Attachment 3 - Bid Schedule.pdf

PDF 325 KB Posted

Attached to
Natomas Reach D Pumping Plant 4 Federal contract opportunity
Solicitation number
W9123821B0002
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document contains a bid schedule and details for a federal contract opportunity with the Department of the Army Corps of Engineers Engineering District Sacramento. The bid schedule specifies line items for various construction tasks required to relocate and modify Pumping Plant 4 in the Natomas Basin Reach D, including removing the existing building and trash rack, raising the pump station pad, installing new pumps and a trash rack, reconfiguring intake and outfall structures, and installing fencing and gates. Estimated quantities and units of measure are provided for each line item. The related federal contract opportunity notice seeks bids to perform the work, which includes relocating discharge pipes 10 feet higher, adding a new vault and outfall structure, driveway, and power from adjacent lines. The solicitation number is W9123821B0002 and is titled the Natomas Reach D Pumping Plant 4 project.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

American River Common Features Natomas Basin Reach D Pumping Plant 4 Modification

DESIGN DOCUMENTATION REPORT BID SCHEDULE

SPECIFICATION NO. 2337

Item No. Description Quantity Unit of

Measure Unit

Price Total

Price

Base Contract

0001 Mobilization/Demobilization 1 JOB

0002 Traffic Controls 1 JOB

SWPPP

1 JOB

Cultural Monitoring

1 JOB

0005 Dewatering 1 JOB

Clearing and Grubbing

1 JOB

Stripping

1,250* CY

Excavation

4,750* CY

0009 Fill 8,560* CY

Aggregate Surface Course

870* CY

Demolition of Pumping Plant 4

1 JOB

Pumping Plant 4 Structure

1 JOB

Pumping Plant 4 3’ High Concrete

Retaining Wall

10* CY

Remove and Dispose Existing

Pumping Plant 4 Pumps and Outfall

3 EA

Remove and Dispose Three 48-inch

Discharge Pipes and Outfall

885* LF

North Main Drain Concrete Liner

28* CY

48-Inch Pipe

825* LF

42-Inch Pipe

30* LF

Transformer Pad

1 JOB

Outfall Structure

1 JOB

Valve Vault

1 JOB

3’x3’ Drop Inlet

1 EA

24” Pipe

105* LF

Caltrans Stone Protection “Light

Class”

205* CY

Stone Protection

20* CY

Soil-Filled Stone Protection

85* CY

Turbidity Curtain

155* LF

Caltrans Stone Protection No. 1

293* CY

Caltrans Stone Protection No. 8

Fabric

1,118* SF

Remove and Dispose Existing

Trashrake and Trashrack

1 JOB

Trashrake and Trashrack

1 JOB

Electrical Building

1 JOB

Cathodic Protection

1 JOB

RD1000 Electrical

1 JOB

Chain Link Fence

465* LF

Swing Gate

2 EA

4’ Personnel Gate

1 EA

Silt Fencing

1 JOB

Erosion Control Seeding

1 JOB

PZ35 Steel Sheet Piling

678* SF

BASE TOTAL PRICE

* Indicates quantity is estimated and subject to the FAR clause 52.211-18, Variation in Estimated