contractor shall notify the COR in advance of the delay or as soon as possible if unable to notify in advance. Failure to provide the service or variation from the accepted schedule will require written explanation by the contractor. If and when additional service(s) are added, the schedule will be modified.

4.2 Scope of work.

There are two main buildings at the USFS Institute of Forest Genetics (IFG) that have administrative office space, a large conference room, research labs, and storage spaces. The Administrative Office Building is served by two heat pump units that are in good condition and do not need attention. The Mirov Lab/Conference Room Building is served by a large McQuay Air Handler (AHU) that includes an air-cooled direct-expansion cooling section, and there is currently an inoperable hot water boiler that serves the AHU heating coil and reheat coils within the building. There are also separate split systems serving other portions of the lab building that are not in need of service.

The overall goal of this contract is to provide a fully functional HVAC system for the IFG lab space. In order to do this, the contractor shall provide investigation, diagnostics, repair and/or replacement of existing HVAC equipment in accordance with this PWS and attached pictures and drawings.

The HVAC systems in the Mirov Lab/Conference Room Building are made up of the following major components:

Large McQuay Air Handler model RPSC2CCS with the following features:

o Chiller section with direct-expansion cooling o Heating coil served by the hot water boiler o Ultraviolet treatment for the airstream o Minor air leaks were noted at some exterior supply duct seams and around the air handler access doors.

Raypak hot water boiler (propane-fired, model number H8-0992B) with associated pumps and accessories to provide heating hot water to the AHU and the re-heat coils in the building system.

This unit is not currently operational and needs to be replaced. The nameplate shows 831,600 BTU/HR Output and 990,000 BTU/HR Input.

There is a Johnson Metasys building automation system (BAS) that is operational but in need of some maintenance and/or repairs as some subsystems do not appear to be reporting data to the central control controller.

An American Standard split-system that serves the conference room, this unit is in good condition and NOT in need of service.

Two Mitsubishi mini-split units serving refrigerated storage spaces, these are recently installed and NOT in need of service.

The existing HVAC controls are currently operating in a state of reduced functionality. There are multiple zones served by either Variable Air Volume (VAV) or Constant Air Volume (CAV) boxes. These boxes are currently distributing air to the building, but the thermostats do not appear to be reporting zone temperatures to the control system. The sensors and controllers need to have some troubleshooting and repairs completed to restore their proper operation.

Any newly installed equipment must meet energy efficiency requirements as required by ASHRAE 90.1.

CLIN 0001 (Base) – Before performing replacement or repair work, the contractor must perform an audit of the existing Boiler, AHU, and controls system to confirm what system components need to be replaced or repaired for the system to be brought back to full functionality. The known problems with the systems are documented above. A report of this audit documenting the existing system components and necessary replacement, or repair actions shall be submitted to the Government before work on the system commences. Submit a workplan and material/product data for Government review and acceptance prior to start of work on site.

CLIN 0002 (Base) – As part of this audit, the contractor must perform a test and balance (TAB) survey of the existing air handler to document the fan performance and existing airflow at the terminal units. The supply and return fans shall be set to their respective maximum flow rates and the air supply/exhaust outlets and return/outdoor air inlets measured and recorded. Where applicable, the minimum and maximum flows for a unit shall be recorded (for example, for a VAV box that has a minimum and maximum airflow).

CLIN 0003 (Base) –The Contactor is required to provide and install a new boiler and accessories (if investigation and diagnosis reveals that pumps, valves, or other existing items are not currently functioning) needed for the heating hot water system to provide hot water to the heating coils connected to the existing system. All applicable manufacturer instructions and recommendations shall be followed. Once the boiler replacement work is completed, the heating hot water pump performance shall also be measured and recorded. The Contractor shall exercise caution to not to damage the integrity of the existing roof, lath and plaster ceiling structure, walls, utilities, and conduits during the installation process and take proactive steps to protect and preserve those features.

CLIN 0004 (Base) – Air-Side Repair Work:

As noted above in the existing conditions, the supply ductwork and air handler access doors require maintenance and re-sealing in some places. These seams and seals shall be repaired to bring the air handler back to a state of full functionality.

