Environmental Review Report This report is provided by the Directorate of Public Works, Environmental Division (ENV) at the request of the project proponent. This review expires 12 months from the date of approval or if site conditions or project descriptions change. If archeological remains or evidence of endangered species are found during the course of a project, stop the activity and contact ENV at (831) 386-2763.
ENV Review No. 16046
Project Summary: 1391: 79297 (2016). Secure Microgrid Control System. Design-build (contractor will develop final designs based upon RFP design). Construct a secure, integrated smart grid control system (Supervisory, Control and Data Acquisition System (SCADA)) and 1 MW storage battery to coalesce existing photovoltaic arrays, an existing 1MW storage battery, and an existing standby 435 kW
National Environmental Policy Act Compliance Review
Project Line Items Final
RECNEPARequired
The following summary includes proponent actions required for compliance with environmental laws, as well as actions ENV has taken. Failure to implement compliance requirements may result in the proponent violating federal or State law.
This review is for the project as described above and no additional actions. Activities not described in the project description will require an additional review. Excavation, grading, trenching or other digging on FHL requires a FHL Dig Permit; contact FHL DPW Engineering at 831-386-2429.
Action re-reviewed to consider 2018 revisions to RFP package. Project will go out for design and construction.
Avoid floodplains in final design. PWE review is required for design for construction, trenching, or ground disturbance.
New trenching to be monitored by PWE. Please notify PWE x2520 one week prior to work.
Avoid trenching with the drip-line of trees.
Conclusion: Permit and consultation requirements are addressed - see Attachment 1.
Categorical exclusion: Routine procurement of goods and services (complying with applicable procedures for sustainable or ``green'' procurement) to support operations and infrastructure, including routine utility services and contracts.
NEPA Summary Citation 651.30(e)(1)
Categorical exclusion: Acquisition, installation, and operation of utility and communication systems, mobile antennas, data processing cable and similar electronic equipment that use existing right-of-way, easement, distribution systems, and/or facilities (REC required).
NEPA Summary Citation 651.30(e)(2)-REC
Installation FHL TimelineWork Order 79297
Friday, May 4, 2018 Page 1 of 4
ENV Review No. 16046
Project Summary: 1391: 79297 (2016). Secure Microgrid Control System. Design-build (contractor will develop final designs based upon RFP design). Construct a secure, integrated smart grid control system (Supervisory, Control and Data Acquisition System (SCADA)) and 1 MW storage battery to coalesce existing photovoltaic arrays, an existing 1MW storage battery, and an existing standby 435 kW
Proponent Information
This REC is reviewed and approved as meeting the standards of 32 CFR 651. The undersigned concurs with the findings of this review - see NEPA comments above for limitations and concerns.
Place Electronic Signature Below in PDF
Environmental Chief Review and Signature
Signature of the proponent validates that screening criteria (32 CFR 651.29) have been met:
Proponent Signature (Required for REC) Date
Proponent Signature (Record of Environmental Consideration)
Greg Vallery gregory.l.vallery.civ@mail.Proponent POC POC Email Kristi Yu kristi.m.yu.civ@mail.milProponent POC POC Email
Friday, May 4, 2018 Page 2 of 4
CLARK.ELIZABET
H.R.1231929017
Digitally signed by
CLARK.ELIZABETH.R.1231929017
Date: 2018.05.04 11:08:26 -07'00'
VALLERY.GREGORY.L.1257482916 Digitally signed by VALLERY.GREGORY.L.1257482916 Date: 2018.05.04 17:02:11 -07'00'
Project Summary: 1391: 79297 (2016). Secure Microgrid Control System. Design-build (contractor will develop final designs based upon RFP design). Construct a secure, integrated smart grid control system (Supervisory, Control and Data Acquisition System (SCADA)) and 1 MW storage battery to coalesce existing photovoltaic arrays, an existing 1MW storage battery, and an existing standby 435 kW
Natural Resources Compliance Review
Integrated Natural Resources Management Plan Coordination Review
Cultural Resources Review
Environmental Compliance Review
Environmental Review Report, Attachments Part 1 Project Information
Section 7 Requirement Informal ConsultationStatus Complete
Date Completed 6/14/2016
Reviewer Liz Clark Section 7 Process Programmatic Consultation
Site Visit Resource Survey Conducted
Complete 6/14/2016Robert PikeStatus Date CompletedReviewer
Site Visit Resource Survey Conducted
Compliant w/ Integrated Nat. Res. Mgmt. Plan Compliant w/ Migratory Bird Treaty Act
Complete
6/13/2016 Lisa Cipolla
Status
Date Completed Reviewer
Section 106 Process: Other
Site Visit Professional Survey Conducted?
Complete 6/13/2016Mike MoellerStatus Date CompletedReviewer
Drinking Water Permit Storm Water Plan/NOI
Clean Water Act 401/402 Permit Waste Water Permit
Air Permit Restoration/clean up
Other Permit Site Visit
Resource Survey Conducted
Requires Lead Survey
Requires Asbestos Survey Requires PCB Survey
All Surveys Conducted
ENV Review No. 16046 Installation FHL Timeline
Location(s) Cantonment
Project Summary 1391: 79297 (2016). Secure Microgrid Control System. Design-build (contractor will develop final designs based upon RFP design). Construct a secure, integrated smart grid control system (Supervisory, Control and Data Acquisition System (SCADA)) and 1 MW storage battery to coalesce existing photovoltaic arrays, an existing 1MW storage battery, and an existing standby 435 kW Syngas generator into an electrical microgrid system.
Upgrade the existing electrical distribution system to provide greater connectivity and sectionalizing capability. Upgrade the existing energy generation control systems to incorporate generation control by the new SCADA to match electricity generation and available load, and make tham compliant with DoD 8500 guidelines.
Project Comment Includes trenching for underground ductbank loop adjacent to Route Tampa, installation of fiber optic telecommunications, concrete pads and fencing as needed.
Track Vehicles 0 Wheeled Vehicles 0 Personnel 0 Ammo
Work Order 79297
Friday, May 4, 2018 Page 3 of 4
Project Summary: 1391: 79297 (2016). Secure Microgrid Control System. Design-build (contractor will develop final designs based upon RFP design). Construct a secure, integrated smart grid control system (Supervisory, Control and Data Acquisition System (SCADA)) and 1 MW storage battery to coalesce existing photovoltaic arrays, an existing 1MW storage battery, and an existing standby 435 kW
Correspondence Log Environmental Review Report, Attachments Part 2
6/10/2016 ER Received
Comment POCDate Type
Friday, May 4, 2018 Page 4 of 4
Environmental Review Report
This report is provided by the Directorate of Public Works, Environmental Division (ENV) at the request of the project proponent. This review expires 12 months from the date of approval or if site conditions or project descriptions change. If archeological remains or evidence of endangered species are found during the course of a project, stop the activity and contact ENV at (831) 386-2763.
ENV Review No. 16047
Project Summary: 1391 82028, (2016). Install 5MW of Solar PV consisting of roof mounted, canopy mounted, and ground mounted arrays with 3 MWhr battery storage. There are over 40 buildings to be considered for roof mounted Solar PV. Total square footage of roof space is approximately 500K SF. There are five acres of land available for ground mounted/canopy mounted arrays. This project will also
National Environmental Policy Act Compliance Review
Project Line Items Final
RECNEPARequired
The following summary includes proponent actions required for compliance with environmental laws, as well as actions ENV has taken. Failure to implement compliance requirements may result in the proponent violating federal or State law.
This review is for the project as described above and no additional actions. Activities not described in the project description will require an additional review. Excavation, grading, trenching or other digging on FHL requires a FHL Dig Permit; contact FHL DPW Engineering at 831-386-2429.
Action re-reviewed to consider 2018 revisions to RFP package. Project will go out for design and construction.
Avoid floodplains in final design. PWE review is required for design for construction, trenching, or ground disturbance.
Per preliminary plans and discussion, this action is for rooftop solar on non-hisotirc buildings, and canopy mounted over existing parking areas. No new ground mounted arrays are proposed or reviewed. This review should be updated when design plans become available.
Conclusion: Permit and consultation requirements are addressed - see Attachment 1.
Categorical exclusion: Modification, product improvement, or configuration engineering design change to materiel, structure, or item that does not change the original impact of the materiel, structure, or item on the environment (REC required).
NEPA Summary
Citation 651.30(e)(4)-REC
Categorical exclusion: Acquisition, installation, and operation of utility and communication systems, mobile antennas, data processing cable and similar electronic equipment that use existing right-of-way, easement, distribution systems, and/or facilities (REC required).
NEPA Summary
Citation 651.30(e)(2)-REC
Installation FHL TimelineWork Order 82028
16047-01
Rooftop - among most cantonment buildings. (DPW has list, Hacienda is excluded).
Line Item #
Line Item
Review Status
Comment
16047-02
Canopy mounted (carport photovoltaic) --PX parking lot (parking for buildings 79, 80, 81) --HQ parking lot (parking lot for HQ building 238) --SW of bowling alley (fenced MEP).
Pages 489 (C-137), 490 (C-138), and 492 (C-140) of April 2018 Final Corrected RFP - Appendices - Part 3.
Line Item #
Line Item
Review Status
Comment
16047-03
Ground mounted photovoltaic - -Former O&M storage yard
Page 491 (C-139) of April 2018 Final Corrected RFP - Appendices - Part 3.
Line Item #
Line Item
Review Status
Comment
Friday, May 4, 2018 Page 1 of 4
ENV Review No. 16047
Project Summary: 1391 82028, (2016). Install 5MW of Solar PV consisting of roof mounted, canopy mounted, and ground mounted arrays with 3 MWhr battery storage. There are over 40 buildings to be considered for roof mounted Solar PV. Total square footage of roof space is approximately 500K SF. There are five acres of land available for ground mounted/canopy mounted arrays. This project will also
Proponent Information
This REC is reviewed and approved as meeting the standards of 32 CFR 651. The undersigned concurs with the findings of this review - see NEPA comments above for limitations and concerns.
Place Electronic Signature Below in PDF
Environmental Chief Review and Signature
Signature of the proponent validates that screening criteria (32 CFR 651.29) have been met:
Proponent Signature (Required for REC) Date
Proponent Signature (Record of Environmental Consideration)
Greg Vallery gregory.l.vallery.civ@mail.Proponent POC POC Email
Kristi Yu kristi.m.yu.civ@mail.milProponent POC POC Email
Friday, May 4, 2018 Page 2 of 4
Project Summary: 1391 82028, (2016). Install 5MW of Solar PV consisting of roof mounted, canopy mounted, and ground mounted arrays with 3 MWhr battery storage. There are over 40 buildings to be considered for roof mounted Solar PV. Total square footage of roof space is approximately 500K SF. There are five acres of land available for ground mounted/canopy mounted arrays. This project will also
Natural Resources Compliance Review
Integrated Natural Resources Management Plan Coordination Review
Cultural Resources Review
Environmental Compliance Review
Environmental Review Report, Attachments Part 1
Project Information
Signature of the proponent validates that screening criteria (32 CFR 651.29) have been met:
Proponent Signature (Required for REC) Date
Section 7 Requirement No ConsultationStatus Complete
Date Completed 6/14/2016
Reviewer Liz Clark Section 7 Process
Site Visit Resource Survey Conducted
Complete 6/14/2016Robert PikeStatus Date CompletedReviewer
Site Visit Resource Survey Conducted
Compliant w/ Integrated Nat. Res. Mgmt. Plan Compliant w/ Migratory Bird Treaty Act
Complete
6/13/2016 Lisa Cipolla
Status
Date Completed Reviewer
Section 106 Process: Undertaking not pursuant to 36CFR800
Site Visit Professional Survey Conducted?
Complete 6/13/2016Mike MoellerStatus Date CompletedReviewer
Drinking Water Permit
Storm Water Plan/NOI
Clean Water Act 401/402 Permit
Waste Water Permit
Air Permit
Restoration/clean up
Other Permit
Site Visit
Resource Survey Conducted
Requires Lead Survey
Requires Asbestos Survey
Requires PCB Survey
All Surveys Conducted
ENV Review No. 16047 Installation FHL Timeline
Location(s)
Project Summary 1391 82028, (2016). Install 5MW of Solar PV consisting of roof mounted, canopy mounted, and ground mounted arrays with 3 MWhr battery storage. There are over 40 buildings to be considered for roof mounted Solar PV. Total square footage of roof space is approximately 500K SF. There are five acres of land available for ground mounted/canopy mounted arrays. This project will also construct a 3MWHr battery energy storage system (BESS). **Ground mounted not planned, canopy mounted over existing parking areas by PX and HQ.**
Project Comment
Track Vehicles 0 Wheeled Vehicles 0 Personnel 0 Ammo
Work Order 82028
Friday, May 4, 2018 Page 3 of 4
Project Summary: 1391 82028, (2016). Install 5MW of Solar PV consisting of roof mounted, canopy mounted, and ground mounted arrays with 3 MWhr battery storage. There are over 40 buildings to be considered for roof mounted Solar PV. Total square footage of roof space is approximately 500K SF. There are five acres of land available for ground mounted/canopy mounted arrays. This project will also
Correspondence Log
Environmental Review Report, Attachments Part 2
6/10/2016 ER Received
Comment
POCDate Type
Friday, May 4, 2018 Page 4 of 4
W
SAN
SD
E
FO
SD
SD
SD
SD