Appendix D.pdf
PDF 918 KB Posted
- Attached to
- USFS IFG HVAC Rpr & Maint Project
- Solicitation number
- W9123824Q0054
About this file
This document is a Performance Work Statement (PWS) for the HVAC equipment repairs and replacement project at the U.S. Forest Service Pacific Southwest Research Station Institute of Forest Genetics facility in Placerville, California. The PWS provides details on the existing HVAC equipment and controls, including service tags, boiler controls, and zone maps for the basement and first floor.
The related federal contract opportunity is a solicitation (W9123824Q0054) issued by the U.S. Army Corps of Engineers Sacramento District for the USFS IFG HVAC Repair and Maintenance Project. The solicitation requires all questions to be submitted by August 1, 2024, and a site visit is scheduled for July 31, 2024. The solicitation does not provide any additional details on the required products, services, pricing, or award information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 - Cancellation.pdf | ||
| IFG HVAC Site Visit Pictures.pdf | ||
| Site Visit Sign in Sheet.pdf | ||
| Placerville HVAC Q and A .pdf | ||
| Appendix E.pdf | ||
| Appendix C.pdf | ||
| W9123824Q0054 Solicitation.pdf | ||
| Appendix B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
U.S. FOREST SERVICE PACIFIC SOUTHWEST RESEARCH STATION
INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT
PLACERVILLE, CALIFORNIA
Date: 11 July 2024
APPENDIX D
Existing Equipment Controls
Figure 7. Service tags for the AHU and Building Automation System
INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT
Figure 8. Boiler control screen, showing boiler is off
INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT
Figure 9. Basement zone map with terminal units
INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT
Figure 10. First floor zone map with terminal units
| PWS KO final approved - no pictures 19 |
| PWS KO final approved - no pictures 20 |
| PWS KO final approved - no pictures 21 |
| PWS KO final approved - no pictures 22 |
File details come from the government source that posted it. Updated .