CLIN 0005 (Base) – HVAC Controls Work:

Also documented above is the current state of the Johnson Metasys controls system. Some of the devices are not reporting to the building automation system, and these shall be repaired or replaced as needed to restore full functionality of the controls system. This may include thermostats, temperature sensors, airflow sensors, and other similar devices connected to the boiler system, air handler, or terminal units (VAV and CAV boxes) that report data to the automation system.

CLIN 0006 (Base) –Retro-commissioning:

Once any new equipment has been installed and any necessary repairs have been made to the existing equipment, the system operation must be validated by a retro-commissioning effort. As-built drawings should be referenced to determine sequences of operation that the system must perform to be considered fully functional. A full set of construction drawings has not been located for this building or system(s), but some controls system drawings and other system documentation has been compiled, which will be made available to the contractor. This commissioning shall be performed by a commissioning agent meeting the following requirements:

Commissioning Agent (CxA) must have a minimum of two years of commissioning experience, including two projects of similar size and complexity to this project. CxA must be certified in one of the following:

NEBB Building System Commissioning Professional (CxCP) ACG Certified Commissioning Authority (CxA)

Certified Commissioning Supervisor BCA Certified Commissioning Professional (CCP) AEE Certified Building Commissioning Professional (CBCP) University of Wisconsin-Madison Qualified Commissioning Process Provider (QCxP) ASHRAE Building Commissioning Professional (BCxP)

Deliverables for the commissioning process:

Commissioning plan including methodology for performing equipment commissioning, roles and responsibilities of various people involved (contractor, subcontractors, owner, CxA, Government, etc.) and test scripts for functional performance testing of the New Boiler and Existing Air Handler to demonstrate proper system function, including any safety devices present in the systems (such as a freeze stat in the AHU or flow switch in the boiler pumping loop).

Commissioning report documenting the results of the tests performed.

Issues Log that documents problems encountered during inspections and testing, the party responsible for correction, and a description of the resolution of the issue including a date the issue was resolved.

Operation and Maintenance Manuals for the installed equipment, and warranty certificates for the new equipment.

CLIN 0007 (Base) –User Training: Following the completion of the above commissioning process, the contractor is to provide a minimum of 4 hours of user training for the USFS staff to enable them to operate and maintain the system(s).

4.3 Contractor Reporting.

4.3.1 Status Updates. The contractor shall submit status report via email to the Government COR at the request of the Government but at no more frequently than a bi-weekly (every two weeks) basis. These status updates shall include, at a minimum:

a) A summary of work completed in the field, permit status, and any significant events.

b) If requested by the Contracting Officer’s Representative (COR), the Contractor shall provide a copy of all weight tickets for project debris transported to a commercial landfill. Also provide the estimated weight and type of material for all debris transported to the installation landfill.

c) Progress photos (in electronic format) depicting major work activities accomplished during the reporting period.

d) Upon request, copies of daily field logs shall be provided. At minimum, field logs will include a summary of workers by classification, the move-on and move-off of construction equipment, materials and equipment delivered to the site, and total cumulative hours worked.

4.3.2 Progress Reports. The Contractor shall submit a Progress Report no later than 1700 hrs Pacific Time on Friday afternoon, as warranted but not more frequently than a bi-weekly (every two weeks) basis, and according to the distribution and quantities in paragraph 4.5.3 below. These weekly Progress Reports shall address the following:

a) A summary of work completed in the field with respect to all schedule milestones. Annotate and explain all deviations. Denote anticipated or actual delay of a scheduled field activity, to include basis and any effect on subsequent events or scheduled activities.

b) Any outside inspection reports, audits, or other administrative information developed/completed or anticipated.

c) Copies of all Quality Assured Data, sampling and test results and any other laboratory deliverables received, if any.

d) Documentation of material recycling including receipts of recycle centers. Project photos are acceptable provided a sufficient explanation is attached.

4.3.3 Final Report. The Contractor shall provide a final report no later than 10 working days after completion of project. The final report shall include a detailed description of work performed and lessons learned. A summary of the disposition of all project debris materials will include the quantity and type of debris materials recycled, salvaged, reused, and disposed of and shall be presented in chart form showing original material quantity estimated, quantity recycled, percentage recycled, and approximate cost or cost savings versus a commercial landfill alternative.

