This amendment modifies the specifications for a wetlands mitigation construction project. The project involves constructing a new tidal basin and enhancing adjacent degraded marshland at the Alameda Point Campus in Alameda County, California. The specifications outline requirements for temporary construction facilities, environmental controls, and compliance with permits from the Army Corps of Engineers, Regional Water Quality Control Board, BCDC, and other agencies. Key aspects include erosion and sediment control plans, restrictions on equipment usage and idling, air quality mitigation procedures, noise limits, cultural and biological resource protections, and restoration obligations.

View the file

Other files for this federal contract opportunity

Other files attached to DVA Alameda Wetlands Mitigation, newest first.
File Type Posted
W9123821B0004 Bid Abstract Approved.pdf PDF
W9123821B0004 Amendment 0003 - Extend Bid Due Date.pdf PDF
Amendment 0003- Appendix F of CASQA Stormwater BMP Handbook for Construction.pdf PDF
Amendment 0002 - Wage Determination 1.14.22.pdf PDF
HTHSoilsInvestigationMemo (Informational Only).pdf PDF
Amendment 0002- Revised Specifications.pdf PDF
Amendment 0002 - Drawings (GI100-01 and GI1003-300).pdf PDF
W9123821B0004 Amendment 0002.pdf PDF
Amendment 0001 - Extended Bid Due date.pdf PDF
Wetlands Geotechnical Tech Memorandum(Appendix D BOD OCT2018).pdf PDF
Contaminant Management Plan.pdf PDF
VA Alameda Final 401 Permit.pdf PDF
U.S. Fish and Wildlife Biological Opinion.pdf PDF
National Marine Fisheries Service (NMFS) Letter of Concurrence Alameda Point Outpatient VA Clinic.pdf PDF
VA Alameda Final 404 Permit.pdf PDF
S.F. Bay Conservation and Development (BCDC) Commission Letter.pdf PDF
Wetlands site visit sign in sheet.pdf PDF
Pre-Award Survey.pdf PDF
Alameda_Wetland_Geotechnical Soil Information.pdf PDF
Plans - DVA Alameda Wetlands Mitigation.pdf PDF
W9123821B0004 Alameda Wetlands Mitigation.pdf PDF
Alameda Point Gate location.pdf PDF
Specifications - DVA Alameda Wetlands Mitigation.pdf PDF
Wage Determination 10.28.21.pdf PDF
DVA Alameda - Wetlands Bid Schedule.xlsx XLSX spreadsheet
Alameda Point Gate - Map.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM

VA PROJECT 612-115

Project Location: Alameda Point, CA

Project Title: VA Multi-Specialty Outpatient Clinic, Columbarium and Conservation Management Office (CMO)

Submission Type: Construction Documents 2 (CD2)

Revision Date: January 28, 2022

WETLANDS MITIGATION

PROJECT MANUAL – SPECIFICATIONS

HDR Architecture, Inc.

201 California St., Suite 1500

CLIENT: Department of Veteran Affairs Office of Construction & Facilities Management

San Francisco, CA 94111 1175 Nimitz Avenue, Suite 210 Vallejo, CA 94592

Director: Sheila Nematollahi-Rad Contracting Officer: Reginald Berry Project Managers: Warren Yip

Architecture; Interior Design;

Medical Equipment Planning;

Signage; Mechanical, Electrical, Plumbing Engineering; Security;

Sustainability

HDR Architecture, Inc.

201 California St., Suite 1500 San Francisco, CA 94111

Cemetery/Columbarium

Anderson Engineering of MN 13605 1st Avenue, Suite 100 Plymouth, MN 55441

Master Plan/Landscape Arch.

Smith & Smith Landscape Architects 1501 North Point Street San Francisco, CA 94123

Telecommunications

TEECOM Design Group 1333 Broadway, Suite 600 Oakland, CA 94612

Elevator

Van Deusen & Associates 221 Main Street San Francisco, CA 94105

Irrigation

Dickson & Associates P.O. Box 415 Palo Cedro, CA 96073

Geotechnical

PBS Engineering and Environmental Inc.

4412 SW Corbett Avenue Portland, OR 97239

Civil Engineering

HDR Engineering 2365 Iron Point Road, Suite 300 Folsom, CA 95630

Structural Engineering

Degenkolb Engineers 235 Montgomery St., Suite 500 San Francisco, CA 94105

Blast Loading

Hinman Consulting Engineers One Bush Street, Suite 510 San Francisco, CA 94104

Food Service

Breit Ideas 155 E. Campbell Ave., Suite 214 San Francisco, CA 95008

Acoustical

Mei Wu Acoustics 3 Twin Dolphin Dr., Suite 190 Redwood City, CA 94065

Cost Estimating

Leland Saylor Associates 101 Montgomery Street, Suite 800 San Francisco, CA 94104

Commissioning

ARGO Systems 1362 Mellon Road, Suite 100 Hanover, MD 21076 eCube, inc.

1900 Folsom St., Suite 109 Boulder, CO 80302

THIS PAGE INTENTIONALLY LEFT BLANK

DEPARTMENT OF VETERANS AFFAIRS VA ALAMEDA POINT

PROJECT NO. 612-115

REVISION: JANUARY 24, 2022

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS --- 01 50 00 - 1

SECTION 01 50 00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 REFERENCES

A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

1. AMERICAN WATER WORKS ASSOCIATION (AWWA)

a. AWWA C511 Standard for Reduced-Pressure Principle Backflow Prevention Assembly

2. FOUNDATION FOR CROSS-CONNECTION CONTROL AND HYDRAULIC RESEARCH

(FCCCHR)

a. FCCCHR List (continuously updated) List of Approved Backflow

Prevention Assemblies

b. FCCCHR Manual (10th Edition) Manual of Cross-Connection

Control

3. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

a. NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations

b. NFPA 70 National Electrical Code

4. U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

a. FAA AC 70/7460-1 (2015; Rev L) Obstruction Marking and Lighting

5. U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

a. MUTCD Manual on Uniform Traffic Control Devices

1.2 SUBMITTALS

A. Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.

B. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

C. Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

1. SD-01 Preconstruction Submittals

a. Construction Site Plan; G

b. Traffic Control Plan; G

2. SD-03 Product Data

a. Backflow Preventers; G

3. SD-06 Test Reports

a. Backflow Preventer Tests

4. SD-07 Certificates

a. Backflow Tester Certification

b. Backflow Preventers Certificate of Full Approval

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS --- 01 50 00 - 2

1.3 CONSTRUCTION SITE PLAN

A. Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas.

1.4 BACKFLOW PREVENTERS CERTIFICATE

A. Certificate of Full Approval from FCCCHR List, University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval. Certificate of Provisional Approval will not be acceptable.

1.4.1 Backflow Tester Certificate

A. Prior to testing, submit to the Contracting Officer certification issued by the State or local regulatory agency attesting that the backflow tester has successfully completed a certification course sponsored by the regulatory agency. Tester must not be affiliated with any company participating in any other phase of this Contract.

1.4.2 Backflow Prevention Training Certificate

A. Submit a certificate recognized by the State or local authority that states the Contractor has completed at least 10 hours of training in backflow preventer installations. The certificate must be current.

1.5 WINTER STORM CONDITION OF READINESS

A. Unless directed otherwise, comply with:

1. Condition FOUR (Sustained winds of 93 km/hr (50 knots) or greater expected within 72 hours): Normal daily jobsite cleanup and good housekeeping practices. Collect and store in piles or containers scrap lumber, waste material, and rubbish for removal and disposal at the close of each work day. Maintain the construction site including storage areas, free of accumulation of debris.

Stack form lumber in neat piles less than one m 4 feet high.

Remove all debris, trash, or objects that could become missile hazards. Contact Contracting Officer for Condition Requirements.

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS --- 01 50 00 - 3

2. Condition THREE (Sustained winds of 93 km/hr (50 knots) or greater expected within 48 hours): Maintain "Condition FOUR" requirements and commence securing operations necessary for "Condition ONE" which cannot be completed within 18 hours. Cease all routine activities which might interfere with securing operations. Commence securing and stow all gear and portable equipment. Make preparations for securing buildings. Review requirements pertaining to "Condition TWO" and continue action as necessary to attain "Condition THREE" readiness. Contact Contracting Officer for weather and COR updates and completion of required actions.

3. Condition TWO (Sustained winds of 93 km/hr (50 knots) or greater expected within 24 hours): Curtail or cease routine activities until securing operation is complete. Reinforce or remove form work and scaffolding. Secure machinery, tools, equipment, materials, or remove from the jobsite. Expend every effort to clear all missile hazards and loose equipment from general base areas. Contact Contracting Officer for weather and Condition of Readiness (COR) updates and completion of required actions.

4. Condition ONE. (Sustained winds of 93 km/hr (50 knots) or greater expected within 12 hours): Secure the jobsite, and leave Government premises.

PART 2 - PRODUCTS

2.1 TEMPORARY SIGNAGE

A. Bulletin Board

1. Immediately upon beginning of work, provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer.

B. Project and Safety Signs

1. The requirements for the signs, their content, and location are as specified in Section 01 58 00 PROJECT IDENTIFICATION. Erect signs within 15 days after receipt of the notice to proceed.

Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.

2.2 TEMPORARY TRAFFIC CONTROL

A. Haul Roads

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS --- 01 50 00 - 4

1. Construct access and haul roads necessary for proper prosecution of the work under this contract. Construct with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic are be avoided. Provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control, although optional, must be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads are subject to approval by the Contracting Officer. Lighting must be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations.

B. Barricades

1. Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required.

Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

2.3 CONSTRUCTION SITE FENCING

A. Install high-visibility fencing between construction limits and work being executed in Environmentally Sensitive Areas (ESA’s) on the Wetlands site by other contractor (shown in the ‘Not for Construction’ labeled drawings).

2.4 TEMPORARY WIRING

A. Provide temporary wiring in accordance with NFPA 241 and NFPA 70.

Include frequent inspection of all equipment and apparatus.

2.5 BACKFLOW PREVENTERS

A. Reduced pressure principle type conforming to the applicable requirements AWWA C511. Provide backflow preventers complete with 150 pound flanged cast iron, mounted gate valve and strainer, 304 stainless steel or bronze internal parts.

B. The particular make, model/design, and size of backflow preventers to be installed must be included in the latest edition of the List of Approved.

C. Backflow Prevention Assemblies issued by the FCCCHR List and be accompanied by a Certificate of Full Approval from FCCCHR List.

D. After installation conduct Backflow Preventer Tests and provide test reports verifying that the installation meets the FCCCHR Manual Standards.

PART 3 - EXECUTION

3.1 EMPLOYEE PARKING

A. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS --- 01 50 00 - 5

3.2 TEMPORARY BULLETIN BOARD

A. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.

3.3 AVAILABILITY AND USE OF UTILITY SERVICES

A. Temporary Utilities

1. Contractor to provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.

2. To obtain temporary electrical power, submit a request and application through the City of Alameda permit center.

a. City of Alameda Planning-Building-Transportation Department can be access at: alamedaca.gov/Departments/Planning- Building-and-Transportation

b. City of Alameda’s Online Application Portal can be accessed at: app.oncamino.com/alameda-ca/login

B. Payment for Utility Services

3. The point at which the Government will deliver such utilities or services and the quantity available is as indicated. Pay all costs incurred in connecting, converting, and transferring the utilities to the work. Make connections, including providing backflow-preventing devices on connections to domestic water lines; and providing transformers; and make disconnections.

Under no circumstances will taps to Medical Facility fire hydrants be allowed for obtaining domestic water.

C. Electricity

1. Contractor to provide connections, sized to provide service required for power and lighting. Locate feeder and branch wiring with area distribution boxes so that power is available throughout the project site by use of power cords. 120/240 electrical volt feeder service is available. Provide lighting as required for safe and secure operations. Electricity used will not be furnished by the Government.

D. Water

1. Reference EM 385-1-1.

E. Sanitation

1. Contractor to provide and maintain within the construction area minimum field-type sanitary facilities approved by the Contracting Officer and periodically empty wastes into a municipal, district, or station sanitary sewage system, or remove waste to a commercial facility. Obtain approval from the system owner prior to discharge into any municipal, district, or commercial sanitary sewer system.

Any penalties and / or fines associated with improper discharge will be the responsibility of the Contractor. Coordinate with the Contracting Officer and follow station regulations and procedures when discharging into the station sanitary sewer system. Maintain these conveniences at all times without nuisance. Include provisions for pest control and elimination of odors. Government toilet facilities will not be available to Contractor's personnel.

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS --- 01 50 00 - 6

2. Provide temporary sewer and sanitation facilities that are self-contained units with both urinals and stool capabilities.

3. Ventilate the units to control odors and fumes and empty and clean them at least once a week or more often if required by the Contracting Officer. The doors shall be self-closing. The exterior of the unit shall match the base standard color. Locate the facility behind the construction fence or out of the public view.

F. Telephone

1. Make arrangements and pay all costs for telephone facilities desired.

G. Obstruction Lighting of Cranes

1. Provide a minimum of 2 aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 30 meters (100 feet) above ground level. Light construction and installation must comply with FAA AC 70/7460-1. Lights must be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer.

H. Fire Protection

1. Provide temporary fire protection equipment for the protection of personnel and property during construction. Remove debris and flammable materials daily to minimize potential hazards.

3.4 TRAFFIC PROVISIONS

A. Maintenance of Traffic

1. Conduct operations in a manner that will not close any thoroughfare or interfere in any way with traffic on railways or highways except with written permission of the Contracting Officer at least 15 calendar days prior to the proposed modification date, and provide a Traffic Control Plan detailing the proposed controls to traffic movement for approval. The plan must be in accordance with State and local regulations and the MUTCD, Part VI. Make all notifications and obtain any permits required for modification to traffic movements outside Station's jurisdiction. Contractor may move oversized and slow-moving vehicles to the worksite provided requirements of the highway authority have been met.

2. Conduct work so as to minimize obstruction of traffic, and maintain traffic on at least half of the roadway width at all times. Obtain approval from the Contracting Officer prior to starting any activity that will obstruct traffic.

3. Provide, erect, and maintain, at contractors expense, lights, barriers, signals, passageways, detours, and other items, that may be required by the Life Safety Signage, overhead protection authority having jurisdiction.

B. Protection of Traffic

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS --- 01 50 00 - 7

1. Maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment the work, and the erection and maintenance of adequate warning, danger, and direction signs, will be as required by the State and local authorities having jurisdiction. Protect the traveling public from damage to person and property. Minimize the interference with public traffic on roads selected for hauling material to and from the site. Investigate the adequacy of existing roads and their allowable load limit. Contractor is responsible for the repair of any damage to roads caused by construction operations.

C. Dust Control

1. Dust control methods and procedures must be approved by the

Contracting Officer. Treat dust abatement on access roads with applications of calcium chloride, water sprinklers, or similar methods or treatment.

3.5 CONTRACTOR'S TEMPORARY FACILITIES

A. Government office and warehouse facilities will not be available to Contractor personnel. Contractor may locate trailers at project site with approval from the Contracting Officer.

B. Contractor Safety Systems:

1. Safety

A. Protect the integrity of any installed safety systems or personnel safety devices. If entrance into systems serving safety devices is required, the Contractor must obtain prior approval from the Contracting Officer. If it is temporarily necessary to remove or disable personnel safety devices in order to accomplish contract requirements, provide alternative means of protection prior to removing or disabling any permanently installed safety devices or equipment and obtain approval from the Contracting Officer.

B. If it is temporarily necessary to remove or disable personnel safety devices in order to accomplish contract requirements, provide alternative means of protection prior to removing or disabling any permanently installed safety devices or equipment and obtain approval from the Contracting Officer.

2. Storage Area: Contractor may provide for storage within designated work areas, meeting the following requirements.

3. Supplemental Storage Area: Utilities, fencing, and storage area security are responsibility of Contractor.

4. Appearance of Trailers:

a. Trailers utilized on site by the Contractor for administrative or material storage purposes must present a clean and neat exterior appearance and be in a state of good repair.

b. Trailers which, in the opinion of the Contracting Officer, require exterior painting or maintenance will not be allowed on installation property.

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS --- 01 50 00 - 8

5. Security Provisions

a. Provide adequate outside security lighting at the Contractor's temporary facilities. The Contractor will be responsible for the security of its own equipment; in addition, the Contractor will notify the appropriate law enforcement agency requesting periodic security checks of the temporary project field office.

6. Weather Protection of Temporary Facilities and Stored Materials

a. Take necessary precautions to ensure that roof openings and other critical openings in the building are monitored carefully. Take immediate actions required to seal off such openings when rain or other detrimental weather is imminent, and at the end of each workday. Ensure that the openings are completely sealed off to protect materials and equipment in the building from damage.

7. Building and Site Storm Protection

a. When a warning of high winds is issued, take precautions to minimize danger to persons, and protect the work and nearby Government property. Precautions must include, but are not limited to, closing openings; removing loose materials, tools and equipment from exposed locations; and removing or securing scaffolding and other temporary work. Close openings in the work when storms of lesser intensity pose a threat to the work or any nearby Government property.

3.6 PLANT COMMUNICATION

A. Whenever the Contractor has the individual elements of its plant so located that operation by normal voice between these elements is not satisfactory, the Contractor must install a satisfactory means of communication, such as telephone or other suitable devices and made available for use by Government personnel.

3.7 DUMPSTERS

A. See Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT.

3.8 CLEANUP

A. Remove construction debris, waste materials, packaging material and the like from the work site daily.

B. Any dirt or mud which is tracked onto paved or surfaced roadways must be cleaned away.

C. Store any salvageable materials resulting from demolition activities within the fenced area described above or at the supplemental storage area.

D. Neatly stack stored materials not in trailers, whether new or salvaged.

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS --- 01 50 00 - 9

3.9 RESTORATION OF WORK AREAS

A. Upon completion of the project, remove the bulletin board, signs, barricades, haul roads, and any other temporary products from the site. Remove all trailers, materials, and equipment from within the project site.

B. Restore areas used by the Contractor for the storage of equipment or material, or other use to the original or better condition.

C. Remove gravel used to traverse grassed areas and restore the area to its original condition, including top soil and seeding as necessary.

END OF SECTION

REVISION:JANUARY 27, 2022

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 1

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

Perform the work minimizing environmental pollution and damage as the result of construction operations. Comply with all applicable environmental Federal, State, and local laws and regulations.

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the utility of the environment for aesthetic, cultural and/or historical purposes. The control of environmental pollution and damage requires consideration of land, water, and air, and includes management of visual aesthetics, noise, solid waste, as well as other pollutants.

Protect the environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire duration of this contract. Ensure compliance with this section by all subcontractors.

1.2 PAYMENT

No separate payment will be made for the work covered under this section and all costs in connection therewith will be considered a subsidiary obligation of the Contract.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

CALIFORNIA AIR RESOURCES BOARD (CARB)

EPA’S Air Program Mobile Sources Page:

http://www.epa.gov/ebtpages/airmobilesources.html

CARB 13 CCR 2450-2466 Portable Equipment and Engine Registration

CARB 13 CCR 2485 Airborne Toxic Control Measure to Limit Diesel- Fueled Commercial Motor Vehicle Idling

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

WETLAND MANUAL Corps of Engineers Wetlands Delineation Manual

Technical Report Y-87-1

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

http://www.epa.gov/ebtpages/airmobilesources.html

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 2

33 CFR 328 Definitions of Waters of the United States

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generator Hazardous Waste

40 CFR 279 Standards for the Management of Used Oil

49 CFR 171 - 178 Hazardous Materials Regulations

FEDERAL ENVIRONMENTAL REGULATORY REQUIREMENTS

Biological Opinion on the Proposed Naval Air Station Alameda Disposal and Reuse Project in the City of Alameda, Alameda County, California, dated August 29, 2012

National Marine Fisheries (NMFS)Letter of Concurrence, 9 April

Clean Water Act, Section 401 Permit, 27 July 2021

San Francisco Bay Conservation and Development Commission (BCDC)consistency determination, 13 August 2021

Clean Water Act, Section 404 Permit, 27 September 2021

PROJECT SPECIFIC REFERENCES

City of Alameda Marsh Crust Ordinance (MCO)

Erosion Control Mat

1. ASTM D6475 Standard Test Method for Measuring Mass per Unit Area of Erosion Control Blankets

2. ASTM D6525 Standard Test Method for Measuring Nominal Thickness of Rolled Erosion Control Products

3. ASTM D6818 Standard Test Method for Ultimate Tensile Properties of Rolled Erosion Control Products

1.4 DEFINITIONS

1.4.1 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally, and/or historically.

1.4.2 Environmental Protection

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 3

Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.4.3 Contractor Generated Hazardous Waste

Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners, excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.

1.4.4 Hazardous Waste

Hazardous Waste is any material that meets the definition of a solid waste and exhibit a hazardous characteristic (ignitability, corrosivity, reactivity, or toxicity) as specified in 40 CFR 261, Subpart C, or contains a listed hazardous waste as identified in 40 CFR 261, Subpart D.

1.4.5 In-water Construction Activities

For permitting purposes, In-water Construction activities are defined as all work that occurs below the Mean High Water mark (MHW); this applies to work performed below MHW in the dry, as well. Under this contract, limited in-water construction activities will be performed, and the contractor will operate all equipment from above the MHW.

1.4.6 Land Application for Discharge Water

The term "Land Application" for discharge water implies that the Contractor must discharge water at a rate which allows the water to percolate into the soil. Sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must not occur. Land Application must be in compliance with all applicable Federal, State, and local laws and regulations.

1.4.7 Pests

The term "pests" means arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.

1.4.8 Surface Discharge

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 4

The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "waters of the United States" and would require a permit to discharge water from the governing agency.

1.4.9 Waters of the United States

All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328.

1.4.10 Wetlands

Wetlands means those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs. Official determination of whether an area is classified as a wetland must be done in accordance with the USACE WETLAND MANUAL.

1.4.10.1 Hard Barrier

A "hard barrier" as it pertains to protection of designated trees and vegetation are concrete "K" or "Jersey" rails.

1.4.11 Cultural Resources

Cultural Resources covered in this section include but are not limited to: any sites of Native American cultural or religious significance, human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock alignments, pavings, wall, or other constructed features; and any indication of agricultural or other human activities.

1.4.12 Historic Property

A historic property is a cultural resource that is listed or is eligible for listing on the National Register of Historic Places

(NRHP).

1.4.13 Tribal Cultural Resource

Tribal cultural resources are defined as sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either included or determined to be eligible for inclusion in the California Register of Historical Resources.

1.4.14 Active Nest

Active nest refers to any bird nest with eggs or chicks present.

1.4.15 Inactive Nest

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 5

Inactive nest refers to any bird nest without eggs or chicks present.

1.4.16 Biological Opinion

The document that states the opinion of the US Fish & Wildlife Service and the National Marine Fisheries Service as to whether or not the Federal action is likely to jeopardize the continued existence of listed species or result in the destruction or adverse modification of critical habitat while specifying the extent of take allowed, the reasonable and prudent measures that would minimize impacts from the federal action, and the terms and conditions with which the federal action agency must comply.

1.4.17 Class I and II Ozone Depleting Substance (ODS)

Class I ODS is defined in Section 602(a) of The Clean Air Act. A list of Class I ODS can be found on the EPA website at the following weblink. https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances.

Class II ODS is defined in Section 602(s) of The Clean Air Act. A list of Class II ODS can be found on the EPA website at the following weblink. https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances.

1.4.18 Electronics Waste

Electronics waste is discarded electronic devices intended for salvage, recycling, or disposal.

1.4.19 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.

1.4.20 Hazardous Debris

Debris, as defined in paragraph Solid Waste, that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) in accordance with 40 CFR 261. Hazardous debris also includes debris that exhibits a characteristic of hazardous waste in accordance with 40 CFR 261.

1.4.21 Hazardous Materials

Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172.

Hazardous material is any material that: Is regulated as a hazardous material in accordance with 49 CFR 173; or requires a Safety Data Sheet (SDS) in accordance with 29 CFR 1910.120; or during end use, treatment, handling, packaging, storage, transportation, or disposal meets or has components that meet or have potential to meet the definition of a https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances.

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 6

hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D.

Designation of a material by this definition, when separately regulated or controlled by other sections or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this section for "control" purposes. Such material includes ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs).

1.4.22 Listed Species

"Listed species" refers to any plant or animal species classified as threatened or endangered by the Federal government or by the State of California. It also refers to any plant or animal species classified as a Species of Special Concern by the State of California.

1.4.23 Non-Nesting Season

Non-nesting season for migratory birds refers to the period beginning on September 1 and continuing through February 14.

1.4.24 Municipal Separate Storm Sewer System (MS4) Permit

MS4 permits are those held by the Government to obtain NPDES permit coverage for their storm water discharges.

1.4.25 National Pollutant Discharge Elimination System (NPDES)

The NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.

Note: the U.S. EPA delegates NPDES permitting authority to the State of California. See SECTION 01 57 23 TEMPORARY STORM WATER POLLUTION

CONTROL.

1.4.26 Oily Waste

Oily waste are those materials that are, or were, mixed with Petroleum, Oils, and Lubricants (POLs) and have become separated from that POLs.

Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, POLs and may be appropriately tested and discarded in a manner which is in compliance with other state and local requirements.

This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: It is not prohibited in other state regulations or local ordinances; the amount generated is "de minimus" (a small amount); it is the result of minor leaks or spills resulting from normal process operations; and free-flowing oil has been removed to the practicable extent possible. Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 7 perform a hazardous waste determination prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.

1.4.27 Pesticide

Pesticide is any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.

1.4.28 Pesticide Treatment Plan

A plan for the prevention, monitoring, and control to eliminate pest infestation.

1.4.29 Regulated Waste

Regulated waste are solid wastes that have specific additional federal, state, or local controls for handling, storage, or disposal.

1.4.30 Sediment

Sediment is soil and other debris that have eroded and have been transported by runoff water or wind.

1.4.31 Solid Waste

Solid waste is a solid, liquid, semi-solid or contained gaseous waste.

A solid waste can be a hazardous waste, non-hazardous waste, or non- Resource Conservation and Recovery Act (RCRA) regulated waste. Types of solid waste typically generated at construction sites may include:

Debris: a non-hazardous solid material generated during the construction, demolition, or renovation of a structure that exceeds 2.5-inch particle size that is: a manufactured object;

plant or animal matter; or natural geologic material (for example, cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics; roofing paper and shingles. Reinforce inert materials with or contain ferrous wire, rods, accessories, and weldments. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.

Green Waste: the vegetative matter from landscaping, land clearing and grubbing, including, but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to remain, be re-located, or be re-used are not included.

Non-Hazardous Waste: Non-hazardous waste is waste that is excluded from, or does not meet, hazardous waste criteria in accordance with 40 CFR 263.

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 8

Recyclables: Recyclables are materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable, wiring, insulated/non-insulated copper wire cable, wire rope, and structural components. It also includes commercial-grade refrigeration equipment with Freon removed, household appliances where the basic material content is metal, clean polyethylene terephthalate bottles, cooking oil, used fuel oil, textiles, high-grade paper products and corrugated cardboard, stackable pallets in good condition, clean crating material, and clean rubber/vehicle tires. Metal meeting the definition of lead contaminated or lead based paint contaminated may be included as recyclable if sold to a scrap metal company.

Paint cans that meet the definition of empty containers in accordance with 40 CFR 261.7 may be included as recyclable if sold to a scrap metal company.

Surplus Soil: Surplus soil is existing soil that is in excess of what is required for this work, including aggregates intended, but not used, for on-site mixing of concrete, mortars, and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is not included and must be managed in accordance with paragraph HAZARDOUS MATERIAL MANAGEMENT.

Scrap Metal: This includes scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe, and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included.

Material not regulated as solid waste: Material not regulated as solid waste is nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended; suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges;

regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.

Wood: Wood is dimension and non-dimension lumber, plywood, chipboard, hardboard. Treated or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included. Treated wood includes, but is not limited to, lumber, utility poles, crossties, and other wood products with chemical treatment.

1.4.32 Trees

Unless otherwise indicated, the terms "tree" or "trees" refers to any native woody plant species having a diameter at breast height (DBH) equal to or greater than 2 inches.

1.4.33 Wastewater

Wastewater is the used water and solids from a community that flow to a treatment plant.

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 9

1.4.34 Storm Water

Storm Water is any precipitation in an urban or suburban area that does not evaporate or soak into the ground, but instead collects and flows into storm drains, rivers, and streams. See SECTION 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL for construction storm water management requirements.

1.4.35 Universal Waste

The universal waste regulations streamline collection requirements for certain hazardous wastes in the following categories: batteries, pesticides, mercury-containing equipment (for example, thermostats), and lamps (for example, fluorescent bulbs). The rule is designed to reduce hazardous waste in the municipal solid waste (MSW) stream by making it easier for universal waste handlers to collect these items and send them for recycling or proper disposal. These regulations can be found at 40 CFR 273.

1.5 QUALIFICATIONS

1.5.1 Biological Monitor

The Contractor's Biological Monitor must meet the following qualifications pertaining to sensitive species in the project area:

1. Demonstrate experience with construction level biological monitoring, and experience analyzing impacts of development on sensitive species in the project area and their habitats.

2. Able to recognize the sensitive species in the project area.

3. Familiar with the natural history, ecology, habitat, and behavior of those species.

4. Familiar with the appropriate state and federal statutes related to those species, scientific research, and conservation.

5. Has academic and professional experience in biological sciences and related natural resources management activities as it pertains to this project. The biological monitor will possess a Bachelor's degree or higher in biological sciences.

6. At minimum, one lead biological monitor will be identified for the duration of construction. The lead biological monitor is not required to be continuously on-site but must be available to biological monitors performing construction monitoring, meet the minimum criteria identified above, and have a minimum of least three years of construction monitoring experience.

7. The biological monitor must have or obtain necessary experience and permissions and/or permits from state and federal agencies to address injured wildlife or wildlife in eminent danger from construction activities. Biologists monitoring a given species (or group of species) described herein must also satisfy all requirements for biologists monitoring that particular species (or group of species), in accordance with PROTOCOLS FOR AVOIDING AND MINIMIZING ENDANGERED AND SPECIAL STATUS SPECIES Article.

The contractor must submit evidence of the Contractor's Biological Monitor qualifications, including the individual qualifications, to the

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 10

Contracting Officer for approval, no less than thirty days prior to starting work.

1.6 REGULATIONS

In order to prevent, abate, and control any environmental pollution arising from the construction activities under this contract, the Contractor and his subcontractors in the performance thereof must comply with all applicable Federal, State, and local laws, and regulations concerning threatened and endangered species, environmental resource protection, environmental pollution control and abatement, and all applicable provisions of EM 385-1-1 in effect on the date of solicitation, as well as the specific requirements stated elsewhere in these specifications. All Construction activity is subject to Federal Environmental laws including, but not limited to: The National Environmental Policy Act (NEPA); Endangered Species Act (ESA); National Historic Preservation Act (NHPA); Resource Conservation and Recovery Act (RCRA); Clean Water Act (CWA); Migratory Bird Treaty Act (MBTA);

Safe Drinking Water Act (SDWA). Obtain all needed permits. Government will provide (1) the Biological Opinion(s) or letter(s) of concurrence under section 7 of the Endangered Species Act, (2) Fish and Wildlife Coordination Act Report, and (3) Letter of Concurrence and Programmatic Agreement from the State Historic Preservation Office for compliance with the National Historic Preservation Act Section 106. Comply with the requirements of these permits.

1.7 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following must be submitted in accordance with SECTION 01 33 00, SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Environmental Protection Plan; G, DO Preconstruction Air Quality Mitigation Report; G, DO Air Quality Mitigation Report; G, DO Air Quality Permit Water Quality Management Plan; G, DO Preconstruction Survey Report Biological Monitor Qualifications; G, DO Environmental Permit Application Water Quality Monitoring Plan; G, DO Dewatering Plan, G Slurry Spill Contingency Plan; G, DO Project Environmental Review Form (PERF); G

SD-06 Test Reports Non-Hazardous Solid Waste Diversion Report Imported Fill Materials Test Results; G, DO Water Quality Reports Water Quality Monitoring Results Monthly Biological Monitor Report

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 11

SD-11 Closeout Submittals Post-Construction Survey Report Biological Summary Monitoring Report

1.8 NOTIFICATION

The Contracting Officer will notify the Contractor in writing of any observed noncompliance with the Federal, State or local laws or regulations, permits, and other elements of the Contractor's Environmental Protection Plan. This may include non-compliance with environmental commitments including measures to reduce or avoid impacts to migratory birds, special status species, and cultural resources.

After receipt of such notice, inform the Contracting Officer of proposed corrective action and take such action when approved. Upon failure to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or costs or damages allowed for any such suspensions.

If work is suspended, delayed, or interrupted due to a court order of competent jurisdiction, the Contracting Officer will determine whether the order is due in any part to the acts or omissions of the Contractor, or subcontractors at any tier, not required by the terms of the contract. If it is determined that the order is not due to Contractor's failing, such suspension, delay, or interruption must be considered as ordered by the Contracting Officer in the administration of the contract.

1.9 ENVIRONMENTAL PROTECTION PLAN

Prior to commencement of construction activities or delivery of materials to the site, submit an Environmental Protection Plan for approval. The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction. Issues of concern must be defined within the Environmental Protection Plan as outlined in this section. Address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Topics or issues which are not identified in this section, but are considered necessary, must be identified and discussed after those items formally identified in this section. Prior to submittal of the Environmental Protection Plan, meet with the Contracting Officer for the purpose of discussing the implementation of the initial Environmental Protection Plan; possible subsequent additions and revisions to the plan including any reporting requirements; and methods for administration of the Contractor's Environmental Plans. The Environmental Protection Plan must be current and maintained onsite by the Contractor. The biological monitor will report any violations or concerns affecting the environment such as; spills, sightings of listed endangered species in or near the work area, conditions of the protective fencing, damage to terrestrial and aquatic habitat, plus any other environmental issues discussed in these specifications. Meet with representatives of the Contracting Officer to alter the environmental protection plan as needed for compliance with the environmental pollution control program.

TEMPORARY ENVIRONMENTAL CONTROLS --- 01 57 19 - 12

1.9.1 Compliance

No requirement in this Section will relieve the Contractor of any applicable Federal, State, and local environmental protection laws and regulations. During Construction, the Contractor will be responsible for identifying, implementing, and submitting for approval any additional requirements to be included in the Environmental Protection Plan.

1.9.2 Contents

Include in the environmental protection plan, but not limit it to, the following:

1. Name(s) of person(s) within the Contractor's organization who is(are) responsible for ensuring adherence to the Environmental Protection Plan.

2. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site, if applicable.

3. A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control and abatement that are applicable to the Contractor's proposed operations and the requirements imposed by those laws, regulations, and permits.

4. Methods for protection of features to be preserved within authorized work areas such as trees, shrubs, vines, grasses and ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, and cultural resources.

5. Procedures to be…