Appendix D.pdf

PDF 918 KB Posted

Attached to
USFS IFG HVAC Rpr & Maint Project
Solicitation number
W9123824Q0054
Issued by

About this file

This document is a Performance Work Statement (PWS) for the HVAC equipment repairs and replacement project at the U.S. Forest Service Pacific Southwest Research Station Institute of Forest Genetics facility in Placerville, California. The PWS provides details on the existing HVAC equipment and controls, including service tags, boiler controls, and zone maps for the basement and first floor.

The related federal contract opportunity is a solicitation (W9123824Q0054) issued by the U.S. Army Corps of Engineers Sacramento District for the USFS IFG HVAC Repair and Maintenance Project. The solicitation requires all questions to be submitted by August 1, 2024, and a site visit is scheduled for July 31, 2024. The solicitation does not provide any additional details on the required products, services, pricing, or award information.

View the file

Other files

File Type Posted
Amendment 0001 - Cancellation.pdf PDF
IFG HVAC Site Visit Pictures.pdf PDF
Site Visit Sign in Sheet.pdf PDF
Placerville HVAC Q and A .pdf PDF
Appendix E.pdf PDF
Appendix C.pdf PDF
W9123824Q0054 Solicitation.pdf PDF
Appendix B.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

U.S. FOREST SERVICE PACIFIC SOUTHWEST RESEARCH STATION

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

PLACERVILLE, CALIFORNIA

Date: 11 July 2024

APPENDIX D

Existing Equipment Controls

Figure 7. Service tags for the AHU and Building Automation System

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

Figure 8. Boiler control screen, showing boiler is off

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

Figure 9. Basement zone map with terminal units

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

Figure 10. First floor zone map with terminal units

PWS KO final approved - no pictures 19
PWS KO final approved - no pictures 20
PWS KO final approved - no pictures 21
PWS KO final approved - no pictures 22

File details come from the government source that posted it. Updated .