5.0 QUALITY CONTROL

5.1 Quality Control and Assurance. In compliance with the contract clause entitled Inspection of Services FAR 52.246-1 and FAR 52-246-4, the Contractor is responsible for performing or having performed all inspections and tests necessary to substantiate that the services furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts.

5.2 Quality Control Plan. The Contractor shall furnish for review by the Government, not later than ten days after receipt of Notice To Proceed (NTP), the Contractor Quality Control (CQC) Plan proposed to implement the requirements of section 4.0 WORK TO BE PERFORMED. The CQC plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. This documentation shall be made available to the Government throughout the term of the contract. At any time it is determined by the COR that the quality control system, personnel, instructions, controls, tests, or records are not providing results which conform to contract requirements, action shall be taken by the Contractor to correct the deficiency, i.e., replacement of personnel, additional quality control inspections, etc.

5.3 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Quality Assurance Surveillance Plan (QASP)

Performance Requirements Summary (PRS)

The table on the following page lists the PWS requirements/deliverables that the Government shall monitor. The absence of any contract requirement from the PRS/QASP does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract, including the clauses entitled “Inspection of Services” and “Default.”

The table defines the standard for each listed PWS service, sites the respective specification, provides the method of surveillance, and describes Remedies for not meeting acceptable quality level (AQL) standards.

Government Quality Assurance

The Contracting Officer (KO) has overall responsibility for overseeing the Contractor’s performance. The COR shall monitor day-to-day contract compliance and administration. The COR is responsible for technical administration of the project. The COR also assures proper Government surveillance of the Contractor’s performance and shall monitor, record, and report on the technical performance of the Contractor on a day-to-day basis. The COR, along with USACE subject matter experts, shall assure the Contractor is meeting contract PWS standards, as well as all Federal, state, and local regulatory requirements. The Government intends to use the following methods to monitor standards:

Inspection and review of all required documents and submittals.

Periodic inspection of work processes or output.

100% inspection at the completion of key work segments and deliverables.

Customer feedback.

Performance Evaluation

Performance of services shall be evaluated to determine whether or not it meets the performance requirements of the contract. The COR shall evaluate and report Contractor performance to the Contracting Officer at each milestone and delivery per the project schedule. Progress inspection reports shall be submitted as required. When the performance requirement is not met, a contract discrepancy report (CDR) shall be issued to the Contractor by the COR. The Contractor must respond to the CDR and return it to the COR within five (5) calendar days of receipt. Failure to meet acceptable performance standards may result in one or all of the following actions:

Contractor reperformance of the work at no additional cost to the Government, until the work meets the minimum AQL.

Termination of the contract.

QASP

Required Service Standards Acceptable Quality

Level Method of surveillance

Remedy

Preparation and submittal of all pre-project, documents, forms, permit requests, and notifications.

Permitting documentation, requests and notifications shall be performed by Contractor prior to start of work associated with those activities

100% 100% Government inspection

Remedy: The Contractor shall re-perform to the performance standard, at no additional cost to the Government. Continuous review until performance is satisfactory.

Repair and replace existing equipment as stated in the PWS.

Meet material and work requirements as stated in the

PWS.

Meets acceptable or better performance standards with no meaningful regulatory deviation.

100 % inspection Remedy: The Contractor shall re-perform to the performance standard, at no additional cost to the Government. Continuous review until performance is satisfactory.

Debris disposal to include handling, transporting, and disposal means and methods.

Recycle, and reuse debris materials per industry best practices to the maximum economic extent. Effort also includes tracking, reporting, and accounting for all debris material quantities and respective disposition method.

Follow good business practices and sustainability guidelines to dispose of materials in the most Environmentally sound manner.

Follow EPA guidance on How to Properly Dispose of Refrigeration and Air- Conditioning Equipment (https://www.epa.gov/sites/d efault/files/documents/Const rAndDemo_EquipDisposal.

pdf).

Meets acceptable or better performance standards with no meaningful regulatory deviation

Periodic progress and final inspection

Remedy: The Contractor shall re-perform to the performance standard, at no additional cost to the Government. Continuous review until performance is satisfactory.

Reporting to include weekly, monthly, and final reports.

Follow approved procedures for reporting in the Quality Control Plan (QCP) meet the requirements in this PWS.

Schedule weekly coordination meetings

Meets timelines and acceptable or better performance standards.

