Appendix B.pdf

PDF 2 MB Posted

Attached to
USFS IFG HVAC Rpr & Maint Project
Solicitation number
W9123824Q0054
Issued by

About this file

This document is a Performance Work Statement (PWS) for the HVAC equipment repairs and replacement project at the U.S. Forest Service Pacific Southwest Research Station Institute of Forest Genetics facility in Placerville, California.

The PWS provides detailed requirements and specifications for repairing and replacing the existing HVAC equipment, including a propane-fired boiler, air handler, and refrigerant circuit. It includes pictures of the current equipment and conditions. The solicitation (W9123824Q0054) is being issued by the Department of the Army Corps of Engineers Engineering District Sacramento, with a site visit scheduled for July 31, 2024 and a question deadline of August 1, 2024. Offerors must submit their proposals in response to this requirement.

View the file

Other files

File Type Posted
Amendment 0001 - Cancellation.pdf PDF
IFG HVAC Site Visit Pictures.pdf PDF
Site Visit Sign in Sheet.pdf PDF
Placerville HVAC Q and A .pdf PDF
Appendix E.pdf PDF
Appendix C.pdf PDF
W9123824Q0054 Solicitation.pdf PDF
Appendix D.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

U.S. FOREST SERVICE PACIFIC SOUTHWEST RESEARCH STATION

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

PLACERVILLE, CALIFORNIA

Date: 11 July 2024

APPENDIX B

PICTURES

Pictures of Existing Conditions:

Figure 1. Existing propane-fired boiler on outdoor concrete pad, under protective structure

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

Figure 2. Existing boiler nameplate

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

Figure 3. Existing propane-fired boiler’s electrical panel, pumps and accessories

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

Figure 4. Portion of ductwork from lab area to McQuay Air Handler

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

Figure 5. Air Handler Nameplate

INSTITUTE OF FOREST GENETICS HVAC EQUIPMENT REPAIRS AND REPLACEMENT

Figure 6. Refrigerant circuit in the cooling section of the AHU, there reportedly a leak that needs to be repaired and the system charge brought to the correct level

PWS KO final approved - no pictures 12
PWS KO final approved - no pictures 13
PWS KO final approved - no pictures 14
PWS KO final approved - no pictures 15
PWS KO final approved - no pictures 16
PWS KO final approved - no pictures 17

File details come from the government source that posted it. Updated .