Natomas Reach D Pumping Plant 4 Federal contract opportunity
Solicitation number
W9123821B0002
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document package includes construction drawings and a related federal contract opportunity notice. The drawings show plans for modifications to Natomas Reach D Pumping Plant 4, including relocating discharge pipes 10 feet higher, adding a new vault and outfall structure, removing existing buildings and installing a new trash rack. Additional work includes raising the pump station pad, installing new pumps but not a new building, and reconfiguring access roads. The 6-foot chain link fenced site will include gates as shown.

The related solicitation is for the Natomas Reach D Pumping Plant 4 project. Work includes relocating discharge pipes higher, adding a new vault and outfall, removing existing buildings and installing a new trash rack. The pump station pad will be raised and have new pumps installed. A driveway to the new trash rack and power from adjacent lines is also required. Six-foot fencing will enclose the area with gates. Access roads will be reconfigured. The Department of the Army Corps of Engineers Engineering District Sacramento is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Natomas Reach D Pumping Plant 4, newest first.
File Type Posted
Bid Abstract - Pumping Plant 4.final.xlsx XLSX spreadsheet
Bid Abstract - Pumping Plant 4.xlsx XLSX spreadsheet
Bid Abstract - Pumping Plant 4.xlsx XLSX spreadsheet
Amendment 2- Drawings -122- Pipeline Replacement.pdf PDF
Amendment 2 - Drawings - 131 - Site Plan.pdf PDF
Amendment 2 - Revised Specs.pdf PDF
Amendment 0002 - Revised Plans and Specifications.pdf PDF
Amendment 0001 - Extend Bid Due Date and Changed Bid Opening Time.pdf PDF
Site Visit Sign-in Sheet 12.30.20.pdf PDF
Attachment 1 - Specifications.pdf PDF
Site Visit Staging Area Map.pdf PDF
W9123821B0002 Solicitation.pdf PDF
Attachment 3 - Bid Schedule.pdf PDF
Attachment 5 - Pre-Award Survey.pdf PDF
Attachment 4 - Wage Determination.pdf PDF
Attachment 2 - Drawings.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUMP NO. 3

PUMP NO. 2

PUMP NO. 1

42" WELDED

48" WELDED

42"x48" ECCENTRIC REDUCER

EXIST. LEVEE CL

FL =45.3 W.S.P. (EACH PIPE) FL =45.3 W.S.P. (EACH PIPE)

INSTALL 48" AMERICAN FLOW CONTROL SERIES 2500

RESILENT WEDGE GATE VALVE WITH FLANGED ENDS AND

BEVEL GEARING ACTUATOR, OR APPROVED EQUAL (EA. PIPE)

REAR WALL

48" WELDED

STEEL PIPE

DISCHARGE PIPE NO. 2 DETAIL

NOTE:

ALL WELDED STEEL DISCHARGE PIPE JOINTS

SHALL BE FULL PENETRATION BUTT WELDS AS

PER CVFPM STANDARDS AND AWWA C206.

STEEL PIPE

STEEL PIPE

SALVAGED 8" SIPHON

BREAKER VALVE

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C T

N

O

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P S

F

E

N G

I N

E E

R S

S P

E

F I L

F I L

A M

E

M-502

P I P

E

N

O

D

U M

P

D

E T

A I L

S

W

D

U P

L A

N T

I E

R

D

S

M I T

H

R

M

A L T

Z A

H N

W

D

U P

L A

N T

I

R

S A

M d w g

FINAL DRAWINGS

A M

E R

I C

I V

M

M O

N

F

E A

T U

R E

S

N A

T O

M A

S

B

A S

A

H

U

M P

I N

G

P

L A

M O

D I F

I C

A T

I O

N S

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

A N

S I

D

B E

A M

S

H

A V

E

B

E E

N

R

E V

I S

B

E

F

L U

S H

W

T

H

O

U T

S I D

E

W

A L L S

J A

N

AutoCAD SHX Text

PUMP PLAN DETAIL

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

PIPES

AutoCAD SHX Text

EL. 26.00

AutoCAD SHX Text

EL. 22.25

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

NORMAL OPERATING EL. 15.0

AutoCAD SHX Text

LOW PUMP OFF EL. 9.0

AutoCAD SHX Text

PUMP ON EL.16.5

AutoCAD SHX Text

PUMP OFF EL. 13.0

AutoCAD SHX Text

EL. 3.75

AutoCAD SHX Text

EL. -2.50

AutoCAD SHX Text

C EL.

AutoCAD SHX Text L

AutoCAD SHX Text 18.75

Sheets and Views
M-502 PIPE NO. 2 AND PUMP DETAILS

File details come from the government source that posted it. Updated .