100% Government review Remedy: The Contractor shall re-perform to the performance standard, at no additional cost to the Government. Continuous review until performance is satisfactory.

Accident Prevention Plan to include Contractor Health and Safety Plan, work site safety performance and compliance.

Accident Prevention Plan with Activity Hazard Analysis appendix, have been accepted.

Meets acceptable or better performance standards.

100% Government review Remedy: The Contractor shall re-perform to the performance standard, at no additional cost to the Government. Continuous review until performance is satisfactory.

Contractor’s Quality Control Plan.

Proposed procedures and Quality Control Plan (QCP) meet the requirements in this PWS, and have been accepted.

Meets acceptable or better performance standards.

100% Government review Remedy: The Contractor shall re-perform to the performance standard, at no additional cost to the Government. Continuous review until performance is satisfactory.

5. 4 Quality Assurance Surveillance Plan. The Government will evaluate the Contractor’s performance under the Quality Assurance Surveillance Plan (QASP). The QASP provides a systematic method to evaluate performance for this contract. The Contractor is fully expected to comply with all requirements in the PWS. The COR will monitor the Contractors performance to ensure it meets the standards of the contract. When an observation indicates defective performance, the COR or will record the observation. The Contractor shall initial the recording of the observation, which does not necessarily constitute concurrence with the observation, only acknowledgement that he or she has been made aware of the defective performance. Unacceptable performance may result in the COR taking any of the following actions: Require the Contractor to take necessary action to reperform the work, at no additional cost to the Government, until it meets the AQL, and ensure that future performance conforms to the contract requirements, and issues a Contract Discrepancy Report (CDR). The KO may require the Project Manager to meet with the KO, COR, and other Government personnel as deemed necessary. The Contractor may request a meeting with KO when he or she believes such a meeting is necessary. Written minutes of any such meetings shall be recorded by the Contractor, reviewed and accepted by the KO and signed by the Project Manager and the. Copies of any such meeting minutes shall be maintained by the Contractor. If the Contractor does not concur with any portion of the minutes, such non-concurrence shall be provided in writing to the KO within one calendar day following receipt of the approved minutes.

All work performed and equipment used under the contract will be subject to inspection at all times by the Government. The Government’s inspection program is not a substitute for the Quality Control by the Contractor.

(Appendix A).

6.0 SAFETY

6.1 Safety Requirements. In order to provide safety control for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with OSHA and all pertinent provisions of the publication 29 CFR 1910 (Occupational Safety and Health Standards), and the EM 385-1-1 (USACE Safety and Health Requirement Manual – online. https://www.publications.usace.army.mil/USACE-Publications/Engineer- Manuals/). When there are any discrepancies between the OSHA and EM-385-1-1 regulations, the EM 385-1-1 shall rule. Contractor is subject to all USACE health and safety regulations and requirements.

Appropriate signs designated by Fire, Safety & Security shall be provided by the contractor and placed as indicated in work areas. Within one calendar day after commencement of work, erect a safety bulletin board at the job site.

Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the COR, that is accessible and includes all mandatory information for employee and visitor review, shall be deemed as meeting the requirement for a bulletin board. Include and maintain information on safety bulletin board as required by EM 385-1-1 section 01.A.07.

The work areas shall be closed off to unauthorized personnel. All project-associated activities shall be performed without damaging or contaminating adjacent work and areas. Where such work or areas are damaged or contaminated, the Contractor shall restore work and areas to the original condition at no additional cost to the Government.

All accidents shall be reported to the COR immediately both verbally and followed up in writing (email) as soon as possible. As warranted, the USACE Safety Office shall be notified using ENG 3394 through the Contractors Site Safety and Health Officer (SSHO). This is to be accomplished within the same shift, preferably as soon after the accident as is practical. A completed Occupational Safety and Health Administration (OSHA) Form 300; and ENG 3394 shall be submitted to the Safety Office within 5 days after an accident. In the event of serious injury or damage, work shall stop and everything shall be left in place exactly as it was at the time of the accident, except when rendered safe actions are warranted to prevent the possibility of more damage or injury. Medical expenses for Contractor personnel are the responsibility of the Contractor.

