Amendment 0002 - Revised Plans and Specifications.pdf

PDF 359 KB Posted

Attached to
Natomas Reach D Pumping Plant 4 Federal contract opportunity
Solicitation number
W9123821B0002
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This amendment modifies a solicitation to provide revised plans and specifications for relocating and raising the discharge pipes of Pumping Plant 4 at the Natomas Reach D site to be above the 200-year flood elevation, adding a new vault and outfall structure, removing the existing pumping plant building and trash rack, reconfiguring the pump station intake and installing a new trash rack, raising the pump station pad and installing new pumps, constructing a driveway to the new trash rack adjacent to the electrical building with power from adjacent PG&E lines, enclosing the pumping plant area with six-foot chain link fencing and gates, and reconfiguring access ramps and landside toe roads to accommodate the new layout. The U.S. Army Corps of Engineers Engineering District Sacramento issued the modification to provide revised technical specifications for the pumping plant upgrades at the Natomas Reach D site in Sacramento, California under solicitation number W9123821B0002.

View the file

Other files for this federal contract opportunity

Other files attached to Natomas Reach D Pumping Plant 4, newest first.
File Type Posted
Bid Abstract - Pumping Plant 4.final.xlsx XLSX spreadsheet
Bid Abstract - Pumping Plant 4.xlsx XLSX spreadsheet
Bid Abstract - Pumping Plant 4.xlsx XLSX spreadsheet
Amendment 2 - Drawings - 131 - Site Plan.pdf PDF
Amendment 2 - Revised Specs.pdf PDF
Amendment 2 - Drawings - 502 - Pipe 2 Pump details.pdf PDF
Amendment 2- Drawings -122- Pipeline Replacement.pdf PDF
Amendment 0001 - Extend Bid Due Date and Changed Bid Opening Time.pdf PDF
Site Visit Sign-in Sheet 12.30.20.pdf PDF
W9123821B0002 Solicitation.pdf PDF
Attachment 3 - Bid Schedule.pdf PDF
Attachment 5 - Pre-Award Survey.pdf PDF
Attachment 4 - Wage Determination.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 1 - Specifications.pdf PDF
Site Visit Staging Area Map.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to post revised plans and specif ications No other changes are made or implied

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jan-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123821B0002

X 9B. DATED (SEE ITEM 11)

15-Dec-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jan-2021

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123821B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

File details come from the government source that posted it. Updated .