This amendment modifies a solicitation for an optimized remediation contract at Beale Air Force Base in California. The Department of the Army Corps of Engineers, Engineering District Sacramento is seeking environmental remediation services at fifteen Installation Restoration Program sites and eight Military Munitions Response Program sites over a ten-year period. The amendment provides additional general information regarding transition of work from the incumbent contractor, revises key personnel requirements to include project and QC geophysicists, and specifies deliverables from the incumbent related to the 2020 annual groundwater monitoring report. Offerors must acknowledge receipt of the amendment by the specified date. The resulting contract is expected to be firm-fixed price awarded to one prime contractor responsible for management and quality of all services to achieve site-specific objectives within defined performance periods.

View the file

Other files for this federal contract opportunity

Other files attached to Beale AFB Optimized Remediation Contract (ORC), newest first.
File Type Posted
SF30_Amendment 0003.pdf PDF
A01.12 SF33 Attachment C-1 BAFB_PWS_Enclosure 2A AR GFI Apr 2020.xlsx XLSX spreadsheet
SF30_Amendment 0001.pdf PDF
Beale_AFB_Enclosure_2B_GFI_List_20200406.xlsx XLSX spreadsheet
TU002_GW_March_2020.pdf PDF
SF33 Attachment J-1 DBA Wage Determination Yuba County CA.pdf PDF
TU002_GW_January_2020.pdf PDF
SF33 Attachment C-1 BAFB_PWS Enclosure 1 Acronyms and Definitions.pdf PDF
SF33 Attachment C-1 BAFB_PWS Enclosure 4 OPSEC Addendum 20190607.pdf PDF
SF33 Attachment C-1 BAFB_PWS_Enclosure 3 GFP 20190827.xlsx XLSX spreadsheet
SF33 Attachment B-1 Beale AFB_FY20_Sub-CLIN Structure_20200110.xlsx XLSX spreadsheet
SF33 Attachment J-2 SCA Wage Determination Yuba County CA.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 5. Ensuring Chemistry Data Fact Sheet April 2013.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 7. BAFB_PWS Attachment QASP Template v1 20191019.DOCX DOCX document
SF33 Attachment J-1 DBA Wage Determination Yuba County CA.pdf PDF
SF33 Attachment C-1 BAFB_PWS_Enclosure 2A AR Feb 2020.xlsx XLSX spreadsheet
SF33 Attachment L-2 Past Performance Quality Questionaire.docx DOCX document
SF33 Attachment C-1 BAFB_PWS Attachment 4. AFGM2019-32-01, AFFF Related Waste Mgmt Implementation Guidance.pdf PDF
SF33 Attachment L-1 Labor Category Qualifications 1 Dec 2019.pdf PDF
SF33 Attachment L-3 ORC PMP Guidance v1.0_20191115.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 6. Interim Guidance on 1-4 Dioxane, Environmental Restoration Program.pdf PDF
SF33 W9123820R0002 Beale AFB ORC.pdf PDF
SF33 Attachment C-1 BAFB_FY20_PWS_20200305.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 3. Optimization Benefit Template_190710.docx DOCX document
SF33 Attachment C-1 Beale_AFB_Enclosure_2B_GFI_List_20200227.xlsx XLSX spreadsheet
SF33 Attachment C-1 BAFB_PWS Attachment 1. ORC PMP Guidance v1.0_20191115.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 2. CPSMR template- 25Aug2019.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0002 is to:

a. Provide additional General Information in regards to the PWS.

b. Revise Section L, Paragraph 4.6 Factor 3: Management Approach, Key Personnel Qualif ications, to add "Project Geophysicist" and "QC Geophysicist".

NOTE: Offerors must acknow ledge receipt of this amendment of date specif ied in the bid (or as amended) by one of the follow ing methods:

In the space provided on the SF 33, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE BY DATE SPECIFIED

MAY RESULT IN REJECTION OF YOUR PROPOSAL.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123820R0002

X 9B. DATED (SEE ITEM 11)

12-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Apr-2020

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123820R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

Amendment 0002 - Beale AFB Optimized Remediation Contract (ORC)

General Information:

PWS –Paragraph 8.1.2 Transition of Work, Table 2, Transition of Work Table – Revised by

Amendment 0001 - It was noted that the current contractor will now perform the Aug-Sep 2020

BGMP sampling event. It is also noted that the ORC contractor will finalize the 2020 Annual

BGMP Report.

To ensure that all contractors (including the incumbent contractor) are proposing the same scope and schedule the following additional information is provided:

THE CURRENT CONTRACTOR WILL PROVIDE A TECHNICAL MEMO AS A DATA

DELIVERY FOR THE SAMPLES COLLECTED DURING THE AUG-SEP SAMPLING

EVENT.

THE ORC CONTRACTOR WILL FINALIZE THE CY2020 ANNUAL BGMP REPORT.

THE CURRENT CONTRACTOR WILL PROVIDE A 2019 ANNUAL BGMP REPORT.

SECTION L ADDENDUM - Instructions, Conditions, and Notices to Offerors or

Respondents Addendum

4.6 Factor 3: Management Approach

Offeror shall submit a detailed management plan describing how the Offeror will manage performance of the contract in order to achieve the Performance Objectives within the

Performance Periods and ensure quality services and deliverables. The detailed management plan shall include the following information:

• A description of a qualified field and management team, including key personnel, subcontractors, and other relevant team members such as joint ventures, consultants, mentor/protégé, etc., with identification of roles, responsibilities, and communication strategies demonstrating efficient and effective management of the contract performance.

• An organizational chart.

• Key personnel meeting the requirements identified in Attachment L-1. The following key personnel must be fulfilled by the Prime Contractor: Program Manager, Senior Project

Manager, Contracts Manager, Program QA/QC, and Program Health and Safety Manager. The remaining key personnel may be fulfilled by a teaming partner or a specialized consultant/Subcontractor; however, they shall not be a second- or third-tier Subcontractor:

Program Chemist and Public Affairs Officer.

• A description of how the Offeror successfully implemented the proposed remediation technologies on similar projects/sites submitted for Factors 2 and 4 of this solicitation.

• A description of the Offeror’s procedures/processes to ensure high-quality services and deliverables. At a minimum, the Offeror shall include procedures/processes that address the following:

o change management o prime and subcontractor staffing management o sampling and analysis o health and safety

• A description of how communication between stakeholders (Air Force, USACE, Offeror, Regulators, and Community) will be maintained.

• Identification of risks to management approach success, and how Offeror will monitor and eliminate or mitigate risks.

Key Personnel Qualifications: The Offeror shall submit resumes and evidence of relevant professional certifications not including evidence of relevant professional registration(s) for the following key personnel:

• Program Manager

• Senior Project Manager

• Contracts Manager

• Program QA/QC

• Program Health and Safety Manager

• Program Chemist

• Public Affairs Officer

• Project Geophysicist

• QC Geophysicist

(End of Summary of Changes)