Designate a Safety person at the project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Alternate SSHO shall be at the work site at all times to implement and oversee the Contractor’s safety program and government-accepted Accident Prevention Plan. The SSHO’s training, experience, and qualifications shall be IAW EM 385-1-1 paragraph 01.A.17, entitled Site Safety and Health Officer (SSHO), and all associated sub-paragraphs. The SSHO must ensure the requirements of EM 385-1-1 section 1 and 29 CFR

1926.16 are met for the project. Any observed violation of safety requirements can be grounds for the Government to stop work. Work shall not continue until the violation is corrected.

USACE will hold contractors accountable for their safety and health performance.

A Competent Person shall be provided for all of the hazards identified in the Contractor’s Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide proper credentials of the Competent Persons(s) to the COR for acceptance in consultation with the USACE Safety Office prior to start of the project.

The equipment used by the Contractor for the specified service shall be in satisfactory operating condition and shall be maintained in good condition. The Government reserves the right to require the Contractor to discontinue the use of unsatisfactory equipment and to require that such equipment be replaced with acceptable equipment to maintain contract compliance. The decision of the Contracting Officer as to serviceability of the equipment shall be final.

Equipment shall meet current Federal, State and local safety requirements and all applicable requirements of the

USACE EM 385-1-1.

6.2 Accident Prevention Plan (APP). The Contractor shall obtain the USACE Project Safety Officer’s approval of the Accident Prevention Plan BEFORE starting any on-site work.

a) The Contractor shall use a qualified Safety and Health Manager (SHM) to prepare the written site-specific Accident Prevention Plan (APP) in accordance with the format and requirements of USACE EM 385-1-1. Cover all paragraph and subparagraph elements in Appendix A of USACE EM 385-1-1 “Minimum Basic Outline for Preparation of Accident Prevention Plan.” Activity Hazard Analyses (AHAs) shall be appended to the APP. The SHM must have been engaged in safety and occupational health for at least 3 years with at least 50% of the time each year devoted to safety and occupational health.

b) The APP shall be job specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor’s overall safety and health program (SHP). Any portions of the Contractor’s overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the “controlling authority” for all work site safety and health of the Subcontractors. The Contractor is responsible for informing their Subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting Subcontractor operations to ensure that accident prevention responsibilities are being carried out. The Contractor, COR, and Site Safety and Health Officer (SSHO) shall sign the APP.

c) The Contractor shall submit the APP to the USACE Project Safety Officer within 10 days of award. The Government will review the documents within 10 days. The Contractor shall resubmit the documents, with any requested changes, within 5 days of request.

6.3 Injury and Illness Prevention Program (IIPP) Appendix to the APP. For projects within California, the Contractor shall develop and implement an Injury and Illness Prevention Program (IIPP) that shall be attached to the APP as an appendix. The IIPP shall address all elements of Title 8 California Code of Regulations (CCR) Section 3203 and Section 1509. IIPP appendix elements that overlap with APP elements need not be duplicated in the IIPP, provided each safety and occupational health issue is adequately documented in the APP. The IIPP shall be developed under the direct supervision of a qualified SHM.

6.4 Environmental Safety Program. Contractor must comply with all Environmental and Occupational Safety and Health Laws. The contractor shall perform in compliance with Federal, State and local laws, rules, and regulations pertaining to environmental protection, occupational health and safety, transportation, storage, and disposal of hazardous materials and hazardous waste.

6.5 Deliverable schedule for health and safety plans. The contractor shall provide submittals required by Section 6.0 to the COR within 15 days of award. The Government will review the documents within 10 days. The contractor shall resubmit the documents, with any requested changes, within 5 days of request. Submissions shall be provided in Microsoft Office Word and shall be provided on a CD and/or electronic format.

7.0 GENERAL SUBMITTAL REQUIREMENTS

7.1 Submittals. Submittals shall include but not be limited to the following list of items to be provided by the Contractor. This list does not relieve the Contractor of the responsibility of ensuring the accuracy or completeness of the list or responsibility of providing all submittals required by regulatory and contract documents (Reference Appendix D). The Government will review the documents within 14 days. The contractor shall resubmit the documents, with any requested changes, within 5 days of request. Submissions shall be provided in Microsoft Office Word and shall be provided on a CD and/or electronic format.

- Contractor Quality Control (CQC) Plan (Sections 5.1 and 5.2)

- APP/AHA/IPP (Section 6.0)

- Work Plan (Section 7.2)

- Product Data for New Boiler and any necessary accessories

Submissions shall be provided in Microsoft Office Word or Adobe Acrobat (.pdf) and shall be provided in electronic format.

7.2 Work Plan. The contractor shall prepare a Project Work Plan (PWP) that identifies in detail the work to be completed as indicated below. All work shall be completed in accordance with all applicable laws, regulations and Regulatory Agency guidance or instructions. As a minimum, the PWP shall include project description, project objectives, schedule, and detailed sketches, schematics and PEMB Plans.

8.0 DEFINITIONS, ABBREVIATIONS AND ACRONYMS

8.1 Contracting Officer’s Representative (COR): A person designated in writing by the Contracting Officer to conduct specific and limited technical administrative actions under the contract. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel.

8.2 Test: Any operation or series of operations under fixed conditions which compares actual performance to design standards.

9.0 REFERENCES

All applicable Federal and State regulations. It shall be the contractor’s responsibility to adhere to all applicable federal and state regulations pertaining to the specific work.

The Contractor’s APP/IPP, SSHP Appendix and subsequent activities must comply with the following referenced documents (most current version, if different than the date referenced), at a minimum:

EM 385-1-1, USACE Safety & Health Requirements Manual, EM 385-1-1, current Edition

Title 29 Code of Federal Regulations (CFR) 1910, Occupational Safety and Health Standards.

29 CFR 1926, Safety and Health Regulations for Construction.

29 CFR 1926.65/29 CFR1910.120, Hazardous Waste Operations and Emergency Response.

USACE, Safety and Occupational Health Document Requirements for Hazardous, Toxic and Radioactive

Waste (HTRW) Activities, ER 385-1-92.

NIOSH/OSHA/USCG/EPA, Occupational Safety and Health Guidance Manual for Hazardous Waste Activities.

American Conference of Governmental Industrial Hygienists (ACGIH®), TLVs® and BELs®, Threshold Limit Values for Chemical Substances and Physical Agents & Biological Exposure Indices.

Title 8 California Code of Regulations (CCR) Chapter 4 Subchapter 4, Construction Safety Orders.

8 CCR Chapter 4 Subchapter 7, General Industry Safety Orders.

8 CCR Sections 3203 & 1509, Injury and Illness Prevention Program.

OSHA ancillary safety and health regulations governing certain aspects for this contract include:

Respiratory Protection (29 CFR 1910.134/8 CCR Section 5144)

Occupational Noise Exposure (29 CFR 1910.95/8 CCR Sections 5095-5100)

Hazard Communication (29 CFR 1910.1200/29 CFR 1926.59/8 CCR Section 5194)

The Control of Hazardous Energy (Lockout/Tagout) (29 CFR 1910.147)

Proposition 65 (22 CCR Section 12000) Chemicals Know to the State to Cause Cancer or Reproductive Toxicity

APPENDICES

Appendix B Pictures Appendix C Site Maps Appendix D Existing Equipment Controls Appendix E Existing wiring information.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 17-SEP-2024 TO

16-SEP-2025

N/A U.S. FOREST SERVICE

JENNY HU

REDWOOD SCIENCES LABORATORY

1700 BAYVIEW DRIVE

ARCATA CA 95521

916-758-1288

W91238

0002 POP 17-SEP-2024 TO

16-SEP-2025

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 17-SEP-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 17-SEP-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 17-SEP-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 17-SEP-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 17-SEP-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-17 Ownership or Control of Offeror AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.209-2 Prohibition on Contracting with Inverted Domestic

Corporations--Representation

NOV 2015

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024 52.223-10 Waste Reduction Program MAY 2024 52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons.

MAY 2024

52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners.

MAY 2024

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

52.232-8 Discounts For Prompt Payment FEB 2002 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

JAN 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2023

252.205-7000 Provision Of Information To Cooperative Agreement Holders JUN 2023 252.211-7003 Item Unique Identification and Valuation JAN 2023 252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7012 Preference For Certain Domestic Commodities APR 2022 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JAN 2023

252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial

Services

NOV 2023

252.247-7023 Transportation of Supplies by Sea JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block…