W9123818B0001_Amend_0002.pdf

PDF 125 KB Posted

Attached to
Natomas Basin Reach D Levee Improvement Construction Project Federal contract opportunity
Solicitation number
W91238-18-B-0001
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

W9123818B0001 Amend 0002

View the file

Other files for this federal contract opportunity

Other files attached to Natomas Basin Reach D Levee Improvement Construction Project, newest first.
File Type Posted
B01.01_Abstract_KO_Signed.pdf PDF
21_Mar_18_Final_Bid_Schedule.pdf PDF
G-003_Revised.pdf PDF
Plant_4_Program_Requirements_and_Functional_Review_40_95_00_A....pdf PDF
M401_Revised.pdf PDF
W91238-18-B-0001_Amend_0004.pdf PDF
Amend_0004_Comformed.pdf PDF
CD111_Revised.pdf PDF
21_Mar_Specs_Conformed.pdf PDF
E-007_Revised.pdf PDF
00_73_05._Revised.pdf PDF
A07.1_W9123818B0001_Amend_0003.pdf PDF
Wage_Determination_CA9_3-2-2018.pdf PDF
KleinfelderBorrowReport.pdf PDF
FinalDDRAppendixD-NatomasReach_D_GDR_100COMPLETE.pdf PDF
No_Additional_Site_Visits.pdf PDF
01_22_00.pdf PDF
A07.01-18B0001_AMD_01.docx.pdf PDF
01_45_00.pdf PDF
Exhibit_A_-FinalNatDBidSchedule.pdf PDF
A07.5_Site_Visit_Attendees.pdf PDF
00_01_15.pdf PDF
A07.7_W91238-18-B-0001_IFB.docx DOCX document
Reach_D_-_B_and_V_Sheets_Final_Dec_05.pdf PDF
Reach_D_Plans_Final_Dec_05.pdf PDF
00_73_05.pdf PDF
Reach_D_Specs.pdf PDF
18_Jan_FinalNatDBidSchedule.pdf PDF
WD_9_Feb_18.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of this amendment is to extend the bid-opening date as indicated in the follow ing pages and update the w age determination.

B. Except as noted in the follow ing pages, all other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818B0001

X 9B. DATED (SEE ITEM 11)

15-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Mar-2018

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123818B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CLIN 0001 Exhibit(s) 1 Attachment 1 Wage Determination 9

Feb 18

49 09-FEB-2018

Attachment 2 00 01 15 9 14-FEB-2018 Attachment 3 00 73 05 17 14-FEB-2018 Attachment 4 Reach D B and V Sheets 18 05-DEC-2017 Attachment 5 Reach D Plans 160 05-DEC-2017 Attachment 6 Reach D Specifications 1026 14-FEB-2018 Attachment 7 01 45 00 11 27-FEB-2018 Attachment 8 01 22 00 49 27-FEB-2018 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CLIN 0001 Exhibit(s) 1 Attachment 1 Wage Determination CA9

3-2-2018

45 02-MAR-2018

Attachment 2 00 01 15 9 14-FEB-2018 Attachment 3 00 73 05 17 14-FEB-2018 Attachment 4 Reach D B and V Sheets 18 05-DEC-2017 Attachment 5 Reach D Plans 160 05-DEC-2017 Attachment 6 Reach D Specifications 1026 14-FEB-2018 Attachment 7 01 45 00 11 27-FEB-2018 Attachment 8 01 22 00 49 27-FEB-2018

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 15-Mar-2018 02:00 PM to 29-Mar-2018 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it.