Amendment 0004 - Extend Proposal Due Date.pdf
PDF 361 KB Posted
- Attached to
- Dugway Proving Grounds Microgrid Federal contract opportunity
- Solicitation number
- W9123821R0045
About this file
This amendment extends the proposal due date for solicitation number W9123821R0045 from May 18, 2021 to June 2, 2021. The solicitation is for the design and construction of a complete and operational microgrid at Dugway Proving Grounds in Utah. The microgrid will integrate an existing 12-MW diesel generator plant and 2-MW solar array with a new battery energy storage system and SCADA system to be installed into the existing base utility grid. The microgrid will be controlled by a new Microgrid Control System and will interface with an existing utility-grade database system and total building EMCS, as well as a future planned 2-MW solar array. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Sacramento.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SEL 3530.3.pdf | ||
| SEL 3530.2.pdf | ||
| SEL 3530.4.pdf | ||
| SEL 3530.1.pdf | ||
| Amendment 0005 - Updated pictures.pdf | ||
| PICTURES.pdf | ||
| Amendment 0003 - Extend Proposal Due Date.pdf | ||
| Amendment 0002 - Extend Proposal Due Date.pdf | ||
| DPG Microgrid Site Visit sign-in Sheet.pdf | ||
| Amendment 0001 - Extend Proposal Due Date.pdf | ||
| Attachment 3 - Pre-Award Survey.pdf | ||
| W9123821R0045 Dugway Microgrid Solicitation.pdf | ||
| Attachment 4 - Past Performance Questionnaire.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Attachment 2 - Wage Determination.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to extend the proposal due date, and upload picutres taken from the site visit.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123821R0045
X 9B. DATED (SEE ITEM 11)
11-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-May-2021
CODE
US ARMY CORPS OF ENGINEERS, SACRAMENTO
CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123821R0045
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 18-May-2021 10:00 AM to 02-Jun-2021 10:00 AM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .