This federal contract opportunity solicitation seeks construction services for a wetlands mitigation project located in Alameda County, California. The project consists of constructing a new tidal basin wetland area and enhancing adjacent existing degraded marshland on the Alameda Point Campus site. Construction of the tidal basin includes excavating to the basin floor, grading of channels, and constructing a riprap and aggregate connection through the seawall. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Sacramento. Responses are due under solicitation number W9123821B0004. The opportunity aims to fulfill the need for onsite wetlands mitigation resulting from unavoidable fill to existing wetlands in the Alameda Point area, as determined by the 2018 Alameda Basis of Design Report.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-5
-5
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
E
D
P
R
O
F
ESS
I O
N
A
L
N
G
I
N
E
E R
D
A
N
I
M
. J A
B
B
O
U
R
C
I V I L
S
T
A
T
O
F
C A
L
I
F
O
R
N
I
A
6/30/22
DEPARTMENT OF VETERANS AFFAIRS
ALAMEDA POINT, CALIFORNIA
VA ALAMEDA WETLAND MITIGATION
PROJECT 612-115
ISSUED FOR CONSTRUCTION
GI100
COVER SHEET
LOCATION MAP
NOT TO SCALE
VICINITY MAP
NOT TO SCALE
PROJECT
LOCATION
PROJECT
LOCATION
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed
Professional Engineer under the laws of the State of California.
DANIEL M. JABBOUR, P.E. (date)
My license renewal date is June 30, 2022.
Pages or sheets covered by this seal:
GI100 - GI103, CD101 - CD103, CS101 - CS104, CG101 - CG104 and CE101
10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E E
R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
6/30/22
-5
-5
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
SITE PLAN SYMBOLOGY GENERAL SYMBOLOGYMATERIALS IN PLAN/SECTION
1. THIS IS A STANDARD SHEET
SHOWING COMMON SYMBOLOGY.
ALL SYMBOLS ARE NOT
NECESSARILY USED ON THIS
PROJECT.
2. SCREENING OR SHADING OF WORK
IS USED TO INDICATE EXISTING
COMPONENTS OR TO
DE-EMPHASIZE PROPOSED
IMPROVEMENTS TO HIGHLIGHT
SELECTED TRADE WORK. REFER
TO CONTEXT OF EACH SHEET FOR
USAGE.
TARGET ELEVATION
KEY NOTE NUMBER
SECTION LETTER
DETAIL NUMBER
SECTION LETTER
DETAIL NUMBER
ELEVATION NUMBER
SECTION CUT MARKER
DETAIL MARKER
SINGLE ELEVATION OR PHOTO MARKER
ELEVATION NUMBER
MULTIPLE ELEVATION OR PHOTO MARKER
EL 6.4
PLAN TITLE
SHEET WHERE SECTION IS
LOCATED *
SHEET WHERE DETAIL
IS LOCATED *
ELEVATION IDENTIFICATION NUMBER
SECTION TITLE
* FOR COMMON DETAILS AND SECTIONS OR
DETAILS THAT ARE CUT OR CALLED OUT ON
MULTIPLE SHEETS, THE SHEET NUMBER IS
REPLACED BY A DASH (-).
ARROW INDICATES
POINT OF VIEW
SHEET WHERE ELEVATION
IS LOCATED *
ARROW INDICATES POINT
OF VIEW ELEVATION
INDICATES SHEET WHERE
ELEVATION IS LOCATED
ELEVATION TITLE
NORTH ARROW
ARROW INDICATES DIRECTION
OF PLAN NORTH
DETAIL TITLE
A
B D
C
N
X
XXX
PLAN
SCALE
X
XXX
SECTION
SCALE
A
DETAIL
SCALE
X
XXX
X
XXX
ELEVATION
SCALE
ARROW INDICATES
DIRECTION OF SECTION CUT
GI101
INDEX OF SHEETS, ABBREVIATIONS,
SYMBOLS AND LEGEND
ABBREVIATIONS
APPROX APPROXIMATE
EXIST EXISTING
FT FEET
H HORIZONTAL
MAX MAXIMUM
MHW MEAN HIGH WATER
MHHW MEAN HIGHER HIGH WATER
MIN MINIMUM
MSL MEAN SEA LEVEL
NTS NOT TO SCALE
OC ON CENTER
TYP TYPICAL
V VERTICAL
ALIGNMENT CENTERLINE
CA LEAST TERN SETBACK
COORDINATE POINT
ENVIRONMENTALLY SENSATIVE AREA
(ESA) FENCE
EXISTING GRADE
(PROFILE OR SECTION)
FINISHED GRADE
(PROFILE OR SECTION)
HAUL ROUTE
LIMITS OF CONSTRUCTION
MAJOR CONTOUR
MINOR CONTOUR
NO HAULING
PERIMETER OF TIDAL MARSH CREATION
AREA AND TIDAL MARSH TRANSITION
ZONE
PERIMETER OF TIDAL MARSH
ENHANCEMENT AREA AND TRANSITION
ZONE ENHANCEMENT AREA
SILT CURTAIN
SILT FENCE
SITE ACCESS ROUTE
SLOPE INDICATOR
SPOT ELEVATION
TIDAL CHANNEL
WETLANDS DELINEATION (2012)
2% OR 10:1
SURVEY PLAN SYMBOLOGY
CONTROL POINT
GEOTECHNICAL BORE LOCTION
GEOTECHNICAL TRENCH
RUNWAY LIGHT
EDGE OF PAVEMENT
FENCE
FLOW LINE
GRADE BREAK
MAJOR CONTOUR
MINOR CONTOUR
TELEPHONE LINE
TOE OF SLOPE
TOP OF SLOPE
WATERLINE
X
2% SLOPED GRADE AREA
AGGREGATE BEDDING
ASPHALT AND AGGREGATE BASE
REMOVAL
CLEAR AND GRUB AND
REMOVE 12" OF TOPSOIL
CLEAR AND GRUB IN
TRANSITION ZONE ENHANCEMENT AREA
EXISTING SEAWALL
GROUND
JURISDICTIONAL WATERS OF THE
U.S./STATE TO BE PROTECTED
MARSH PLAIN/WETLAND FLOOR
(TIDAL MARSH CREATION AREA)
REINFORCED CONCRETE AND
AGGREGATE BASE REMOVAL
RIPRAP
SEAWALL REMOVAL
SOIL REMOVAL AREA #1
SOIL REMOVAL AREA #2
TIDAL MARSH ENHANCEMENT AREA
TIDAL MARSH TRANSITION ZONE
TIDAL MARSH TRANSITION ZONE @ 9.5'
TRANSITION ZONE ENHANCEMENT AREA
GI100 COVER SHEET
GI101 INDEX OF SHEETS,
ABBREVIATIONS, SYMBOLS AND LEGEND
GI102 GENERAL NOTES
GI103 HAUL ROUTE AND SOIL DISPOSAL AREA PLAN
VF101 SURVEY (1 OF 3)
VF102 SURVEY (2 OF 3)
VF103 SURVEY (3 OF 3)
CD101 DEMOLITION PLAN
CD102 SOIL REMOVAL PLAN
CD103 SOIL REMOVAL PLAN SECTIONS
CS101 SITE PLAN
CS102 TIDAL MARSH CHANNEL CONTROL PLAN
CS103 TIDAL MARSH LIMITS CONTROL PLAN
CS104 PROJECT CONTROL TABLES
CG101 GRADING PLAN
CG102 TIDAL INLET PLAN
CG103 CHANNEL PROFILE AND SECTIONS
CG104 CHANNEL SECTIONS
CE101 EROSION CONTROL PLAN
REFERENCE DRAWINGS
R-LD100 NON-NATIVE PLANT CONTROL (BY OTHERS)
R-LP101 SEEDING PLAN (BY OTHERS)
R-LP102 PLANTING PLAN AND NOTES (BY OTHERS)
INDEX OF SHEETS
C x
W x
SF
ESA
HR
CLT
SAR
SF
SC
-5
-5
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
GENERAL NOTES:
GI102
GENERAL NOTES
1. IDENTIFY AN EROSION CONTROL SUPERVISOR WHO IS
KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSION
PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES
(BMP'S). THE EROSION CONTROL SUPERVISOR SHALL WORK WITH THE
ENGINEER THAT PREPARED THE SWPPP TO OVERSEE AND IMPLEMENT
THE SWPPP, AND THE INSTALLATION, INSPECTION, AND MAINTENANCE
OF EROSION PREVENTION AND SEDIMENT CONTROL BMP'S BEFORE
AND DURING CONSTRUCTION.
2. DEVELOP A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS ON THE
SITE TO ENSURE THE SWPPP WILL BE IMPLEMENTED AND MAINTAINED.
3. INSPECT EROSION CONTROL DEVICES ON THE SITE AT LEAST EVERY
SEVEN DAYS OR WITHIN 24 HOURS AFTER A STORM EVENT OF 0.5
INCHES OR MORE. ELIMINATE DEFICIENCIES FOUND BECAUSE OF
THESE INSPECTIONS. MAINTAIN A RECORD OF ALL INSPECTION
REPORTS PER THE REQUIREMENTS OF THE NPDES PERMIT. INCLUDE IN
THE REPORTS DOCUMENTATION OF EROSION CONTROL DEFICIENCIES,
MAINTENANCE ISSUES AND REPAIRS OR OTHER CORRECTIVE
MEASURES THAT WERE IMPLEMENTED. PROVIDE COPIES OF THE
INSPECTION REPORTS TO THE CONTRACTING OFFICER.
4. REQUIREMENTS FOR MAINTENANCE OF INDIVIDUAL EROSION AND
SEDIMENT CONTROL DEVICES ARE DESCRIBED IN THE GENERAL
PERMIT FOR STORM WATER DISCHARGE ASSOCIATED WITH
CONSTRUCTION ACTIVITIES.
5. WHEN THE PROJECT IS COMPLETED, THE ENTIRE SITE HAS BEEN
STABILIZED AND ALL EROSION CONTROL MEASURES HAVE BEEN
REMOVED, SUBMIT AND PAY FEE FOR NOTICE OF TERMINATION (NOT).
1. NOTIFY THE CONTRACTING OFFICER AT LEAST 48 HOURS PRIOR TO BEGINNING
GRADING. PERFORMANCE OF UNOBSERVED AND UNAPPROVED GRADING
WORK WILL REQUIRE ADDITIONAL WORK, CORRECTIONS AND MATERIALS
TESTING AT THE CONTRACTOR'S EXPENSE.
2. MATERIALS REQUIRED FOR THE COMPLETE EXECUTION OF THE PROJECT SHALL
BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE
NOTED.
3. PROVIDE LIGHTS, SIGNS, BARRICADES, FLAGMEN OR OTHER DEVICES
NECESSARY TO PROVIDE FOR PUBLIC SAFETY DURING THE CONSTRUCTION
PERIOD.
4. ELEVATIONS IN THIS PLAN SET ARE PROVIDED IN NAVD88 VERTICAL DATUM.
MEAN SEA LEVEL IS 3.22 FEET.
SOIL EROSION AND SEDIMENT CONTROL NOTES:
1. SEE 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
2. PROVIDE A STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
PREPARED BY A LICENSED PROFESSIONAL ENGINEER REGISTERED IN
THE STATE OF CALIFORNIA TO ADDRESS ALL LOCAL, STATE AND
FEDERAL REQUIREMENTS. THE SWPPP SHALL BE COMPLETED PRIOR
TO THE BEGINNING OF CONSTRUCTION AND SUBMITTED TO THE
CONTRACTING OFFICER FOR INFORMATIONAL PURPOSES. AT A
MINIMUM THE SWPPP SHALL INCORPORATE INFORMATION IN THIS
SHEET SET AS WELL AS THE BMP INFORMATION ON THE SITE GRADING
AND DRAINAGE PLAN AND SITE LAYOUT PLAN.
3. INSTALL SOIL EROSION AND SEDIMENT CONTROL MEASURES IN
ACCORDANCE WITH THE APPROVED SWPPP REQUIREMENTS AND THE
APPROVED CALIFORNIA DEPARTMENT OF ENVIRONMENTAL QUALITY
GENERAL PERMIT FOR STORM WATER DISCHARGES.
4. INSTALL SEDIMENT CONTROL MEASURES PRIOR TO CONSTRUCTION
ACTIVITIES.
5. CONTAIN ERODED MATERIALS WITHIN THE SITE AND PREVENT ERODED
MATERIAL FROM ENTERING DRAINAGE WAYS, ADJACENT WETLANDS
AND THE BAY.
6. PERFORM GRADING IN SUCH A MANNER AS TO COMPLY WITH THE
STANDARDS ESTABLISHED BY THE AIR QUALITY MAINTENANCE
DISTRICT FOR AIRBORNE PARTICLES (DUST).
7. INSTALL STABILIZED CONSTRUCTION ENTRANCE(S) TO REDUCE
SEDIMENT TRANSFER TO PAVED SURFACES OUTSIDE OF THE GRADING
LIMITS.
8. CLEAN ALAMEDA AIR BASE PAVED SURFACES AND CITY STREETS OF
DIRT AND DEBRIS THAT IS ATTRIBUTABLE TO CONSTRUCTION
ACTIVITIES. REMOVE SEDIMENT SPILLED, DROPPED, WASHED OR
TRACKED ONTO ADJACENT ROADWAYS, TAXIWAYS OR RUNWAYS ON A
DAILY BASIS. MORE FREQUENT REMOVALS MAY BE REQUIRED BY THE
VA, AT NO ADDITIONAL COST, IF SIGNIFICANT DEPOSITS OCCUR.
9. DO NOT DISTURB VEGETATION OUTSIDE OF WORK AREAS.
10. REPAIR AND/OR RECTIFY ANY DAMAGE(S) INCURRED BY RUNOFF
AND/OR EROSION. REPAIR IS INCIDENTAL TO THE COST OF
INSTALLING BMP'S.
11. IF BEST MANAGEMENT PRACTICES (BMPS) ARE REMOVED TO
ACCOMMODATE CONSTRUCTION THEY MUST BE REPLACED OR
ANOTHER TEMPORARY BMP MUST BE USED IN ITS PLACE PRIOR TO
LEAVING THE SITE AT THE END OF EACH WORKING DAY.
12. REMOVE BUILT UP SEDIMENT FROM BEHIND SILT FENCE OR OTHER
BMP'S AS NECESSARY TO PREVENT FAILURE.
13. A CONTAINED AND COVERED AREA ON-SITE SHALL BE USED FOR
STORAGE OF CEMENT BAGS, PAINTS, FLAMMABLES, OILS, FERTILIZERS,
PESTICIDES OR OTHER MATERIALS THAT HAVE POTENTIAL FOR BEING
DISCHARGED TO ADJACENT WETLANDS, STORM SEWERS OR THE BAY
BY WIND OR WATER IN THE EVENT OF A MATERIAL SPILL.
14. PROVIDE CONTAINMENT DIKES OR OTHER PROTECTIVE MEASURES
AROUND ALL ON-SITE FUELING AND CHEMICAL STORAGE AREAS.
COMPLY WITH THE STATE OF CALIFORNIA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES FOR THE NOTIFICATION,
CONTAINMENT, INVESTIGATION, REMEDIATION AND DISPOSAL OF FUEL,
OIL, OR ANY HAZARDOUS MATERIAL THAT IS RELEASED.
15. CONSTRUCTION EQUIPMENT AND TOOLS SHALL NOT BE CLEANED OR
RINSED INTO A STREET, TAXIWAY, RUNWAY, GUTTER, STORM DRAIN,
WETLANDS OR THE BAY.
16. ALL CONSTRUCTION DEBRIS SHALL BE GATHERED ON A REGULAR
BASIS AND PLACED IN A DUMPSTER WHICH IS EMPTIED OR REMOVED
WEEKLY. WHEN FEASIBLE, TARPS SHALL BE USED ON THE GROUND TO
COLLECT FALLEN DEBRIS OR SPLATTERS THAT COULD CONTRIBUTE TO
STORMWATER POLLUTION.
17. REMOVE ALL EROSION CONTROL DEVICES AT THE END OF THE
PROJECT AFTER NEW SITE IMPROVEMENTS ARE COMPLETE AND
DEVICES ARE NO LONGER REQUIRED AS PER NPDES PERMIT
REQUIREMENTS.
SPECIFIC EROSION CONTROL REQUIREMENTS:
COMMUNICATIONS:
1. A SUPERINTENDENT OR CONTRACTOR'S REPRESENTATIVE SHALL BE PRESENT
ON SITE DURING ALL WORKING HOURS FOR THE DURATION OF CONSTRUCTION.
2. PROVIDE EMERGENCY TELEPHONE NUMBER FOR THE ON SITE
SUPERINTENDENT OR CONTRACTOR'S REPRESENTATIVE TO THE RESIDENT
ENGINEER, POLICE AND FIRE DEPARTMENTS.
3. POST EMERGENCY TELEPHONE NUMBERS FOR PUBLIC WORKS, AMBULANCE,
POLICE AND FIRE DEPARTMENTS ON SITE.
UTILITIES:
1. UTILITIES AND UNDERGROUND FACILITIES SHOWN ARE FOR INFORMATION
ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
LOCATION AND DEPTH WITH THE APPROPRIATE AGENCIES. NEITHER THE
OWNER, NOR THE CITY, NOR THE DESIGN PROFESSIONAL ASSUMES
RESPONSIBILITY THAT THE UTILITIES AND UNDERGROUND FACILITIES
INDICATED WILL BE THE UTILITIES AND UNDERGROUND FACILITIES
ENCOUNTERED.
2. CONTACT UNDERGROUND SERVICE ALERT (USA 800-227-2600) 48 HOURS PRIOR
TO BEGINNING WORK TO HAVE THE LOCATION OF EXISTING UNDERGROUND
UTILITIES MARKED. IDENTIFY, LOCATE AND PROTECT ALL UNDERGROUND
UTILITIES AND FACILITIES.
3. NOTIFY PUBLIC OR PRIVATE UTILITY OWNERS 48 HOURS PRIOR TO
COMMENCEMENT OF WORK ADJACENT TO THE UTILITY UNLESS AN EXCAVATION
PERMIT SPECIFIES OTHERWISE.
4. REPAIR OR REPLACE ANY UNDERGROUND FACILITIES THAT ARE DAMAGED
DURING CONSTRUCTION.
1. THE SITE CONTAINS ELEVATED GROUNDWATER DUE TO THE
PROXIMITY OF THE SITE TO THE BAY. WET EXCAVATION CONDITIONS
SHOULD BE ANTICIPATED.
2. DEWATERING OF EXCAVATIONS WILL LIKELY NOT BE FEASIBLE DUE TO
THE PRESENCE OF SANDY SOILS. WORK BELOW GROUNDWATER
ELEVATIONS WILL LIKELY NEED TO BE CONDUCTED IN SUBMERGED
CONDITIONS.
3. TIDAL FLUCTUATIONS WILL RESULT IN VARIABLE CONDITIONS ON THE
WORK SITE. MONITOR TIDAL DATA AND PLAN WORK
SEQUENCE/PHASING/DAILY SCHEDULING ACCORDINGLY.
CARE OF WATER:
1. THE GOVERNMENT WILL ENTER INTO A SEPARATE CONTRACT TO
COMPLETE SEEDING, NON-NATIVE PLANT CONTROL, AND PLANTINGS IN
THE WETLANDS AND TRANSITION AREAS.
2. COORDINATE WITH THE CONTRACTOR PERFORMING NOT IN CONTRACT
(NIC) WORK TO FACILITATE TIMELY EFFICIENT COMPLETION OF THE
WETLAND PROJECT. THIS COORDINATION MUST INCLUDE
COMMUNICATING IN ADVANCE THE SCHEDULE, AND COOPERATION ON
USE OF THE SITE, ACCESS CONTROL, SITE CLEANUP, AND USE OF THE
HAUL ROAD.
3. SUCCESSFUL PERFORMANCE OF THE TIDAL MARSH IS DEPENDENT ON
PLANTINGS THAT ARE BEING IMPLEMENTED OUTSIDE OF THIS
CONTRACT. DELAYS IN INSTALLATION OF PLANTINGS MAY IMPACT
STABILITY AND EROSION POTENTIAL WITHIN THE TIDAL MARSH.
COORDINATION WITH OTHER CONTRACTORS:
W x
W x
W x
W x
W x
W x
C x
SAN FRANCISCO BAY
M O
N A
R C
H
S
T R
E E
T
T A
X I W
Y
M O
N A
R C
H
S
T R
E E
T
T
A
X
I
W
U
N
W
A
Y
C L T
C L
TCALIFORNIA
LEAST TERN
COLONY
SOIL DISPOSAL
AREA 1
280,000 SF
S F
S F
S F
S F
S F
SFSFSFSFSFSF
S
F
W E
S T
T O
W E
R A
V E
W E
S T
M
ID
W A
Y A
V E
PERIMETER OF TIDAL MARSH
CREATION AREA AND TIDAL
MARSH TRANSITION ZONE.
SEE SHEET CS101
H
U
L
I
N
G
SITE ACCESS ROUTE
S
E T
B A
C K
N O
H A
U L
IN
G
U
L
I
N
G
S
A
R
S A
R
S A
R
S A
R
S A
R
C
L
T
C
L
T
C
L
T
C
L
T
C
L
T
C
LT
C L T
C
L
T
C
L
T
C
L
T
C
L
T
C
L T
GATED ENTRANCE
PROTECT 2" AT
GRADE WATERLINE
C L T
C L T
C
L
T
C
L
T
C
L
T
C
L
T
C
L
T
C L T
C
LT
C
L
T
C
L
T
C
L
T
C
L
T
C
L
T
C L T
PROTECT AT GRADE
TELEPHONE LINE
S A
R
S A
R
S A
R
US FISH &
WILDLIFE OFFICE
STAGING AREA
STAGING AREA
CONTRACTOR'S
ACCESS TO SITE
PERIMETER OF TIDAL
MARSH ENHANCEMENT AREA
SEE SHEET CS101
U
L
I
N
G
H
R
H
R
H
R
H
R
H
R
H
R
H
R
H
R
H
R
H
R
H
R
H
R
H
R
H
R
H
R
H
R
U
L
I
N
G
U
L
I
N
G
U
L I N
G
U
L I N
G
U
L I N
G
U
L
I
N
G
N O
H A
U L
IN
G
E A
S T
-W E
S T
T A
X
IW
A Y
E A
S T
-W E
S T
T A
X
IW
A Y
T A
X
IW
A Y
N O
N O
H A
U L
IN
G
U
L I N
G
.5
' S
E T
B A
C K
N O
H A
U L
IN
G
CA LEAST TERN SETBACK
HAUL ROUTE
NO HAULING
SITE ACCESS ROUTE
JURISDICTIONAL WATERS
OF THE U.S./STATE TO BE
PROTECTED (4.7 ACRES)
LIMITS OF CONSTRUCTION
RIPRAP SPLASH PAD
STAGING AREAS
TIDAL CHANNEL
PERIMETER OF TIDAL
MARSH ENHANCEMENT
AREA WHICH INCLUDES:
ENHANCEMENT AREA,
TRANSITION ZONE
ENHANCEMENT AREA AND
NON-NATIVE PLANT
CONTROL IN
JURISDICTIONAL WATERS
OF THE U.S./STATE
(14.8 ACRES)
TIDAL MARSH
ENHANCEMENT AREA
(10.5 ACRES)
JURISDICTIONAL WATERS
OF THE U.S./STATE TO BE
PROTECTED (0.4 ACRES)
PERIMETER OF TIDAL
MARSH CREATION AREA
AND TIDAL MARSH
TRANSITION ZONE
(11.3 ACRES)
TIDAL MARSH CREATION
AREA (8.0 ACRES)
CLT
HR
SAR
1. PERFORM NO WORK IN JURISDICTIONAL
WATERS OF THE U.S./STATE TO BE
PROTECTED.
2. PLACE DISPOSED SOILS AND PAVEMENT
MATERIALS WITHIN SOIL DISPOSAL AREA 1
TO A DEPTH OF APPROXIMATELY 4 TO 5
FT.
3. USE DESIGNATED SITE ACCESS POINTS
AND REMAIN ON ONLY DESIGNATED
CONSTRUCTION ROUTES. CONSTRUCTION
VEHICLES AND EQUIPMENT ACCESS
PROHIBITED FROM APRIL 1 THROUGH
AUGUST 15 (CALIFORNIA LEAST TERN
BREEDING SEASON), IN ACCORDANCE
WITH USFWS BIOLOGICAL OPINION ON
THE PROPOSED NAS ALAMEDA DISPOSAL
& REFUSE PROJECT IN THE CITY OF
ALAMEDA, ALAMEDA CO., CALIFORNIA
(2012). SEE USFWS B.O. FOR CLT
PROTECTION DETAILS.
SOIL DISPOSAL AREA
POINT NO.
NORTHING
2115449.43
2115358.90
2115203.06
2115203.06
2115360.67
EASTING
6032883.05
6032797.97
6032797.97
6034184.55
6034184.55
LEAST TERN COLONY
POINT NO.
NORTHING
2113165.01
2112403.37
2112358.55
2113120.19
EASTING
6036464.93
6036406.51
6036990.91
6037049.32
LIMITS OF STAGING AREAS
POINT NO.
NORTHING
2111913.21
2111865.33
2111337.74
2110970.67
2111304.93
2111538.90
2111375.35
2111151.09
EASTING
6036077.77
6036666.67
6036987.60
6036650.03
6037546.58
6037940.89
6037998.03
6037646.32
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
GI103
HAUL ROUTE AND SOIL DISPOSAL AREA PLAN
VF101
SURVEY (1 OF 3)
10/01/20210 ISSUED FOR CONSTRUCTION
OCTOBER 01,2021
SURVEY (2 OF 3)
VF102
VF103
SURVEY (3 OF 3)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SEE GENERAL NOTE 2 (TYP)
LIMITS OF CONSTRUCTION
CLEAR AND GRUB,
REMOVE 12" OF TOPSOIL
(SEE NOTE 5)
FULL DEPTH
SAW CUT
PROTECT IN PLACE EXISTING
JURISDICTIONAL WATERS
OF THE U.S./STATE
LIMITS SHOWN ARE APPROXIMATE.
CONFIRM LIMITS IN FIELD WITH
PROJECT BIOLOGIST
FULL DEPTH SAW CUT
FULL DEPTH SAW CUT
FULL DEPTH SAW CUT
PROTECT EXISTING
SEAWALL IN PLACE
CLEAR AND GRUB TO SEAWALL,
REMOVE 12" OF TOPSOIL
(SEE NOTE 5)
PROTECT EXISTING
SEAWALL IN PLACE
SEE GENERAL NOTE 1
PROTECT EXISTING CONCRETE
STOOP AT PIER
PROTECT EXISTING SEAWALL IN PLACE
APPROX LIMITS OF
GRADED TIDAL MARSH
LIMITS OF TIDAL MARSH
FLOOR AT ELEV 6.4'
FULL DEPTH
SAW CUT
EXISTING TIDAL MARSH
(WATERS OF THE U.S./STATE)
FULL DEPTH SAW CUT
FULL DEPTH SAW CUT
CLEAR AND GRUB IN
TRANSITION ZONE
ENHANCEMENT AREA
(SEE NOTE 6)
CLEAR AND GRUB,
REMOVE 12" OF TOPSOIL
(SEE NOTE 5)
ABANDONED RUNWAY
ABANDONED TAXIWAY
ICE PLANT
ICE PLANT
ICE PLANT
ICE PLANT
ICE PLANT
ICE PLANT
ASPHALTIC
CONCRETE OR
CONCRETE
ASPHALTIC
CONCRETE OR
CONCRETE
ASPHALTIC
CONCRETE OR
CONCRETE
ASPHALTIC
CONCRETE OR
CONCRETE
ICE PLANT, DIRT AND
REMNANTS OF ASPHALTIC
CONCRETE AND CONCRETE
N
N
-5
-5
SAN FRANCISCO BAY
SAN FRANCISCO BAY
POND
POND
POND
EROSION
AREA 1
ICE PLANT
ICE PLANT
EROSION
AREA NOT
PREVIOUSLY
IDENTIFIED
EROSION
AREA NOT
PREVIOUSLY
IDENTIFIED
W x
W x
W x
W x
W
VISIBLE EDGE
OF PAVEMENT
UTILITY BOX (TYP)
UTILITY BOX (TYP)
SIGN
EDGE OF PAVEMENT
2.5"Ø BROKEN OFF RISER (TYP)
2.5"Ø BROKEN OFF RISER (TYP)
UTILITY BOX (TYP)
UTILITY BOX (TYP)
UTILITY VAULT
2" Ø 2' TALL PVC RISER
VISIBLE EDGE OF PAVEMENT
UTILITY VAULT
UTILITY BOX (TYP)
2' TALL ELEC LIGHT PEDESTAL
2.5"Ø RISER W/LIGHT
2.5"Ø BROKEN OFF RISER (TYP)
2.5"Ø BROKEN OFF RISER (TYP)
4" Ø 3' TALL RISER W/LIGHT
UTILITY VAULT
UTILITY VAULT
UTILITY VAULT
4" Ø 3' TALL RISER W/LIGHT
2' TALL ELEC LIGHT PEDESTAL
UTILITY VAULT
3" Ø 0.5' TALL PVC RISER
UTILITY VAULT
UTILITY VAULT
VISIBLE EDGE OF PAVEMENT
UTILITY VAULT
UTILITY VAULT
EDGE OF WATER
EDGE OF WATER
VISIBLE EDGE
OF PAVEMENT
POSSIBLE
GEOTECHNICAL
TRENCH LOCATION
POSSIBLE
GEOTECHNICAL
TRENCH LOCATION
MD&A CONTROL POINT
#1001 MAG NAIL IN
PAVEMENT ELEV: 9.25'
CONC STOOP
AT PIER
MD&A CONTROL POINT
#1003 MAG NAIL IN
PAVEMENT ELEV: 8.53'
GRADE BREAK IN ROCK SEAWALL
FACE OF ROCK SEAWALL
ROCK SEAWALL AT THE WATERLINE
AT THE TIME OF THE SURVEY
APPROX LOCATION OF TOE OF ROCK WALL
TOP OF SLOPE
MD&A CONTROL POINT
#1002 MAG NAIL IN
PAVEMENT ELEV: 8.93'
2" Ø 2' TALL
PVC RISER
WOODEN PIER FOR RUNWAY LIGHTING
APPROX LOCATION OF TOE OF ROCK WALL
GRADE BREAK IN ROCK SEAWALL
FACE OF
ROCK SEAWALL
TOP OF SLOPE
GRADE BREAK
2.5"Ø RISER W/LIGHT
FACE OF
ROCK SEAWALL
GRADE BREAK IN
ROCK SEAWALL
PROTECT IN PLACE
EXISTING JURISDICTIONAL
WATERS OF THE U.S./STATE
40.2 6'
1. REMOVE AND SALVAGE ROCK
FROM OPENING OF PROPOSED
TIDAL INLET TO AN ELEVATION
OF 2.22 FEET. SEE SHEET CD103.
2. REMOVE ALL LIGHTS, CONDUITS,
RISERS, VAULTS, PIPES, WIRING
OR OTHER UTILITY OR AIRPORT
STRUCTURES LOCATED WITHIN
THE LIMITS OF CONSTRUCTION.
NOT ALL ITEMS INDICATED FOR
REMOVAL ARE SHOWN ON
DEMOLITION PLAN.
3. ELEVATIONS ARE IN NAVD88
VERTICAL DATUM. MEAN SEA
LEVEL IS 3.22 FEET.
4. SEE SHEET CE101 FOR LIMITS
OF ENVIRONMENTALLY
SENSITIVE AREA FENCE.
5. REMOVE AND DISPOSE OF
TOPSOIL OFF SITE.
6. NO TOPSOIL REMOVAL
REQUIRED IN TRANSITION ZONE
ENHANCEMENT AREA.
AIRPORT/UTILITY
REMOVAL ITEM
CLEAR AND GRUB AND
REMOVE TOP SOIL
CLEAR AND GRUB
TRANSITION ZONE
ENHANCEMENT AREA
JURISDICTIONAL WATERS
OF THE U.S./STATE
TO BE PROTECTED
REMOVE ASPHALT AND
AGGREGATE BASE
REMOVE REINFORCED
CONCRETE AND
AGGREGATE BASE
REMOVE AND
SALVAGE ROCK
LIMITS OF
CONSTRUCTION
GEOTECHNICAL BORE
LOCATION
GEOTECHNICAL TRENCH
X
SEAWALL REMOVAL AREA
POINT NO.
NORTHING
2110285.57
2110278.99
2110276.90
2110270.23
2110277.97
2110283.76
EASTING
6037254.57
6037254.02
6037271.74
6037320.20
6037320.85
6037274.81
SAW CUT LIMITS
POINT NO.
NORTHING
2111147.20
2111304.35
2111282.05
2111204.84
2111027.55
2110930.32
2110842.97
2110729.29
2110656.24
EASTING
6037639.12
6037541.06
6037021.66
6036895.36
6036880.12
6036889.99
6036875.67
6036817.98
6036796.11
JURISDICTIONAL
WATERS OF THE US LMITS
POINT NO.
NORTHING
2110856.28
2110848.24
2110839.06
2110850.98
2110969.09
2111005.05
2111103.82
2111155.76
2111170.59
2111178.91
EASTING
6037397.26
6037401.99
6037412.62
6037447.55
6037542.68
6037566.39
6037645.18
6037699.97
6037700.37
6037684.77
CD101
DEMOLITION PLAN
A B
A N
D O
N E
D R
U N
W A
Y
A B
A N
D O
N E
D T
A X
IW
A
Y
IC
E
P L
A N
T
IC
E
P L
A N
T
IC
E
P L
A N
T
IC
E
P L
A N
T
IC
E
P L
A N
T
IC
E
P L
A N
T
A S
P H
A L
T
IC
C O
N C
R E
T E
O R
C O
N C
R E
T E
A S
P H
A L
T
IC
C O
N C
R E
T E
O R
C O
N C
R E
T E
A S
P H
A L
T
IC
C O
N C
R E
T E
O R
C O
N C
R E
T E
A S
P H
A L
T
IC
C O
N C
R E
T E
O R
C O
N C
R E
T E
IC
E
P L
A N
T
D
IR
T A
N D
R E
M N
A N
T S
O F
A S
P H
A L
T
IC
C O
N C
R E
T E
A N
D C
O N
C R
E T
E
N77°03'42"W 205.60'
N52°55'25"W
349.71'
-5
-5
S A
N F
R A
N C
IS
C
O B
A Y
S A
N F
R A
N C
IS
C
O B
A Y
S A
N F
R A
N C
IS
C
O B
A Y
P O
N D
P O
N D
P O
N D
P O
N D
E R
O S
IO
N
A R
E A
E R
O S
IO
N
A R
E A
IC
E
P L
A N
T
IC
E
P L
A N
TIC
E
P L
A N
T
E R
O S
IO
N
A R
E A
N O
T
P R
E V
IO
U
S L
Y
ID
E
N T
IF
IE
D
E R
O S
IO
N
A R
E A
N O
T
P R
E V
IO
U
S L
Y
ID
E
N T
IF
IE
D
VISIBLE EDGE
OF PAVEMENT
UTILITY BOX (TYP)
UTILITY BOX (TYP)
SIGN
EDGE OF PAVEMENT
2.5"Ø BROKEN OFF RISER (TYP)
2.5"Ø BROKEN OFF RISER (TYP)
UTILITY BOX (TYP)
UTILITY BOX (TYP)
UTILITY VAULT
2" Ø 2' TALL PVC RISER
VISIBLE EDGE OF PAVEMENT
UTILITY VAULT
UTILITY BOX (TYP)
2' TALL ELEC LIGHT PEDESTAL
2.5"Ø RISER W/LIGHT
2.5"Ø BROKEN OFF RISER (TYP)
2.5"Ø BROKEN OFF RISER (TYP)
4" Ø 3' TALL RISER W/LIGHT
UTILITY VAULT
UTILITY VAULT
UTILITY VAULT
4" Ø 3' TALL RISER W/LIGHT
2' TALL ELEC LIGHT PEDESTAL
UTILITY VAULT
3" Ø 0.5' TALL PVC RISER
UTILITY VAULT
UTILITY VAULT
VISIBLE EDGE OF PAVEMENT
UTILITY VAULT
UTILITY VAULT
EDGE OF WATER
EDGE OF WATER
VISIBLE EDGE
OF PAVEMENT
POSSIBLE
GEOTECHNICAL
TRENCH LOCATION
POSSIBLE
GEOTECHNICAL
TRENCH LOCATION
MD&A CONTROL POINT
#1001 MAG NAIL IN
PAVEMENT ELEV: 9.25'
CONC STOOP
AT PIER
MD&A CONTROL POINT
#1003 MAG NAIL IN
PAVEMENT ELEV: 8.53'
GRADE BREAK IN ROCK SEAWALL
FACE OF ROCK SEAWALL
ROCK SEAWALL AT THE WATERLINE
AT THE TIME OF THE SURVEY
APPROX LOCATION OF TOE OF ROCK WALL
TOP OF SLOPE
MD&A CONTROL POINT
#1002 MAG NAIL IN
PAVEMENT ELEV: 8.93'
2" Ø 2' TALL
PVC RISER
WOODEN PIER FOR RUNWAY LIGHTING
APPROX LOCATION OF TOE OF ROCK WALL
GRADE BREAK IN ROCK SEAWALL
FACE OF
ROCK SEAWALL
TOP OF SLOPE
GRADE BREAK
2" Ø 2' TALL
PVC RISER
EDGE OF WATER
8' TALL CYCLONE FENCE
5' Ø STEEL PIPE RISER
CONC HEADWALL
GRADE BREAK
FACE OF ROCK SEAWALL
ROCK SEAWALL AT THE WATERLINE
AT THE TIME OF THE SURVEY
U S
F
IS
H
W
IL
D L
IF
E
O F
F
IC
E
2.5"Ø RISER W/LIGHT
FACE OF
ROCK SEAWALL
GRADE BREAK IN
ROCK SEAWALL
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
0 50'50' 25'
C
CD103
D
CD103
LIMITS OF CONSTRUCTION
PROTECT IN PLACE EXISTING
JURISDICTIONAL WATERS
OF THE U.S./STATE
PROTECT IN PLACE
EXISTING JURISDICTIONAL
WATERS OF THE U.S./STATE
EXISTING TIDAL MARSH
(WATERS OF THE U.S./STATE)
APPROXIMATE LIMITS OF
GRADED TIDAL MARSH
LIMITS OF TIDAL MARSH
FLOOR AT ELEV 6.4'
PROTECT EXISTING
SEAWALL IN PLACE
PROTECT EXISTING CONCRETE
STOOP AT PIER
PROTECT EXISTING SEAWALL IN PLACE
TIDAL MARSH INLET
PROTECT EXISTING
SEAWALL IN PLACE
-5
-5
SAN FRANCISCO BAY
SAN FRANCISCO BAY
POND
POND
POND
EROSION
AREA 1
ICE PLANT
ICE PLANT
EROSION
AREA NOT
PREVIOUSLY
IDENTIFIED
EROSION
AREA NOT
PREVIOUSLY
IDENTIFIED
W x
W x
W x
W x
2" Ø 2' TALL PVC RISER
EDGE OF WATER
EDGE OF WATER
CONC STOOP
AT PIER
GRADE BREAK IN ROCK SEAWALL
FACE OF ROCK SEAWALL
ROCK SEAWALL AT THE WATERLINE
AT THE TIME OF THE SURVEY
APPROX LOCATION OF TOE OF ROCK WALL
TOP OF SLOPE
WOODEN PIER FOR RUNWAY LIGHTING
APPROX LOCATION OF TOE OF ROCK WALL
GRADE BREAK IN ROCK SEAWALL
FACE OF
ROCK SEAWALL
TOP OF SLOPE
GRADE BREAK
FACE OF
ROCK SEAWALL
GRADE BREAK IN
ROCK SEAWALL
A
CD103
B
CD103
E
C D
SEE GENERAL NOTE 1
1. REMOVE SOILS FROM
REMOVAL AREA 1 TO AN
ELEVATION OF 6.4 FEET.
2. REMOVE SOILS FROM
REMOVAL AREA 2 TO AN
ELEVATION OF 4.9 FEET.
3. DISPOSE OF SOILS IN SOIL
DISPOSAL AREA 1 SHOWN ON
SHEET GI103.
4. ELEVATIONS ARE IN NAVD88
VERTICAL DATUM. MEAN SEA
LEVEL IS 3.22 FEET
JURISDICTIONAL WATERS
OF THE U.S./STATE
TO BE PROTECTED
SOIL REMOVAL AREA 1
SOIL REMOVAL AREA 2
LIMITS OF
CONSTRUCTION
SOIL REMOVAL AREAS
POINT NO.
NORTHING
2110842.19
2110755.42
2110706.02
2110462.06
2110505.07
2110556.90
2110583.47
2110660.01
2110704.80
2110784.97
2110797.21
2110832.28
2110538.03
2110337.03
2110330.79
2110316.17
2110435.93
EASTING
6037367.42
6037218.26
6037203.39
6037419.10
6037405.34
6037396.23
6037402.79
6037440.79
6037440.73
6037412.18
6037379.62
6037372.70
6036886.33
6037026.84
6037039.32
6037206.60
6037432.63
ELEVATION
8.98
9.49
9.02
8.40
8.53
9.02
9.01
9.86
9.94
9.92
8.82
8.87
8.83
8.63
8.61
8.86
8.56
DESCRIPTION
AREA 1 LIMITS
AREA 1 LIMITS
AREA 1 & 2 LIMITS
AREA 1 & 2 LIMITS
AREA 1 LIMITS
AREA 1 LIMITS
AREA 1 LIMITS
AREA 1 LIMITS
AREA 1 LIMITS
AREA 1 LIMITS
AREA 1 LIMITS
AREA 1 LIMITS
AREA 2 LIMITS
AREA 2 LIMITS
AREA 2 LIMITS
AREA 2 LIMITS
AREA 2 LIMITS
CD102
SOIL REMOVAL PLAN
-5
-5
S A
N F
R A
N C
IS
C
O B
A Y
S A
N F
R A
N C
IS
C
O B
A Y
S A
N F
R A
N C
IS
C
O B
A Y
P O
N D
P O
N D
P O
N D
P O
N D
E R
O S
IO
N
A R
E A
E R
O S
IO
N
A R
E A
IC
E
P L
A N
T
IC
E
P L
A N
TIC
E
P L
A N
T
E R
O S
IO
N
A R
E A
N O
T
P R
E V
IO
U
S L
Y
ID
E
N T
IF
IE
D
E R
O S
IO
N
A R
E A
N O
T
P R
E V
IO
U
S L
Y
ID
E
N T
IF
IE
D
2" Ø 2' TALL PVC RISER
EDGE OF WATER
EDGE OF WATER
CONC STOOP
AT PIER
GRADE BREAK IN ROCK SEAWALL
FACE OF ROCK SEAWALL
ROCK SEAWALL AT THE WATERLINE
AT THE TIME OF THE SURVEY
APPROX LOCATION OF TOE OF ROCK WALL
TOP OF SLOPE
WOODEN PIER FOR RUNWAY LIGHTING
APPROX LOCATION OF TOE OF ROCK WALL
GRADE BREAK IN ROCK SEAWALL
FACE OF
ROCK SEAWALL
TOP OF SLOPE
GRADE BREAK
2" Ø 2' TALL
PVC RISER
EDGE OF WATER
8' TALL CYCLONE FENCE
5' Ø STEEL PIPE RISER
CONC HEADWALL
GRADE BREAK
FACE OF ROCK SEAWALL
ROCK SEAWALL AT THE WATERLINE
AT THE TIME OF THE SURVEY
U S
F
IS
H
W
IL
D L
IF
E
O F
F
IC
E
FACE OF
ROCK SEAWALL
GRADE BREAK IN
ROCK SEAWALL
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
0 50'50' 25'
3RD ORDER
CHANNEL
2ND ORDER
CHANNEL
H
V
EXIST GRADE
SOIL REMOVAL
AREA #2
SOIL REMOVAL
AREA #1
0'
5'
10'
15'
SOIL REMOVAL SECTION (AREAS 1 AND 2)
A
CD102
EL 4.9'
EL 6.4'
H
V
H
V
E L E
V A
T I O
N
F
T
FINISHED GRADE,
SEE SHEET CG101
H
V
H
V
THIS AREA REMOVED
AS PART OF CHANNEL
EXCAVATION,
SEE SHEET CG103
FINISHED GRADE OF
TIDAL MARSH
LIMITS OF SOIL REMOVAL
SOIL REMOVAL AREA 1
SOIL REMOVAL AREA 2
FILL IN TOPSOIL REMOVAL
AREA
H
V
C
CD102
EL 6.4'
EL 9.25'±
FINISHED GRADE OF
TIDAL BASIN FLOOR
EXCAVATE AND DISPOSE
OF SOIL FROM AREA 1 IN
SOIL DISPOSAL AREA
SOIL REMOVAL ADJACENT
TO RUNWAY (AREA 1)
EXCAVATE SOILS OUTSIDE OF
SOIL REMOVAL AREA 1 LIMITS
LIMIT OF SOIL REMOVAL AREA SHOWN
IN PLAN VIEW ON SHEET CD102
REMOVE AND DISPOSE OF
3" ASPHALT PAVEMENT TO
SOIL DISPOSAL AREA 1
DURING DEMOLITION
REMOVE AND DISPOSE OF
18'' AGGREGATE BASE TO
SOIL DISPOSAL AREA 1
DURING DEMOLITION
H
V
SOIL REMOVAL ADJACENT
TO RUNWAY (AREA 2)
EL 4.9'
EL 9.25'±
EXCAVATE AND DISPOSE OF SOIL FROM
AREA 2 IN SOIL DISPOSAL AREA
D
CD102
REMOVE AND DISPOSE OF
18'' AGGREGATE BASE TO
SOIL DISPOSAL AREA 1
DURING DEMOLITION
LIMIT OF SOIL REMOVAL AREA SHOWN
IN PLAN VIEW ON SHEET CD102
REMOVE AND DISPOSE OF
3" ASPHALT PAVEMENT TO
SOIL DISPOSAL AREA 1
DURING DEMOLITION
1. IN AREAS WHERE SOIL REMOVAL
EXTENDS BELOW FINISHED
GRADE OF THE TIDAL MARSH,
PLACE SUITABLE FILL AND
COMPACT TO RETURN TO
DESIGN GRADE.
2. ELEVATIONS ARE IN NAVD88
VERTICAL DATUM. MEAN SEA
LEVEL IS 3.22 FEET.
EXISTING SEAWALL
CHANNEL
ELEV = 2.22'
REMOVE ROCK TO CREATE A
TRAPAZOIDAL OPENING IN SEAWALL
TO AN ELEVATION OF 2.22 FEET
ROCK REMOVAL FROM SEAWALL
E
CD102
20'
H
V
H
V
TIDAL WATER SURFACE
ELEV = VARIES
LIMITS OF CONSTRUCTION
SEAWALL
(APPROXIMATE LIMITS SHOWN)
ELEV = 6.4'
FINISHED GRADE OF
TIDAL BASIN FLOOR
SEE SHEET CG101
SOIL REMOVAL ADJACENT TO SEAWALL (AREA 1)
B
CD102
CLEAR AND GRUB, STRIP 12" AND DISPOSE OF TOPSOIL
SEE SHEET CG104 FOR DETAIL
H
:1 V
H
V
FILL TO RETURN TO
PRE-EXISTING GRADE
CD103
SOIL REMOVAL PLAN SECTIONS
A B
A N
D O
N E
D R
U N
W A
Y
A B
A N
D O
N E
D T
A X
IW
A
Y
IC
E
P L
A N
T
IC
E
P L
A N
T
IC
E
P L
A N
T
IC
E
P L
A N
T
IC
E
P L
A N
T
IC
E
P L
A N
T
A S
P H
A L
T
IC
C O
N C
R E
T E
O R
C O
N C
R E
T E
A S
P H
A L
T
IC
C O
N C
R E
T E
O R
C O
N C
R E
T E
A S
P H
A L
T
IC
C O
N C
R E
T E
O R
C O
N C
R E
T E
A S
P H
A L
T
IC
C O
N C
R E
T E
O R
C O
N C
R E
T E
IC
E
P L
A N
T
D
IR
T A
N D
R E
M N
A N
T S
O F
A S
P H
A L
T
IC
C O
N C
R E
T E
A N
D C
O N
C R
E T
E
N77°03'42"W 205.60'
N52°55'25"W
349.71'
-5
-5
S A
N F
R A
N C
IS
C
O B
A Y
S A
N F
R A
N C
IS
C
O B
A Y
S A
N F
R A
N C
IS
C
O B
A Y
P O
N D
P O
N D
P O
N D
P O
N D
E R
O S
IO
N
A R
E A
E R
O S
IO
N
A R
E A
IC
E
P L
A N
T
IC
E
P L
A N
TIC
E
P L
A N
T
E R
O S
IO
N
A R
E A
N O
T
P R
E V
IO
U
S L
Y
ID
E
N T
IF
IE
D
E R
O S
IO
N
A R
E A
N O
T
P R
E V
IO
U
S L
Y
ID
E
N T
IF
IE
D
VISIBLE EDGE
OF PAVEMENT
UTILITY BOX (TYP)
UTILITY BOX (TYP)
SIGN
EDGE OF PAVEMENT
2.5"Ø BROKEN OFF RISER (TYP)
2.5"Ø BROKEN OFF RISER (TYP)
UTILITY BOX (TYP)
UTILITY BOX (TYP)
UTILITY VAULT
2" Ø 2' TALL PVC RISER
VISIBLE EDGE OF PAVEMENT
UTILITY VAULT
UTILITY BOX (TYP)
2' TALL ELEC LIGHT PEDESTAL
2.5"Ø RISER W/LIGHT
2.5"Ø BROKEN OFF RISER (TYP)
2.5"Ø BROKEN OFF RISER (TYP)
4" Ø 3' TALL RISER W/LIGHT
UTILITY VAULT
UTILITY VAULT
UTILITY VAULT
4" Ø 3' TALL RISER W/LIGHT
2' TALL ELEC LIGHT PEDESTAL
UTILITY VAULT
3" Ø 0.5' TALL PVC RISER
UTILITY VAULT
UTILITY VAULT
VISIBLE EDGE OF PAVEMENT
UTILITY VAULT
UTILITY VAULT
EDGE OF WATER
EDGE OF WATER
VISIBLE EDGE
OF PAVEMENT
POSSIBLE
GEOTECHNICAL
TRENCH LOCATION
POSSIBLE
GEOTECHNICAL
TRENCH LOCATION
MD&A CONTROL POINT
#1001 MAG NAIL IN
PAVEMENT ELEV: 9.25'
CONC STOOP
AT PIER
MD&A CONTROL POINT
#1003 MAG NAIL IN
PAVEMENT ELEV: 8.53'
GRADE BREAK IN ROCK SEAWALL
FACE OF ROCK SEAWALL
ROCK SEAWALL AT THE WATERLINE
AT THE TIME OF THE SURVEY
APPROX LOCATION OF TOE OF ROCK WALL
TOP OF SLOPE
MD&A CONTROL POINT
#1002 MAG NAIL IN
PAVEMENT ELEV: 8.93'
2" Ø 2' TALL
PVC RISER
WOODEN PIER FOR RUNWAY LIGHTING
APPROX LOCATION OF TOE OF ROCK WALL
GRADE BREAK IN ROCK SEAWALL
FACE OF
ROCK SEAWALL
TOP OF SLOPE
GRADE BREAK
2" Ø 2' TALL
PVC RISER
EDGE OF WATER
8' TALL CYCLONE FENCE
5' Ø STEEL PIPE RISER
CONC HEADWALL
GRADE BREAK
FACE OF ROCK SEAWALL
ROCK SEAWALL AT THE WATERLINE
AT THE TIME OF THE SURVEY
U S
F
IS
H
W
IL
D L
IF
E
O F
F
IC
E
2.5"Ø RISER W/LIGHT
FACE OF
ROCK SEAWALL
GRADE BREAK IN
ROCK SEAWALL
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
JURISDICTIONAL WATERS
OF THE U.S./STATE TO BE
PROTECTED (4.7 ACRES)
LIMITS OF CONSTRUCTION
RIPRAP SPLASH PAD
TIDAL CHANNEL
TIDAL MARSH BASIN FLOOR
@ 6.4 FEET (8.0 ACRES)
TIDAL MARSH CREATION
AREA (11.3 ACRES)
TIDAL MARSH
TRANSITION ZONE
(3.3 ACRES)
JURISDICTIONAL WATERS
OF THE U.S./STATE TO BE
PROTECTED (.4 ACRES)
PERIMETER OF TIDAL
MARSH ENHANCEMENT
AREA WHICH INCLUDES:
ENHANCEMENT AREA,
TRANSITION ZONE
ENHANCEMENT AREA AND
NON-NATIVE PLANT
CONTROL IN
JURISDICTIONAL WATERS
OF THE U.S/STATE
(14.8 ACRES)
TIDAL MARSH
ENHANCEMENT AREA
(10.1 ACRES)
TRANSITION ZONE
ENHANCEMENT AREA
(4.3 ACRES)
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
PROTECT JURISDICTIONAL WATERS OF U.S./STATE
SAN FRANCISCO BAY
M O
N A
R C
H
S
T R
E E
T
T A
X I W
M O
N A
R C
H
S
T R
E E
T
E A
S T
-W E
S T
T A
X
IW
A Y
T
A
X
I
W
A
S T
-W E
S T
T A
X
IW
A Y
R
U
N
W
A
Y
T A
X
IW
A Y
N O
EXISTING TIDAL MARSH
(WATERS OF THE U.S./STATE)
309+29.78
304+00
307+00
309+00
TIDAL MARSH ENHANCEMENT AREA, TYP
TRANSITION ZONE ENHANCEMENT AREA, TYP
EXISTING SEAWALL
PIER (NOT IN USE)
CONCRETE STOOP AT PIER
TIDAL INLET
LIMITS OF CONSTRUCTION
EXISTING SEAWALL
RIPRAP SPLASH PAD
FIRST ORDER CHANNEL, TYP
SECOND ORDER CHANNEL, TYP
EXISTING SEAWALL
TIDAL MARSH CREATION AREA,
SEE NOTE 3
LIMITS OF CONSTRUCTION
PROTECT JURISDICTIONAL
WATERS OF THE U.S./STATE
SEE NOTE 2
THIRD ORDER CHANNEL
SEE SHEET CG103
LIMITS OF CONSTRUCTION
TIDAL MARSH TRANSITION ZONE,
SEE NOTE 3
1. PERFORM NO WORK IN
JURISDICTIONAL WATERS OF
THE U.S./STATE TO BE
PROTECTED.
2. SEE CD101 FOR LIMITS OF
JURISDICTIONAL WATERS OF
THE U.S./STATE TO BE
PROTECTED.
3. SEEDING AND PLANTING IN
THE WETLANDS AND
TRANSITION ZONES ARE NOT
IN CONTRACT.
LIMITS OF CONSTRUCTION
POINT NO.
NORTHING
2111913.21
2111865.17
2111337.47
2111260.95
2111322.63
2111593.57
2111402.87
2111388.10
2111033.29
2111029.76
2110702.92
2110724.91
2110160.88
2110284.38
2110680.23
2110718.56
EASTING
6036077.77
6036666.78
6036987.78
6037425.04
6037586.44
6038037.98
6038153.86
6038309.63
6038657.99
6038708.36
6038685.40
6038444.22
6038393.19
6036977.82
6036739.98
6036803.11
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
CS101
SITE PLAN
THIRD ORDER CHANNEL
FIRST ORDER CHANNEL
SECOND ORDER CHANNEL
238 101
LIMITS OF SLOPED
TRANSITION ZONE
FOR TIDAL MARSH
LIMITS OF CONSTRUCTION
EXISTING SEAWALL
RIPRAP SPLASH PAD
EXISTING TIDAL MARSH
(WATERS OF THE U.S./STATE)
EXISTING CONCRETE
STOOP AT END OF PIER
TIDAL INLET
JURISDICTIONAL WATERS
OF THE U.S./STATE TO BE
PROTECTED
LIMITS OF CONSTRUCTION
LIMITS OF SLOPED
TRANSITION ZONE FOR
TIDAL MARSH
RIPRAP
TIDAL CHANNEL
TIDAL MARSH CREATION
AREA
TIDAL MARSH
ENHANCEMENT AREA
TRANSITION ZONE
ENHANCEMENT AREA
1. PERFORM NO WORK IN
JURISDICTIONAL WATERS OF
THE U.S./STATE TO BE
PROTECTED.
2. ELEVATIONS ARE IN NAVD88
VERTICAL DATUM. MEAN SEA
LEVEL IS 3.22 FEET.
-5
-5
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
CS102
TIDAL MARSH CHANNEL CONTROL PLAN
LIMITS OF SLOPED TRANSITION
ZONE FOR TIDAL MARSH
LIMITS OF TIDAL BASIN FLATS
LIMITS OF CONSTRUCTION
EXISTING SEAWALL
RIPRAP SPLASH PAD
EXISTING TIDAL MARSH
(WATERS OF THE U.S./STATE)
EXISTING CONCRETE
STOOP AT END OF PIER
TIDAL INLET
JURISDICTIONAL WATERS
OF THE U.S./STATE TO BE
PROTECTED
LIMITS OF CONSTRUCTION
LIMITS OF SLOPED
TRANSITION ZONE FOR
TIDAL MARSH
RIPRAP
TIDAL MARSH CREATION
AREA
TIDAL MARSH
ENHANCEMENT AREA
TRANSITION ZONE
ENHANCEMENT AREA
1. PERFORM NO WORK IN
JURISDICTIONAL WATERS OF
THE U.S./STATE TO BE
PROTECTED.
2. ELEVATIONS ARE IN NAVD88
VERTICAL DATUM. MEAN SEA
LEVEL IS 3.22 FEET.
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
CS103
TIDAL MARSH LIMITS CONTROL PLAN
1. ELEVATIONS ARE IN NAVD88
VERTICAL DATUM. MEAN SEA
LEVEL IS 3.22 FEET.
3RD ORDER CHANNEL
POINT NO.
NORTHING
2110266.90
2110305.54
2110322.82
2110354.19
2110380.81
2110403.48
2110416.87
2110426.85
2110461.79
2110515.19
2110554.62
2110595.10
2110628.58
2110653.76
2110680.05
2110711.40
2110743.12
2110780.34
2110820.68
2110863.82
2110903.96
2110909.42
2110915.02
2110958.27
2110993.41
EASTING
6037286.47
6037289.69
6037283.81
6037268.55
6037246.00
6037221.34
6037203.79
6037184.10
6037140.36
6037123.54
6037123.64
6037132.70
6037157.19
6037169.19
6037159.87
6037131.98
6037104.51
6037087.82
6037093.90
6037117.11
6037145.21
6037149.37
6037153.34
6037161.35
6037134.89
ELEVATION
2.22
2.22
2.27
2.37
2.46
2.55
2.62
2.68
2.83
2.99
3.10
3.21
3.33
3.41
3.48
3.60
3.72
3.83
3.94
4.08
4.21
4.23
4.25
4.38
4.50
DESCRIPTION
BEGIN CHANNEL INLET
END CHANNEL INLET
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF TANGENCY
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
2ND ORDER CHANNELS
POINT NO.
NORTHING
2110428.54
2110455.40
2110462.85
2110462.27
2110453.85
2110449.31
2110463.32
2110478.41
2110487.98
2110481.02
2110476.44
2110471.52
2110464.05
2110458.68
2110455.63
2110462.02
2110645.11
2110666.41
2110655.35
2110646.63
2110641.06
2110760.65
2110738.02
2110709.29
2110858.46
2110863.63
2110848.02
2110836.85
2110826.28
2110838.04
2110994.35
2110992.85
2110983.68
2110972.54
2110969.64
2110975.38
2111014.65
2111032.15
2111055.75
EASTING
6037180.12
6037202.85
6037222.77
6037244.24
6037263.61
6037289.25
6037310.12
6037131.23
6037114.54
6037096.61
6037092.71
6037089.27
6037082.95
6037074.77
6037057.07
6037040.27
6037167.69
6037193.97
6037225.94
6037236.26
6037248.57
6037093.44
6037056.08
6037023.19
6037113.86
6037147.12
6037176.94
6037185.61
6037211.16
6037236.19
6037124.46
6037114.11
6037087.27
6037060.61
6037042.39
6037024.86
6037130.28
6037143.18
6037185.26
ELEVATION
2.69
3.00
3.26
3.52
3.78
4.11
4.42
2.89
2.98
3.38
3.50
3.62
3.82
4.02
4.38
4.75
3.38
3.70
4.29
4.52
4.72
3.77
4.20
4.73
4.06
4.19
4.37
4.45
4.60
4.75
4.52
4.55
4.61
4.67
4.71
4.75
4.56
4.62
4.75
DESCRIPTION
BEGIN CHANNEL
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
BEGIN CHANNEL
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
BEGIN CHANNEL
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
BEGIN/END CHANNEL
BEGIN/END CHANNEL
MIDPOINT OF CURVATURE
BEGIN/END CHANNEL
BEGIN/END CHANNEL
MIDPOINT OF CURVATURE
POINT OF TANGENCY
POINT OF CURVATURE
MIDPOINT OF CURVATURE
BEGIN/END CHANNEL
MIDPOINT OF CURVATURE
POINT OF CURVATURE
POINT OF INTERSECTION
POINT OF CURVATURE
MIDPOINT OF CURVATURE
BEGIN/END CHANNEL
MIDPOINT OF CURVATURE
POINT OF TANGENCY
BEGIN/END CHANNEL
1ST ORDER CHANNELS
POINT NO.
NORTHING
2110693.02
2110674.38
2110657.93
2110647.61
2110635.42
2110614.14
2110608.31
2110697.82
2110705.04
2110718.72
2110723.34
2110719.48
2110624.67
2110610.18
2110594.32
2110576.30
2110641.64
2110659.44
2110821.25
2110807.21
2110792.36
2110774.44
2110861.61
2110891.53
2110962.24
2110948.27
2110914.56
2110890.80
2110989.07
2111006.92
2111032.61
2111052.46
2111064.60
2111080.67
2111061.36
2111049.44
2111029.11
2111023.06
2111027.46
2111084.60
2111117.92
EASTING
6037032.44
6037035.51
6037026.22
6037016.82
6037010.02
6036991.47
6036963.85
6037000.07
6036975.30
6036957.52
6036942.67
6036927.60
6037246.83
6037254.69
6037263.40
6037261.78
6037278.46
6037302.49
6037235.26
6037244.50
6037254.53
6037254.25
6037254.65
6037256.11
6037019.31
6037022.15
6037024.50
6037000.49
6037013.39
6037014.19
6037030.43
6037053.44
6037064.46
6037067.66
6037209.33
6037230.97
6037247.82
6037259.79
6037272.47
6037204.25
6037195.11
ELEVATION
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
DESCRIPTION
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
MIDPOINT OF CURVATURE
POINT OF TANGENCY
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
MIDPOINT OF CURVATURE
END CHANNEL
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
MIDPOINT OF CURVATURE
END CHANNEL
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
MIDPOINT OF CURVATURE
POINT OF TANGENCY
POINT OF CURVATURE
MIDPOINT OF CURVATURE
END CHANNEL
MIDPOINT OF CURVATURE
END CHANNEL
LIMITS OF TIDAL MARSH
POINT NO.
NORTHING
2110318.50
2110336.61
2110376.51
2110456.67
2110534.81
2110562.94
2110601.21
2110673.94
2110756.91
2110834.52
2110894.30
2110999.18
2111007.22
2110988.52
2111202.51
2111201.04
2110991.85
2111148.50
2111021.52
2110954.31
2110915.52
2110784.90
2110781.58
2110676.18
2110623.94
2110488.64
2110352.58
2110337.82
2110330.85
2110382.50
2110380.63
2110328.99
2110325.42
2110325.14
EASTING
6037414.68
6037299.24
6037409.07
6037378.39
6037348.29
6037421.35
6037353.05
6037223.25
6037346.75
6037462.29
6037336.60
6037030.61
6037353.97
6037135.27
6037086.40
6037081.82
6037137.61
6036988.17
6037129.27
6036951.74
6036777.94
6036898.97
6036895.60
6037009.94
6036863.48
6036947.52
6037042.81
6037231.72
6037283.25
6037289.32
6037305.17
6037299.10
6037350.98
6037350.96
ELEVATION
6.40
5.38
6.40
6.40
6.40
9.50
6.40
5.86
6.40
9.49
6.40
5.94
6.40
4.88
6.40
6.40
4.49
6.40
4.79
6.40
10.00
6.40
6.40
6.03
6.40
6.40
6.40
6.40
2.29
6.40
6.40
4.43
6.40
6.40
DESCRIPTION
BEGIN RADIUS
CENTER RADIUS
END RADIUS
EDGE OF MARSH PLAIN
BEGIN RADIUS
CENTER RADIUS
END RADIUS
CENTER RADIUS
END RADIUS
CENTER RADIUS
END RADIUS
CENTER RADIUS
END RADIUS
CENTER RADIUS
END RADIUS
BEGIN RADIUS
CENTER RADIUS
END RADIUS
CENTER RADIUS
END RADIUS
CENTER RADIUS
END RADIUS
BEGIN RADIUS
CENTER RADIUS
END RADIUS
EDGE OF MARSH PLAIN
EDGE OF MARSH PLAIN
EDGE OF MARSH PLAIN
CENTER OF RADIUS
END RADIUS
BEGIN RADIUS
CENTER RADIUS
END RADIUS
EDGE OF MARSH PLAIN
TRAINING DIKES
POINT NO.
NORTHING
2110280.16
2110300.14
2110318.83
2110320.95
2110325.37
2110323.08
2110301.38
2110278.99
2110336.04
2110336.46
2110341.44
2110336.87
2110270.23
2110269.95
EASTING
6037244.08
6037245.75
6037238.76
6037243.29
6037240.94
6037247.81
6037255.89
6037254.02
6037335.72
6037330.74
6037331.15
6037325.75
6037320.20
6037330.21
ELEVATION
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
DESCRIPTION
TOP EDGE DIKE
TOP EDGE DIKE
BEGIN/END CURVATURE
CENTER CURVE RADIUS
BEGIN/END CURVATURE
BEGIN/END CURVATURE
TOP EDGE DIKE
TOP EDGE DIKE
BEGIN/END CURVATURE
CENTER CURVE RADIUS
BEGIN/END CURVATURE
BEGIN/END CURVATURE
TOP EDGE DIKE
TOP EDGE DIKE
RIPRAP SPLASHPAD
POINT NO.
NORTHING
2110656.24
2110267.04
EASTING
6036796.11
6037571.24
ELEVATION
6.40
7.15
SLOPE TRANSITION LIMITS
POINT NO.
NORTHING
2111114.39
2111208.00
2111043.37
2110907.16
2110794.51
EASTING
6036963.71
6037137.69
6037347.81
6037340.71
6037384.84
ESA FENCE
POINT NO.
NORTHING
2111665.47
2111329.78
2111252.19
2111315.02
2111372.15
2111586.17
2111397.77
2111409.24
2111293.41
2111203.78
2111176.68
2111155.44
2111077.82
2111017.86
2110937.34
2110920.35
2110879.65
2110834.21
2110767.20
2110694.37
2110592.62
2110567.77
2110507.29
2110488.57
2110470.57
2110443.20
2110428.91
2110572.95
2110367.17
2110351.03
2110290.87
2110253.10
2111188.92
2111143.30
2111046.62
2110857.11
2110842.73
2110829.44
2110843.71
2111000.02
2111151.78
2111175.61
EASTING
6036778.30
6036982.40
6037425.79
6037590.29
6037690.97
6038042.16
6038339.55
6038074.71
6037858.61
6037748.84
6037728.14
6037727.57
6037674.34
6037647.14
6037568.88
6037536.86
6037499.82
6037480.82
6037490.59
6037511.55
6037510.17
6037505.09
6037533.25
6037564.07
6037576.83
6037577.26
6037560.72
6037457.01
6037537.81
6037533.32
6037562.30
6037563.00
6037684.06
6037621.58
6037537.02
6037386.91
6037395.37
6037410.75
6037452.57
6037573.25
6037708.37
6037709.01
-5
-5
Drawing number
MR KC
612-115
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
F
E
D
C
B
A
Office of Construction and Facilities ManagementAlameda Point, California
LEGEND
GENERAL NOTES
PLAN
NORTH
KEY PLAN
VA ALAMEDA WETLAND MITIGATION PROJECT
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
CONSULTANTS: ARCHITECTS/ENGINEERS:
7 8 9
Civil Engineering
HDR Engineering, Inc.
2365 Iron Point Road, Suite 300 Folsom, CA 95630
Wetland Biologist
H.T. Harvey & Associates 983 University Avenue Building D Los Gatos, CA 95032
Surveyor
Michael Dequine & Associates, Inc.
2295 Gateway Oaks Drive, Suite 140 Sacramento, CA 95833
U.S. Department of Veterans Affairs
NO REVISIONS DATE
OCTOBER 01, 2021
William Ulibarri, Director of Project Delivery
N/A
ISSUED FOR CONSTRUCTION 10/01/2021
C 63110
Exp.
R E
G
I
S
T
E
R
O
F
ESS
I O
N
G
I
N
E
E R
D
A
N
I
A
B
B
O
U
R
C
I V I L
S
T
A
C A
L
I
F
O
R
N
I
A
6/30/22
CS104
PROJECT CONTROL TABLES
1. PERFORM NO WORK…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .