M401_Revised.pdf

PDF 199 KB Posted

Attached to
Natomas Basin Reach D Levee Improvement Construction Project Federal contract opportunity
Solicitation number
W91238-18-B-0001
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

M401 Revised

View the file

Other files for this federal contract opportunity

Other files attached to Natomas Basin Reach D Levee Improvement Construction Project, newest first.
File Type Posted
B01.01_Abstract_KO_Signed.pdf PDF
21_Mar_18_Final_Bid_Schedule.pdf PDF
G-003_Revised.pdf PDF
Plant_4_Program_Requirements_and_Functional_Review_40_95_00_A....pdf PDF
W91238-18-B-0001_Amend_0004.pdf PDF
Amend_0004_Comformed.pdf PDF
CD111_Revised.pdf PDF
21_Mar_Specs_Conformed.pdf PDF
E-007_Revised.pdf PDF
00_73_05._Revised.pdf PDF
A07.1_W9123818B0001_Amend_0003.pdf PDF
W9123818B0001_Amend_0002.pdf PDF
Wage_Determination_CA9_3-2-2018.pdf PDF
KleinfelderBorrowReport.pdf PDF
FinalDDRAppendixD-NatomasReach_D_GDR_100COMPLETE.pdf PDF
No_Additional_Site_Visits.pdf PDF
01_22_00.pdf PDF
A07.01-18B0001_AMD_01.docx.pdf PDF
01_45_00.pdf PDF
Exhibit_A_-FinalNatDBidSchedule.pdf PDF
A07.5_Site_Visit_Attendees.pdf PDF
00_01_15.pdf PDF
A07.7_W91238-18-B-0001_IFB.docx DOCX document
Reach_D_-_B_and_V_Sheets_Final_Dec_05.pdf PDF
Reach_D_Plans_Final_Dec_05.pdf PDF
00_73_05.pdf PDF
Reach_D_Specs.pdf PDF
18_Jan_FinalNatDBidSchedule.pdf PDF
WD_9_Feb_18.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

S P

E C N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

FINAL SUBMITTAL

A M

E R

IC

A N R

IV

E R C

O M

M O

N F

E A

T U

R E

S

N A

T O

M A

S B

A S

IN

R

E A

C H D W

IN

D

O W

IN

-H

O U

S E D

E S

IG

N

A

C R

A M

E N

T O D

IS

T R

IC

T

J S

T R

E E

T

S A

C R

A M

E N

T O

C A

D E

C E

M B

E R

A N

S I-

D

PP4

A of Engineers

US Army Corps

M-401

P U

M P

IN

G P

L A

N T P

P

C O

N C

E P

T U

A L D

E S

IG

N

T R

A S

H R

A K

E

W

D U

P L

A N

T

IE

R

D S

M

IT

H

R

M A

L T

Z A

H N

W

D U

P L

A N

T

IE

R

FRONT VIEW

UNIT WIDTH

TYP.

7'-2

SECTION A-A

3" CLR.

" BAR

" CTR.

" CTR.

2" CLR.

ADDITIONAL SITE VERIFICATION.

2. SITE DIMENSIONS ARE SUBJECT TO CHANGE UPON

BRACING.

STRUCTURAL REVIEW FOR REQUIRED SEISMIC

1. ANCHORAGE AT DECK TO BE SUBMITTED FOR

NOTE#2:

CLR.

TYP.

7'-2

A A

TYP.

CLR.

R E F

F O

R

S

H

IP

P

IN

G

M A

X

S P

A C

IN

G

TYP. SIDE VIEW @ UNIT

UNIT #1 UNIT #2

EQUIPMENT

CAUTION

AUTOMATICALLY

MAY START

N O

M

IN

A L

INTAKE WIDTH

15'

" CLR.

EL. +22.25

c

EL. 3.75

R E

F

R E

F

CHUTE

DISCHARGE

HINGED

MANUAL

18'-5"*d

" CLR.

NOTE#1:

6'-9"*d

NOT SHOWN

EACH SIDE OF TRASH RACKS

AND SUPPORTS AS REQUIRED

NON CLEANED FILLER SCREEN BARS

AS REQUIRED

SUPPORTS INCLUDED

TRASH RACK LATERAL

AS REQUIRED

SUPPORTS INCLUDED

TRASH RACK

C O

N T

R A

C T N

O

D E

S

IG

N F

IL

E N

O

-0

-0

F

IL

E N

A M

E

-0

-0

M -4

X X

X .d w g

A S-102

WSE = EL. +20.0

PARTIAL BASE VIEW

T B

D e

e. VERIFY MAXIMUM WATER HEIGHT.

d. VERIFY CHANNEL DEPTH (2) PLACES.

c. VERIFY CHANNEL HEIGHT.

(1) RIGHT HAND.

b. VERIFY MOTOR LOCATION (1) LEFT HAND AND

HEIGHT OF CHANNEL.

a. VERIFY CHANNEL WIDTH DIMENSION AT THE FULL

INCLUDE BUT NOT LIMITED TO:

PERTAINING TO THE TRASH RACK DESIGN, TO

6. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS

MINIMUM THICKNESS NEOPRENE GASKETS.

STRUCTURAL COMPONENTS BE INSULATED WITH 1/8"

MAKE COMPONENTS CONTACT WITH CARBON STEEL

WHERE THE STAINLESS STEEL TRASH RAKE AND RACK

5. THE CONTRACTOR SHALL ENSURE THAT ANY LOCATIONS

CONSTRUCTED OF A36 COATED STEEL.

4. THE TRASH RAKE AND FILLER SCREEN BARS SHALL BE

REQUIRED ON EACH SIDE OF THE TRASH RACK.

DESIGN OF THE NON-CLEANED FILLER BARS AS

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

3 INCHES CLEAR.

WITH THE PUMP MANUFACTURER, BUT NOT TO EXCEED

2. THE CONTRACTOR SHALL COORDINATE BAR SPACING

SPECIFICATIONS.

SUPPORTS, AND ANCHORING DETAILS AS PER THE

DESIGN OF THE TRASH RAKE SYSTEM, STRUCTURAL

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

C H

A N

G E

D N

O T

E

/2

/2

File details come from the government source that posted it.