SF33 Attachment C-1 BAFB_PWS Attachment 3. Optimization Benefit Template_190710.docx

DOCX document 37 KB Posted

Attached to
Beale AFB Optimized Remediation Contract (ORC) Federal contract opportunity
Solicitation number
W9123820R0002
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document contains a performance work statement and details regarding an optimized remediation contract opportunity for Beale Air Force Base in California. The ten-year firm-fixed price contract will require the contractor to conduct environmental remediation and maintenance activities at fifteen Installation Restoration Program sites and eight Military Munitions Response Program sites to achieve specified performance objectives. Services will include optimized remediation through enhancement of existing remedies, implementation of optimization strategies to accelerate progress, and achievement of site-specific goals. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Sacramento, and interested offerors should contact the named contracting officer or contract specialist for additional guidance or the large file distribution containing further relevant details.

View the file

Other files for this federal contract opportunity

Other files attached to Beale AFB Optimized Remediation Contract (ORC), newest first.
File Type Posted
SF30_Amendment 0003.pdf PDF
SF30_Amendment 0002.pdf PDF
TU002_GW_January_2020.pdf PDF
Beale_AFB_Enclosure_2B_GFI_List_20200406.xlsx XLSX spreadsheet
TU002_GW_March_2020.pdf PDF
SF33 Attachment J-1 DBA Wage Determination Yuba County CA.pdf PDF
A01.12 SF33 Attachment C-1 BAFB_PWS_Enclosure 2A AR GFI Apr 2020.xlsx XLSX spreadsheet
SF30_Amendment 0001.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 5. Ensuring Chemistry Data Fact Sheet April 2013.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 7. BAFB_PWS Attachment QASP Template v1 20191019.DOCX DOCX document
SF33 Attachment J-1 DBA Wage Determination Yuba County CA.pdf PDF
SF33 Attachment C-1 BAFB_PWS_Enclosure 2A AR Feb 2020.xlsx XLSX spreadsheet
SF33 Attachment L-2 Past Performance Quality Questionaire.docx DOCX document
SF33 Attachment C-1 Beale_AFB_Enclosure_2B_GFI_List_20200227.xlsx XLSX spreadsheet
SF33 Attachment C-1 BAFB_PWS Attachment 1. ORC PMP Guidance v1.0_20191115.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 2. CPSMR template- 25Aug2019.docx DOCX document
SF33 Attachment C-1 BAFB_PWS Attachment 4. AFGM2019-32-01, AFFF Related Waste Mgmt Implementation Guidance.pdf PDF
SF33 Attachment L-1 Labor Category Qualifications 1 Dec 2019.pdf PDF
SF33 Attachment L-3 ORC PMP Guidance v1.0_20191115.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 6. Interim Guidance on 1-4 Dioxane, Environmental Restoration Program.pdf PDF
SF33 W9123820R0002 Beale AFB ORC.pdf PDF
SF33 Attachment C-1 BAFB_FY20_PWS_20200305.pdf PDF
SF33 Attachment C-1 BAFB_PWS Enclosure 1 Acronyms and Definitions.pdf PDF
SF33 Attachment C-1 BAFB_PWS Enclosure 4 OPSEC Addendum 20190607.pdf PDF
SF33 Attachment C-1 BAFB_PWS_Enclosure 3 GFP 20190827.xlsx XLSX spreadsheet
SF33 Attachment B-1 Beale AFB_FY20_Sub-CLIN Structure_20200110.xlsx XLSX spreadsheet
SF33 Attachment J-2 SCA Wage Determination Yuba County CA.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPTIMIZATION EXAMPLES

AFIID_SITEID_CPSMR##_OB##-MMMYYYY

(e.g., MOODY_OT012_CPSMR12_OB01-DEC2020) Installation Name: (e.g., Moody AFB) Site ID: (e.g., OT012) Reporting Period: (e.g., 1 May 2020 – 30 April 2021)

Site Performance Objective at the Time of Contract Award:

Reduce LCC & RA-O
☐Reduce LCC & LTM
☐OES
☐Alternate Objective
☐Other Site Categories
☐

Optimization activities are defined as any remedial activities and performance monitoring above and beyond what is required to maintain compliance in accordance with an approved decision document. Comment by Sam Yoon: Peaches will find O&M language from PWS.

Optimization Activities Implemented:

1. Describe specific details of optimization activities (see Key Optimization Elements)

Optimization Outcome(s):

1. Results in: a) reduction in contaminant mass, b) reduction in contaminant concentrations,

c) reduction in LCC, or d) any combination of any activities prompting acceleration to RC.

2. Provide supporting information for optimization activities using tables, plots or figures, and/or photos.

3. Identify the need for changes to decision document (e.g., Explanation of Significant Differences [ESD], ROD Amendment [RODA]) to improve the remedy efficiency and/or shorten remedy duration to achieve endpoint.

Issues/Obstacles Encountered:

1. Describe issues that could impact schedule.

Planned Optimization Activities for Next Reporting Period (including Potential Issues):

1. Describe planned optimization activities (see Key Optimization Elements)

2. Identify activities that would shorten restoration life cycle.

Key Optimization Elements:

· Site Understanding – Updating conceptual site model (CSM) to better understand site conditions

· Design Optimization Review – Reviewing design of selected remedies to effectively target contaminant source(s) and contaminant plume based on site conditions

· Remedy Process Optimization – Enhancing remedy effectiveness or efficiency to accelerate remediation timeline; i.e., Operations & Maintenance

· Monitoring Optimization – Optimizing number and location of monitoring wells and/or minimizing sampling frequency

OPTIMIZATION EXAMPLES

Site Understanding:

· Identify data gaps

· Use real-time measurements

· Sequence activities focusing on source control first

· Conduct strategic sampling

Design Optimization Review

· Conduct design optimization reviews to evaluate remedy selected and ensure streamlined remedial action operations

· Address challenges associated with source uncertainties and/or plume uncertainties by the selected remedy as designed

· Add new nested wells with shortened well screens

Remedial Process Optimization

Operations
In Situ Treatments (e.g., Enhanced Reductive Dechlorination [ERD], Monitored Natural Attenuation [MNA], Permeable Reactive Barrier [PRB], In Situ Chemical Oxidation [ISCO])

· Contaminant footprint reductions

· Recirculation of treated extracted groundwater through in situ bioreactors with treated water

· Application of phytoremediation where appropriate (regulatory agency approval is required for new remedial alternative(s))

Ex Situ Treatments (e.g., Pump and Treat [P&T], Air Sparging [AS], Soil Vapor Extraction [SVE])

· >90% uptime with 99.99% off-gas treatment before discharge to the atmosphere

· Change from energy-intensive thermal/catalytic converter to carbon adsorption to treat off-gas

· Transition of low mass recovery for an existing P&T system to passive management systems (regulatory agency approval is required for new remedial alternative[s])

Ex Situ Treatment (e.g., Light Non-Aqueous Phase Liquid [LNAPL] Recovery)

· Evaluation for point-of-termination for product recovery when reaching to asymptotic recovery

· Use of LNAPL transmissivity data to evaluate LNAPL recoverability

· Evaluation of Natural Source Zone depletion (NSZD) rates

Maintenance
In Situ Treatments (e.g., ERD, MNA, PRB, ISCO)

· Few optimization opportunities

Ex Situ Treatments (e.g., P&T, AS, SVE)

· Appropriate process monitoring (e.g., pressure, flowrates, O2/CO2, energy consumptions) to minimize downtimes and prevent system failure

· Maintain uninterrupted system operation

· Maintain and replace aging infrastructure to improve remedy efficiency, avoiding well fouling, pump and filter replacements as appropriate

· Modification of extraction operations from steady rates to pulsed operation or variable frequency/adjustable speed driver use Ex Situ Treatment (e.g., LNAPL Recovery)

· Maintain aging infrastructure to improve remedy efficiency, avoiding well fouling, pump and filter replacements as appropriate

· Review process monitoring (operation) performance and identify the source that is less efficient

· Make necessary changes, as appropriate and required, to overcome site-specific conditions that affected performance

Monitoring Optimization

Performance Monitoring
· Use decision logic and decision support tools to manage and track remedy progress (e.g., Monitoring and Remediation Optimization System [MAROS])

· Progress may be on track, but evaluate chlorinated compound degradation pathways or Edible Vegetable Oil partitioning by Compound-specific Isotope Analysis

· Progress may be on track, but evaluate a potential contaminant rebound after injectant is depleted

· Review performance monitoring data to evaluate the effectiveness and appropriateness of key performance metrics/standards

· Change from active remediation to natural attenuation

Compliance
· Document decision to comply with alternative performance expectations and goals, if all remedial alternatives fail to achieve performance expectations and if remedial technologies are more harmful than the site conditions

· Revisit Applicable or Relevant and Appropriate Requirements (ARARs), Remedial Action Objectives (RAOs), and the selected remedy in the context of updated information and performance monitoring data

Data Management
· Improved data management including improving data management planning, data acquisition, data processing, data analysis (using 3-D visualization analysis), data preservation and storage, and data publication and sharing.

References AFCEC. 2014. Optimizing Remedies with Performance-Based Contracts. Presented by. Dr. Kent Glover. AFCEC/CZTE. Presented at FRTR Meeting. November.

ITRC. 2004. Remediation Process Optimization: Identifying Opportunities for Enhanced and More Efficient Site Remediation NAVFAC. 2017. Portfolio Optimization (P-OPT) Review of the Navy’s IRP Site- Phase I Overview and Findings. Open Environmental Restoration Resource (OER2) Webinar. Presented by NAVFAC Environmental Restoration Program. August 23.

U.S. EPA. 2017. Superfund Optimization Progress Report 2011-2015. Office of Land and Emergency Management. EPA-542-R-17-002. June.